# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-06T04:00:00.03 8.02
2025-03-06T04:00:01.03 8.01
2025-03-06T04:00:02.03 8.03
2025-03-06T04:00:03.03 8.02
2025-03-06T04:00:04.03 8.03
2025-03-06T04:00:05.03 8.05
2025-03-06T04:00:06.03 8.03
2025-03-06T04:00:07.03 8.03
2025-03-06T04:00:08.03 8.03
2025-03-06T04:00:09.03 8.03
2025-03-06T04:00:10.03 8.01
2025-03-06T04:00:11.03 8.01
2025-03-06T04:00:12.03 8.03
2025-03-06T04:00:13.03 8.03
2025-03-06T04:00:14.03 8.03
2025-03-06T04:00:15.03 8.03
2025-03-06T04:00:16.03 8.04
2025-03-06T04:00:17.03 8.04
2025-03-06T04:00:18.03 8.03
2025-03-06T04:00:19.03 8.01
2025-03-06T04:00:20.03 8.03
2025-03-06T04:00:21.03 8.01
2025-03-06T04:00:22.03 8.02
2025-03-06T04:00:23.03 8.03
2025-03-06T04:00:24.03 8.01
2025-03-06T04:00:25.03 8.05
2025-03-06T04:00:26.03 8.01
2025-03-06T04:00:27.03 8.03
2025-03-06T04:00:28.03 8.02
2025-03-06T04:00:29.03 8.03
2025-03-06T04:00:30.03 8.02
2025-03-06T04:00:31.03 8.02
2025-03-06T04:00:32.03 8.03
2025-03-06T04:00:33.03 8.03
2025-03-06T04:00:34.03 8.01
2025-03-06T04:00:35.03 8.04
2025-03-06T04:00:36.03 8.04
2025-03-06T04:00:37.03 8.03
2025-03-06T04:00:38.03 8.03
2025-03-06T04:00:39.03 8.02
2025-03-06T04:00:40.03 8.04
2025-03-06T04:00:41.03 8.02
2025-03-06T04:00:42.03 8.03
2025-03-06T04:00:43.03 7.96
2025-03-06T04:00:44.03 8.03
2025-03-06T04:00:45.03 8.03
2025-03-06T04:00:46.03 8.01
2025-03-06T04:00:47.03 8.03
2025-03-06T04:00:48.03 8.02
2025-03-06T04:00:49.03 8.02
2025-03-06T04:00:50.03 8.01
2025-03-06T04:00:51.03 8.04
2025-03-06T04:00:52.03 8.03
2025-03-06T04:00:53.03 8.01
2025-03-06T04:00:54.03 8.03
2025-03-06T04:00:55.03 8.00
2025-03-06T04:00:56.03 8.03
2025-03-06T04:00:57.03 8.01
2025-03-06T04:00:58.03 8.03
2025-03-06T04:00:59.04 8.03
2025-03-06T04:01:00.04 8.03
2025-03-06T04:01:01.04 8.02
2025-03-06T04:01:02.04 8.03
2025-03-06T04:01:03.04 8.03
2025-03-06T04:01:04.04 8.02
2025-03-06T04:01:05.04 8.03
2025-03-06T04:01:06.04 8.03
2025-03-06T04:01:07.04 8.01
2025-03-06T04:01:08.04 8.03
2025-03-06T04:01:09.04 8.03
2025-03-06T04:01:10.04 8.00
2025-03-06T04:01:11.04 8.01
2025-03-06T04:01:12.04 8.03
2025-03-06T04:01:13.04 8.03
2025-03-06T04:01:14.04 8.05
2025-03-06T04:01:15.04 8.03
2025-03-06T04:01:16.04 8.03
2025-03-06T04:01:17.04 8.01
2025-03-06T04:01:18.04 8.00
2025-03-06T04:01:19.04 8.05
2025-03-06T04:01:20.04 8.02
2025-03-06T04:01:21.04 8.03
2025-03-06T04:01:22.04 8.03
2025-03-06T04:01:23.04 8.03
2025-03-06T04:01:24.04 8.01
2025-03-06T04:01:25.04 8.03
2025-03-06T04:01:26.04 8.04
2025-03-06T04:01:27.04 8.06
2025-03-06T04:01:28.04 8.03
2025-03-06T04:01:29.04 8.03
2025-03-06T04:01:30.04 8.03
2025-03-06T04:01:31.04 8.04
2025-03-06T04:01:32.04 8.03
2025-03-06T04:01:33.04 8.01
2025-03-06T04:01:34.04 8.01
2025-03-06T04:01:35.04 8.01
2025-03-06T04:01:36.04 8.02
2025-03-06T04:01:37.04 8.02
2025-03-06T04:01:38.04 8.03
2025-03-06T04:01:39.04 8.01
2025-03-06T04:01:40.04 8.02
2025-03-06T04:01:41.04 8.02
2025-03-06T04:01:42.04 8.01
2025-03-06T04:01:43.04 8.01
2025-03-06T04:01:44.04 8.02
2025-03-06T04:01:45.04 8.03
2025-03-06T04:01:46.04 8.03
2025-03-06T04:01:47.04 8.03
2025-03-06T04:01:48.04 8.03
2025-03-06T04:01:49.04 8.03
2025-03-06T04:01:50.04 8.01
2025-03-06T04:01:51.04 8.01
2025-03-06T04:01:52.04 8.03
2025-03-06T04:01:53.04 8.02
2025-03-06T04:01:54.04 8.01
2025-03-06T04:01:55.04 8.02
2025-03-06T04:01:56.04 8.03
2025-03-06T04:01:57.04 8.03
2025-03-06T04:01:58.04 8.03
2025-03-06T04:01:59.04 8.04
2025-03-06T04:02:00.04 8.01
2025-03-06T04:02:01.04 8.02
2025-03-06T04:02:02.04 8.01
2025-03-06T04:02:03.04 8.01
2025-03-06T04:02:04.04 8.01
2025-03-06T04:02:05.04 8.02
2025-03-06T04:02:06.04 8.01
2025-03-06T04:02:07.04 8.02
2025-03-06T04:02:08.04 8.03
2025-03-06T04:02:09.04 8.01
2025-03-06T04:02:10.04 8.02
2025-03-06T04:02:11.04 8.05
2025-03-06T04:02:12.04 8.03
2025-03-06T04:02:13.04 8.01
2025-03-06T04:02:14.04 8.03
2025-03-06T04:02:15.04 8.05
2025-03-06T04:02:16.04 8.00
2025-03-06T04:02:17.04 8.03
2025-03-06T04:02:18.04 8.03
2025-03-06T04:02:19.04 8.01
2025-03-06T04:02:20.04 8.03
2025-03-06T04:02:21.04 8.05
2025-03-06T04:02:22.04 8.03
2025-03-06T04:02:23.04 8.01
2025-03-06T04:02:24.04 8.01
2025-03-06T04:02:25.04 8.01
2025-03-06T04:02:26.04 8.02
2025-03-06T04:02:27.04 8.01
2025-03-06T04:02:28.04 8.03
2025-03-06T04:02:29.04 8.03
2025-03-06T04:02:30.04 8.01
2025-03-06T04:02:31.04 8.01
2025-03-06T04:02:32.04 8.01
2025-03-06T04:02:33.04 8.02
2025-03-06T04:02:34.04 8.03
2025-03-06T04:02:35.04 8.02
2025-03-06T04:02:36.04 8.03
2025-03-06T04:02:37.04 8.03
2025-03-06T04:02:38.04 8.03
2025-03-06T04:02:39.04 8.00
2025-03-06T04:02:40.04 8.02
2025-03-06T04:02:41.04 8.01
2025-03-06T04:02:42.04 8.03
2025-03-06T04:02:43.04 8.01
2025-03-06T04:02:44.04 8.04
2025-03-06T04:02:45.04 8.03
2025-03-06T04:02:46.04 8.03
2025-03-06T04:02:47.04 8.01
2025-03-06T04:02:48.04 8.03
2025-03-06T04:02:49.04 8.01
2025-03-06T04:02:50.04 8.00
2025-03-06T04:02:51.04 8.01
2025-03-06T04:02:52.04 8.02
2025-03-06T04:02:53.04 8.02
2025-03-06T04:02:54.04 8.01
2025-03-06T04:02:55.04 8.01
2025-03-06T04:02:56.04 8.01
2025-03-06T04:02:57.04 8.03
2025-03-06T04:02:58.04 7.99
2025-03-06T04:02:59.04 8.02
2025-03-06T04:03:00.04 8.01
2025-03-06T04:03:01.04 8.05
2025-03-06T04:03:02.05 8.01
2025-03-06T04:03:03.04 8.02
2025-03-06T04:03:04.04 8.03
2025-03-06T04:03:05.04 8.01
2025-03-06T04:03:06.04 8.02
2025-03-06T04:03:07.04 8.02
2025-03-06T04:03:08.04 8.04
2025-03-06T04:03:09.04 8.01
2025-03-06T04:03:10.04 8.03
2025-03-06T04:03:11.04 8.01
2025-03-06T04:03:12.05 8.02
2025-03-06T04:03:13.04 8.02
2025-03-06T04:03:14.04 8.01
2025-03-06T04:03:15.04 8.02
2025-03-06T04:03:16.04 8.03
2025-03-06T04:03:17.04 8.02
2025-03-06T04:03:18.04 8.02
2025-03-06T04:03:19.04 8.03
2025-03-06T04:03:20.04 8.03
2025-03-06T04:03:21.04 8.01
2025-03-06T04:03:22.05 8.02
2025-03-06T04:03:23.04 8.01
2025-03-06T04:03:24.04 8.03
2025-03-06T04:03:25.04 8.02
2025-03-06T04:03:26.04 8.02
2025-03-06T04:03:27.04 8.02
2025-03-06T04:03:28.04 8.00
2025-03-06T04:03:29.04 7.99
2025-03-06T04:03:30.04 8.04
2025-03-06T04:03:31.04 8.05
2025-03-06T04:03:32.05 8.01
2025-03-06T04:03:33.04 8.01
2025-03-06T04:03:34.04 8.01
2025-03-06T04:03:35.04 8.02
2025-03-06T04:03:36.05 8.01
2025-03-06T04:03:37.05 8.02
2025-03-06T04:03:38.05 8.04
2025-03-06T04:03:39.05 8.01
2025-03-06T04:03:40.05 8.01
2025-03-06T04:03:41.05 8.03
2025-03-06T04:03:42.05 8.03
2025-03-06T04:03:43.05 8.03
2025-03-06T04:03:44.05 8.03
2025-03-06T04:03:45.05 8.03
2025-03-06T04:03:46.05 8.03
2025-03-06T04:03:47.05 8.03
2025-03-06T04:03:48.05 8.04
2025-03-06T04:03:49.05 8.03
2025-03-06T04:03:50.05 8.03
2025-03-06T04:03:51.05 8.03
2025-03-06T04:03:52.05 8.02
2025-03-06T04:03:53.05 8.03
2025-03-06T04:03:54.05 8.03
2025-03-06T04:03:55.05 8.00
2025-03-06T04:03:56.05 8.05
2025-03-06T04:03:57.05 8.02
2025-03-06T04:03:58.05 8.03
2025-03-06T04:03:59.05 8.03
2025-03-06T04:04:00.05 8.02
2025-03-06T04:04:01.05 7.99
2025-03-06T04:04:02.05 8.03
2025-03-06T04:04:03.05 8.01
2025-03-06T04:04:04.05 8.00
2025-03-06T04:04:05.05 8.01
2025-03-06T04:04:06.05 8.03
2025-03-06T04:04:07.05 8.03
2025-03-06T04:04:08.05 8.00
2025-03-06T04:04:09.05 8.02
2025-03-06T04:04:10.05 8.03
2025-03-06T04:04:11.05 8.03
2025-03-06T04:04:12.05 8.03
2025-03-06T04:04:13.05 8.04
2025-03-06T04:04:14.05 8.04
2025-03-06T04:04:15.05 8.03
2025-03-06T04:04:16.05 8.03
2025-03-06T04:04:17.05 8.05
2025-03-06T04:04:18.05 8.01
2025-03-06T04:04:19.05 8.03
2025-03-06T04:04:20.05 8.03
2025-03-06T04:04:21.05 8.02
2025-03-06T04:04:22.05 8.03
2025-03-06T04:04:23.05 8.00
2025-03-06T04:04:24.05 8.02
2025-03-06T04:04:25.05 8.01
2025-03-06T04:04:26.05 8.02
2025-03-06T04:04:27.05 8.01
2025-03-06T04:04:28.05 8.02
2025-03-06T04:04:29.05 8.01
2025-03-06T04:04:30.05 8.03
2025-03-06T04:04:31.05 8.04
2025-03-06T04:04:32.05 8.03
2025-03-06T04:04:33.05 8.00
2025-03-06T04:04:34.05 8.02
2025-03-06T04:04:35.05 8.02
2025-03-06T04:04:36.05 8.05
2025-03-06T04:04:37.05 8.02
2025-03-06T04:04:38.05 8.01
2025-03-06T04:04:39.05 8.04
2025-03-06T04:04:40.05 8.01
2025-03-06T04:04:41.05 8.01
2025-03-06T04:04:42.06 8.02
2025-03-06T04:04:43.05 8.01
2025-03-06T04:04:44.05 8.04
2025-03-06T04:04:45.05 8.04
2025-03-06T04:04:46.05 8.03
2025-03-06T04:04:47.05 8.03
2025-03-06T04:04:48.05 8.02
2025-03-06T04:04:49.05 8.03
2025-03-06T04:04:50.05 8.01
2025-03-06T04:04:51.05 8.05
2025-03-06T04:04:52.05 8.04
2025-03-06T04:04:53.05 8.04
2025-03-06T04:04:54.05 8.03
2025-03-06T04:04:55.05 8.02
2025-03-06T04:04:56.05 8.03
2025-03-06T04:04:57.05 8.01
2025-03-06T04:04:58.05 8.03
2025-03-06T04:04:59.05 8.01
2025-03-06T04:05:00.05 8.00
2025-03-06T04:05:01.05 8.00
2025-03-06T04:05:02.05 8.02
2025-03-06T04:05:03.05 8.01
2025-03-06T04:05:04.05 8.02
2025-03-06T04:05:05.05 8.01
2025-03-06T04:05:06.05 8.03
2025-03-06T04:05:07.05 8.01
2025-03-06T04:05:08.05 8.05
2025-03-06T04:05:09.05 8.03
2025-03-06T04:05:10.05 8.03
2025-03-06T04:05:11.05 8.05
2025-03-06T04:05:12.05 8.03
2025-03-06T04:05:13.05 8.01
2025-03-06T04:05:14.05 8.01
2025-03-06T04:05:15.05 8.03
2025-03-06T04:05:16.05 8.03
2025-03-06T04:05:17.05 8.03
2025-03-06T04:05:18.05 8.03
2025-03-06T04:05:19.05 8.03
2025-03-06T04:05:20.05 8.03
2025-03-06T04:05:21.05 8.03
2025-03-06T04:05:22.05 8.01
2025-03-06T04:05:23.09 8.01
2025-03-06T04:05:24.04 8.02
2025-03-06T04:05:25.04 8.03
2025-03-06T04:05:26.04 8.01
2025-03-06T04:05:27.04 8.03
2025-03-06T04:05:28.04 8.04
2025-03-06T04:05:29.04 8.03
2025-03-06T04:05:30.04 8.03
2025-03-06T04:05:31.04 8.05
2025-03-06T04:05:32.05 8.02
2025-03-06T04:05:33.04 8.03
2025-03-06T04:05:34.04 8.04
2025-03-06T04:05:35.04 8.03
2025-03-06T04:05:36.04 8.02
2025-03-06T04:05:37.04 8.02
2025-03-06T04:05:38.04 8.03
2025-03-06T04:05:39.04 8.02
2025-03-06T04:05:40.04 8.03
2025-03-06T04:05:41.04 8.03
2025-03-06T04:05:42.05 8.03
2025-03-06T04:05:43.04 8.03
2025-03-06T04:05:44.04 8.04
2025-03-06T04:05:45.04 8.02
2025-03-06T04:05:46.04 8.01
2025-03-06T04:05:47.04 8.02
2025-03-06T04:05:48.04 8.01
2025-03-06T04:05:49.04 8.03
2025-03-06T04:05:50.04 8.02
2025-03-06T04:05:51.04 8.02
2025-03-06T04:05:52.06 8.03
2025-03-06T04:05:53.03 8.03
2025-03-06T04:05:54.03 8.02
2025-03-06T04:05:55.03 8.03
2025-03-06T04:05:56.03 8.03
2025-03-06T04:05:57.03 8.03
2025-03-06T04:05:58.03 8.01
2025-03-06T04:05:59.03 8.03
2025-03-06T04:06:00.03 8.05
2025-03-06T04:06:01.03 8.04
2025-03-06T04:06:02.03 8.03
2025-03-06T04:06:03.07 8.03
2025-03-06T04:06:04.02 8.04
2025-03-06T04:06:05.02 8.04
2025-03-06T04:06:06.02 8.03
2025-03-06T04:06:07.02 8.02
2025-03-06T04:06:08.02 8.03
2025-03-06T04:06:09.02 8.04
2025-03-06T04:06:10.02 8.03
2025-03-06T04:06:11.02 8.03
2025-03-06T04:06:12.02 8.04
2025-03-06T04:06:13.02 8.00
2025-03-06T04:06:14.02 8.05
2025-03-06T04:06:15.02 8.03
2025-03-06T04:06:16.02 8.01
2025-03-06T04:06:17.03 8.01
2025-03-06T04:06:18.03 8.03
2025-03-06T04:06:19.03 8.03
2025-03-06T04:06:20.03 8.03
2025-03-06T04:06:21.03 8.03
2025-03-06T04:06:22.03 8.04
2025-03-06T04:06:23.03 8.03
2025-03-06T04:06:24.03 8.02
2025-03-06T04:06:25.03 8.02
2025-03-06T04:06:26.03 8.03
2025-03-06T04:06:27.03 8.03
2025-03-06T04:06:28.03 8.03
2025-03-06T04:06:29.03 8.05
2025-03-06T04:06:30.03 8.01
2025-03-06T04:06:31.03 8.03
2025-03-06T04:06:32.03 8.02
2025-03-06T04:06:33.03 8.02
2025-03-06T04:06:34.03 8.04
2025-03-06T04:06:35.03 8.01
2025-03-06T04:06:36.03 8.01
2025-03-06T04:06:37.03 8.02
2025-03-06T04:06:38.03 8.03
2025-03-06T04:06:39.03 8.03
2025-03-06T04:06:40.03 8.03
2025-03-06T04:06:41.03 8.04
2025-03-06T04:06:42.03 8.03
2025-03-06T04:06:43.03 8.03
2025-03-06T04:06:44.03 8.01
2025-03-06T04:06:45.03 8.03
2025-03-06T04:06:46.03 8.01
2025-03-06T04:06:47.03 8.04
2025-03-06T04:06:48.03 8.05
2025-03-06T04:06:49.03 8.03
2025-03-06T04:06:50.03 8.05
2025-03-06T04:06:51.03 8.02
2025-03-06T04:06:52.03 8.04
2025-03-06T04:06:53.03 8.05
2025-03-06T04:06:54.03 8.03
2025-03-06T04:06:55.03 8.05
2025-03-06T04:06:56.03 8.03
2025-03-06T04:06:57.03 8.00
2025-03-06T04:06:58.03 8.03
2025-03-06T04:06:59.03 8.05
2025-03-06T04:07:00.03 8.03
2025-03-06T04:07:01.03 8.05
2025-03-06T04:07:02.03 8.02
2025-03-06T04:07:03.03 8.03
2025-03-06T04:07:04.03 8.02
2025-03-06T04:07:05.03 8.05
2025-03-06T04:07:06.03 8.01
2025-03-06T04:07:07.03 8.04
2025-03-06T04:07:08.03 8.03
2025-03-06T04:07:09.03 8.04
2025-03-06T04:07:10.03 8.02
2025-03-06T04:07:11.03 8.01
2025-03-06T04:07:12.03 8.04
2025-03-06T04:07:13.03 8.01
2025-03-06T04:07:14.03 8.01
2025-03-06T04:07:15.03 8.03
2025-03-06T04:07:16.03 8.03
2025-03-06T04:07:17.03 8.04
2025-03-06T04:07:18.03 8.03
2025-03-06T04:07:19.03 8.03
2025-03-06T04:07:20.03 8.03
2025-03-06T04:07:21.03 8.01
2025-03-06T04:07:22.03 8.01
2025-03-06T04:07:23.03 8.01
2025-03-06T04:07:24.03 8.03
2025-03-06T04:07:25.03 8.01
2025-03-06T04:07:26.03 8.01
2025-03-06T04:07:27.03 8.03
2025-03-06T04:07:28.05 8.01
2025-03-06T04:07:29.02 8.01
2025-03-06T04:07:30.02 8.02
2025-03-06T04:07:31.02 8.04
2025-03-06T04:07:32.02 8.03
2025-03-06T04:07:33.02 8.05
2025-03-06T04:07:34.02 8.03
2025-03-06T04:07:35.03 8.03
2025-03-06T04:07:36.03 8.01
2025-03-06T04:07:37.03 8.02
2025-03-06T04:07:38.03 8.03
2025-03-06T04:07:39.03 8.03
2025-03-06T04:07:40.03 8.03
2025-03-06T04:07:41.03 8.02
2025-03-06T04:07:42.03 8.01
2025-03-06T04:07:43.03 8.02
2025-03-06T04:07:44.03 8.03
2025-03-06T04:07:45.03 8.04
2025-03-06T04:07:46.03 8.03
2025-03-06T04:07:47.03 8.03
2025-03-06T04:07:48.03 8.03
2025-03-06T04:07:49.03 8.03
2025-03-06T04:07:50.03 8.03
2025-03-06T04:07:51.03 8.03
2025-03-06T04:07:52.03 8.01
2025-03-06T04:07:53.03 8.03
2025-03-06T04:07:54.03 8.04
2025-03-06T04:07:55.03 8.03
2025-03-06T04:07:56.03 8.03
2025-03-06T04:07:57.03 8.02
2025-03-06T04:07:58.03 8.03
2025-03-06T04:07:59.03 8.03
2025-03-06T04:08:00.03 8.02
2025-03-06T04:08:01.03 8.02
2025-03-06T04:08:02.03 8.02
2025-03-06T04:08:03.08 8.03
2025-03-06T04:08:04.02 8.02
2025-03-06T04:08:05.02 8.04
2025-03-06T04:08:06.02 8.03
2025-03-06T04:08:07.02 8.03
2025-03-06T04:08:08.02 8.03
2025-03-06T04:08:09.02 8.03
2025-03-06T04:08:10.02 8.03
2025-03-06T04:08:11.02 8.02
2025-03-06T04:08:12.02 8.01
2025-03-06T04:08:13.02 8.03
2025-03-06T04:08:14.02 8.03
2025-03-06T04:08:15.02 8.03
2025-03-06T04:08:16.02 8.04
2025-03-06T04:08:17.02 8.02
2025-03-06T04:08:18.02 8.00
2025-03-06T04:08:19.02 8.03
2025-03-06T04:08:20.02 8.00
2025-03-06T04:08:21.02 8.01
2025-03-06T04:08:22.02 8.03
2025-03-06T04:08:23.02 8.03
2025-03-06T04:08:24.02 8.00
2025-03-06T04:08:25.02 8.01
2025-03-06T04:08:26.02 8.02
2025-03-06T04:08:27.02 8.03
2025-03-06T04:08:28.02 8.03
2025-03-06T04:08:29.02 8.02
2025-03-06T04:08:30.02 8.03
2025-03-06T04:08:31.02 8.03
2025-03-06T04:08:32.02 8.01
2025-03-06T04:08:33.02 8.02
2025-03-06T04:08:34.02 8.03
2025-03-06T04:08:35.02 8.03
2025-03-06T04:08:36.02 8.01
2025-03-06T04:08:37.02 8.01
2025-03-06T04:08:38.02 8.04
2025-03-06T04:08:39.02 8.02
2025-03-06T04:08:40.02 8.01
2025-03-06T04:08:41.02 8.03
2025-03-06T04:08:42.02 8.01
2025-03-06T04:08:43.02 8.01
2025-03-06T04:08:44.02 8.02
2025-03-06T04:08:45.02 8.01
2025-03-06T04:08:46.02 8.01
2025-03-06T04:08:47.02 8.02
2025-03-06T04:08:48.02 8.05
2025-03-06T04:08:49.02 8.02
2025-03-06T04:08:50.02 8.03
2025-03-06T04:08:51.02 8.05
2025-03-06T04:08:52.02 8.02
2025-03-06T04:08:53.02 8.01
2025-03-06T04:08:54.02 8.05
2025-03-06T04:08:55.02 8.03
2025-03-06T04:08:56.02 8.05
2025-03-06T04:08:57.02 8.03
2025-03-06T04:08:58.02 8.01
2025-03-06T04:08:59.02 8.02
2025-03-06T04:09:00.02 8.03
2025-03-06T04:09:01.02 8.03
2025-03-06T04:09:02.02 8.05
2025-03-06T04:09:03.02 8.01
2025-03-06T04:09:04.02 8.01
2025-03-06T04:09:05.02 8.03
2025-03-06T04:09:06.02 8.03
2025-03-06T04:09:07.02 8.03
2025-03-06T04:09:08.02 8.03
2025-03-06T04:09:09.02 8.03
2025-03-06T04:09:10.02 8.03
2025-03-06T04:09:11.02 8.04
2025-03-06T04:09:12.02 8.03
2025-03-06T04:09:13.02 8.03
2025-03-06T04:09:14.02 8.04
2025-03-06T04:09:15.02 8.01
2025-03-06T04:09:16.02 8.04
2025-03-06T04:09:17.02 8.03
2025-03-06T04:09:18.02 8.03
2025-03-06T04:09:19.02 8.01
2025-03-06T04:09:20.02 8.02
2025-03-06T04:09:21.02 8.03
2025-03-06T04:09:22.02 8.01
2025-03-06T04:09:23.02 8.03
2025-03-06T04:09:24.02 8.03
2025-03-06T04:09:25.02 8.03
2025-03-06T04:09:26.02 8.01
2025-03-06T04:09:27.02 8.02
2025-03-06T04:09:28.02 8.02
2025-03-06T04:09:29.02 8.03
2025-03-06T04:09:30.02 8.02
2025-03-06T04:09:31.02 8.03
2025-03-06T04:09:32.02 8.03
2025-03-06T04:09:33.02 8.02
2025-03-06T04:09:34.02 8.03
2025-03-06T04:09:35.02 8.02
2025-03-06T04:09:36.02 8.03
2025-03-06T04:09:37.02 8.03
2025-03-06T04:09:38.02 8.01
2025-03-06T04:09:39.02 8.03
2025-03-06T04:09:40.02 8.03
2025-03-06T04:09:41.02 8.03
2025-03-06T04:09:42.02 8.03
2025-03-06T04:09:43.02 8.04
2025-03-06T04:09:44.02 8.04
2025-03-06T04:09:45.02 8.03
2025-03-06T04:09:46.02 8.02
2025-03-06T04:09:47.02 8.03
2025-03-06T04:09:48.02 8.02
2025-03-06T04:09:49.02 8.05
2025-03-06T04:09:50.02 8.03
2025-03-06T04:09:51.02 8.01
2025-03-06T04:09:52.02 8.02
2025-03-06T04:09:53.02 8.03
2025-03-06T04:09:54.02 8.01
2025-03-06T04:09:55.02 8.01
2025-03-06T04:09:56.02 8.03
2025-03-06T04:09:57.02 8.01
2025-03-06T04:09:58.02 8.01
2025-03-06T04:09:59.02 8.02
2025-03-06T04:10:00.02 8.00
2025-03-06T04:10:01.02 8.02
2025-03-06T04:10:02.02 8.04
2025-03-06T04:10:03.02 8.03
2025-03-06T04:10:04.02 8.05
2025-03-06T04:10:05.02 8.01
2025-03-06T04:10:06.02 8.03
2025-03-06T04:10:07.02 8.03
2025-03-06T04:10:08.02 8.01
2025-03-06T04:10:09.02 8.02
2025-03-06T04:10:10.02 8.01
2025-03-06T04:10:11.02 8.01
2025-03-06T04:10:12.02 8.02
2025-03-06T04:10:13.05 8.03
2025-03-06T04:10:14.01 8.05
2025-03-06T04:10:15.01 8.01
2025-03-06T04:10:16.01 8.01
2025-03-06T04:10:17.01 8.01
2025-03-06T04:10:18.01 8.00
2025-03-06T04:10:19.01 8.01
2025-03-06T04:10:20.01 8.01
2025-03-06T04:10:21.01 8.01
2025-03-06T04:10:22.01 8.04
2025-03-06T04:10:23.01 8.01
2025-03-06T04:10:24.01 8.02
2025-03-06T04:10:25.02 8.01
2025-03-06T04:10:26.01 8.03
2025-03-06T04:10:27.01 8.05
2025-03-06T04:10:28.01 8.03
2025-03-06T04:10:29.01 8.03
2025-03-06T04:10:30.02 8.05
2025-03-06T04:10:31.01 8.00
2025-03-06T04:10:32.01 8.03
2025-03-06T04:10:33.01 8.02
2025-03-06T04:10:34.01 8.03
2025-03-06T04:10:35.01 8.01
2025-03-06T04:10:36.01 8.01
2025-03-06T04:10:37.01 8.01
2025-03-06T04:10:38.01 8.02
2025-03-06T04:10:39.01 8.03
2025-03-06T04:10:40.01 8.02
2025-03-06T04:10:41.01 8.01
2025-03-06T04:10:42.01 8.02
2025-03-06T04:10:43.01 8.03
2025-03-06T04:10:44.01 8.03
2025-03-06T04:10:45.02 8.03
2025-03-06T04:10:46.01 8.03
2025-03-06T04:10:47.01 8.03
2025-03-06T04:10:48.01 8.03
2025-03-06T04:10:49.01 8.03
2025-03-06T04:10:50.01 8.03
2025-03-06T04:10:51.01 8.05
2025-03-06T04:10:52.01 8.03
2025-03-06T04:10:53.01 8.03
2025-03-06T04:10:54.01 8.03
2025-03-06T04:10:55.02 8.02
2025-03-06T04:10:56.01 8.01
2025-03-06T04:10:57.01 8.02
2025-03-06T04:10:58.01 8.00
2025-03-06T04:10:59.01 8.00
2025-03-06T04:11:00.01 8.03
2025-03-06T04:11:01.01 8.03
2025-03-06T04:11:02.01 8.00
2025-03-06T04:11:03.01 8.01
2025-03-06T04:11:04.01 8.03
2025-03-06T04:11:05.02 8.02
2025-03-06T04:11:06.01 8.05
2025-03-06T04:11:07.01 8.02
2025-03-06T04:11:08.01 8.03
2025-03-06T04:11:09.01 8.03
2025-03-06T04:11:10.01 8.03
2025-03-06T04:11:11.01 8.03
2025-03-06T04:11:12.01 8.03
2025-03-06T04:11:13.01 8.03
2025-03-06T04:11:14.01 8.03
2025-03-06T04:11:15.01 8.03
2025-03-06T04:11:16.01 8.03
2025-03-06T04:11:17.01 8.04
2025-03-06T04:11:18.01 8.04
2025-03-06T04:11:19.01 8.04
2025-03-06T04:11:20.03 8.01
2025-03-06T04:11:21.00 8.03
2025-03-06T04:11:22.00 8.01
2025-03-06T04:11:23.00 8.04
2025-03-06T04:11:24.00 8.05
2025-03-06T04:11:25.00 8.02
2025-03-06T04:11:26.00 8.04
2025-03-06T04:11:27.00 8.02
2025-03-06T04:11:28.00 8.03
2025-03-06T04:11:29.00 8.03
2025-03-06T04:11:30.02 8.01
2025-03-06T04:11:31.00 8.03
2025-03-06T04:11:32.00 8.04
2025-03-06T04:11:33.00 8.01
2025-03-06T04:11:34.00 8.03
2025-03-06T04:11:35.00 8.01
2025-03-06T04:11:36.00 8.01
2025-03-06T04:11:37.00 8.04
2025-03-06T04:11:38.00 8.02
2025-03-06T04:11:39.00 8.01
2025-03-06T04:11:40.00 8.01
2025-03-06T04:11:41.00 8.03
2025-03-06T04:11:42.00 8.03
2025-03-06T04:11:43.00 8.03
2025-03-06T04:11:44.00 8.03
2025-03-06T04:11:45.00 8.02
2025-03-06T04:11:46.00 8.03
2025-03-06T04:11:47.00 8.01
2025-03-06T04:11:48.00 8.03
2025-03-06T04:11:49.00 8.00
2025-03-06T04:11:50.00 8.03
2025-03-06T04:11:51.00 8.03
2025-03-06T04:11:52.00 8.04
2025-03-06T04:11:53.00 8.04
2025-03-06T04:11:54.00 8.02
2025-03-06T04:11:55.00 8.02
2025-03-06T04:11:56.00 8.04
2025-03-06T04:11:57.00 8.01
2025-03-06T04:11:58.00 8.05
2025-03-06T04:11:59.00 8.02
2025-03-06T04:12:00.00 8.05
2025-03-06T04:12:01.00 8.03
2025-03-06T04:12:02.00 8.05
2025-03-06T04:12:03.00 8.01
2025-03-06T04:12:04.00 8.01
2025-03-06T04:12:05.00 8.02
2025-03-06T04:12:06.00 8.01
2025-03-06T04:12:07.00 8.01
2025-03-06T04:12:08.00 8.03
2025-03-06T04:12:09.00 8.03
2025-03-06T04:12:10.00 8.01
2025-03-06T04:12:11.00 8.03
2025-03-06T04:12:12.00 8.01
2025-03-06T04:12:13.06 8.00
2025-03-06T04:12:13.99 8.01
2025-03-06T04:12:14.99 8.02
2025-03-06T04:12:15.99 8.01
2025-03-06T04:12:16.99 8.03
2025-03-06T04:12:17.99 8.03
2025-03-06T04:12:18.99 8.03
2025-03-06T04:12:19.99 8.02
2025-03-06T04:12:20.99 8.01
2025-03-06T04:12:21.99 8.01
2025-03-06T04:12:22.99 8.01
2025-03-06T04:12:23.99 8.01
2025-03-06T04:12:24.99 8.01
2025-03-06T04:12:25.99 8.01
2025-03-06T04:12:26.99 8.02
2025-03-06T04:12:27.99 8.01
2025-03-06T04:12:28.99 8.01
2025-03-06T04:12:29.99 8.04
2025-03-06T04:12:30.99 8.00
2025-03-06T04:12:31.99 8.03
2025-03-06T04:12:32.99 8.01
2025-03-06T04:12:33.99 8.01
2025-03-06T04:12:34.99 8.00
2025-03-06T04:12:35.99 8.01
2025-03-06T04:12:36.99 8.02
2025-03-06T04:12:37.99 8.01
2025-03-06T04:12:38.99 8.03
2025-03-06T04:12:39.99 8.02
2025-03-06T04:12:40.99 8.00
2025-03-06T04:12:41.99 8.01
2025-03-06T04:12:42.99 8.01
2025-03-06T04:12:43.99 8.03
2025-03-06T04:12:44.99 8.01
2025-03-06T04:12:45.99 8.00
2025-03-06T04:12:46.99 8.01
2025-03-06T04:12:47.99 8.01
2025-03-06T04:12:48.99 8.02
2025-03-06T04:12:49.99 8.01
2025-03-06T04:12:50.99 8.03
2025-03-06T04:12:51.99 8.03
2025-03-06T04:12:52.99 8.03
2025-03-06T04:12:53.99 8.02
2025-03-06T04:12:54.99 8.03
2025-03-06T04:12:55.99 8.02
2025-03-06T04:12:56.99 8.03
2025-03-06T04:12:57.99 8.02
2025-03-06T04:12:58.99 8.05
2025-03-06T04:12:59.99 8.01
2025-03-06T04:13:00.99 8.01
2025-03-06T04:13:01.99 8.01
2025-03-06T04:13:02.99 8.01
2025-03-06T04:13:03.99 8.04
2025-03-06T04:13:04.99 8.01
2025-03-06T04:13:05.99 8.03
2025-03-06T04:13:06.99 8.03
2025-03-06T04:13:07.99 8.02
2025-03-06T04:13:08.99 8.03
2025-03-06T04:13:09.99 8.01
2025-03-06T04:13:10.99 8.02
2025-03-06T04:13:11.99 8.03
2025-03-06T04:13:12.99 8.01
2025-03-06T04:13:13.99 8.04
2025-03-06T04:13:14.99 8.03
2025-03-06T04:13:15.99 8.02
2025-03-06T04:13:16.99 8.01
2025-03-06T04:13:17.99 8.03
2025-03-06T04:13:18.99 8.01
2025-03-06T04:13:19.99 8.03
2025-03-06T04:13:20.99 8.02
2025-03-06T04:13:21.99 8.04
2025-03-06T04:13:22.99 8.02
2025-03-06T04:13:23.99 8.03
2025-03-06T04:13:24.99 8.02
2025-03-06T04:13:25.99 8.03
2025-03-06T04:13:26.99 8.03
2025-03-06T04:13:27.99 8.01
2025-03-06T04:13:28.99 8.01
2025-03-06T04:13:29.99 8.01
2025-03-06T04:13:30.99 8.01
2025-03-06T04:13:31.99 8.03
2025-03-06T04:13:33.05 8.01
2025-03-06T04:13:33.98 8.03
2025-03-06T04:13:34.98 8.02
2025-03-06T04:13:35.98 8.01
2025-03-06T04:13:36.98 8.02
2025-03-06T04:13:37.98 8.02
2025-03-06T04:13:38.98 8.02
2025-03-06T04:13:39.98 8.01
2025-03-06T04:13:40.98 8.03
2025-03-06T04:13:41.98 8.03
2025-03-06T04:13:42.98 8.03
2025-03-06T04:13:43.98 8.01
2025-03-06T04:13:44.98 8.02
2025-03-06T04:13:45.98 8.03
2025-03-06T04:13:46.98 8.05
2025-03-06T04:13:47.98 8.03
2025-03-06T04:13:48.98 8.03
2025-03-06T04:13:49.98 8.04
2025-03-06T04:13:50.98 8.04
2025-03-06T04:13:51.98 8.03
2025-03-06T04:13:52.98 8.02
2025-03-06T04:13:53.98 8.03
2025-03-06T04:13:54.98 8.03
2025-03-06T04:13:55.98 8.00
2025-03-06T04:13:56.98 8.04
2025-03-06T04:13:57.98 8.01
2025-03-06T04:13:58.98 8.04
2025-03-06T04:13:59.98 8.00
2025-03-06T04:14:00.98 8.03
2025-03-06T04:14:01.98 8.05
2025-03-06T04:14:02.98 8.03
2025-03-06T04:14:03.98 8.02
2025-03-06T04:14:04.98 8.02
2025-03-06T04:14:05.98 8.05
2025-03-06T04:14:06.98 8.03
2025-03-06T04:14:07.98 8.01
2025-03-06T04:14:08.98 8.03
2025-03-06T04:14:09.98 8.02
2025-03-06T04:14:10.98 8.01
2025-03-06T04:14:11.98 8.02
2025-03-06T04:14:12.98 8.03
2025-03-06T04:14:13.98 8.03
2025-03-06T04:14:14.98 8.01
2025-03-06T04:14:15.98 8.03
2025-03-06T04:14:16.98 8.03
2025-03-06T04:14:17.98 8.01
2025-03-06T04:14:18.98 8.03
2025-03-06T04:14:19.98 8.05
2025-03-06T04:14:20.98 8.01
2025-03-06T04:14:21.98 8.01
2025-03-06T04:14:22.98 8.04
2025-03-06T04:14:23.98 8.03
2025-03-06T04:14:24.98 8.01
2025-03-06T04:14:25.98 8.01
2025-03-06T04:14:26.98 8.04
2025-03-06T04:14:27.98 8.02
2025-03-06T04:14:28.98 8.03
2025-03-06T04:14:29.98 8.03
2025-03-06T04:14:30.98 8.01
2025-03-06T04:14:31.98 8.04
2025-03-06T04:14:32.98 8.03
2025-03-06T04:14:33.98 8.04
2025-03-06T04:14:34.98 8.02
2025-03-06T04:14:35.98 8.02
2025-03-06T04:14:36.98 8.01
2025-03-06T04:14:37.98 8.03
2025-03-06T04:14:38.98 8.03
2025-03-06T04:14:39.98 8.01
2025-03-06T04:14:40.98 8.03
2025-03-06T04:14:41.98 8.02
2025-03-06T04:14:42.98 8.01
2025-03-06T04:14:43.98 8.03
2025-03-06T04:14:44.98 8.01
2025-03-06T04:14:45.98 8.00
2025-03-06T04:14:46.98 8.02
2025-03-06T04:14:47.98 8.01
2025-03-06T04:14:48.98 8.03
2025-03-06T04:14:49.98 8.02
2025-03-06T04:14:50.98 8.03
2025-03-06T04:14:51.98 8.03
2025-03-06T04:14:52.98 8.01
2025-03-06T04:14:53.98 8.05
2025-03-06T04:14:54.98 8.03
2025-03-06T04:14:55.98 8.03
2025-03-06T04:14:56.98 8.01
2025-03-06T04:14:57.98 8.01
2025-03-06T04:14:58.98 8.05
2025-03-06T04:14:59.98 8.03
2025-03-06T04:15:00.98 8.03
2025-03-06T04:15:02.01 8.03
2025-03-06T04:15:02.97 8.03
2025-03-06T04:15:03.97 8.03
2025-03-06T04:15:04.97 8.01
2025-03-06T04:15:05.97 8.02
2025-03-06T04:15:06.97 8.03
2025-03-06T04:15:07.97 8.00
2025-03-06T04:15:08.97 8.03
2025-03-06T04:15:09.97 8.03
2025-03-06T04:15:10.97 8.01
2025-03-06T04:15:11.97 8.03
2025-03-06T04:15:12.97 8.03
2025-03-06T04:15:13.97 8.03
2025-03-06T04:15:14.97 8.02
2025-03-06T04:15:15.97 8.01
2025-03-06T04:15:16.97 8.01
2025-03-06T04:15:17.97 8.01
2025-03-06T04:15:18.97 8.03
2025-03-06T04:15:19.97 8.01
2025-03-06T04:15:20.97 8.03
2025-03-06T04:15:21.97 8.02
2025-03-06T04:15:22.97 8.03
2025-03-06T04:15:23.97 8.03
2025-03-06T04:15:24.97 8.01
2025-03-06T04:15:25.97 8.03
2025-03-06T04:15:26.97 8.01
2025-03-06T04:15:27.97 8.03
2025-03-06T04:15:28.97 8.02
2025-03-06T04:15:29.97 8.01
2025-03-06T04:15:30.97 8.03
2025-03-06T04:15:31.97 8.03
2025-03-06T04:15:32.97 8.03
2025-03-06T04:15:33.97 8.01
2025-03-06T04:15:34.97 8.00
2025-03-06T04:15:35.97 8.03
2025-03-06T04:15:36.97 8.02
2025-03-06T04:15:37.97 8.02
2025-03-06T04:15:38.97 8.00
2025-03-06T04:15:39.97 8.01
2025-03-06T04:15:40.97 8.03
2025-03-06T04:15:41.97 8.03
2025-03-06T04:15:42.97 8.00
2025-03-06T04:15:43.97 8.02
2025-03-06T04:15:44.97 8.01
2025-03-06T04:15:45.97 8.01
2025-03-06T04:15:46.97 8.02
2025-03-06T04:15:47.97 8.04
2025-03-06T04:15:48.97 8.01
2025-03-06T04:15:49.97 8.02
2025-03-06T04:15:50.97 8.03
2025-03-06T04:15:51.97 8.00
2025-03-06T04:15:52.97 8.01
2025-03-06T04:15:53.97 8.01
2025-03-06T04:15:54.97 8.01
2025-03-06T04:15:55.97 8.01
2025-03-06T04:15:56.97 8.03
2025-03-06T04:15:57.97 8.01
2025-03-06T04:15:58.97 8.01
2025-03-06T04:15:59.97 8.02
2025-03-06T04:16:00.97 8.03
2025-03-06T04:16:01.97 8.03
2025-03-06T04:16:02.97 8.00
2025-03-06T04:16:03.97 8.00
2025-03-06T04:16:04.97 8.02
2025-03-06T04:16:05.97 8.03
2025-03-06T04:16:06.97 8.03
2025-03-06T04:16:07.97 8.02
2025-03-06T04:16:08.97 8.01
2025-03-06T04:16:09.97 8.04
2025-03-06T04:16:10.97 8.03
2025-03-06T04:16:11.97 8.04
2025-03-06T04:16:12.97 8.04
2025-03-06T04:16:13.97 8.03
2025-03-06T04:16:14.97 8.06
2025-03-06T04:16:15.97 8.03
2025-03-06T04:16:16.97 8.05
2025-03-06T04:16:17.97 8.05
2025-03-06T04:16:18.97 8.01
2025-03-06T04:16:19.97 8.03
2025-03-06T04:16:20.97 8.02
2025-03-06T04:16:21.97 8.03
2025-03-06T04:16:22.97 8.01
2025-03-06T04:16:23.97 8.02
2025-03-06T04:16:24.97 8.02
2025-03-06T04:16:25.97 8.03
2025-03-06T04:16:26.97 8.02
2025-03-06T04:16:27.97 8.03
2025-03-06T04:16:28.97 8.03
2025-03-06T04:16:29.97 8.01
2025-03-06T04:16:30.97 8.05
2025-03-06T04:16:31.97 8.05
2025-03-06T04:16:32.97 8.03
2025-03-06T04:16:33.97 8.03
2025-03-06T04:16:34.97 8.03
2025-03-06T04:16:35.97 8.01
2025-03-06T04:16:36.97 8.05
2025-03-06T04:16:37.97 8.03
2025-03-06T04:16:38.97 8.01
2025-03-06T04:16:39.97 8.04
2025-03-06T04:16:40.97 8.03
2025-03-06T04:16:41.97 8.03
2025-03-06T04:16:42.97 8.03
2025-03-06T04:16:43.97 8.01
2025-03-06T04:16:44.97 8.03
2025-03-06T04:16:45.97 8.01
2025-03-06T04:16:46.97 8.05
2025-03-06T04:16:47.97 8.02
2025-03-06T04:16:48.97 8.04
2025-03-06T04:16:49.97 8.03
2025-03-06T04:16:50.97 8.03
2025-03-06T04:16:51.97 8.03
2025-03-06T04:16:52.97 8.02
2025-03-06T04:16:53.98 8.03
2025-03-06T04:16:54.98 8.03
2025-03-06T04:16:55.98 8.01
2025-03-06T04:16:56.98 8.02
2025-03-06T04:16:57.98 8.04
2025-03-06T04:16:58.98 8.04
2025-03-06T04:16:59.98 8.02
2025-03-06T04:17:00.98 8.04
2025-03-06T04:17:01.98 8.04
2025-03-06T04:17:02.98 8.03
2025-03-06T04:17:03.98 8.03
2025-03-06T04:17:04.98 8.02
2025-03-06T04:17:05.98 8.02
2025-03-06T04:17:06.98 8.03
2025-03-06T04:17:07.98 8.03
2025-03-06T04:17:08.98 8.01
2025-03-06T04:17:09.98 8.01
2025-03-06T04:17:10.98 8.01
2025-03-06T04:17:11.98 8.03
2025-03-06T04:17:12.98 8.03
2025-03-06T04:17:13.98 8.03
2025-03-06T04:17:14.98 8.03
2025-03-06T04:17:15.98 8.01
2025-03-06T04:17:16.98 8.03
2025-03-06T04:17:17.98 8.03
2025-03-06T04:17:18.98 8.01
2025-03-06T04:17:19.98 8.01
2025-03-06T04:17:20.98 8.02
2025-03-06T04:17:21.98 8.03
2025-03-06T04:17:22.98 8.02
2025-03-06T04:17:23.98 8.00
2025-03-06T04:17:24.98 8.03
2025-03-06T04:17:25.98 8.03
2025-03-06T04:17:26.98 8.03
2025-03-06T04:17:27.98 8.03
2025-03-06T04:17:28.98 8.04
2025-03-06T04:17:29.98 8.03
2025-03-06T04:17:30.98 8.01
2025-03-06T04:17:31.98 8.03
2025-03-06T04:17:32.98 8.00
2025-03-06T04:17:33.98 8.02
2025-03-06T04:17:34.98 8.03
2025-03-06T04:17:35.98 8.03
2025-03-06T04:17:36.98 8.01
2025-03-06T04:17:37.98 8.03
2025-03-06T04:17:38.98 8.02
2025-03-06T04:17:39.98 8.01
2025-03-06T04:17:40.98 8.00
2025-03-06T04:17:41.98 8.02
2025-03-06T04:17:43.07 8.02
2025-03-06T04:17:43.97 8.02
2025-03-06T04:17:44.97 8.02
2025-03-06T04:17:45.97 8.04
2025-03-06T04:17:46.97 8.01
2025-03-06T04:17:47.97 8.03
2025-03-06T04:17:48.97 8.03
2025-03-06T04:17:49.97 8.01
2025-03-06T04:17:50.97 8.04
2025-03-06T04:17:51.97 8.04
2025-03-06T04:17:52.97 8.00
2025-03-06T04:17:53.97 8.01
2025-03-06T04:17:54.97 8.02
2025-03-06T04:17:55.97 8.01
2025-03-06T04:17:56.97 8.02
2025-03-06T04:17:57.97 8.05
2025-03-06T04:17:58.97 8.00
2025-03-06T04:17:59.97 8.03
2025-03-06T04:18:00.97 8.02
2025-03-06T04:18:01.97 8.01
2025-03-06T04:18:02.97 8.00
2025-03-06T04:18:03.97 8.05
2025-03-06T04:18:04.97 8.02
2025-03-06T04:18:05.97 8.03
2025-03-06T04:18:06.97 8.04
2025-03-06T04:18:07.97 8.03
2025-03-06T04:18:08.97 8.01
2025-03-06T04:18:09.97 8.03
2025-03-06T04:18:10.97 8.01
2025-03-06T04:18:11.97 8.01
2025-03-06T04:18:12.97 8.03
2025-03-06T04:18:13.97 8.03
2025-03-06T04:18:14.97 8.03
2025-03-06T04:18:15.97 8.02
2025-03-06T04:18:16.97 8.01
2025-03-06T04:18:17.97 8.03
2025-03-06T04:18:18.97 8.01
2025-03-06T04:18:19.97 8.03
2025-03-06T04:18:20.97 8.03
2025-03-06T04:18:21.97 8.04
2025-03-06T04:18:22.97 8.03
2025-03-06T04:18:23.97 8.02
2025-03-06T04:18:24.97 8.03
2025-03-06T04:18:25.97 8.01
2025-03-06T04:18:26.97 8.03
2025-03-06T04:18:27.97 8.02
2025-03-06T04:18:28.97 8.01
2025-03-06T04:18:29.97 8.03
2025-03-06T04:18:30.97 8.03
2025-03-06T04:18:31.97 8.03
2025-03-06T04:18:32.97 8.02
2025-03-06T04:18:33.97 8.02
2025-03-06T04:18:34.97 8.01
2025-03-06T04:18:35.97 8.02
2025-03-06T04:18:36.97 8.02
2025-03-06T04:18:37.97 8.02
2025-03-06T04:18:38.97 8.02
2025-03-06T04:18:39.97 8.03
2025-03-06T04:18:40.97 8.02
2025-03-06T04:18:41.97 8.03
2025-03-06T04:18:42.97 8.01
2025-03-06T04:18:43.97 8.01
2025-03-06T04:18:44.97 8.03
2025-03-06T04:18:45.97 8.01
2025-03-06T04:18:46.97 8.03
2025-03-06T04:18:47.97 8.01
2025-03-06T04:18:48.97 8.02
2025-03-06T04:18:49.97 8.01
2025-03-06T04:18:50.97 8.03
2025-03-06T04:18:51.97 8.02
2025-03-06T04:18:52.97 8.02
2025-03-06T04:18:53.97 8.02
2025-03-06T04:18:54.97 8.02
2025-03-06T04:18:55.97 8.03
2025-03-06T04:18:56.97 8.01
2025-03-06T04:18:57.97 8.02
2025-03-06T04:18:58.97 8.01
2025-03-06T04:18:59.97 8.03
2025-03-06T04:19:00.97 8.01
2025-03-06T04:19:01.97 8.03
2025-03-06T04:19:03.07 8.05
2025-03-06T04:19:04.09 8.04
2025-03-06T04:19:05.08 8.01
2025-03-06T04:19:06.07 8.03
2025-03-06T04:19:07.07 8.03
2025-03-06T04:19:08.07 8.05
2025-03-06T04:19:09.07 8.01
2025-03-06T04:19:10.07 8.01
2025-03-06T04:19:11.07 8.03
2025-03-06T04:19:12.07 8.02
2025-03-06T04:19:13.07 8.01
2025-03-06T04:19:14.07 8.02
2025-03-06T04:19:15.07 8.01
2025-03-06T04:19:16.07 8.03
2025-03-06T04:19:17.07 8.03
2025-03-06T04:19:18.07 8.02
2025-03-06T04:19:19.07 8.01
2025-03-06T04:19:20.07 8.02
2025-03-06T04:19:21.07 8.03
2025-03-06T04:19:22.07 8.03
2025-03-06T04:19:23.07 8.01
2025-03-06T04:19:24.07 8.02
2025-03-06T04:19:25.07 8.03
2025-03-06T04:19:26.07 8.03
2025-03-06T04:19:27.07 8.03
2025-03-06T04:19:28.07 8.01
2025-03-06T04:19:29.07 8.03
2025-03-06T04:19:30.07 8.02
2025-03-06T04:19:31.07 8.02
2025-03-06T04:19:32.07 8.03
2025-03-06T04:19:33.07 8.03
2025-03-06T04:19:34.07 8.02
2025-03-06T04:19:35.07 8.02
2025-03-06T04:19:36.07 8.03
2025-03-06T04:19:37.07 8.03
2025-03-06T04:19:38.07 8.02
2025-03-06T04:19:39.07 8.03
2025-03-06T04:19:40.07 8.01
2025-03-06T04:19:41.07 8.03
2025-03-06T04:19:42.07 8.02
2025-03-06T04:19:43.10 8.01
2025-03-06T04:19:44.06 8.03
2025-03-06T04:19:45.06 8.02
2025-03-06T04:19:46.06 8.03
2025-03-06T04:19:47.06 8.00
2025-03-06T04:19:48.06 8.02
2025-03-06T04:19:49.06 8.02
2025-03-06T04:19:50.06 8.00
2025-03-06T04:19:51.06 8.03
2025-03-06T04:19:52.06 8.02
2025-03-06T04:19:53.06 8.02
2025-03-06T04:19:54.06 8.03
2025-03-06T04:19:55.06 8.02
2025-03-06T04:19:56.06 8.03
2025-03-06T04:19:57.06 8.03
2025-03-06T04:19:58.06 8.03
2025-03-06T04:19:59.06 8.01
2025-03-06T04:20:00.06 8.03
2025-03-06T04:20:01.06 8.04
2025-03-06T04:20:02.06 8.01
2025-03-06T04:20:03.06 8.01
2025-03-06T04:20:04.06 8.01
2025-03-06T04:20:05.07 8.03
2025-03-06T04:20:06.06 8.03
2025-03-06T04:20:07.06 8.03
2025-03-06T04:20:08.06 8.02
2025-03-06T04:20:09.06 8.03
2025-03-06T04:20:10.06 8.01
2025-03-06T04:20:11.06 8.02
2025-03-06T04:20:12.06 8.01
2025-03-06T04:20:13.06 8.02
2025-03-06T04:20:14.06 8.02
2025-03-06T04:20:15.06 8.06
2025-03-06T04:20:16.06 8.01
2025-03-06T04:20:17.06 8.01
2025-03-06T04:20:18.06 8.05
2025-03-06T04:20:19.06 8.03
2025-03-06T04:20:20.06 8.02
2025-03-06T04:20:21.06 8.01
2025-03-06T04:20:22.06 8.02
2025-03-06T04:20:23.06 8.02
2025-03-06T04:20:24.06 8.01
2025-03-06T04:20:25.06 8.03
2025-03-06T04:20:26.06 8.03
2025-03-06T04:20:27.06 8.02
2025-03-06T04:20:28.06 8.01
2025-03-06T04:20:29.06 8.04
2025-03-06T04:20:30.06 8.03
2025-03-06T04:20:31.06 8.01
2025-03-06T04:20:32.06 8.02
2025-03-06T04:20:33.06 8.02
2025-03-06T04:20:34.06 8.03
2025-03-06T04:20:35.07 8.03
2025-03-06T04:20:36.07 8.03
2025-03-06T04:20:37.07 8.01
2025-03-06T04:20:38.07 8.03
2025-03-06T04:20:39.07 8.01
2025-03-06T04:20:40.07 8.04
2025-03-06T04:20:41.07 8.03
2025-03-06T04:20:42.07 8.03
2025-03-06T04:20:43.07 8.01
2025-03-06T04:20:44.07 8.01
2025-03-06T04:20:45.07 8.02
2025-03-06T04:20:46.07 8.03
2025-03-06T04:20:47.07 8.03
2025-03-06T04:20:48.07 8.01
2025-03-06T04:20:49.07 8.00
2025-03-06T04:20:50.07 8.02
2025-03-06T04:20:51.07 8.02
2025-03-06T04:20:52.07 8.02
2025-03-06T04:20:53.07 8.02
2025-03-06T04:20:54.07 8.00
2025-03-06T04:20:55.07 8.04
2025-03-06T04:20:56.07 8.02
2025-03-06T04:20:57.07 8.01
2025-03-06T04:20:58.07 8.01
2025-03-06T04:20:59.07 8.03
2025-03-06T04:21:00.07 8.01
2025-03-06T04:21:01.07 8.04
2025-03-06T04:21:02.07 8.03
2025-03-06T04:21:03.07 8.02
2025-03-06T04:21:04.07 8.01
2025-03-06T04:21:05.07 8.03
2025-03-06T04:21:06.07 8.04
2025-03-06T04:21:07.07 8.03
2025-03-06T04:21:08.07 8.04
2025-03-06T04:21:09.07 8.06
2025-03-06T04:21:10.07 8.01
2025-03-06T04:21:11.07 8.03
2025-03-06T04:21:12.07 8.02
2025-03-06T04:21:13.07 8.03
2025-03-06T04:21:14.07 8.00
2025-03-06T04:21:15.07 8.03
2025-03-06T04:21:16.07 8.01
2025-03-06T04:21:17.07 8.03
2025-03-06T04:21:18.07 8.03
2025-03-06T04:21:19.07 8.01
2025-03-06T04:21:20.07 8.04
2025-03-06T04:21:21.07 8.04
2025-03-06T04:21:22.07 8.01
2025-03-06T04:21:23.07 8.01
2025-03-06T04:21:24.07 8.01
2025-03-06T04:21:25.07 8.03
2025-03-06T04:21:26.07 8.03
2025-03-06T04:21:27.07 8.03
2025-03-06T04:21:28.07 8.02
2025-03-06T04:21:29.07 8.03
2025-03-06T04:21:30.07 8.03
2025-03-06T04:21:31.07 8.01
2025-03-06T04:21:32.07 8.01
2025-03-06T04:21:33.07 8.03
2025-03-06T04:21:34.07 8.03
2025-03-06T04:21:35.07 8.01
2025-03-06T04:21:36.07 8.01
2025-03-06T04:21:37.07 8.03
2025-03-06T04:21:38.07 8.03
2025-03-06T04:21:39.07 8.01
2025-03-06T04:21:40.07 8.01
2025-03-06T04:21:41.07 8.01
2025-03-06T04:21:42.07 8.02
2025-03-06T04:21:43.07 8.04
2025-03-06T04:21:44.07 8.04
2025-03-06T04:21:45.07 8.02
2025-03-06T04:21:46.07 8.03
2025-03-06T04:21:47.07 8.02
2025-03-06T04:21:48.07 8.02
2025-03-06T04:21:49.07 8.02
2025-03-06T04:21:50.07 8.03
2025-03-06T04:21:51.07 8.00
2025-03-06T04:21:52.07 8.03
2025-03-06T04:21:53.07 8.03
2025-03-06T04:21:54.07 8.01
2025-03-06T04:21:55.08 8.03
2025-03-06T04:21:56.07 8.00
2025-03-06T04:21:57.07 8.03
2025-03-06T04:21:58.07 8.02
2025-03-06T04:21:59.07 8.03
2025-03-06T04:22:00.07 8.05
2025-03-06T04:22:01.07 8.01
2025-03-06T04:22:02.07 8.03
2025-03-06T04:22:03.07 8.03
2025-03-06T04:22:04.07 8.00
2025-03-06T04:22:05.07 8.02
2025-03-06T04:22:06.07 8.03
2025-03-06T04:22:07.07 8.00
2025-03-06T04:22:08.07 8.00
2025-03-06T04:22:09.07 8.00
2025-03-06T04:22:10.07 8.01
2025-03-06T04:22:11.07 8.02
2025-03-06T04:22:12.08 8.03
2025-03-06T04:22:13.08 8.01
2025-03-06T04:22:14.08 8.02
2025-03-06T04:22:15.08 8.01
2025-03-06T04:22:16.08 8.01
2025-03-06T04:22:17.08 8.02
2025-03-06T04:22:18.08 8.03
2025-03-06T04:22:19.08 8.05
2025-03-06T04:22:20.08 8.01
2025-03-06T04:22:21.08 8.02
2025-03-06T04:22:22.08 8.00
2025-03-06T04:22:23.08 8.03
2025-03-06T04:22:24.08 8.03
2025-03-06T04:22:25.08 8.01
2025-03-06T04:22:26.08 8.03
2025-03-06T04:22:27.08 8.01
2025-03-06T04:22:28.08 8.03
2025-03-06T04:22:29.08 8.03
2025-03-06T04:22:30.08 8.01
2025-03-06T04:22:31.08 8.03
2025-03-06T04:22:32.08 8.03
2025-03-06T04:22:33.08 8.01
2025-03-06T04:22:34.08 8.01
2025-03-06T04:22:35.08 8.03
2025-03-06T04:22:36.08 8.03
2025-03-06T04:22:37.08 8.03
2025-03-06T04:22:38.08 8.01
2025-03-06T04:22:39.08 8.03
2025-03-06T04:22:40.08 8.03
2025-03-06T04:22:41.08 8.03
2025-03-06T04:22:42.08 8.02
2025-03-06T04:22:43.08 8.03
2025-03-06T04:22:44.08 8.05
2025-03-06T04:22:45.08 8.01
2025-03-06T04:22:46.08 8.00
2025-03-06T04:22:47.08 8.01
2025-03-06T04:22:48.08 8.02
2025-03-06T04:22:49.08 8.03
2025-03-06T04:22:50.08 8.00
2025-03-06T04:22:51.08 8.01
2025-03-06T04:22:52.08 8.03
2025-03-06T04:22:53.08 8.04
2025-03-06T04:22:54.08 8.03
2025-03-06T04:22:55.08 8.04
2025-03-06T04:22:56.08 8.02
2025-03-06T04:22:57.08 8.01
2025-03-06T04:22:58.08 8.01
2025-03-06T04:22:59.08 8.03
2025-03-06T04:23:00.08 8.03
2025-03-06T04:23:01.08 8.03
2025-03-06T04:23:02.08 8.04
2025-03-06T04:23:03.08 8.03
2025-03-06T04:23:04.08 8.03
2025-03-06T04:23:05.08 8.03
2025-03-06T04:23:06.08 8.01
2025-03-06T04:23:07.08 8.03
2025-03-06T04:23:08.08 8.03
2025-03-06T04:23:09.08 8.03
2025-03-06T04:23:10.08 8.03
2025-03-06T04:23:11.08 8.03
2025-03-06T04:23:12.08 8.03
2025-03-06T04:23:13.08 8.03
2025-03-06T04:23:14.08 8.01
2025-03-06T04:23:15.08 8.01
2025-03-06T04:23:16.08 8.01
2025-03-06T04:23:17.08 8.02
2025-03-06T04:23:18.08 8.00
2025-03-06T04:23:19.08 8.03
2025-03-06T04:23:20.08 8.01
2025-03-06T04:23:21.08 8.03
2025-03-06T04:23:22.08 8.03
2025-03-06T04:23:23.08 8.01
2025-03-06T04:23:24.08 8.03
2025-03-06T04:23:25.08 8.04
2025-03-06T04:23:26.08 8.01
2025-03-06T04:23:27.08 8.03
2025-03-06T04:23:28.08 8.03
2025-03-06T04:23:29.08 8.02
2025-03-06T04:23:30.08 8.02
2025-03-06T04:23:31.08 8.03
2025-03-06T04:23:32.08 8.01
2025-03-06T04:23:33.08 8.03
2025-03-06T04:23:34.08 8.03
2025-03-06T04:23:35.08 8.01
2025-03-06T04:23:36.08 8.01
2025-03-06T04:23:37.08 8.01
2025-03-06T04:23:38.08 8.03
2025-03-06T04:23:39.08 8.00
2025-03-06T04:23:40.08 8.03
2025-03-06T04:23:41.08 8.01
2025-03-06T04:23:42.08 8.02
2025-03-06T04:23:43.15 8.01
2025-03-06T04:23:44.07 8.02
2025-03-06T04:23:45.07 8.03
2025-03-06T04:23:46.07 8.01
2025-03-06T04:23:47.07 8.01
2025-03-06T04:23:48.07 8.04
2025-03-06T04:23:49.07 8.02
2025-03-06T04:23:50.07 8.03
2025-03-06T04:23:51.07 8.04
2025-03-06T04:23:52.07 8.04
2025-03-06T04:23:53.07 8.03
2025-03-06T04:23:54.07 8.03
2025-03-06T04:23:55.07 8.01
2025-03-06T04:23:56.07 8.02
2025-03-06T04:23:57.07 8.02
2025-03-06T04:23:58.07 8.01
2025-03-06T04:23:59.07 8.02
2025-03-06T04:24:00.07 8.03
2025-03-06T04:24:01.07 8.03
2025-03-06T04:24:02.07 8.00
2025-03-06T04:24:03.07 8.01
2025-03-06T04:24:04.07 8.02
2025-03-06T04:24:05.07 8.05
2025-03-06T04:24:06.07 8.03
2025-03-06T04:24:07.07 8.04
2025-03-06T04:24:08.07 8.01
2025-03-06T04:24:09.07 8.03
2025-03-06T04:24:10.07 8.01
2025-03-06T04:24:11.07 8.03
2025-03-06T04:24:12.07 8.03
2025-03-06T04:24:13.07 8.01
2025-03-06T04:24:14.07 8.02
2025-03-06T04:24:15.07 8.05
2025-03-06T04:24:16.07 8.03
2025-03-06T04:24:17.07 8.03
2025-03-06T04:24:18.07 8.03
2025-03-06T04:24:19.07 8.03
2025-03-06T04:24:20.07 8.03
2025-03-06T04:24:21.07 8.04
2025-03-06T04:24:22.07 8.03
2025-03-06T04:24:23.07 8.03
2025-03-06T04:24:24.07 8.02
2025-03-06T04:24:25.07 8.01
2025-03-06T04:24:26.07 8.02
2025-03-06T04:24:27.07 8.05
2025-03-06T04:24:28.07 8.02
2025-03-06T04:24:29.07 8.01
2025-03-06T04:24:30.07 8.03
2025-03-06T04:24:31.07 8.03
2025-03-06T04:24:32.07 8.01
2025-03-06T04:24:33.07 8.03
2025-03-06T04:24:34.07 8.02
2025-03-06T04:24:35.07 8.04
2025-03-06T04:24:36.07 8.02
2025-03-06T04:24:37.07 8.02
2025-03-06T04:24:38.07 8.01
2025-03-06T04:24:39.07 8.01
2025-03-06T04:24:40.07 8.03
2025-03-06T04:24:41.07 8.01
2025-03-06T04:24:42.07 8.03
2025-03-06T04:24:43.07 8.03
2025-03-06T04:24:44.07 8.03
2025-03-06T04:24:45.07 8.03
2025-03-06T04:24:46.07 8.02
2025-03-06T04:24:47.07 8.02
2025-03-06T04:24:48.07 8.03
2025-03-06T04:24:49.07 8.03
2025-03-06T04:24:50.07 8.04
2025-03-06T04:24:51.07 8.03
2025-03-06T04:24:52.07 8.03
2025-03-06T04:24:53.07 8.01
2025-03-06T04:24:54.07 8.03
2025-03-06T04:24:55.07 8.05
2025-03-06T04:24:56.07 8.02
2025-03-06T04:24:57.07 8.00
2025-03-06T04:24:58.07 8.01
2025-03-06T04:24:59.07 8.03
2025-03-06T04:25:00.07 8.01
2025-03-06T04:25:01.07 8.03
2025-03-06T04:25:02.07 8.03
2025-03-06T04:25:03.07 8.01
2025-03-06T04:25:04.07 8.01
2025-03-06T04:25:05.07 8.01
2025-03-06T04:25:06.07 8.01
2025-03-06T04:25:07.07 8.02
2025-03-06T04:25:08.07 8.03
2025-03-06T04:25:09.07 8.01
2025-03-06T04:25:10.07 8.01
2025-03-06T04:25:11.07 8.05
2025-03-06T04:25:12.07 8.02
2025-03-06T04:25:13.07 8.01
2025-03-06T04:25:14.07 8.03
2025-03-06T04:25:15.07 8.01
2025-03-06T04:25:16.07 8.03
2025-03-06T04:25:17.07 8.02
2025-03-06T04:25:18.07 8.01
2025-03-06T04:25:19.07 8.04
2025-03-06T04:25:20.07 8.04
2025-03-06T04:25:21.07 8.01
2025-03-06T04:25:22.07 8.01
2025-03-06T04:25:23.07 8.03
2025-03-06T04:25:24.07 8.03
2025-03-06T04:25:25.08 8.01
2025-03-06T04:25:26.06 8.01
2025-03-06T04:25:27.06 8.02
2025-03-06T04:25:28.06 8.01
2025-03-06T04:25:29.06 8.02
2025-03-06T04:25:30.06 8.02
2025-03-06T04:25:31.06 8.03
2025-03-06T04:25:32.06 8.02
2025-03-06T04:25:33.06 8.01
2025-03-06T04:25:34.06 8.02
2025-03-06T04:25:35.07 8.01
2025-03-06T04:25:36.06 8.03
2025-03-06T04:25:37.06 8.04
2025-03-06T04:25:38.06 8.03
2025-03-06T04:25:39.06 8.01
2025-03-06T04:25:40.06 8.04
2025-03-06T04:25:41.06 8.02
2025-03-06T04:25:42.06 8.04
2025-03-06T04:25:43.06 8.03
2025-03-06T04:25:44.06 8.03
2025-03-06T04:25:45.07 8.03
2025-03-06T04:25:46.07 8.03
2025-03-06T04:25:47.07 8.02
2025-03-06T04:25:48.07 8.00
2025-03-06T04:25:49.07 8.02
2025-03-06T04:25:50.07 8.01
2025-03-06T04:25:51.07 8.01
2025-03-06T04:25:52.07 8.03
2025-03-06T04:25:53.07 8.03
2025-03-06T04:25:54.07 8.01
2025-03-06T04:25:55.07 8.03
2025-03-06T04:25:56.07 8.03
2025-03-06T04:25:57.07 8.04
2025-03-06T04:25:58.07 8.05
2025-03-06T04:25:59.07 8.01
2025-03-06T04:26:00.07 8.03
2025-03-06T04:26:01.07 8.02
2025-03-06T04:26:02.07 8.02
2025-03-06T04:26:03.07 8.03
2025-03-06T04:26:04.07 8.04
2025-03-06T04:26:05.07 8.03
2025-03-06T04:26:06.07 8.05
2025-03-06T04:26:07.07 8.03
2025-03-06T04:26:08.07 8.01
2025-03-06T04:26:09.07 8.02
2025-03-06T04:26:10.07 8.02
2025-03-06T04:26:11.07 8.03
2025-03-06T04:26:12.07 8.03
2025-03-06T04:26:13.07 8.04
2025-03-06T04:26:14.07 8.02
2025-03-06T04:26:15.07 8.03
2025-03-06T04:26:16.07 8.01
2025-03-06T04:26:17.07 8.03
2025-03-06T04:26:18.07 8.03
2025-03-06T04:26:19.07 8.02
2025-03-06T04:26:20.07 8.03
2025-03-06T04:26:21.07 8.01
2025-03-06T04:26:22.07 8.03
2025-03-06T04:26:23.07 8.03
2025-03-06T04:26:24.07 8.03
2025-03-06T04:26:25.07 8.03
2025-03-06T04:26:26.07 8.01
2025-03-06T04:26:27.07 8.02
2025-03-06T04:26:28.07 8.03
2025-03-06T04:26:29.07 8.03
2025-03-06T04:26:30.07 8.04
2025-03-06T04:26:31.07 8.03
2025-03-06T04:26:32.14 8.03
2025-03-06T04:26:33.06 8.03
2025-03-06T04:26:34.06 8.05
2025-03-06T04:26:35.06 8.01
2025-03-06T04:26:36.06 8.03
2025-03-06T04:26:37.06 8.03
2025-03-06T04:26:38.06 8.02
2025-03-06T04:26:39.06 8.02
2025-03-06T04:26:40.08 8.02
2025-03-06T04:26:41.05 8.04
2025-03-06T04:26:42.05 8.02
2025-03-06T04:26:43.05 8.03
2025-03-06T04:26:44.05 8.03
2025-03-06T04:26:45.05 8.04
2025-03-06T04:26:46.05 8.02
2025-03-06T04:26:47.05 8.02
2025-03-06T04:26:48.06 8.04
2025-03-06T04:26:49.04 8.03
2025-03-06T04:26:50.04 8.02
2025-03-06T04:26:51.04 8.03
2025-03-06T04:26:52.04 8.01
2025-03-06T04:26:53.04 8.01
2025-03-06T04:26:54.04 8.03
2025-03-06T04:26:55.04 8.01
2025-03-06T04:26:56.04 8.01
2025-03-06T04:26:57.04 8.05
2025-03-06T04:26:58.04 8.03
2025-03-06T04:26:59.04 8.01
2025-03-06T04:27:00.04 8.02
2025-03-06T04:27:01.04 8.02
2025-03-06T04:27:02.04 8.01
2025-03-06T04:27:03.04 8.03
2025-03-06T04:27:04.04 8.03
2025-03-06T04:27:05.04 8.01
2025-03-06T04:27:06.04 8.04
2025-03-06T04:27:07.04 8.01
2025-03-06T04:27:08.04 8.03
2025-03-06T04:27:09.04 8.03
2025-03-06T04:27:10.04 8.05
2025-03-06T04:27:11.04 8.01
2025-03-06T04:27:12.05 8.03
2025-03-06T04:27:13.04 8.02
2025-03-06T04:27:14.05 8.01
2025-03-06T04:27:15.04 8.04
2025-03-06T04:27:16.04 8.03
2025-03-06T04:27:17.04 8.03
2025-03-06T04:27:18.04 8.01
2025-03-06T04:27:19.04 8.03
2025-03-06T04:27:20.04 8.01
2025-03-06T04:27:21.04 8.02
2025-03-06T04:27:22.05 8.04
2025-03-06T04:27:23.04 8.02
2025-03-06T04:27:24.05 8.01
2025-03-06T04:27:25.04 8.03
2025-03-06T04:27:26.04 8.02
2025-03-06T04:27:27.04 8.01
2025-03-06T04:27:28.04 8.02
2025-03-06T04:27:29.05 8.00
2025-03-06T04:27:30.05 8.01
2025-03-06T04:27:31.05 8.01
2025-03-06T04:27:32.05 8.02
2025-03-06T04:27:33.05 8.01
2025-03-06T04:27:34.05 8.01
2025-03-06T04:27:35.05 8.03
2025-03-06T04:27:36.05 8.02
2025-03-06T04:27:37.05 8.03
2025-03-06T04:27:38.05 8.02
2025-03-06T04:27:39.05 8.01
2025-03-06T04:27:40.05 8.00
2025-03-06T04:27:41.05 8.04
2025-03-06T04:27:42.05 8.04
2025-03-06T04:27:43.05 8.03
2025-03-06T04:27:44.05 8.01
2025-03-06T04:27:45.05 8.01
2025-03-06T04:27:46.05 8.03
2025-03-06T04:27:47.05 8.03
2025-03-06T04:27:48.05 8.02
2025-03-06T04:27:49.05 8.01
2025-03-06T04:27:50.05 8.02
2025-03-06T04:27:51.05 8.03
2025-03-06T04:27:52.05 8.03
2025-03-06T04:27:53.05 8.02
2025-03-06T04:27:54.05 8.03
2025-03-06T04:27:55.05 8.02
2025-03-06T04:27:56.05 8.03
2025-03-06T04:27:57.05 8.03
2025-03-06T04:27:58.05 8.02
2025-03-06T04:27:59.05 8.02
2025-03-06T04:28:00.05 8.02
2025-03-06T04:28:01.05 8.02
2025-03-06T04:28:02.05 8.04
2025-03-06T04:28:03.05 8.03
2025-03-06T04:28:04.05 8.04
2025-03-06T04:28:05.05 8.02
2025-03-06T04:28:06.05 8.01
2025-03-06T04:28:07.05 8.01
2025-03-06T04:28:08.05 8.01
2025-03-06T04:28:09.05 8.02
2025-03-06T04:28:10.05 8.02
2025-03-06T04:28:11.05 8.01
2025-03-06T04:28:12.05 8.00
2025-03-06T04:28:13.05 8.03
2025-03-06T04:28:14.05 8.03
2025-03-06T04:28:15.05 8.02
2025-03-06T04:28:16.05 8.02
2025-03-06T04:28:17.05 8.03
2025-03-06T04:28:18.05 8.02
2025-03-06T04:28:19.05 8.02
2025-03-06T04:28:20.05 8.02
2025-03-06T04:28:21.05 8.02
2025-03-06T04:28:22.05 8.03
2025-03-06T04:28:23.05 8.04
2025-03-06T04:28:24.05 8.02
2025-03-06T04:28:25.05 8.02
2025-03-06T04:28:26.05 8.01
2025-03-06T04:28:27.05 8.03
2025-03-06T04:28:28.05 8.02
2025-03-06T04:28:29.05 8.03
2025-03-06T04:28:30.05 8.01
2025-03-06T04:28:31.05 8.02
2025-03-06T04:28:32.05 8.03
2025-03-06T04:28:33.05 8.03
2025-03-06T04:28:34.05 8.01
2025-03-06T04:28:35.05 8.01
2025-03-06T04:28:36.05 8.01
2025-03-06T04:28:37.05 8.00
2025-03-06T04:28:38.05 8.02
2025-03-06T04:28:39.05 8.01
2025-03-06T04:28:40.05 7.99
2025-03-06T04:28:41.05 8.04
2025-03-06T04:28:42.05 8.02
2025-03-06T04:28:43.05 8.02
2025-03-06T04:28:44.05 8.03
2025-03-06T04:28:45.05 8.02
2025-03-06T04:28:46.05 8.04
2025-03-06T04:28:47.05 8.03
2025-03-06T04:28:48.05 8.03
2025-03-06T04:28:49.05 8.03
2025-03-06T04:28:50.05 8.00
2025-03-06T04:28:51.05 8.01
2025-03-06T04:28:52.05 8.02
2025-03-06T04:28:53.05 8.03
2025-03-06T04:28:54.05 8.00
2025-03-06T04:28:55.05 8.05
2025-03-06T04:28:56.05 8.02
2025-03-06T04:28:57.05 8.02
2025-03-06T04:28:58.05 8.03
2025-03-06T04:28:59.05 8.02
2025-03-06T04:29:00.05 8.03
2025-03-06T04:29:01.05 8.03
2025-03-06T04:29:02.05 8.03
2025-03-06T04:29:03.05 8.02
2025-03-06T04:29:04.05 8.01
2025-03-06T04:29:05.05 8.01
2025-03-06T04:29:06.05 8.03
2025-03-06T04:29:07.05 8.02
2025-03-06T04:29:08.05 8.03
2025-03-06T04:29:09.05 8.02
2025-03-06T04:29:10.05 8.00
2025-03-06T04:29:11.05 8.03
2025-03-06T04:29:12.05 8.01
2025-03-06T04:29:13.05 8.02
2025-03-06T04:29:14.05 8.01
2025-03-06T04:29:15.05 8.03
2025-03-06T04:29:16.05 8.02
2025-03-06T04:29:17.05 8.03
2025-03-06T04:29:18.05 8.04
2025-03-06T04:29:19.05 8.03
2025-03-06T04:29:20.05 8.03
2025-03-06T04:29:21.05 8.01
2025-03-06T04:29:22.05 8.03
2025-03-06T04:29:23.05 8.03
2025-03-06T04:29:24.05 8.03
2025-03-06T04:29:25.05 8.03
2025-03-06T04:29:26.05 8.02
2025-03-06T04:29:27.05 8.05
2025-03-06T04:29:28.05 8.03
2025-03-06T04:29:29.05 8.02
2025-03-06T04:29:30.05 8.03
2025-03-06T04:29:31.05 8.02
2025-03-06T04:29:32.05 8.04
2025-03-06T04:29:33.05 8.02
2025-03-06T04:29:34.05 8.04
2025-03-06T04:29:35.05 8.03
2025-03-06T04:29:36.05 8.03
2025-03-06T04:29:37.05 8.04
2025-03-06T04:29:38.05 8.03
2025-03-06T04:29:39.05 8.03
2025-03-06T04:29:40.05 8.03
2025-03-06T04:29:41.05 8.01
2025-03-06T04:29:42.05 8.03
2025-03-06T04:29:43.05 8.03
2025-03-06T04:29:44.05 8.03
2025-03-06T04:29:45.05 8.03
2025-03-06T04:29:46.05 8.03
2025-03-06T04:29:47.05 8.03
2025-03-06T04:29:48.05 8.01
2025-03-06T04:29:49.05 8.05
2025-03-06T04:29:50.05 8.03
2025-03-06T04:29:51.05 8.03
2025-03-06T04:29:52.05 8.02
2025-03-06T04:29:53.05 8.01
2025-03-06T04:29:54.05 8.03
2025-03-06T04:29:55.05 8.04
2025-03-06T04:29:56.05 8.03
2025-03-06T04:29:57.05 7.99
2025-03-06T04:29:58.05 8.00
2025-03-06T04:29:59.05 8.02
2025-03-06T04:30:00.05 8.02
2025-03-06T04:30:01.05 8.03
2025-03-06T04:30:02.05 8.02
2025-03-06T04:30:03.05 8.03
2025-03-06T04:30:04.05 8.03
2025-03-06T04:30:05.05 8.05
2025-03-06T04:30:06.05 8.03
2025-03-06T04:30:07.05 8.03
2025-03-06T04:30:08.05 8.04
2025-03-06T04:30:09.05 8.03
2025-03-06T04:30:10.05 8.05
2025-03-06T04:30:11.05 8.02
2025-03-06T04:30:12.05 8.02
2025-03-06T04:30:13.05 8.01
2025-03-06T04:30:14.05 8.05
2025-03-06T04:30:15.05 8.04
2025-03-06T04:30:16.05 8.00
2025-03-06T04:30:17.05 8.03
2025-03-06T04:30:18.05 8.03
2025-03-06T04:30:19.05 8.02
2025-03-06T04:30:20.05 8.02
2025-03-06T04:30:21.05 8.05
2025-03-06T04:30:22.05 8.03
2025-03-06T04:30:23.05 8.01
2025-03-06T04:30:24.05 8.01
2025-03-06T04:30:25.05 8.01
2025-03-06T04:30:26.05 8.01
2025-03-06T04:30:27.05 8.03
2025-03-06T04:30:28.05 8.04
2025-03-06T04:30:29.05 8.03
2025-03-06T04:30:30.05 8.03
2025-03-06T04:30:31.05 8.01
2025-03-06T04:30:32.05 8.00
2025-03-06T04:30:33.05 8.02
2025-03-06T04:30:34.05 8.05
2025-03-06T04:30:35.05 8.03
2025-03-06T04:30:36.05 8.03
2025-03-06T04:30:37.05 8.01
2025-03-06T04:30:38.05 8.03
2025-03-06T04:30:39.05 8.01
2025-03-06T04:30:40.08 8.02
2025-03-06T04:30:41.04 8.03
2025-03-06T04:30:42.05 8.04
2025-03-06T04:30:43.04 8.02
2025-03-06T04:30:44.04 8.03
2025-03-06T04:30:45.04 8.03
2025-03-06T04:30:46.04 8.03
2025-03-06T04:30:47.04 8.02
2025-03-06T04:30:48.04 8.05
2025-03-06T04:30:49.04 8.02
2025-03-06T04:30:50.04 8.03
2025-03-06T04:30:51.04 8.01
2025-03-06T04:30:52.04 8.03
2025-03-06T04:30:53.04 8.03
2025-03-06T04:30:54.04 8.03
2025-03-06T04:30:55.04 8.04
2025-03-06T04:30:56.04 8.03
2025-03-06T04:30:57.04 8.05
2025-03-06T04:30:58.04 8.04
2025-03-06T04:30:59.04 8.02
2025-03-06T04:31:00.04 8.01
2025-03-06T04:31:01.04 8.03
2025-03-06T04:31:02.04 8.01
2025-03-06T04:31:03.04 8.03
2025-03-06T04:31:04.04 8.03
2025-03-06T04:31:05.04 8.03
2025-03-06T04:31:06.04 8.03
2025-03-06T04:31:07.04 8.02
2025-03-06T04:31:08.04 8.02
2025-03-06T04:31:09.04 8.02
2025-03-06T04:31:10.04 8.03
2025-03-06T04:31:11.04 8.02
2025-03-06T04:31:12.04 8.02
2025-03-06T04:31:13.04 8.03
2025-03-06T04:31:14.04 8.04
2025-03-06T04:31:15.04 8.03
2025-03-06T04:31:16.04 8.04
2025-03-06T04:31:17.04 8.04
2025-03-06T04:31:18.04 8.04
2025-03-06T04:31:19.04 8.02
2025-03-06T04:31:20.04 8.05
2025-03-06T04:31:21.04 8.01
2025-03-06T04:31:22.04 8.03
2025-03-06T04:31:23.04 8.01
2025-03-06T04:31:24.04 8.02
2025-03-06T04:31:25.04 8.02
2025-03-06T04:31:26.04 8.02
2025-03-06T04:31:27.04 8.03
2025-03-06T04:31:28.04 8.01
2025-03-06T04:31:29.04 8.01
2025-03-06T04:31:30.04 8.03
2025-03-06T04:31:31.04 8.03
2025-03-06T04:31:32.04 8.03
2025-03-06T04:31:33.04 8.02
2025-03-06T04:31:34.04 8.00
2025-03-06T04:31:35.04 8.03
2025-03-06T04:31:36.04 8.01
2025-03-06T04:31:37.04 8.01
2025-03-06T04:31:38.04 8.03
2025-03-06T04:31:39.04 8.03
2025-03-06T04:31:40.04 8.01
2025-03-06T04:31:41.04 8.03
2025-03-06T04:31:42.04 8.03
2025-03-06T04:31:43.04 8.01
2025-03-06T04:31:44.04 8.03
2025-03-06T04:31:45.04 8.05
2025-03-06T04:31:46.04 8.03
2025-03-06T04:31:47.04 8.03
2025-03-06T04:31:48.04 8.03
2025-03-06T04:31:49.04 8.03
2025-03-06T04:31:50.04 8.01
2025-03-06T04:31:51.04 8.02
2025-03-06T04:31:52.04 8.02
2025-03-06T04:31:53.04 8.03
2025-03-06T04:31:54.04 8.02
2025-03-06T04:31:55.04 8.00
2025-03-06T04:31:56.04 8.01
2025-03-06T04:31:57.04 8.03
2025-03-06T04:31:58.04 8.02
2025-03-06T04:31:59.04 8.03
2025-03-06T04:32:00.04 8.02
2025-03-06T04:32:01.04 8.03
2025-03-06T04:32:02.04 8.01
2025-03-06T04:32:03.04 8.02
2025-03-06T04:32:04.04 8.03
2025-03-06T04:32:05.04 8.04
2025-03-06T04:32:06.04 8.00
2025-03-06T04:32:07.04 8.01
2025-03-06T04:32:08.04 8.03
2025-03-06T04:32:09.04 8.03
2025-03-06T04:32:10.04 8.03
2025-03-06T04:32:11.04 8.03
2025-03-06T04:32:12.05 8.04
2025-03-06T04:32:13.03 8.03
2025-03-06T04:32:14.03 8.03
2025-03-06T04:32:15.03 8.02
2025-03-06T04:32:16.03 8.03
2025-03-06T04:32:17.03 8.02
2025-03-06T04:32:18.03 8.04
2025-03-06T04:32:19.03 8.03
2025-03-06T04:32:20.03 8.02
2025-03-06T04:32:21.03 8.03
2025-03-06T04:32:22.03 8.03
2025-03-06T04:32:23.03 8.01
2025-03-06T04:32:24.03 8.00
2025-03-06T04:32:25.03 8.02
2025-03-06T04:32:26.03 8.03
2025-03-06T04:32:27.03 8.03
2025-03-06T04:32:28.03 8.02
2025-03-06T04:32:29.03 8.03
2025-03-06T04:32:30.03 8.03
2025-03-06T04:32:31.03 8.02
2025-03-06T04:32:32.03 8.05
2025-03-06T04:32:33.03 8.05
2025-03-06T04:32:34.03 8.02
2025-03-06T04:32:35.03 8.04
2025-03-06T04:32:36.03 8.03
2025-03-06T04:32:37.03 8.05
2025-03-06T04:32:38.04 8.03
2025-03-06T04:32:39.04 8.01
2025-03-06T04:32:40.04 8.04
2025-03-06T04:32:41.04 8.01
2025-03-06T04:32:42.04 8.03
2025-03-06T04:32:43.13 8.01
2025-03-06T04:32:44.02 8.05
2025-03-06T04:32:45.02 8.03
2025-03-06T04:32:46.02 8.03
2025-03-06T04:32:47.02 8.03
2025-03-06T04:32:48.02 8.01
2025-03-06T04:32:49.03 8.01
2025-03-06T04:32:50.03 8.00
2025-03-06T04:32:51.03 8.02
2025-03-06T04:32:52.03 8.05
2025-03-06T04:32:53.03 8.02
2025-03-06T04:32:54.03 8.03
2025-03-06T04:32:55.03 8.04
2025-03-06T04:32:56.03 8.05
2025-03-06T04:32:57.03 8.03
2025-03-06T04:32:58.03 8.00
2025-03-06T04:32:59.03 8.01
2025-03-06T04:33:00.03 8.04
2025-03-06T04:33:01.03 8.03
2025-03-06T04:33:02.03 8.05
2025-03-06T04:33:03.03 8.02
2025-03-06T04:33:04.03 8.03
2025-03-06T04:33:05.03 8.02
2025-03-06T04:33:06.03 8.03
2025-03-06T04:33:07.03 8.05
2025-03-06T04:33:08.03 8.01
2025-03-06T04:33:09.03 8.02
2025-03-06T04:33:10.03 8.01
2025-03-06T04:33:11.03 8.03
2025-03-06T04:33:12.03 8.03
2025-03-06T04:33:13.03 8.02
2025-03-06T04:33:14.03 8.04
2025-03-06T04:33:15.03 8.04
2025-03-06T04:33:16.03 8.02
2025-03-06T04:33:17.03 8.03
2025-03-06T04:33:18.03 8.03
2025-03-06T04:33:19.03 8.02
2025-03-06T04:33:20.03 8.03
2025-03-06T04:33:21.03 8.04
2025-03-06T04:33:22.03 8.03
2025-03-06T04:33:23.03 8.02
2025-03-06T04:33:24.03 8.01
2025-03-06T04:33:25.03 8.03
2025-03-06T04:33:26.03 8.04
2025-03-06T04:33:27.03 8.03
2025-03-06T04:33:28.03 8.04
2025-03-06T04:33:29.03 8.05
2025-03-06T04:33:30.03 8.01
2025-03-06T04:33:31.03 8.01
2025-03-06T04:33:32.03 8.03
2025-03-06T04:33:33.03 8.02
2025-03-06T04:33:34.03 8.04
2025-03-06T04:33:35.03 8.03
2025-03-06T04:33:36.03 8.01
2025-03-06T04:33:37.03 8.01
2025-03-06T04:33:38.03 8.02
2025-03-06T04:33:39.03 8.02
2025-03-06T04:33:40.03 8.01
2025-03-06T04:33:41.03 8.03
2025-03-06T04:33:42.03 8.03
2025-03-06T04:33:43.03 8.02
2025-03-06T04:33:44.03 8.02
2025-03-06T04:33:45.03 8.02
2025-03-06T04:33:46.03 8.01
2025-03-06T04:33:47.03 8.00
2025-03-06T04:33:48.03 8.03
2025-03-06T04:33:49.03 8.01
2025-03-06T04:33:50.03 8.03
2025-03-06T04:33:51.03 8.01
2025-03-06T04:33:52.03 8.03
2025-03-06T04:33:53.03 8.01
2025-03-06T04:33:54.03 8.02
2025-03-06T04:33:55.03 8.01
2025-03-06T04:33:56.03 8.01
2025-03-06T04:33:57.03 8.05
2025-03-06T04:33:58.03 8.03
2025-03-06T04:33:59.03 8.01
2025-03-06T04:34:00.03 8.02
2025-03-06T04:34:01.03 8.03
2025-03-06T04:34:02.03 8.03
2025-03-06T04:34:03.12 8.02
2025-03-06T04:34:04.03 8.03
2025-03-06T04:34:05.03 8.01
2025-03-06T04:34:06.03 8.02
2025-03-06T04:34:07.03 7.96
2025-03-06T04:34:08.03 8.03
2025-03-06T04:34:09.03 8.03
2025-03-06T04:34:10.03 8.01
2025-03-06T04:34:11.03 8.03
2025-03-06T04:34:12.03 8.04
2025-03-06T04:34:13.03 8.03
2025-03-06T04:34:14.03 8.04
2025-03-06T04:34:15.03 8.05
2025-03-06T04:34:16.03 8.03
2025-03-06T04:34:17.03 8.01
2025-03-06T04:34:18.03 8.03
2025-03-06T04:34:19.03 8.01
2025-03-06T04:34:20.03 8.03
2025-03-06T04:34:21.03 8.03
2025-03-06T04:34:22.03 8.02
2025-03-06T04:34:23.03 8.03
2025-03-06T04:34:24.03 8.02
2025-03-06T04:34:25.03 8.01
2025-03-06T04:34:26.03 8.01
2025-03-06T04:34:27.03 8.03
2025-03-06T04:34:28.03 8.03
2025-03-06T04:34:29.03 8.03
2025-03-06T04:34:30.03 8.01
2025-03-06T04:34:31.03 8.02
2025-03-06T04:34:32.04 8.02
2025-03-06T04:34:33.02 8.03
2025-03-06T04:34:34.02 8.05
2025-03-06T04:34:35.02 8.06
2025-03-06T04:34:36.02 8.00
2025-03-06T04:34:37.02 8.05
2025-03-06T04:34:38.02 8.03
2025-03-06T04:34:39.02 8.03
2025-03-06T04:34:40.02 8.01
2025-03-06T04:34:41.02 8.03
2025-03-06T04:34:42.02 8.02
2025-03-06T04:34:43.11 8.03
2025-03-06T04:34:44.01 8.01
2025-03-06T04:34:45.01 8.02
2025-03-06T04:34:46.01 8.04
2025-03-06T04:34:47.01 8.03
2025-03-06T04:34:48.01 8.02
2025-03-06T04:34:49.01 8.02
2025-03-06T04:34:50.01 8.03
2025-03-06T04:34:51.01 8.01
2025-03-06T04:34:52.01 8.02
2025-03-06T04:34:53.01 8.00
2025-03-06T04:34:54.01 8.02
2025-03-06T04:34:55.01 8.00
2025-03-06T04:34:56.01 8.02
2025-03-06T04:34:57.01 8.00
2025-03-06T04:34:58.01 8.01
2025-03-06T04:34:59.01 8.03
2025-03-06T04:35:00.01 8.03
2025-03-06T04:35:01.01 8.01
2025-03-06T04:35:02.01 8.01
2025-03-06T04:35:03.01 8.03
2025-03-06T04:35:04.01 8.04
2025-03-06T04:35:05.01 8.01
2025-03-06T04:35:06.01 8.00
2025-03-06T04:35:07.01 8.04
2025-03-06T04:35:08.01 8.01
2025-03-06T04:35:09.01 8.02
2025-03-06T04:35:10.01 8.04
2025-03-06T04:35:11.01 8.00
2025-03-06T04:35:12.01 8.04
2025-03-06T04:35:13.01 8.03
2025-03-06T04:35:14.01 8.03
2025-03-06T04:35:15.01 8.01
2025-03-06T04:35:16.01 7.99
2025-03-06T04:35:17.01 8.02
2025-03-06T04:35:18.01 8.00
2025-03-06T04:35:19.01 8.03
2025-03-06T04:35:20.01 8.05
2025-03-06T04:35:21.01 8.01
2025-03-06T04:35:22.01 8.03
2025-03-06T04:35:23.01 8.01
2025-03-06T04:35:24.01 8.00
2025-03-06T04:35:25.01 8.05
2025-03-06T04:35:26.01 8.03
2025-03-06T04:35:27.01 8.03
2025-03-06T04:35:28.01 8.03
2025-03-06T04:35:29.01 8.03
2025-03-06T04:35:30.01 8.03
2025-03-06T04:35:31.01 8.02
2025-03-06T04:35:32.01 8.03
2025-03-06T04:35:33.01 8.04
2025-03-06T04:35:34.01 8.03
2025-03-06T04:35:35.01 8.04
2025-03-06T04:35:36.01 8.00
2025-03-06T04:35:37.01 8.01
2025-03-06T04:35:38.01 8.01
2025-03-06T04:35:39.01 8.03
2025-03-06T04:35:40.01 8.01
2025-03-06T04:35:41.01 8.00
2025-03-06T04:35:42.01 8.02
2025-03-06T04:35:43.01 8.01
2025-03-06T04:35:44.01 8.04
2025-03-06T04:35:45.01 8.05
2025-03-06T04:35:46.01 8.01
2025-03-06T04:35:47.01 8.04
2025-03-06T04:35:48.01 8.04
2025-03-06T04:35:49.01 8.03
2025-03-06T04:35:50.01 8.04
2025-03-06T04:35:51.01 8.05
2025-03-06T04:35:52.01 8.04
2025-03-06T04:35:53.01 8.03
2025-03-06T04:35:54.01 8.03
2025-03-06T04:35:55.01 8.03
2025-03-06T04:35:56.01 8.03
2025-03-06T04:35:57.01 8.03
2025-03-06T04:35:58.01 8.03
2025-03-06T04:35:59.01 8.02
2025-03-06T04:36:00.01 8.03
2025-03-06T04:36:01.01 8.03
2025-03-06T04:36:02.01 8.03
2025-03-06T04:36:03.01 8.01
2025-03-06T04:36:04.01 8.01
2025-03-06T04:36:05.01 8.03
2025-03-06T04:36:06.01 8.01
2025-03-06T04:36:07.01 8.00
2025-03-06T04:36:08.01 8.04
2025-03-06T04:36:09.01 8.01
2025-03-06T04:36:10.01 8.02
2025-03-06T04:36:11.01 8.03
2025-03-06T04:36:12.01 8.01
2025-03-06T04:36:13.01 8.00
2025-03-06T04:36:14.01 8.05
2025-03-06T04:36:15.01 8.03
2025-03-06T04:36:16.01 8.04
2025-03-06T04:36:17.01 8.02
2025-03-06T04:36:18.01 8.00
2025-03-06T04:36:19.01 8.02
2025-03-06T04:36:20.01 8.02
2025-03-06T04:36:21.01 8.03
2025-03-06T04:36:22.01 8.03
2025-03-06T04:36:23.01 8.03
2025-03-06T04:36:24.01 8.01
2025-03-06T04:36:25.01 8.03
2025-03-06T04:36:26.01 8.03
2025-03-06T04:36:27.01 8.01
2025-03-06T04:36:28.01 8.03
2025-03-06T04:36:29.01 8.03
2025-03-06T04:36:30.01 8.03
2025-03-06T04:36:31.01 8.03
2025-03-06T04:36:32.01 8.04
2025-03-06T04:36:33.01 8.03
2025-03-06T04:36:34.01 8.03
2025-03-06T04:36:35.01 8.05
2025-03-06T04:36:36.01 8.04
2025-03-06T04:36:37.01 8.03
2025-03-06T04:36:38.01 8.03
2025-03-06T04:36:39.01 8.01
2025-03-06T04:36:40.01 8.05
2025-03-06T04:36:41.01 8.03
2025-03-06T04:36:42.01 8.02
2025-03-06T04:36:43.01 8.04
2025-03-06T04:36:44.01 8.00
2025-03-06T04:36:45.01 8.01
2025-03-06T04:36:46.01 8.04
2025-03-06T04:36:47.01 8.02
2025-03-06T04:36:48.01 8.03
2025-03-06T04:36:49.01 8.02
2025-03-06T04:36:50.01 8.03
2025-03-06T04:36:51.01 8.02
2025-03-06T04:36:52.01 8.00
2025-03-06T04:36:53.01 8.03
2025-03-06T04:36:54.01 8.03
2025-03-06T04:36:55.01 8.01
2025-03-06T04:36:56.01 8.02
2025-03-06T04:36:57.01 8.03
2025-03-06T04:36:58.01 8.03
2025-03-06T04:36:59.01 8.04
2025-03-06T04:37:00.01 8.00
2025-03-06T04:37:01.01 8.00
2025-03-06T04:37:02.01 8.03
2025-03-06T04:37:03.01 8.01
2025-03-06T04:37:04.01 8.04
2025-03-06T04:37:05.01 8.04
2025-03-06T04:37:06.01 8.03
2025-03-06T04:37:07.01 8.05
2025-03-06T04:37:08.01 8.01
2025-03-06T04:37:09.01 8.01
2025-03-06T04:37:10.01 8.02
2025-03-06T04:37:11.01 8.04
2025-03-06T04:37:12.01 8.02
2025-03-06T04:37:13.01 8.03
2025-03-06T04:37:14.01 8.02
2025-03-06T04:37:15.01 8.03
2025-03-06T04:37:16.01 8.00
2025-03-06T04:37:17.01 8.03
2025-03-06T04:37:18.01 8.04
2025-03-06T04:37:19.01 8.01
2025-03-06T04:37:20.01 8.03
2025-03-06T04:37:21.01 8.02
2025-03-06T04:37:22.01 8.04
2025-03-06T04:37:23.01 8.00
2025-03-06T04:37:24.01 8.03
2025-03-06T04:37:25.01 8.01
2025-03-06T04:37:26.01 8.03
2025-03-06T04:37:27.01 8.03
2025-03-06T04:37:28.01 8.04
2025-03-06T04:37:29.01 8.03
2025-03-06T04:37:30.01 8.00
2025-03-06T04:37:31.01 8.01
2025-03-06T04:37:32.01 8.02
2025-03-06T04:37:33.01 8.03
2025-03-06T04:37:34.01 7.99
2025-03-06T04:37:35.01 8.01
2025-03-06T04:37:36.01 8.03
2025-03-06T04:37:37.01 8.04
2025-03-06T04:37:38.01 8.01
2025-03-06T04:37:39.01 8.04
2025-03-06T04:37:40.02 8.03
2025-03-06T04:37:41.01 8.03
2025-03-06T04:37:42.01 8.01
2025-03-06T04:37:43.01 8.04
2025-03-06T04:37:44.01 8.03
2025-03-06T04:37:45.01 8.04
2025-03-06T04:37:46.01 8.01
2025-03-06T04:37:47.01 8.04
2025-03-06T04:37:48.01 8.02
2025-03-06T04:37:49.01 8.03
2025-03-06T04:37:50.01 8.01
2025-03-06T04:37:51.01 8.03
2025-03-06T04:37:52.01 8.03
2025-03-06T04:37:53.01 8.04
2025-03-06T04:37:54.01 8.03
2025-03-06T04:37:55.01 8.03
2025-03-06T04:37:56.01 8.03
2025-03-06T04:37:57.01 8.04
2025-03-06T04:37:58.01 8.01
2025-03-06T04:37:59.01 8.01
2025-03-06T04:38:00.01 8.05
2025-03-06T04:38:01.02 8.02
2025-03-06T04:38:02.01 8.02
2025-03-06T04:38:03.01 8.02
2025-03-06T04:38:04.01 8.01
2025-03-06T04:38:05.01 8.02
2025-03-06T04:38:06.01 8.01
2025-03-06T04:38:07.02 8.01
2025-03-06T04:38:08.02 8.02
2025-03-06T04:38:09.02 8.00
2025-03-06T04:38:10.02 8.00
2025-03-06T04:38:11.02 8.02
2025-03-06T04:38:12.02 8.01
2025-03-06T04:38:13.02 8.03
2025-03-06T04:38:14.02 8.05
2025-03-06T04:38:15.02 8.02
2025-03-06T04:38:16.02 8.02
2025-03-06T04:38:17.02 8.03
2025-03-06T04:38:18.02 8.03
2025-03-06T04:38:19.02 8.05
2025-03-06T04:38:20.02 8.03
2025-03-06T04:38:21.02 8.01
2025-03-06T04:38:22.02 8.03
2025-03-06T04:38:23.02 8.04
2025-03-06T04:38:24.02 8.05
2025-03-06T04:38:25.02 8.01
2025-03-06T04:38:26.02 8.03
2025-03-06T04:38:27.02 8.02
2025-03-06T04:38:28.02 8.01
2025-03-06T04:38:29.02 8.03
2025-03-06T04:38:30.02 8.02
2025-03-06T04:38:31.02 8.01
2025-03-06T04:38:32.02 8.01
2025-03-06T04:38:33.02 8.03
2025-03-06T04:38:34.02 8.03
2025-03-06T04:38:35.02 8.01
2025-03-06T04:38:36.02 8.04
2025-03-06T04:38:37.02 8.02
2025-03-06T04:38:38.02 8.01
2025-03-06T04:38:39.02 8.03
2025-03-06T04:38:40.02 8.03
2025-03-06T04:38:41.02 8.03
2025-03-06T04:38:42.02 8.03
2025-03-06T04:38:43.02 8.02
2025-03-06T04:38:44.02 8.03
2025-03-06T04:38:45.02 8.03
2025-03-06T04:38:46.02 8.02
2025-03-06T04:38:47.02 8.01
2025-03-06T04:38:48.02 8.01
2025-03-06T04:38:49.02 8.01
2025-03-06T04:38:50.02 8.02
2025-03-06T04:38:51.02 8.03
2025-03-06T04:38:52.02 8.00
2025-03-06T04:38:53.02 8.03
2025-03-06T04:38:54.02 8.04
2025-03-06T04:38:55.02 8.01
2025-03-06T04:38:56.02 8.04
2025-03-06T04:38:57.02 8.02
2025-03-06T04:38:58.02 8.00
2025-03-06T04:38:59.02 8.03
2025-03-06T04:39:00.02 8.01
2025-03-06T04:39:01.02 8.02
2025-03-06T04:39:02.02 8.03
2025-03-06T04:39:03.02 8.03
2025-03-06T04:39:04.02 8.01
2025-03-06T04:39:05.02 8.01
2025-03-06T04:39:06.02 8.05
2025-03-06T04:39:07.02 8.02
2025-03-06T04:39:08.02 8.03
2025-03-06T04:39:09.02 8.02
2025-03-06T04:39:10.02 8.01
2025-03-06T04:39:11.02 8.01
2025-03-06T04:39:12.02 8.05
2025-03-06T04:39:13.02 8.01
2025-03-06T04:39:14.02 8.03
2025-03-06T04:39:15.02 8.01
2025-03-06T04:39:16.02 8.01
2025-03-06T04:39:17.02 8.02
2025-03-06T04:39:18.02 8.01
2025-03-06T04:39:19.02 8.04
2025-03-06T04:39:20.02 8.02
2025-03-06T04:39:21.02 8.05
2025-03-06T04:39:22.02 8.03
2025-03-06T04:39:23.02 8.01
2025-03-06T04:39:24.02 8.00
2025-03-06T04:39:25.02 8.02
2025-03-06T04:39:26.02 8.04
2025-03-06T04:39:27.02 8.00
2025-03-06T04:39:28.02 8.03
2025-03-06T04:39:29.02 8.03
2025-03-06T04:39:30.02 8.02
2025-03-06T04:39:31.02 8.01
2025-03-06T04:39:32.02 8.03
2025-03-06T04:39:33.02 8.02
2025-03-06T04:39:34.02 8.03
2025-03-06T04:39:35.02 8.01
2025-03-06T04:39:36.02 8.03
2025-03-06T04:39:37.02 8.03
2025-03-06T04:39:38.02 8.03
2025-03-06T04:39:39.02 8.03
2025-03-06T04:39:40.02 8.01
2025-03-06T04:39:41.02 8.02
2025-03-06T04:39:42.02 8.03
2025-03-06T04:39:43.02 8.04
2025-03-06T04:39:44.02 8.03
2025-03-06T04:39:45.02 8.01
2025-03-06T04:39:46.02 8.00
2025-03-06T04:39:47.02 8.01
2025-03-06T04:39:48.02 8.01
2025-03-06T04:39:49.02 8.05
2025-03-06T04:39:50.02 8.01
2025-03-06T04:39:51.02 8.03
2025-03-06T04:39:52.02 8.03
2025-03-06T04:39:53.02 8.01
2025-03-06T04:39:54.02 8.03
2025-03-06T04:39:55.02 8.03
2025-03-06T04:39:56.02 8.05
2025-03-06T04:39:57.02 8.03
2025-03-06T04:39:58.02 8.03
2025-03-06T04:39:59.02 8.01
2025-03-06T04:40:00.02 8.03
2025-03-06T04:40:01.02 8.04
2025-03-06T04:40:02.02 8.03
2025-03-06T04:40:03.02 8.02
2025-03-06T04:40:04.02 8.05
2025-03-06T04:40:05.02 8.01
2025-03-06T04:40:06.02 8.01
2025-03-06T04:40:07.02 8.03
2025-03-06T04:40:08.02 8.05
2025-03-06T04:40:09.02 8.05
2025-03-06T04:40:10.02 8.04
2025-03-06T04:40:11.02 8.03
2025-03-06T04:40:12.02 8.04
2025-03-06T04:40:13.08 8.03
2025-03-06T04:40:14.01 8.03
2025-03-06T04:40:15.01 8.01
2025-03-06T04:40:16.01 8.02
2025-03-06T04:40:17.01 8.05
2025-03-06T04:40:18.01 8.01
2025-03-06T04:40:19.01 8.02
2025-03-06T04:40:20.01 8.02
2025-03-06T04:40:21.01 8.01
2025-03-06T04:40:22.01 8.03
2025-03-06T04:40:23.01 8.01
2025-03-06T04:40:24.01 8.02
2025-03-06T04:40:25.01 8.01
2025-03-06T04:40:26.01 8.03
2025-03-06T04:40:27.01 8.02
2025-03-06T04:40:28.01 8.03
2025-03-06T04:40:29.01 8.05
2025-03-06T04:40:30.01 8.03
2025-03-06T04:40:31.01 8.02
2025-03-06T04:40:32.01 8.03
2025-03-06T04:40:33.01 8.03
2025-03-06T04:40:34.01 8.02
2025-03-06T04:40:35.01 8.03
2025-03-06T04:40:36.01 8.02
2025-03-06T04:40:37.01 8.01
2025-03-06T04:40:38.01 8.03
2025-03-06T04:40:39.01 8.03
2025-03-06T04:40:40.01 8.03
2025-03-06T04:40:41.01 8.02
2025-03-06T04:40:42.01 8.01
2025-03-06T04:40:43.01 8.02
2025-03-06T04:40:44.01 8.01
2025-03-06T04:40:45.01 8.01
2025-03-06T04:40:46.01 8.01
2025-03-06T04:40:47.01 8.03
2025-03-06T04:40:48.01 8.01
2025-03-06T04:40:49.01 8.01
2025-03-06T04:40:50.01 8.02
2025-03-06T04:40:51.01 8.01
2025-03-06T04:40:52.01 8.02
2025-03-06T04:40:53.01 8.03
2025-03-06T04:40:54.01 8.03
2025-03-06T04:40:55.01 8.02
2025-03-06T04:40:56.01 8.03
2025-03-06T04:40:57.01 8.03
2025-03-06T04:40:58.01 8.03
2025-03-06T04:40:59.01 8.02
2025-03-06T04:41:00.01 8.00
2025-03-06T04:41:01.01 8.02
2025-03-06T04:41:02.01 8.03
2025-03-06T04:41:03.01 8.01
2025-03-06T04:41:04.01 8.00
2025-03-06T04:41:05.01 8.05
2025-03-06T04:41:06.01 8.03
2025-03-06T04:41:07.01 8.01
2025-03-06T04:41:08.01 8.03
2025-03-06T04:41:09.01 8.03
2025-03-06T04:41:10.01 8.01
2025-03-06T04:41:11.01 8.04
2025-03-06T04:41:12.01 8.02
2025-03-06T04:41:13.01 8.05
2025-03-06T04:41:14.01 8.02
2025-03-06T04:41:15.01 8.01
2025-03-06T04:41:16.01 8.01
2025-03-06T04:41:17.01 8.01
2025-03-06T04:41:18.01 8.03
2025-03-06T04:41:19.01 8.01
2025-03-06T04:41:20.01 8.01
2025-03-06T04:41:21.01 8.02
2025-03-06T04:41:22.01 7.99
2025-03-06T04:41:23.01 8.00
2025-03-06T04:41:24.01 8.02
2025-03-06T04:41:25.01 8.04
2025-03-06T04:41:26.01 8.01
2025-03-06T04:41:27.01 8.02
2025-03-06T04:41:28.01 8.02
2025-03-06T04:41:29.01 8.01
2025-03-06T04:41:30.01 8.02
2025-03-06T04:41:31.01 8.01
2025-03-06T04:41:32.01 8.02
2025-03-06T04:41:33.01 8.01
2025-03-06T04:41:34.01 8.01
2025-03-06T04:41:35.01 8.02
2025-03-06T04:41:36.01 8.02
2025-03-06T04:41:37.01 8.01
2025-03-06T04:41:38.01 8.03
2025-03-06T04:41:39.01 8.03
2025-03-06T04:41:40.01 8.02
2025-03-06T04:41:41.01 8.03
2025-03-06T04:41:42.01 8.03
2025-03-06T04:41:43.01 8.02
2025-03-06T04:41:44.01 8.01
2025-03-06T04:41:45.01 8.03
2025-03-06T04:41:46.01 8.01
2025-03-06T04:41:47.01 8.02
2025-03-06T04:41:48.01 8.03
2025-03-06T04:41:49.01 8.02
2025-03-06T04:41:50.01 8.01
2025-03-06T04:41:51.01 8.03
2025-03-06T04:41:52.01 8.03
2025-03-06T04:41:53.01 8.04
2025-03-06T04:41:54.01 8.00
2025-03-06T04:41:55.01 8.04
2025-03-06T04:41:56.01 8.04
2025-03-06T04:41:57.01 8.04
2025-03-06T04:41:58.01 8.03
2025-03-06T04:41:59.01 8.04
2025-03-06T04:42:00.01 8.02
2025-03-06T04:42:01.01 8.03
2025-03-06T04:42:02.01 8.04
2025-03-06T04:42:03.01 8.01
2025-03-06T04:42:04.01 8.01
2025-03-06T04:42:05.01 8.03
2025-03-06T04:42:06.01 8.03
2025-03-06T04:42:07.01 8.02
2025-03-06T04:42:08.01 8.01
2025-03-06T04:42:09.01 8.01
2025-03-06T04:42:10.01 8.03
2025-03-06T04:42:11.01 8.03
2025-03-06T04:42:12.01 8.03
2025-03-06T04:42:13.01 8.00
2025-03-06T04:42:14.01 8.03
2025-03-06T04:42:15.01 8.03
2025-03-06T04:42:16.02 8.03
2025-03-06T04:42:17.00 8.01
2025-03-06T04:42:18.00 8.02
2025-03-06T04:42:19.00 8.03
2025-03-06T04:42:20.00 8.01
2025-03-06T04:42:21.00 8.04
2025-03-06T04:42:22.01 8.05
2025-03-06T04:42:23.00 8.03
2025-03-06T04:42:24.00 8.02
2025-03-06T04:42:25.00 8.03
2025-03-06T04:42:26.00 8.03
2025-03-06T04:42:27.00 8.03
2025-03-06T04:42:28.00 8.03
2025-03-06T04:42:29.00 8.02
2025-03-06T04:42:30.00 8.03
2025-03-06T04:42:31.00 8.01
2025-03-06T04:42:32.00 8.02
2025-03-06T04:42:33.00 8.03
2025-03-06T04:42:34.00 8.01
2025-03-06T04:42:35.00 8.01
2025-03-06T04:42:36.00 8.01
2025-03-06T04:42:37.00 8.01
2025-03-06T04:42:38.00 8.05
2025-03-06T04:42:39.00 8.04
2025-03-06T04:42:40.00 8.01
2025-03-06T04:42:41.00 8.03
2025-03-06T04:42:42.00 8.05
2025-03-06T04:42:43.00 8.01
2025-03-06T04:42:44.00 8.01
2025-03-06T04:42:45.00 8.04
2025-03-06T04:42:46.00 8.02
2025-03-06T04:42:47.00 8.03
2025-03-06T04:42:48.00 8.02
2025-03-06T04:42:49.00 8.01
2025-03-06T04:42:50.00 8.03
2025-03-06T04:42:51.00 8.03
2025-03-06T04:42:52.00 8.01
2025-03-06T04:42:53.00 8.03
2025-03-06T04:42:54.00 8.03
2025-03-06T04:42:55.00 8.04
2025-03-06T04:42:56.00 8.03
2025-03-06T04:42:57.00 8.03
2025-03-06T04:42:58.00 8.01
2025-03-06T04:42:59.00 8.01
2025-03-06T04:43:00.00 8.01
2025-03-06T04:43:01.00 8.03
2025-03-06T04:43:02.00 8.03
2025-03-06T04:43:03.00 8.02
2025-03-06T04:43:04.00 8.04
2025-03-06T04:43:05.00 8.05
2025-03-06T04:43:06.00 8.04
2025-03-06T04:43:07.00 8.03
2025-03-06T04:43:08.00 8.03
2025-03-06T04:43:09.00 8.03
2025-03-06T04:43:10.00 8.01
2025-03-06T04:43:11.00 8.02
2025-03-06T04:43:12.00 8.01
2025-03-06T04:43:13.00 8.01
2025-03-06T04:43:14.00 8.03
2025-03-06T04:43:15.00 8.01
2025-03-06T04:43:16.00 8.02
2025-03-06T04:43:17.00 8.02
2025-03-06T04:43:18.00 8.01
2025-03-06T04:43:19.00 8.05
2025-03-06T04:43:20.00 8.03
2025-03-06T04:43:21.00 8.02
2025-03-06T04:43:22.00 8.03
2025-03-06T04:43:23.00 8.01
2025-03-06T04:43:24.00 8.02
2025-03-06T04:43:25.00 8.03
2025-03-06T04:43:26.01 8.03
2025-03-06T04:43:27.01 8.04
2025-03-06T04:43:28.01 8.02
2025-03-06T04:43:29.01 8.03
2025-03-06T04:43:30.01 8.02
2025-03-06T04:43:31.01 8.02
2025-03-06T04:43:32.01 8.02
2025-03-06T04:43:33.01 8.04
2025-03-06T04:43:34.01 8.03
2025-03-06T04:43:35.01 8.02
2025-03-06T04:43:36.01 8.03
2025-03-06T04:43:37.01 8.02
2025-03-06T04:43:38.01 8.03
2025-03-06T04:43:39.01 8.02
2025-03-06T04:43:40.01 8.02
2025-03-06T04:43:41.01 8.01
2025-03-06T04:43:42.01 8.01
2025-03-06T04:43:43.01 8.03
2025-03-06T04:43:44.01 8.01
2025-03-06T04:43:45.01 8.04
2025-03-06T04:43:46.01 8.02
2025-03-06T04:43:47.01 8.02
2025-03-06T04:43:48.01 8.02
2025-03-06T04:43:49.01 8.01
2025-03-06T04:43:50.01 8.01
2025-03-06T04:43:51.01 8.01
2025-03-06T04:43:52.01 8.01
2025-03-06T04:43:53.01 8.03
2025-03-06T04:43:54.01 8.02
2025-03-06T04:43:55.01 8.06
2025-03-06T04:43:56.01 8.02
2025-03-06T04:43:57.01 8.04
2025-03-06T04:43:58.01 8.03
2025-03-06T04:43:59.01 8.03
2025-03-06T04:44:00.01 8.01
2025-03-06T04:44:01.01 8.05
2025-03-06T04:44:02.01 8.01
2025-03-06T04:44:03.01 8.01
2025-03-06T04:44:04.01 8.01
2025-03-06T04:44:05.01 8.03
2025-03-06T04:44:06.01 8.05
2025-03-06T04:44:07.01 8.03
2025-03-06T04:44:08.01 8.00
2025-03-06T04:44:09.01 8.02
2025-03-06T04:44:10.01 8.01
2025-03-06T04:44:11.01 8.01
2025-03-06T04:44:12.01 8.03
2025-03-06T04:44:13.01 8.03
2025-03-06T04:44:14.01 8.02
2025-03-06T04:44:15.01 8.02
2025-03-06T04:44:16.01 8.01
2025-03-06T04:44:17.01 8.01
2025-03-06T04:44:18.01 8.04
2025-03-06T04:44:19.01 8.01
2025-03-06T04:44:20.01 8.01
2025-03-06T04:44:21.01 8.00
2025-03-06T04:44:22.04 8.04
2025-03-06T04:44:23.00 8.01
2025-03-06T04:44:24.00 8.03
2025-03-06T04:44:25.00 8.03
2025-03-06T04:44:26.00 8.01
2025-03-06T04:44:27.00 8.01
2025-03-06T04:44:28.00 8.04
2025-03-06T04:44:29.00 8.04
2025-03-06T04:44:30.00 8.02
2025-03-06T04:44:31.00 8.03
2025-03-06T04:44:32.00 8.04
2025-03-06T04:44:33.00 8.04
2025-03-06T04:44:34.00 8.02
2025-03-06T04:44:35.00 8.02
2025-03-06T04:44:36.00 8.02
2025-03-06T04:44:37.00 8.03
2025-03-06T04:44:38.00 8.02
2025-03-06T04:44:39.00 8.01
2025-03-06T04:44:40.00 8.04
2025-03-06T04:44:41.00 8.01
2025-03-06T04:44:42.00 8.01
2025-03-06T04:44:43.00 8.03
2025-03-06T04:44:44.00 8.02
2025-03-06T04:44:45.00 8.02
2025-03-06T04:44:46.00 8.01
2025-03-06T04:44:47.00 8.00
2025-03-06T04:44:48.00 8.01
2025-03-06T04:44:49.00 8.03
2025-03-06T04:44:50.00 8.01
2025-03-06T04:44:51.00 8.01
2025-03-06T04:44:52.00 8.02
2025-03-06T04:44:53.00 8.04
2025-03-06T04:44:54.00 8.01
2025-03-06T04:44:55.00 8.02
2025-03-06T04:44:56.00 8.01
2025-03-06T04:44:57.00 8.02
2025-03-06T04:44:58.00 8.03
2025-03-06T04:44:59.00 8.04
2025-03-06T04:45:00.00 8.01
2025-03-06T04:45:01.00 8.02
2025-03-06T04:45:02.00 8.02
2025-03-06T04:45:03.07 8.01
2025-03-06T04:45:04.00 8.03
2025-03-06T04:45:05.00 8.02
2025-03-06T04:45:06.00 8.03
2025-03-06T04:45:07.00 8.01
2025-03-06T04:45:08.00 8.02
2025-03-06T04:45:09.00 8.01
2025-03-06T04:45:10.00 8.03
2025-03-06T04:45:11.00 8.03
2025-03-06T04:45:12.00 8.03
2025-03-06T04:45:13.00 8.01
2025-03-06T04:45:14.00 8.02
2025-03-06T04:45:15.00 8.02
2025-03-06T04:45:16.00 8.02
2025-03-06T04:45:17.00 8.02
2025-03-06T04:45:18.00 8.01
2025-03-06T04:45:19.00 8.03
2025-03-06T04:45:20.00 8.03
2025-03-06T04:45:21.00 8.03
2025-03-06T04:45:22.00 8.02
2025-03-06T04:45:23.00 8.01
2025-03-06T04:45:24.00 8.01
2025-03-06T04:45:25.00 8.03
2025-03-06T04:45:26.00 8.00
2025-03-06T04:45:27.00 8.03
2025-03-06T04:45:28.00 8.02
2025-03-06T04:45:29.00 7.99
2025-03-06T04:45:30.00 8.01
2025-03-06T04:45:31.00 7.99
2025-03-06T04:45:32.00 8.03
2025-03-06T04:45:33.00 8.01
2025-03-06T04:45:34.00 8.01
2025-03-06T04:45:35.00 8.01
2025-03-06T04:45:36.00 8.01
2025-03-06T04:45:37.00 8.02
2025-03-06T04:45:38.00 8.03
2025-03-06T04:45:39.00 8.04
2025-03-06T04:45:40.00 8.03
2025-03-06T04:45:41.00 8.05
2025-03-06T04:45:42.00 8.02
2025-03-06T04:45:43.04 8.02
2025-03-06T04:45:43.99 8.01
2025-03-06T04:45:44.99 8.02
2025-03-06T04:45:45.99 8.01
2025-03-06T04:45:46.99 8.03
2025-03-06T04:45:47.99 8.01
2025-03-06T04:45:48.99 8.03
2025-03-06T04:45:49.99 8.01
2025-03-06T04:45:50.99 8.04
2025-03-06T04:45:51.99 8.01
2025-03-06T04:45:52.99 8.02
2025-03-06T04:45:53.99 8.01
2025-03-06T04:45:54.99 8.01
2025-03-06T04:45:55.99 8.03
2025-03-06T04:45:56.99 8.02
2025-03-06T04:45:57.99 8.05
2025-03-06T04:45:58.99 8.01
2025-03-06T04:45:59.99 8.01
2025-03-06T04:46:00.99 8.02
2025-03-06T04:46:01.99 8.04
2025-03-06T04:46:02.99 8.02
2025-03-06T04:46:03.99 8.03
2025-03-06T04:46:04.99 8.01
2025-03-06T04:46:05.99 8.03
2025-03-06T04:46:06.99 8.02
2025-03-06T04:46:08.00 8.01
2025-03-06T04:46:08.98 8.01
2025-03-06T04:46:09.98 8.05
2025-03-06T04:46:10.98 8.05
2025-03-06T04:46:11.98 8.01
2025-03-06T04:46:12.98 8.02
2025-03-06T04:46:13.98 8.00
2025-03-06T04:46:14.98 8.03
2025-03-06T04:46:15.98 8.03
2025-03-06T04:46:16.98 8.02
2025-03-06T04:46:17.98 8.02
2025-03-06T04:46:18.98 8.01
2025-03-06T04:46:19.98 8.01
2025-03-06T04:46:20.98 8.01
2025-03-06T04:46:21.98 8.01
2025-03-06T04:46:22.98 8.01
2025-03-06T04:46:23.98 8.02
2025-03-06T04:46:24.98 8.03
2025-03-06T04:46:25.98 8.01
2025-03-06T04:46:26.98 8.02
2025-03-06T04:46:27.98 7.99
2025-03-06T04:46:28.98 8.01
2025-03-06T04:46:29.98 8.02
2025-03-06T04:46:30.98 8.03
2025-03-06T04:46:31.98 8.01
2025-03-06T04:46:32.98 8.03
2025-03-06T04:46:33.98 8.01
2025-03-06T04:46:34.98 8.01
2025-03-06T04:46:35.98 8.03
2025-03-06T04:46:36.98 8.03
2025-03-06T04:46:37.98 8.03
2025-03-06T04:46:38.98 8.02
2025-03-06T04:46:39.98 8.01
2025-03-06T04:46:40.98 8.02
2025-03-06T04:46:41.98 8.03
2025-03-06T04:46:42.98 8.03
2025-03-06T04:46:43.98 8.02
2025-03-06T04:46:44.98 8.03
2025-03-06T04:46:45.98 8.02
2025-03-06T04:46:46.98 8.05
2025-03-06T04:46:47.98 8.03
2025-03-06T04:46:48.98 8.03
2025-03-06T04:46:49.98 8.05
2025-03-06T04:46:50.98 8.02
2025-03-06T04:46:51.98 8.03
2025-03-06T04:46:52.98 8.03
2025-03-06T04:46:53.98 8.02
2025-03-06T04:46:54.98 8.03
2025-03-06T04:46:55.98 8.03
2025-03-06T04:46:56.98 8.02
2025-03-06T04:46:57.98 8.03
2025-03-06T04:46:58.98 8.02
2025-03-06T04:46:59.98 8.03
2025-03-06T04:47:00.98 8.03
2025-03-06T04:47:01.98 8.03
2025-03-06T04:47:02.98 8.04
2025-03-06T04:47:03.98 8.02
2025-03-06T04:47:04.98 8.01
2025-03-06T04:47:05.98 8.03
2025-03-06T04:47:06.98 8.01
2025-03-06T04:47:07.98 8.02
2025-03-06T04:47:08.98 8.00
2025-03-06T04:47:09.98 8.01
2025-03-06T04:47:10.98 8.01
2025-03-06T04:47:11.98 8.03
2025-03-06T04:47:12.98 8.01
2025-03-06T04:47:13.98 8.04
2025-03-06T04:47:14.98 8.04
2025-03-06T04:47:15.98 8.01
2025-03-06T04:47:16.98 8.01
2025-03-06T04:47:17.98 8.01
2025-03-06T04:47:18.98 8.00
2025-03-06T04:47:19.98 8.03
2025-03-06T04:47:20.98 8.02
2025-03-06T04:47:21.98 8.00
2025-03-06T04:47:22.98 8.03
2025-03-06T04:47:23.98 8.03
2025-03-06T04:47:24.98 8.03
2025-03-06T04:47:25.98 8.03
2025-03-06T04:47:26.98 8.01
2025-03-06T04:47:27.98 8.03
2025-03-06T04:47:28.98 8.03
2025-03-06T04:47:29.98 8.06
2025-03-06T04:47:30.98 8.01
2025-03-06T04:47:31.98 8.03
2025-03-06T04:47:32.98 8.03
2025-03-06T04:47:33.98 8.03
2025-03-06T04:47:34.98 8.02
2025-03-06T04:47:35.98 8.02
2025-03-06T04:47:36.98 8.03
2025-03-06T04:47:37.98 8.02
2025-03-06T04:47:38.98 8.04
2025-03-06T04:47:39.98 8.05
2025-03-06T04:47:40.98 8.01
2025-03-06T04:47:41.98 8.03
2025-03-06T04:47:42.98 8.03
2025-03-06T04:47:43.98 8.05
2025-03-06T04:47:44.98 8.01
2025-03-06T04:47:45.98 8.01
2025-03-06T04:47:46.98 8.05
2025-03-06T04:47:47.98 8.03
2025-03-06T04:47:48.98 8.01
2025-03-06T04:47:49.98 8.04
2025-03-06T04:47:50.98 8.03
2025-03-06T04:47:51.98 8.01
2025-03-06T04:47:52.98 8.03
2025-03-06T04:47:53.98 8.03
2025-03-06T04:47:54.98 8.04
2025-03-06T04:47:55.98 8.01
2025-03-06T04:47:56.98 8.02
2025-03-06T04:47:57.98 8.03
2025-03-06T04:47:58.98 8.04
2025-03-06T04:47:59.98 8.03
2025-03-06T04:48:00.98 8.01
2025-03-06T04:48:01.98 8.05
2025-03-06T04:48:02.98 8.01
2025-03-06T04:48:03.98 8.01
2025-03-06T04:48:04.98 8.03
2025-03-06T04:48:05.98 8.02
2025-03-06T04:48:06.98 8.03
2025-03-06T04:48:07.98 8.01
2025-03-06T04:48:08.98 8.02
2025-03-06T04:48:09.98 8.01
2025-03-06T04:48:10.98 8.01
2025-03-06T04:48:11.98 8.02
2025-03-06T04:48:12.98 8.02
2025-03-06T04:48:13.98 8.02
2025-03-06T04:48:14.98 8.04
2025-03-06T04:48:15.98 8.05
2025-03-06T04:48:16.98 8.01
2025-03-06T04:48:17.98 8.02
2025-03-06T04:48:18.98 8.04
2025-03-06T04:48:19.98 8.00
2025-03-06T04:48:20.98 8.03
2025-03-06T04:48:21.98 8.02
2025-03-06T04:48:22.98 8.03
2025-03-06T04:48:23.98 8.01
2025-03-06T04:48:24.98 8.03
2025-03-06T04:48:25.98 8.02
2025-03-06T04:48:26.98 8.04
2025-03-06T04:48:27.98 8.01
2025-03-06T04:48:28.98 8.03
2025-03-06T04:48:29.98 8.05
2025-03-06T04:48:30.98 8.03
2025-03-06T04:48:31.98 8.04
2025-03-06T04:48:32.98 8.03
2025-03-06T04:48:33.98 8.01
2025-03-06T04:48:34.98 8.03
2025-03-06T04:48:35.98 8.03
2025-03-06T04:48:36.98 8.03
2025-03-06T04:48:37.98 8.03
2025-03-06T04:48:38.98 8.03
2025-03-06T04:48:39.98 8.02
2025-03-06T04:48:40.99 8.03
2025-03-06T04:48:41.98 8.03
2025-03-06T04:48:42.98 8.02
2025-03-06T04:48:43.99 8.02
2025-03-06T04:48:44.99 8.01
2025-03-06T04:48:45.99 8.02
2025-03-06T04:48:46.99 8.01
2025-03-06T04:48:47.99 8.03
2025-03-06T04:48:48.99 8.01
2025-03-06T04:48:49.99 8.01
2025-03-06T04:48:50.99 8.00
2025-03-06T04:48:51.99 8.02
2025-03-06T04:48:52.99 8.03
2025-03-06T04:48:53.99 8.01
2025-03-06T04:48:54.99 8.01
2025-03-06T04:48:55.99 8.02
2025-03-06T04:48:56.99 8.03
2025-03-06T04:48:57.99 8.03
2025-03-06T04:48:58.99 8.05
2025-03-06T04:48:59.99 8.02
2025-03-06T04:49:00.99 8.03
2025-03-06T04:49:01.99 8.03
2025-03-06T04:49:02.99 8.02
2025-03-06T04:49:03.99 8.03
2025-03-06T04:49:04.99 8.00
2025-03-06T04:49:05.99 8.02
2025-03-06T04:49:06.99 8.03
2025-03-06T04:49:07.99 8.02
2025-03-06T04:49:08.99 8.03
2025-03-06T04:49:09.99 8.01
2025-03-06T04:49:10.99 8.04
2025-03-06T04:49:11.99 7.99
2025-03-06T04:49:12.99 8.03
2025-03-06T04:49:13.99 8.02
2025-03-06T04:49:14.99 8.01
2025-03-06T04:49:15.99 8.02
2025-03-06T04:49:16.99 8.01
2025-03-06T04:49:17.99 8.03
2025-03-06T04:49:18.99 8.03
2025-03-06T04:49:19.99 8.01
2025-03-06T04:49:20.99 8.01
2025-03-06T04:49:21.99 8.03
2025-03-06T04:49:22.99 8.04
2025-03-06T04:49:23.99 8.01
2025-03-06T04:49:24.99 8.03
2025-03-06T04:49:25.99 8.00
2025-03-06T04:49:26.99 8.00
2025-03-06T04:49:27.99 8.04
2025-03-06T04:49:28.99 8.04
2025-03-06T04:49:29.99 8.01
2025-03-06T04:49:30.99 8.02
2025-03-06T04:49:31.99 8.03
2025-03-06T04:49:32.99 8.03
2025-03-06T04:49:33.99 8.03
2025-03-06T04:49:34.99 8.03
2025-03-06T04:49:35.99 8.02
2025-03-06T04:49:36.99 8.04
2025-03-06T04:49:37.99 8.01
2025-03-06T04:49:38.99 8.05
2025-03-06T04:49:39.99 8.03
2025-03-06T04:49:40.99 8.03
2025-03-06T04:49:41.99 8.02
2025-03-06T04:49:42.99 8.01
2025-03-06T04:49:43.99 8.03
2025-03-06T04:49:44.99 8.02
2025-03-06T04:49:45.99 8.02
2025-03-06T04:49:46.99 8.03
2025-03-06T04:49:47.99 8.02
2025-03-06T04:49:48.99 8.01
2025-03-06T04:49:49.99 8.02
2025-03-06T04:49:50.99 8.01
2025-03-06T04:49:51.99 8.01
2025-03-06T04:49:52.99 8.03
2025-03-06T04:49:53.99 8.01
2025-03-06T04:49:54.99 8.03
2025-03-06T04:49:55.99 8.03
2025-03-06T04:49:56.99 8.05
2025-03-06T04:49:57.99 8.03
2025-03-06T04:49:58.99 8.00
2025-03-06T04:50:00.00 8.03
2025-03-06T04:50:01.00 8.02
2025-03-06T04:50:02.00 8.04
2025-03-06T04:50:03.00 8.01
2025-03-06T04:50:04.00 8.01
2025-03-06T04:50:05.00 8.00
2025-03-06T04:50:06.00 8.03
2025-03-06T04:50:07.00 8.03
2025-03-06T04:50:08.00 8.02
2025-03-06T04:50:09.00 8.03
2025-03-06T04:50:10.00 8.03
2025-03-06T04:50:11.00 8.05
2025-03-06T04:50:12.00 8.03
2025-03-06T04:50:13.00 8.02
2025-03-06T04:50:14.00 8.03
2025-03-06T04:50:15.00 8.03
2025-03-06T04:50:16.00 8.02
2025-03-06T04:50:17.00 8.00
2025-03-06T04:50:18.00 8.02
2025-03-06T04:50:19.00 8.02
2025-03-06T04:50:20.00 8.01
2025-03-06T04:50:21.00 8.03
2025-03-06T04:50:22.00 8.03
2025-03-06T04:50:23.00 8.03
2025-03-06T04:50:24.00 8.03
2025-03-06T04:50:25.00 8.02
2025-03-06T04:50:26.00 8.02
2025-03-06T04:50:27.00 8.02
2025-03-06T04:50:28.00 8.02
2025-03-06T04:50:29.00 8.03
2025-03-06T04:50:30.00 8.03
2025-03-06T04:50:31.00 8.01
2025-03-06T04:50:32.00 8.03
2025-03-06T04:50:33.06 8.03
2025-03-06T04:50:33.99 8.04
2025-03-06T04:50:34.99 8.02
2025-03-06T04:50:35.99 8.01
2025-03-06T04:50:36.99 8.03
2025-03-06T04:50:37.99 8.01
2025-03-06T04:50:38.99 8.02
2025-03-06T04:50:39.99 8.03
2025-03-06T04:50:40.99 8.04
2025-03-06T04:50:41.99 8.02
2025-03-06T04:50:42.99 8.03
2025-03-06T04:50:43.99 8.01
2025-03-06T04:50:44.99 8.02
2025-03-06T04:50:45.99 8.01
2025-03-06T04:50:46.99 8.03
2025-03-06T04:50:47.99 8.03
2025-03-06T04:50:48.99 8.02
2025-03-06T04:50:49.99 8.03
2025-03-06T04:50:50.99 8.02
2025-03-06T04:50:51.99 8.03
2025-03-06T04:50:52.99 8.04
2025-03-06T04:50:53.99 8.03
2025-03-06T04:50:54.99 8.05
2025-03-06T04:50:55.99 8.04
2025-03-06T04:50:56.99 8.00
2025-03-06T04:50:57.99 8.03
2025-03-06T04:50:58.99 8.01
2025-03-06T04:50:59.99 8.01
2025-03-06T04:51:00.99 8.01
2025-03-06T04:51:01.99 8.01
2025-03-06T04:51:02.99 8.04
2025-03-06T04:51:03.99 8.02
2025-03-06T04:51:04.99 8.01
2025-03-06T04:51:05.99 8.01
2025-03-06T04:51:06.99 8.01
2025-03-06T04:51:07.99 8.01
2025-03-06T04:51:08.99 8.01
2025-03-06T04:51:09.99 8.03
2025-03-06T04:51:10.99 8.02
2025-03-06T04:51:11.99 8.00
2025-03-06T04:51:13.07 8.02
2025-03-06T04:51:13.98 8.03
2025-03-06T04:51:14.98 8.02
2025-03-06T04:51:15.98 8.03
2025-03-06T04:51:16.98 8.03
2025-03-06T04:51:17.98 8.02
2025-03-06T04:51:18.98 8.03
2025-03-06T04:51:19.98 8.03
2025-03-06T04:51:20.98 8.03
2025-03-06T04:51:21.98 8.03
2025-03-06T04:51:22.98 8.03
2025-03-06T04:51:23.98 8.02
2025-03-06T04:51:24.98 8.03
2025-03-06T04:51:25.98 8.03
2025-03-06T04:51:26.98 8.01
2025-03-06T04:51:27.98 8.04
2025-03-06T04:51:28.98 8.02
2025-03-06T04:51:29.98 8.02
2025-03-06T04:51:30.98 8.03
2025-03-06T04:51:31.98 8.01
2025-03-06T04:51:32.98 8.01
2025-03-06T04:51:33.98 8.03
2025-03-06T04:51:34.98 8.01
2025-03-06T04:51:35.98 8.03
2025-03-06T04:51:36.98 8.01
2025-03-06T04:51:37.98 8.03
2025-03-06T04:51:38.98 8.03
2025-03-06T04:51:39.98 8.03
2025-03-06T04:51:40.98 8.02
2025-03-06T04:51:41.98 8.00
2025-03-06T04:51:42.98 8.03
2025-03-06T04:51:43.98 8.03
2025-03-06T04:51:44.98 8.02
2025-03-06T04:51:45.98 8.01
2025-03-06T04:51:46.98 8.03
2025-03-06T04:51:47.98 8.03
2025-03-06T04:51:48.98 8.01
2025-03-06T04:51:49.98 8.03
2025-03-06T04:51:50.98 8.05
2025-03-06T04:51:51.98 8.03
2025-03-06T04:51:52.98 8.03
2025-03-06T04:51:53.98 8.03
2025-03-06T04:51:54.98 8.02
2025-03-06T04:51:55.98 8.03
2025-03-06T04:51:56.98 8.02
2025-03-06T04:51:57.98 8.03
2025-03-06T04:51:58.98 8.03
2025-03-06T04:51:59.98 8.03
2025-03-06T04:52:00.98 8.02
2025-03-06T04:52:01.98 8.02
2025-03-06T04:52:02.98 8.03
2025-03-06T04:52:03.98 8.03
2025-03-06T04:52:04.98 8.04
2025-03-06T04:52:05.98 8.05
2025-03-06T04:52:06.98 8.03
2025-03-06T04:52:07.98 8.01
2025-03-06T04:52:08.98 8.03
2025-03-06T04:52:09.98 8.04
2025-03-06T04:52:10.98 8.04
2025-03-06T04:52:11.98 8.03
2025-03-06T04:52:12.98 8.05
2025-03-06T04:52:13.98 8.05
2025-03-06T04:52:14.98 8.03
2025-03-06T04:52:15.98 8.03
2025-03-06T04:52:16.98 8.04
2025-03-06T04:52:17.98 8.03
2025-03-06T04:52:18.98 8.03
2025-03-06T04:52:19.98 8.03
2025-03-06T04:52:20.98 8.05
2025-03-06T04:52:21.98 8.03
2025-03-06T04:52:22.98 8.01
2025-03-06T04:52:23.98 8.05
2025-03-06T04:52:24.98 8.02
2025-03-06T04:52:25.98 8.04
2025-03-06T04:52:26.98 8.01
2025-03-06T04:52:27.98 8.03
2025-03-06T04:52:28.98 8.02
2025-03-06T04:52:29.98 8.01
2025-03-06T04:52:30.98 8.01
2025-03-06T04:52:31.98 8.03
2025-03-06T04:52:32.98 8.02
2025-03-06T04:52:33.98 8.01
2025-03-06T04:52:34.98 8.03
2025-03-06T04:52:35.98 8.03
2025-03-06T04:52:36.98 8.04
2025-03-06T04:52:37.98 8.03
2025-03-06T04:52:38.98 8.02
2025-03-06T04:52:39.98 8.03
2025-03-06T04:52:40.98 8.05
2025-03-06T04:52:41.98 8.04
2025-03-06T04:52:42.98 8.05
2025-03-06T04:52:43.98 8.02
2025-03-06T04:52:44.98 8.03
2025-03-06T04:52:45.98 8.03
2025-03-06T04:52:46.98 8.01
2025-03-06T04:52:47.98 8.04
2025-03-06T04:52:48.98 8.05
2025-03-06T04:52:49.98 8.03
2025-03-06T04:52:50.98 8.04
2025-03-06T04:52:51.98 8.01
2025-03-06T04:52:52.98 8.03
2025-03-06T04:52:53.98 8.04
2025-03-06T04:52:54.98 8.03
2025-03-06T04:52:55.98 8.02
2025-03-06T04:52:56.98 8.04
2025-03-06T04:52:57.98 8.03
2025-03-06T04:52:58.98 8.02
2025-03-06T04:52:59.98 8.03
2025-03-06T04:53:00.98 8.03
2025-03-06T04:53:01.98 8.03
2025-03-06T04:53:02.98 8.03
2025-03-06T04:53:03.98 8.03
2025-03-06T04:53:04.98 8.03
2025-03-06T04:53:05.98 8.02
2025-03-06T04:53:06.98 8.03
2025-03-06T04:53:07.98 8.01
2025-03-06T04:53:08.98 8.01
2025-03-06T04:53:09.98 8.01
2025-03-06T04:53:10.98 8.04
2025-03-06T04:53:11.98 8.02
2025-03-06T04:53:13.03 8.03
2025-03-06T04:53:13.97 8.02
2025-03-06T04:53:14.97 8.02
2025-03-06T04:53:15.97 8.04
2025-03-06T04:53:16.97 8.01
2025-03-06T04:53:17.97 8.01
2025-03-06T04:53:18.97 8.04
2025-03-06T04:53:19.97 8.03
2025-03-06T04:53:20.97 8.03
2025-03-06T04:53:21.97 8.04
2025-03-06T04:53:22.97 8.03
2025-03-06T04:53:23.97 8.03
2025-03-06T04:53:24.97 8.03
2025-03-06T04:53:25.97 8.04
2025-03-06T04:53:26.97 8.04
2025-03-06T04:53:27.97 8.03
2025-03-06T04:53:28.97 8.01
2025-03-06T04:53:29.97 8.03
2025-03-06T04:53:30.97 8.01
2025-03-06T04:53:31.97 8.01
2025-03-06T04:53:32.97 8.03
2025-03-06T04:53:33.97 8.04
2025-03-06T04:53:34.97 8.00
2025-03-06T04:53:35.97 8.03
2025-03-06T04:53:36.97 8.03
2025-03-06T04:53:37.97 8.03
2025-03-06T04:53:38.97 8.02
2025-03-06T04:53:39.97 8.01
2025-03-06T04:53:40.97 8.03
2025-03-06T04:53:41.97 8.01
2025-03-06T04:53:42.97 8.03
2025-03-06T04:53:43.97 8.03
2025-03-06T04:53:44.97 8.03
2025-03-06T04:53:45.97 8.03
2025-03-06T04:53:46.97 8.02
2025-03-06T04:53:47.97 8.04
2025-03-06T04:53:48.97 8.02
2025-03-06T04:53:49.97 8.02
2025-03-06T04:53:50.97 8.01
2025-03-06T04:53:51.99 8.04
2025-03-06T04:53:52.96 8.03
2025-03-06T04:53:53.96 8.02
2025-03-06T04:53:54.96 8.02
2025-03-06T04:53:55.96 8.02
2025-03-06T04:53:56.96 8.03
2025-03-06T04:53:57.96 8.04
2025-03-06T04:53:58.96 8.01
2025-03-06T04:53:59.96 8.02
2025-03-06T04:54:00.96 8.02
2025-03-06T04:54:01.97 8.01
2025-03-06T04:54:02.97 8.03
2025-03-06T04:54:03.97 8.03
2025-03-06T04:54:04.97 8.01
2025-03-06T04:54:05.97 8.03
2025-03-06T04:54:06.97 8.00
2025-03-06T04:54:07.97 8.02
2025-03-06T04:54:08.97 8.02
2025-03-06T04:54:09.97 8.00
2025-03-06T04:54:10.97 8.01
2025-03-06T04:54:11.97 8.02
2025-03-06T04:54:12.97 8.02
2025-03-06T04:54:13.97 8.01
2025-03-06T04:54:14.97 8.03
2025-03-06T04:54:15.97 8.02
2025-03-06T04:54:16.97 8.00
2025-03-06T04:54:17.97 8.02
2025-03-06T04:54:18.97 8.02
2025-03-06T04:54:19.97 8.03
2025-03-06T04:54:20.97 8.04
2025-03-06T04:54:21.97 8.01
2025-03-06T04:54:22.97 8.01
2025-03-06T04:54:23.97 8.01
2025-03-06T04:54:24.97 8.00
2025-03-06T04:54:25.97 8.01
2025-03-06T04:54:26.97 8.03
2025-03-06T04:54:27.97 8.01
2025-03-06T04:54:28.97 8.03
2025-03-06T04:54:29.97 8.02
2025-03-06T04:54:30.97 8.03
2025-03-06T04:54:31.97 8.01
2025-03-06T04:54:32.97 8.03
2025-03-06T04:54:33.97 8.02
2025-03-06T04:54:34.97 8.05
2025-03-06T04:54:35.97 8.03
2025-03-06T04:54:36.97 8.03
2025-03-06T04:54:37.97 8.03
2025-03-06T04:54:38.97 8.03
2025-03-06T04:54:39.97 8.01
2025-03-06T04:54:40.97 8.02
2025-03-06T04:54:42.00 8.03
2025-03-06T04:54:42.96 8.06
2025-03-06T04:54:43.96 8.03
2025-03-06T04:54:44.96 8.01
2025-03-06T04:54:45.96 8.02
2025-03-06T04:54:46.96 8.02
2025-03-06T04:54:47.96 8.03
2025-03-06T04:54:48.96 8.03
2025-03-06T04:54:49.96 8.03
2025-03-06T04:54:50.96 8.01
2025-03-06T04:54:51.96 8.01
2025-03-06T04:54:52.96 8.03
2025-03-06T04:54:53.96 8.02
2025-03-06T04:54:54.96 8.01
2025-03-06T04:54:55.96 8.02
2025-03-06T04:54:56.96 8.00
2025-03-06T04:54:57.96 8.01
2025-03-06T04:54:58.96 8.03
2025-03-06T04:54:59.96 8.03
2025-03-06T04:55:00.96 8.03
2025-03-06T04:55:01.96 8.02
2025-03-06T04:55:02.96 8.01
2025-03-06T04:55:03.96 8.01
2025-03-06T04:55:04.96 8.01
2025-03-06T04:55:05.96 8.04
2025-03-06T04:55:06.96 8.04
2025-03-06T04:55:07.96 8.03
2025-03-06T04:55:08.96 8.03
2025-03-06T04:55:09.96 8.03
2025-03-06T04:55:10.96 8.02
2025-03-06T04:55:11.96 8.04
2025-03-06T04:55:12.96 8.03
2025-03-06T04:55:13.96 8.03
2025-03-06T04:55:14.96 8.01
2025-03-06T04:55:15.96 8.03
2025-03-06T04:55:16.96 8.03
2025-03-06T04:55:17.96 8.03
2025-03-06T04:55:18.96 8.02
2025-03-06T04:55:19.96 8.01
2025-03-06T04:55:20.96 8.03
2025-03-06T04:55:22.00 8.01
2025-03-06T04:55:22.95 8.03
2025-03-06T04:55:23.95 8.03
2025-03-06T04:55:24.95 8.05
2025-03-06T04:55:25.95 8.01
2025-03-06T04:55:26.95 8.04
2025-03-06T04:55:27.95 8.02
2025-03-06T04:55:28.95 8.05
2025-03-06T04:55:29.95 8.02
2025-03-06T04:55:30.95 8.01
2025-03-06T04:55:31.95 8.03
2025-03-06T04:55:32.95 8.03
2025-03-06T04:55:33.95 8.03
2025-03-06T04:55:34.95 8.03
2025-03-06T04:55:35.95 8.06
2025-03-06T04:55:36.95 8.03
2025-03-06T04:55:37.95 8.03
2025-03-06T04:55:38.95 8.02
2025-03-06T04:55:39.95 8.03
2025-03-06T04:55:40.95 8.01
2025-03-06T04:55:41.95 8.03
2025-03-06T04:55:42.95 8.03
2025-03-06T04:55:43.95 8.02
2025-03-06T04:55:44.95 8.02
2025-03-06T04:55:45.95 8.03
2025-03-06T04:55:46.95 8.03
2025-03-06T04:55:47.95 8.01
2025-03-06T04:55:48.95 8.03
2025-03-06T04:55:49.95 8.02
2025-03-06T04:55:50.95 8.02
2025-03-06T04:55:51.95 8.03
2025-03-06T04:55:52.95 8.02
2025-03-06T04:55:53.95 8.02
2025-03-06T04:55:54.95 8.01
2025-03-06T04:55:55.95 8.01
2025-03-06T04:55:56.95 8.04
2025-03-06T04:55:57.95 8.03
2025-03-06T04:55:58.96 8.03
2025-03-06T04:55:59.94 8.03
2025-03-06T04:56:00.94 8.03
2025-03-06T04:56:01.94 8.01
2025-03-06T04:56:02.94 8.02
2025-03-06T04:56:03.94 8.01
2025-03-06T04:56:04.94 8.03
2025-03-06T04:56:05.94 8.03
2025-03-06T04:56:06.94 8.01
2025-03-06T04:56:07.94 8.02
2025-03-06T04:56:08.94 8.03
2025-03-06T04:56:09.94 8.03
2025-03-06T04:56:10.94 8.02
2025-03-06T04:56:11.94 8.03
2025-03-06T04:56:12.94 8.04
2025-03-06T04:56:13.94 8.03
2025-03-06T04:56:14.94 8.03
2025-03-06T04:56:15.94 8.03
2025-03-06T04:56:16.94 8.02
2025-03-06T04:56:17.94 8.03
2025-03-06T04:56:18.94 8.02
2025-03-06T04:56:19.94 8.02
2025-03-06T04:56:20.94 8.02
2025-03-06T04:56:21.94 8.01
2025-03-06T04:56:22.94 8.04
2025-03-06T04:56:23.94 8.03
2025-03-06T04:56:24.94 8.03
2025-03-06T04:56:25.94 8.01
2025-03-06T04:56:26.94 8.04
2025-03-06T04:56:27.94 8.03
2025-03-06T04:56:28.94 8.03
2025-03-06T04:56:29.94 8.02
2025-03-06T04:56:30.94 8.02
2025-03-06T04:56:31.94 8.03
2025-03-06T04:56:32.94 8.03
2025-03-06T04:56:33.94 8.02
2025-03-06T04:56:34.94 8.01
2025-03-06T04:56:35.94 8.03
2025-03-06T04:56:36.94 8.03
2025-03-06T04:56:37.94 8.01
2025-03-06T04:56:38.94 8.03
2025-03-06T04:56:39.94 8.03
2025-03-06T04:56:40.94 8.04
2025-03-06T04:56:41.94 8.03
2025-03-06T04:56:42.94 8.03
2025-03-06T04:56:43.94 8.06
2025-03-06T04:56:44.94 8.03
2025-03-06T04:56:45.94 8.01
2025-03-06T04:56:46.94 8.02
2025-03-06T04:56:47.94 8.01
2025-03-06T04:56:48.94 8.03
2025-03-06T04:56:49.94 8.04
2025-03-06T04:56:50.94 8.03
2025-03-06T04:56:51.94 8.03
2025-03-06T04:56:52.94 8.03
2025-03-06T04:56:53.94 8.03
2025-03-06T04:56:54.94 8.03
2025-03-06T04:56:55.94 8.02
2025-03-06T04:56:56.94 8.03
2025-03-06T04:56:57.94 8.03
2025-03-06T04:56:58.94 8.02
2025-03-06T04:56:59.94 8.02
2025-03-06T04:57:00.94 8.03
2025-03-06T04:57:01.94 8.00
2025-03-06T04:57:02.94 8.02
2025-03-06T04:57:03.94 8.01
2025-03-06T04:57:04.94 8.04
2025-03-06T04:57:05.94 8.05
2025-03-06T04:57:06.94 8.02
2025-03-06T04:57:07.94 8.01
2025-03-06T04:57:08.94 8.03
2025-03-06T04:57:09.94 8.01
2025-03-06T04:57:10.94 8.02
2025-03-06T04:57:11.94 8.05
2025-03-06T04:57:12.94 8.02
2025-03-06T04:57:13.94 8.03
2025-03-06T04:57:14.94 8.02
2025-03-06T04:57:15.94 8.03
2025-03-06T04:57:16.94 8.02
2025-03-06T04:57:17.94 8.03
2025-03-06T04:57:18.94 8.05
2025-03-06T04:57:19.94 8.02
2025-03-06T04:57:20.94 8.05
2025-03-06T04:57:21.94 8.05
2025-03-06T04:57:22.94 8.01
2025-03-06T04:57:23.94 8.01
2025-03-06T04:57:24.94 8.03
2025-03-06T04:57:25.94 8.02
2025-03-06T04:57:26.94 8.01
2025-03-06T04:57:27.94 8.03
2025-03-06T04:57:28.94 8.02
2025-03-06T04:57:29.94 8.03
2025-03-06T04:57:30.94 8.05
2025-03-06T04:57:31.94 8.05
2025-03-06T04:57:32.94 8.02
2025-03-06T04:57:33.94 8.05
2025-03-06T04:57:34.94 8.03
2025-03-06T04:57:35.94 8.03
2025-03-06T04:57:36.94 8.01
2025-03-06T04:57:37.94 8.03
2025-03-06T04:57:38.94 8.03
2025-03-06T04:57:39.94 8.03
2025-03-06T04:57:40.94 8.03
2025-03-06T04:57:41.94 8.02
2025-03-06T04:57:42.94 8.03
2025-03-06T04:57:43.95 8.03
2025-03-06T04:57:44.93 8.04
2025-03-06T04:57:45.93 8.03
2025-03-06T04:57:46.93 8.05
2025-03-06T04:57:47.93 8.03
2025-03-06T04:57:48.93 8.04
2025-03-06T04:57:49.93 8.02
2025-03-06T04:57:50.93 8.01
2025-03-06T04:57:51.93 8.03
2025-03-06T04:57:52.93 8.03
2025-03-06T04:57:53.93 8.03
2025-03-06T04:57:54.93 8.05
2025-03-06T04:57:55.93 8.01
2025-03-06T04:57:56.93 8.02
2025-03-06T04:57:57.93 8.03
2025-03-06T04:57:58.93 8.01
2025-03-06T04:57:59.93 8.01
2025-03-06T04:58:00.93 8.04
2025-03-06T04:58:01.93 8.03
2025-03-06T04:58:02.93 8.03
2025-03-06T04:58:03.93 8.01
2025-03-06T04:58:04.93 8.00
2025-03-06T04:58:05.93 8.03
2025-03-06T04:58:06.93 8.03
2025-03-06T04:58:07.93 8.03
2025-03-06T04:58:08.93 8.02
2025-03-06T04:58:09.93 8.02
2025-03-06T04:58:10.93 8.01
2025-03-06T04:58:11.93 8.03
2025-03-06T04:58:12.93 8.03
2025-03-06T04:58:13.93 8.03
2025-03-06T04:58:14.93 8.03
2025-03-06T04:58:15.93 8.03
2025-03-06T04:58:16.93 8.03
2025-03-06T04:58:17.93 8.04
2025-03-06T04:58:18.93 8.02
2025-03-06T04:58:19.93 8.05
2025-03-06T04:58:20.93 8.03
2025-03-06T04:58:21.93 8.03
2025-03-06T04:58:22.93 8.03
2025-03-06T04:58:23.93 8.02
2025-03-06T04:58:24.93 8.03
2025-03-06T04:58:25.93 8.03
2025-03-06T04:58:26.93 8.04
2025-03-06T04:58:27.93 8.03
2025-03-06T04:58:28.93 8.02
2025-03-06T04:58:29.93 8.02
2025-03-06T04:58:30.93 8.04
2025-03-06T04:58:31.93 8.00
2025-03-06T04:58:32.93 8.02
2025-03-06T04:58:33.93 8.00
2025-03-06T04:58:34.93 8.03
2025-03-06T04:58:35.93 8.01
2025-03-06T04:58:36.93 8.02
2025-03-06T04:58:37.93 8.02
2025-03-06T04:58:38.93 8.02
2025-03-06T04:58:39.93 8.03
2025-03-06T04:58:40.93 8.03
2025-03-06T04:58:41.93 8.01
2025-03-06T04:58:42.93 8.03
2025-03-06T04:58:43.93 8.02
2025-03-06T04:58:44.93 8.05
2025-03-06T04:58:45.93 8.07
2025-03-06T04:58:46.93 8.02
2025-03-06T04:58:47.93 8.02
2025-03-06T04:58:48.93 8.01
2025-03-06T04:58:49.93 8.04
2025-03-06T04:58:50.93 8.03
2025-03-06T04:58:51.93 8.05
2025-03-06T04:58:52.93 8.03
2025-03-06T04:58:53.93 8.03
2025-03-06T04:58:54.93 8.02
2025-03-06T04:58:55.93 8.02
2025-03-06T04:58:56.93 8.01
2025-03-06T04:58:57.93 8.02
2025-03-06T04:58:58.93 8.03
2025-03-06T04:58:59.93 8.03
2025-03-06T04:59:00.93 8.01
2025-03-06T04:59:01.93 8.02
2025-03-06T04:59:02.93 8.03
2025-03-06T04:59:03.93 8.03
2025-03-06T04:59:04.93 8.05
2025-03-06T04:59:05.93 8.02
2025-03-06T04:59:06.93 8.03
2025-03-06T04:59:07.93 8.04
2025-03-06T04:59:08.93 8.05
2025-03-06T04:59:09.93 8.03
2025-03-06T04:59:10.93 8.03
2025-03-06T04:59:11.93 8.03
2025-03-06T04:59:12.93 8.02
2025-03-06T04:59:13.93 8.03
2025-03-06T04:59:14.93 8.04
2025-03-06T04:59:15.93 8.03
2025-03-06T04:59:16.93 8.01
2025-03-06T04:59:17.93 8.03
2025-03-06T04:59:18.93 8.02
2025-03-06T04:59:19.94 8.03
2025-03-06T04:59:20.94 8.01
2025-03-06T04:59:21.94 8.04
2025-03-06T04:59:22.94 8.03
2025-03-06T04:59:23.94 8.01
2025-03-06T04:59:24.94 8.03
2025-03-06T04:59:25.94 8.04
2025-03-06T04:59:26.94 8.02
2025-03-06T04:59:27.94 8.02
2025-03-06T04:59:28.94 8.04
2025-03-06T04:59:29.94 8.02
2025-03-06T04:59:30.94 8.03
2025-03-06T04:59:31.94 8.01
2025-03-06T04:59:32.94 8.01
2025-03-06T04:59:33.94 8.02
2025-03-06T04:59:34.94 8.03
2025-03-06T04:59:35.94 8.03
2025-03-06T04:59:36.94 8.03
2025-03-06T04:59:37.94 8.02
2025-03-06T04:59:38.94 8.04
2025-03-06T04:59:39.94 8.05
2025-03-06T04:59:40.94 8.03
2025-03-06T04:59:41.94 8.03
2025-03-06T04:59:42.94 8.03
2025-03-06T04:59:43.94 8.03
2025-03-06T04:59:44.94 8.03
2025-03-06T04:59:45.94 8.03
2025-03-06T04:59:46.94 8.03
2025-03-06T04:59:47.94 8.03
2025-03-06T04:59:48.94 8.03
2025-03-06T04:59:49.94 8.01
2025-03-06T04:59:50.94 8.02
2025-03-06T04:59:51.94 8.02
2025-03-06T04:59:52.94 8.03
2025-03-06T04:59:53.94 8.05
2025-03-06T04:59:54.94 8.03
2025-03-06T04:59:55.94 8.03
2025-03-06T04:59:56.94 8.01
2025-03-06T04:59:57.94 8.01
2025-03-06T04:59:58.94 8.02
2025-03-06T04:59:59.94 8.04
