# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-12T10:00:00.23 8.19
2025-03-12T10:00:01.23 8.16
2025-03-12T10:00:02.24 8.16
2025-03-12T10:00:03.22 8.18
2025-03-12T10:00:04.22 8.18
2025-03-12T10:00:05.22 8.18
2025-03-12T10:00:06.22 8.17
2025-03-12T10:00:07.22 8.19
2025-03-12T10:00:08.22 8.17
2025-03-12T10:00:09.22 8.18
2025-03-12T10:00:10.22 8.20
2025-03-12T10:00:11.22 8.16
2025-03-12T10:00:12.22 8.17
2025-03-12T10:00:13.22 8.17
2025-03-12T10:00:14.22 8.19
2025-03-12T10:00:15.22 8.17
2025-03-12T10:00:16.22 8.17
2025-03-12T10:00:17.22 8.17
2025-03-12T10:00:18.22 8.18
2025-03-12T10:00:19.22 8.17
2025-03-12T10:00:20.22 8.19
2025-03-12T10:00:21.22 8.17
2025-03-12T10:00:22.22 8.17
2025-03-12T10:00:23.22 8.17
2025-03-12T10:00:24.22 8.18
2025-03-12T10:00:25.22 8.18
2025-03-12T10:00:26.22 8.19
2025-03-12T10:00:27.22 8.17
2025-03-12T10:00:28.22 8.17
2025-03-12T10:00:29.22 8.17
2025-03-12T10:00:30.22 8.19
2025-03-12T10:00:31.22 8.17
2025-03-12T10:00:32.23 8.15
2025-03-12T10:00:33.22 8.16
2025-03-12T10:00:34.22 8.17
2025-03-12T10:00:35.22 8.14
2025-03-12T10:00:36.22 8.15
2025-03-12T10:00:37.23 8.17
2025-03-12T10:00:38.23 8.19
2025-03-12T10:00:39.23 8.16
2025-03-12T10:00:40.23 8.16
2025-03-12T10:00:41.23 8.19
2025-03-12T10:00:42.23 8.19
2025-03-12T10:00:43.23 8.17
2025-03-12T10:00:44.23 8.17
2025-03-12T10:00:45.23 8.19
2025-03-12T10:00:46.23 8.17
2025-03-12T10:00:47.23 8.17
2025-03-12T10:00:48.23 8.17
2025-03-12T10:00:49.23 8.16
2025-03-12T10:00:50.23 8.19
2025-03-12T10:00:51.23 8.16
2025-03-12T10:00:52.31 8.18
2025-03-12T10:00:53.23 8.15
2025-03-12T10:00:54.23 8.17
2025-03-12T10:00:55.23 8.18
2025-03-12T10:00:56.23 8.17
2025-03-12T10:00:57.23 8.17
2025-03-12T10:00:58.23 8.15
2025-03-12T10:00:59.23 8.17
2025-03-12T10:01:00.23 8.16
2025-03-12T10:01:01.23 8.16
2025-03-12T10:01:02.23 8.16
2025-03-12T10:01:03.23 8.17
2025-03-12T10:01:04.23 8.16
2025-03-12T10:01:05.23 8.17
2025-03-12T10:01:06.23 8.16
2025-03-12T10:01:07.23 8.18
2025-03-12T10:01:08.23 8.18
2025-03-12T10:01:09.23 8.16
2025-03-12T10:01:10.23 8.17
2025-03-12T10:01:11.23 8.16
2025-03-12T10:01:12.23 8.17
2025-03-12T10:01:13.23 8.17
2025-03-12T10:01:14.23 8.19
2025-03-12T10:01:15.23 8.17
2025-03-12T10:01:16.23 8.18
2025-03-12T10:01:17.23 8.17
2025-03-12T10:01:18.23 8.17
2025-03-12T10:01:19.23 8.18
2025-03-12T10:01:20.23 8.16
2025-03-12T10:01:21.23 8.16
2025-03-12T10:01:22.23 8.15
2025-03-12T10:01:23.23 8.17
2025-03-12T10:01:24.23 8.17
2025-03-12T10:01:25.23 8.15
2025-03-12T10:01:26.23 8.17
2025-03-12T10:01:27.23 8.17
2025-03-12T10:01:28.23 8.17
2025-03-12T10:01:29.23 8.20
2025-03-12T10:01:30.23 8.17
2025-03-12T10:01:31.23 8.17
2025-03-12T10:01:32.23 8.17
2025-03-12T10:01:33.23 8.16
2025-03-12T10:01:34.23 8.19
2025-03-12T10:01:35.23 8.16
2025-03-12T10:01:36.23 8.18
2025-03-12T10:01:37.23 8.17
2025-03-12T10:01:38.23 8.18
2025-03-12T10:01:39.23 8.17
2025-03-12T10:01:40.23 8.19
2025-03-12T10:01:41.23 8.17
2025-03-12T10:01:42.23 8.16
2025-03-12T10:01:43.23 8.14
2025-03-12T10:01:44.23 8.17
2025-03-12T10:01:45.23 8.16
2025-03-12T10:01:46.23 8.16
2025-03-12T10:01:47.23 8.16
2025-03-12T10:01:48.23 8.17
2025-03-12T10:01:49.23 8.17
2025-03-12T10:01:50.23 8.15
2025-03-12T10:01:51.23 8.16
2025-03-12T10:01:52.23 8.17
2025-03-12T10:01:53.23 8.17
2025-03-12T10:01:54.23 8.14
2025-03-12T10:01:55.23 8.16
2025-03-12T10:01:56.23 8.19
2025-03-12T10:01:57.23 8.17
2025-03-12T10:01:58.23 8.17
2025-03-12T10:01:59.23 8.19
2025-03-12T10:02:00.23 8.17
2025-03-12T10:02:01.23 8.18
2025-03-12T10:02:02.23 8.17
2025-03-12T10:02:03.23 8.18
2025-03-12T10:02:04.23 8.18
2025-03-12T10:02:05.23 8.17
2025-03-12T10:02:06.23 8.16
2025-03-12T10:02:07.23 8.17
2025-03-12T10:02:08.23 8.17
2025-03-12T10:02:09.23 8.19
2025-03-12T10:02:10.23 8.17
2025-03-12T10:02:11.23 8.17
2025-03-12T10:02:12.23 8.16
2025-03-12T10:02:13.23 8.17
2025-03-12T10:02:14.23 8.19
2025-03-12T10:02:15.23 8.18
2025-03-12T10:02:16.23 8.17
2025-03-12T10:02:17.23 8.17
2025-03-12T10:02:18.23 8.17
2025-03-12T10:02:19.23 8.17
2025-03-12T10:02:20.23 8.16
2025-03-12T10:02:21.23 8.20
2025-03-12T10:02:22.23 8.18
2025-03-12T10:02:23.23 8.17
2025-03-12T10:02:24.23 8.17
2025-03-12T10:02:25.23 8.17
2025-03-12T10:02:26.23 8.16
2025-03-12T10:02:27.23 8.16
2025-03-12T10:02:28.23 8.16
2025-03-12T10:02:29.23 8.16
2025-03-12T10:02:30.23 8.17
2025-03-12T10:02:31.23 8.17
2025-03-12T10:02:32.23 8.16
2025-03-12T10:02:33.23 8.15
2025-03-12T10:02:34.23 8.18
2025-03-12T10:02:35.23 8.15
2025-03-12T10:02:36.23 8.16
2025-03-12T10:02:37.23 8.19
2025-03-12T10:02:38.23 8.16
2025-03-12T10:02:39.23 8.16
2025-03-12T10:02:40.23 8.18
2025-03-12T10:02:41.23 8.19
2025-03-12T10:02:42.23 8.16
2025-03-12T10:02:43.23 8.18
2025-03-12T10:02:44.23 8.17
2025-03-12T10:02:45.23 8.17
2025-03-12T10:02:46.23 8.17
2025-03-12T10:02:47.23 8.18
2025-03-12T10:02:48.23 8.17
2025-03-12T10:02:49.23 8.18
2025-03-12T10:02:50.23 8.15
2025-03-12T10:02:51.23 8.18
2025-03-12T10:02:52.23 8.17
2025-03-12T10:02:53.23 8.17
2025-03-12T10:02:54.23 8.16
2025-03-12T10:02:55.23 8.17
2025-03-12T10:02:56.23 8.17
2025-03-12T10:02:57.23 8.17
2025-03-12T10:02:58.23 8.17
2025-03-12T10:02:59.23 8.17
2025-03-12T10:03:00.23 8.16
2025-03-12T10:03:01.23 8.16
2025-03-12T10:03:02.23 8.17
2025-03-12T10:03:03.23 8.17
2025-03-12T10:03:04.23 8.18
2025-03-12T10:03:05.23 8.17
2025-03-12T10:03:06.23 8.16
2025-03-12T10:03:07.23 8.17
2025-03-12T10:03:08.23 8.19
2025-03-12T10:03:09.23 8.16
2025-03-12T10:03:10.23 8.18
2025-03-12T10:03:11.23 8.17
2025-03-12T10:03:12.25 8.17
2025-03-12T10:03:13.22 8.17
2025-03-12T10:03:14.22 8.17
2025-03-12T10:03:15.22 8.17
2025-03-12T10:03:16.22 8.17
2025-03-12T10:03:17.22 8.18
2025-03-12T10:03:18.22 8.21
2025-03-12T10:03:19.22 8.17
2025-03-12T10:03:20.22 8.18
2025-03-12T10:03:21.22 8.17
2025-03-12T10:03:22.22 8.16
2025-03-12T10:03:23.22 8.18
2025-03-12T10:03:24.22 8.17
2025-03-12T10:03:25.22 8.19
2025-03-12T10:03:26.22 8.16
2025-03-12T10:03:27.22 8.17
2025-03-12T10:03:28.22 8.17
2025-03-12T10:03:29.22 8.17
2025-03-12T10:03:30.22 8.19
2025-03-12T10:03:31.22 8.17
2025-03-12T10:03:32.22 8.19
2025-03-12T10:03:33.22 8.19
2025-03-12T10:03:34.22 8.16
2025-03-12T10:03:35.22 8.17
2025-03-12T10:03:36.22 8.16
2025-03-12T10:03:37.22 8.18
2025-03-12T10:03:38.22 8.17
2025-03-12T10:03:39.22 8.17
2025-03-12T10:03:40.22 8.19
2025-03-12T10:03:41.22 8.20
2025-03-12T10:03:42.22 8.17
2025-03-12T10:03:43.22 8.18
2025-03-12T10:03:44.22 8.16
2025-03-12T10:03:45.22 8.18
2025-03-12T10:03:46.22 8.16
2025-03-12T10:03:47.22 8.19
2025-03-12T10:03:48.22 8.18
2025-03-12T10:03:49.22 8.17
2025-03-12T10:03:50.22 8.16
2025-03-12T10:03:51.22 8.19
2025-03-12T10:03:52.23 8.19
2025-03-12T10:03:53.21 8.19
2025-03-12T10:03:54.21 8.17
2025-03-12T10:03:55.21 8.17
2025-03-12T10:03:56.21 8.17
2025-03-12T10:03:57.21 8.19
2025-03-12T10:03:58.21 8.19
2025-03-12T10:03:59.21 8.17
2025-03-12T10:04:00.21 8.18
2025-03-12T10:04:01.21 8.17
2025-03-12T10:04:02.21 8.18
2025-03-12T10:04:03.21 8.18
2025-03-12T10:04:04.21 8.16
2025-03-12T10:04:05.21 8.17
2025-03-12T10:04:06.21 8.19
2025-03-12T10:04:07.21 8.18
2025-03-12T10:04:08.21 8.17
2025-03-12T10:04:09.21 8.17
2025-03-12T10:04:10.21 8.20
2025-03-12T10:04:11.21 8.19
2025-03-12T10:04:12.21 8.18
2025-03-12T10:04:13.21 8.19
2025-03-12T10:04:14.21 8.17
2025-03-12T10:04:15.21 8.17
2025-03-12T10:04:16.21 8.16
2025-03-12T10:04:17.21 8.19
2025-03-12T10:04:18.21 8.16
2025-03-12T10:04:19.21 8.18
2025-03-12T10:04:20.21 8.16
2025-03-12T10:04:21.21 8.17
2025-03-12T10:04:22.21 8.16
2025-03-12T10:04:23.21 8.18
2025-03-12T10:04:24.21 8.19
2025-03-12T10:04:25.21 8.18
2025-03-12T10:04:26.21 8.17
2025-03-12T10:04:27.21 8.18
2025-03-12T10:04:28.21 8.19
2025-03-12T10:04:29.21 8.19
2025-03-12T10:04:30.21 8.19
2025-03-12T10:04:31.21 8.18
2025-03-12T10:04:32.22 8.18
2025-03-12T10:04:33.22 8.17
2025-03-12T10:04:34.22 8.17
2025-03-12T10:04:35.22 8.18
2025-03-12T10:04:36.22 8.19
2025-03-12T10:04:37.22 8.18
2025-03-12T10:04:38.22 8.16
2025-03-12T10:04:39.22 8.19
2025-03-12T10:04:40.22 8.15
2025-03-12T10:04:41.22 8.20
2025-03-12T10:04:42.31 8.19
2025-03-12T10:04:43.21 8.18
2025-03-12T10:04:44.21 8.16
2025-03-12T10:04:45.21 8.17
2025-03-12T10:04:46.21 8.17
2025-03-12T10:04:47.21 8.17
2025-03-12T10:04:48.21 8.17
2025-03-12T10:04:49.21 8.17
2025-03-12T10:04:50.21 8.18
2025-03-12T10:04:51.21 8.17
2025-03-12T10:04:52.21 8.17
2025-03-12T10:04:53.21 8.18
2025-03-12T10:04:54.21 8.16
2025-03-12T10:04:55.21 8.18
2025-03-12T10:04:56.21 8.16
2025-03-12T10:04:57.21 8.17
2025-03-12T10:04:58.21 8.16
2025-03-12T10:04:59.21 8.15
2025-03-12T10:05:00.21 8.16
2025-03-12T10:05:01.21 8.16
2025-03-12T10:05:02.21 8.16
2025-03-12T10:05:03.21 8.17
2025-03-12T10:05:04.21 8.17
2025-03-12T10:05:05.21 8.18
2025-03-12T10:05:06.21 8.16
2025-03-12T10:05:07.21 8.17
2025-03-12T10:05:08.21 8.16
2025-03-12T10:05:09.21 8.17
2025-03-12T10:05:10.21 8.16
2025-03-12T10:05:11.21 8.16
2025-03-12T10:05:12.21 8.16
2025-03-12T10:05:13.21 8.16
2025-03-12T10:05:14.21 8.17
2025-03-12T10:05:15.21 8.16
2025-03-12T10:05:16.21 8.17
2025-03-12T10:05:17.21 8.17
2025-03-12T10:05:18.21 8.16
2025-03-12T10:05:19.21 8.17
2025-03-12T10:05:20.21 8.19
2025-03-12T10:05:21.21 8.17
2025-03-12T10:05:22.21 8.19
2025-03-12T10:05:23.21 8.19
2025-03-12T10:05:24.21 8.16
2025-03-12T10:05:25.21 8.17
2025-03-12T10:05:26.21 8.17
2025-03-12T10:05:27.21 8.17
2025-03-12T10:05:28.21 8.19
2025-03-12T10:05:29.21 8.18
2025-03-12T10:05:30.21 8.17
2025-03-12T10:05:31.21 8.16
2025-03-12T10:05:32.22 8.14
2025-03-12T10:05:33.22 8.17
2025-03-12T10:05:34.22 8.17
2025-03-12T10:05:35.22 8.17
2025-03-12T10:05:36.22 8.17
2025-03-12T10:05:37.22 8.17
2025-03-12T10:05:38.22 8.18
2025-03-12T10:05:39.22 8.14
2025-03-12T10:05:40.22 8.17
2025-03-12T10:05:41.22 8.17
2025-03-12T10:05:42.22 8.16
2025-03-12T10:05:43.22 8.17
2025-03-12T10:05:44.22 8.16
2025-03-12T10:05:45.22 8.16
2025-03-12T10:05:46.22 8.16
2025-03-12T10:05:47.22 8.17
2025-03-12T10:05:48.22 8.17
2025-03-12T10:05:49.22 8.17
2025-03-12T10:05:50.22 8.17
2025-03-12T10:05:51.22 8.18
2025-03-12T10:05:52.22 8.17
2025-03-12T10:05:53.22 8.18
2025-03-12T10:05:54.22 8.16
2025-03-12T10:05:55.22 8.20
2025-03-12T10:05:56.23 8.16
2025-03-12T10:05:57.23 8.16
2025-03-12T10:05:58.23 8.16
2025-03-12T10:05:59.23 8.17
2025-03-12T10:06:00.23 8.16
2025-03-12T10:06:01.23 8.17
2025-03-12T10:06:02.23 8.17
2025-03-12T10:06:03.23 8.16
2025-03-12T10:06:04.23 8.17
2025-03-12T10:06:05.23 8.17
2025-03-12T10:06:06.23 8.17
2025-03-12T10:06:07.23 8.17
2025-03-12T10:06:08.23 8.19
2025-03-12T10:06:09.23 8.19
2025-03-12T10:06:10.23 8.16
2025-03-12T10:06:11.23 8.16
2025-03-12T10:06:12.23 8.16
2025-03-12T10:06:13.23 8.17
2025-03-12T10:06:14.23 8.17
2025-03-12T10:06:15.23 8.17
2025-03-12T10:06:16.23 8.18
2025-03-12T10:06:17.23 8.17
2025-03-12T10:06:18.23 8.16
2025-03-12T10:06:19.23 8.17
2025-03-12T10:06:20.23 8.20
2025-03-12T10:06:21.23 8.17
2025-03-12T10:06:22.23 8.19
2025-03-12T10:06:23.23 8.15
2025-03-12T10:06:24.23 8.16
2025-03-12T10:06:25.23 8.18
2025-03-12T10:06:26.23 8.16
2025-03-12T10:06:27.23 8.17
2025-03-12T10:06:28.23 8.18
2025-03-12T10:06:29.23 8.14
2025-03-12T10:06:30.23 8.18
2025-03-12T10:06:31.23 8.17
2025-03-12T10:06:32.23 8.18
2025-03-12T10:06:33.23 8.17
2025-03-12T10:06:34.23 8.17
2025-03-12T10:06:35.23 8.16
2025-03-12T10:06:36.23 8.17
2025-03-12T10:06:37.23 8.16
2025-03-12T10:06:38.23 8.17
2025-03-12T10:06:39.23 8.16
2025-03-12T10:06:40.23 8.17
2025-03-12T10:06:41.23 8.16
2025-03-12T10:06:42.23 8.18
2025-03-12T10:06:43.23 8.16
2025-03-12T10:06:44.23 8.18
2025-03-12T10:06:45.23 8.18
2025-03-12T10:06:46.23 8.20
2025-03-12T10:06:47.23 8.18
2025-03-12T10:06:48.23 8.18
2025-03-12T10:06:49.23 8.17
2025-03-12T10:06:50.23 8.19
2025-03-12T10:06:51.23 8.16
2025-03-12T10:06:52.23 8.17
2025-03-12T10:06:53.23 8.17
2025-03-12T10:06:54.23 8.19
2025-03-12T10:06:55.23 8.17
2025-03-12T10:06:56.23 8.16
2025-03-12T10:06:57.23 8.17
2025-03-12T10:06:58.23 8.16
2025-03-12T10:06:59.23 8.18
2025-03-12T10:07:00.23 8.16
2025-03-12T10:07:01.23 8.17
2025-03-12T10:07:02.23 8.19
2025-03-12T10:07:03.23 8.18
2025-03-12T10:07:04.25 8.19
2025-03-12T10:07:05.22 8.18
2025-03-12T10:07:06.22 8.17
2025-03-12T10:07:07.22 8.18
2025-03-12T10:07:08.22 8.19
2025-03-12T10:07:09.22 8.18
2025-03-12T10:07:10.22 8.17
2025-03-12T10:07:11.22 8.18
2025-03-12T10:07:12.22 8.16
2025-03-12T10:07:13.22 8.17
2025-03-12T10:07:14.22 8.19
2025-03-12T10:07:15.22 8.20
2025-03-12T10:07:16.22 8.17
2025-03-12T10:07:17.22 8.19
2025-03-12T10:07:18.22 8.17
2025-03-12T10:07:19.22 8.17
2025-03-12T10:07:20.22 8.16
2025-03-12T10:07:21.22 8.18
2025-03-12T10:07:22.22 8.16
2025-03-12T10:07:23.22 8.18
2025-03-12T10:07:24.22 8.17
2025-03-12T10:07:25.22 8.19
2025-03-12T10:07:26.22 8.16
2025-03-12T10:07:27.22 8.15
2025-03-12T10:07:28.22 8.17
2025-03-12T10:07:29.22 8.20
2025-03-12T10:07:30.22 8.16
2025-03-12T10:07:31.22 8.17
2025-03-12T10:07:32.23 8.20
2025-03-12T10:07:33.23 8.17
2025-03-12T10:07:34.23 8.17
2025-03-12T10:07:35.23 8.19
2025-03-12T10:07:36.23 8.16
2025-03-12T10:07:37.23 8.17
2025-03-12T10:07:38.23 8.19
2025-03-12T10:07:39.23 8.17
2025-03-12T10:07:40.23 8.17
2025-03-12T10:07:41.23 8.17
2025-03-12T10:07:42.23 8.17
2025-03-12T10:07:43.23 8.17
2025-03-12T10:07:44.23 8.16
2025-03-12T10:07:45.23 8.16
2025-03-12T10:07:46.23 8.16
2025-03-12T10:07:47.23 8.18
2025-03-12T10:07:48.23 8.16
2025-03-12T10:07:49.23 8.16
2025-03-12T10:07:50.23 8.16
2025-03-12T10:07:51.23 8.17
2025-03-12T10:07:52.23 8.18
2025-03-12T10:07:53.23 8.17
2025-03-12T10:07:54.23 8.18
2025-03-12T10:07:55.23 8.17
2025-03-12T10:07:56.23 8.18
2025-03-12T10:07:57.23 8.21
2025-03-12T10:07:58.23 8.16
2025-03-12T10:07:59.23 8.19
2025-03-12T10:08:00.23 8.19
2025-03-12T10:08:01.23 8.15
2025-03-12T10:08:02.23 8.18
2025-03-12T10:08:03.23 8.18
2025-03-12T10:08:04.23 8.17
2025-03-12T10:08:05.23 8.16
2025-03-12T10:08:06.23 8.16
2025-03-12T10:08:07.23 8.17
2025-03-12T10:08:08.23 8.19
2025-03-12T10:08:09.23 8.19
2025-03-12T10:08:10.23 8.16
2025-03-12T10:08:11.23 8.16
2025-03-12T10:08:12.23 8.18
2025-03-12T10:08:13.23 8.16
2025-03-12T10:08:14.23 8.19
2025-03-12T10:08:15.23 8.17
2025-03-12T10:08:16.23 8.19
2025-03-12T10:08:17.23 8.17
2025-03-12T10:08:18.23 8.19
2025-03-12T10:08:19.23 8.18
2025-03-12T10:08:20.23 8.18
2025-03-12T10:08:21.23 8.19
2025-03-12T10:08:22.23 8.19
2025-03-12T10:08:23.23 8.20
2025-03-12T10:08:24.23 8.21
2025-03-12T10:08:25.23 8.17
2025-03-12T10:08:26.23 8.19
2025-03-12T10:08:27.23 8.19
2025-03-12T10:08:28.23 8.16
2025-03-12T10:08:29.23 8.16
2025-03-12T10:08:30.23 8.19
2025-03-12T10:08:31.23 8.19
2025-03-12T10:08:32.35 8.17
2025-03-12T10:08:33.22 8.17
2025-03-12T10:08:34.22 8.18
2025-03-12T10:08:35.22 8.19
2025-03-12T10:08:36.22 8.18
2025-03-12T10:08:37.22 8.17
2025-03-12T10:08:38.22 8.17
2025-03-12T10:08:39.22 8.16
2025-03-12T10:08:40.22 8.18
2025-03-12T10:08:41.22 8.17
2025-03-12T10:08:42.22 8.19
2025-03-12T10:08:43.22 8.17
2025-03-12T10:08:44.22 8.17
2025-03-12T10:08:45.22 8.19
2025-03-12T10:08:46.22 8.17
2025-03-12T10:08:47.22 8.16
2025-03-12T10:08:48.22 8.17
2025-03-12T10:08:49.22 8.18
2025-03-12T10:08:50.22 8.18
2025-03-12T10:08:51.22 8.16
2025-03-12T10:08:52.22 8.17
2025-03-12T10:08:53.22 8.19
2025-03-12T10:08:54.22 8.18
2025-03-12T10:08:55.22 8.19
2025-03-12T10:08:56.22 8.19
2025-03-12T10:08:57.22 8.19
2025-03-12T10:08:58.22 8.18
2025-03-12T10:08:59.22 8.18
2025-03-12T10:09:00.22 8.18
2025-03-12T10:09:01.22 8.19
2025-03-12T10:09:02.22 8.18
2025-03-12T10:09:03.22 8.17
2025-03-12T10:09:04.22 8.15
2025-03-12T10:09:05.22 8.19
2025-03-12T10:09:06.22 8.17
2025-03-12T10:09:07.22 8.18
2025-03-12T10:09:08.22 8.19
2025-03-12T10:09:09.22 8.17
2025-03-12T10:09:10.22 8.16
2025-03-12T10:09:11.22 8.17
2025-03-12T10:09:12.22 8.17
2025-03-12T10:09:13.22 8.16
2025-03-12T10:09:14.22 8.17
2025-03-12T10:09:15.22 8.17
2025-03-12T10:09:16.22 8.17
2025-03-12T10:09:17.22 8.17
2025-03-12T10:09:18.22 8.17
2025-03-12T10:09:19.22 8.17
2025-03-12T10:09:20.22 8.17
2025-03-12T10:09:21.22 8.17
2025-03-12T10:09:22.22 8.17
2025-03-12T10:09:23.22 8.17
2025-03-12T10:09:24.22 8.17
2025-03-12T10:09:25.22 8.18
2025-03-12T10:09:26.22 8.17
2025-03-12T10:09:27.22 8.17
2025-03-12T10:09:28.22 8.16
2025-03-12T10:09:29.22 8.15
2025-03-12T10:09:30.22 8.17
2025-03-12T10:09:31.22 8.16
2025-03-12T10:09:32.22 8.18
2025-03-12T10:09:33.22 8.17
2025-03-12T10:09:34.22 8.16
2025-03-12T10:09:35.22 8.17
2025-03-12T10:09:36.22 8.17
2025-03-12T10:09:37.22 8.17
2025-03-12T10:09:38.22 8.17
2025-03-12T10:09:39.22 8.17
2025-03-12T10:09:40.22 8.18
2025-03-12T10:09:41.22 8.19
2025-03-12T10:09:42.22 8.17
2025-03-12T10:09:43.22 8.17
2025-03-12T10:09:44.22 8.17
2025-03-12T10:09:45.22 8.19
2025-03-12T10:09:46.22 8.18
2025-03-12T10:09:47.22 8.19
2025-03-12T10:09:48.22 8.18
2025-03-12T10:09:49.22 8.18
2025-03-12T10:09:50.22 8.17
2025-03-12T10:09:51.22 8.19
2025-03-12T10:09:52.22 8.18
2025-03-12T10:09:53.22 8.17
2025-03-12T10:09:54.22 8.18
2025-03-12T10:09:55.22 8.19
2025-03-12T10:09:56.22 8.17
2025-03-12T10:09:57.22 8.18
2025-03-12T10:09:58.22 8.16
2025-03-12T10:09:59.22 8.17
2025-03-12T10:10:00.22 8.17
2025-03-12T10:10:01.22 8.18
2025-03-12T10:10:02.22 8.17
2025-03-12T10:10:03.22 8.18
2025-03-12T10:10:04.22 8.17
2025-03-12T10:10:05.22 8.17
2025-03-12T10:10:06.22 8.17
2025-03-12T10:10:07.22 8.18
2025-03-12T10:10:08.22 8.19
2025-03-12T10:10:09.22 8.19
2025-03-12T10:10:10.22 8.19
2025-03-12T10:10:11.22 8.17
2025-03-12T10:10:12.22 8.15
2025-03-12T10:10:13.22 8.18
2025-03-12T10:10:14.22 8.17
2025-03-12T10:10:15.22 8.18
2025-03-12T10:10:16.22 8.16
2025-03-12T10:10:17.22 8.16
2025-03-12T10:10:18.22 8.17
2025-03-12T10:10:19.22 8.16
2025-03-12T10:10:20.22 8.17
2025-03-12T10:10:21.22 8.17
2025-03-12T10:10:22.22 8.19
2025-03-12T10:10:23.22 8.17
2025-03-12T10:10:24.22 8.19
2025-03-12T10:10:25.22 8.16
2025-03-12T10:10:26.22 8.18
2025-03-12T10:10:27.22 8.17
2025-03-12T10:10:28.22 8.16
2025-03-12T10:10:29.22 8.17
2025-03-12T10:10:30.22 8.18
2025-03-12T10:10:31.22 8.17
2025-03-12T10:10:32.23 8.17
2025-03-12T10:10:33.22 8.16
2025-03-12T10:10:34.22 8.17
2025-03-12T10:10:35.22 8.17
2025-03-12T10:10:36.22 8.18
2025-03-12T10:10:37.22 8.19
2025-03-12T10:10:38.22 8.19
2025-03-12T10:10:39.22 8.20
2025-03-12T10:10:40.22 8.19
2025-03-12T10:10:41.22 8.18
2025-03-12T10:10:42.22 8.18
2025-03-12T10:10:43.22 8.19
2025-03-12T10:10:44.22 8.17
2025-03-12T10:10:45.22 8.19
2025-03-12T10:10:46.22 8.17
2025-03-12T10:10:47.22 8.19
2025-03-12T10:10:48.22 8.19
2025-03-12T10:10:49.22 8.16
2025-03-12T10:10:50.22 8.17
2025-03-12T10:10:51.22 8.19
2025-03-12T10:10:52.22 8.16
2025-03-12T10:10:53.22 8.18
2025-03-12T10:10:54.22 8.18
2025-03-12T10:10:55.22 8.19
2025-03-12T10:10:56.22 8.17
2025-03-12T10:10:57.22 8.18
2025-03-12T10:10:58.22 8.14
2025-03-12T10:10:59.22 8.17
2025-03-12T10:11:00.22 8.19
2025-03-12T10:11:01.22 8.15
2025-03-12T10:11:02.22 8.16
2025-03-12T10:11:03.22 8.16
2025-03-12T10:11:04.22 8.19
2025-03-12T10:11:05.22 8.16
2025-03-12T10:11:06.22 8.16
2025-03-12T10:11:07.22 8.17
2025-03-12T10:11:08.22 8.18
2025-03-12T10:11:09.22 8.17
2025-03-12T10:11:10.22 8.17
2025-03-12T10:11:11.23 8.18
2025-03-12T10:11:12.22 8.17
2025-03-12T10:11:13.23 8.19
2025-03-12T10:11:14.23 8.17
2025-03-12T10:11:15.23 8.16
2025-03-12T10:11:16.23 8.18
2025-03-12T10:11:17.23 8.17
2025-03-12T10:11:18.23 8.17
2025-03-12T10:11:19.23 8.17
2025-03-12T10:11:20.23 8.18
2025-03-12T10:11:21.23 8.19
2025-03-12T10:11:22.23 8.17
2025-03-12T10:11:23.23 8.19
2025-03-12T10:11:24.23 8.17
2025-03-12T10:11:25.23 8.18
2025-03-12T10:11:26.23 8.17
2025-03-12T10:11:27.23 8.16
2025-03-12T10:11:28.23 8.17
2025-03-12T10:11:29.23 8.18
2025-03-12T10:11:30.23 8.17
2025-03-12T10:11:31.23 8.17
2025-03-12T10:11:32.27 8.18
2025-03-12T10:11:33.22 8.17
2025-03-12T10:11:34.22 8.17
2025-03-12T10:11:35.22 8.17
2025-03-12T10:11:36.22 8.18
2025-03-12T10:11:37.22 8.18
2025-03-12T10:11:38.22 8.18
2025-03-12T10:11:39.22 8.18
2025-03-12T10:11:40.22 8.17
2025-03-12T10:11:41.22 8.17
2025-03-12T10:11:42.22 8.16
2025-03-12T10:11:43.22 8.16
2025-03-12T10:11:44.22 8.16
2025-03-12T10:11:45.22 8.17
2025-03-12T10:11:46.22 8.18
2025-03-12T10:11:47.22 8.16
2025-03-12T10:11:48.22 8.18
2025-03-12T10:11:49.22 8.16
2025-03-12T10:11:50.22 8.16
2025-03-12T10:11:51.22 8.17
2025-03-12T10:11:52.22 8.17
2025-03-12T10:11:53.22 8.17
2025-03-12T10:11:54.22 8.18
2025-03-12T10:11:55.22 8.17
2025-03-12T10:11:56.22 8.17
2025-03-12T10:11:57.22 8.16
2025-03-12T10:11:58.22 8.19
2025-03-12T10:11:59.22 8.17
2025-03-12T10:12:00.22 8.18
2025-03-12T10:12:01.22 8.19
2025-03-12T10:12:02.22 8.18
2025-03-12T10:12:03.22 8.17
2025-03-12T10:12:04.22 8.16
2025-03-12T10:12:05.22 8.17
2025-03-12T10:12:06.22 8.17
2025-03-12T10:12:07.22 8.18
2025-03-12T10:12:08.22 8.18
2025-03-12T10:12:09.22 8.17
2025-03-12T10:12:10.22 8.16
2025-03-12T10:12:11.22 8.18
2025-03-12T10:12:12.22 8.19
2025-03-12T10:12:13.22 8.17
2025-03-12T10:12:14.22 8.17
2025-03-12T10:12:15.22 8.17
2025-03-12T10:12:16.22 8.16
2025-03-12T10:12:17.22 8.16
2025-03-12T10:12:18.22 8.16
2025-03-12T10:12:19.22 8.19
2025-03-12T10:12:20.22 8.18
2025-03-12T10:12:21.22 8.19
2025-03-12T10:12:22.22 8.17
2025-03-12T10:12:23.22 8.16
2025-03-12T10:12:24.22 8.17
2025-03-12T10:12:25.22 8.17
2025-03-12T10:12:26.22 8.16
2025-03-12T10:12:27.22 8.17
2025-03-12T10:12:28.22 8.20
2025-03-12T10:12:29.22 8.15
2025-03-12T10:12:30.22 8.17
2025-03-12T10:12:31.22 8.18
2025-03-12T10:12:32.22 8.17
2025-03-12T10:12:33.22 8.19
2025-03-12T10:12:34.22 8.19
2025-03-12T10:12:35.22 8.17
2025-03-12T10:12:36.22 8.18
2025-03-12T10:12:37.22 8.17
2025-03-12T10:12:38.22 8.17
2025-03-12T10:12:39.22 8.16
2025-03-12T10:12:40.22 8.16
2025-03-12T10:12:41.22 8.16
2025-03-12T10:12:42.22 8.16
2025-03-12T10:12:43.22 8.17
2025-03-12T10:12:44.22 8.17
2025-03-12T10:12:45.22 8.16
2025-03-12T10:12:46.22 8.19
2025-03-12T10:12:47.22 8.17
2025-03-12T10:12:48.22 8.17
2025-03-12T10:12:49.22 8.17
2025-03-12T10:12:50.22 8.17
2025-03-12T10:12:51.22 8.15
2025-03-12T10:12:52.22 8.16
2025-03-12T10:12:53.22 8.16
2025-03-12T10:12:54.22 8.19
2025-03-12T10:12:55.22 8.17
2025-03-12T10:12:56.22 8.16
2025-03-12T10:12:57.22 8.18
2025-03-12T10:12:58.22 8.19
2025-03-12T10:12:59.22 8.18
2025-03-12T10:13:00.22 8.19
2025-03-12T10:13:01.22 8.17
2025-03-12T10:13:02.22 8.17
2025-03-12T10:13:03.22 8.19
2025-03-12T10:13:04.22 8.17
2025-03-12T10:13:05.22 8.17
2025-03-12T10:13:06.22 8.16
2025-03-12T10:13:07.22 8.17
2025-03-12T10:13:08.22 8.16
2025-03-12T10:13:09.22 8.16
2025-03-12T10:13:10.22 8.16
2025-03-12T10:13:11.22 8.17
2025-03-12T10:13:12.22 8.18
2025-03-12T10:13:13.22 8.16
2025-03-12T10:13:14.22 8.19
2025-03-12T10:13:15.22 8.16
2025-03-12T10:13:16.22 8.17
2025-03-12T10:13:17.22 8.16
2025-03-12T10:13:18.22 8.17
2025-03-12T10:13:19.22 8.16
2025-03-12T10:13:20.22 8.15
2025-03-12T10:13:21.22 8.17
2025-03-12T10:13:22.22 8.19
2025-03-12T10:13:23.22 8.19
2025-03-12T10:13:24.22 8.18
2025-03-12T10:13:25.22 8.16
2025-03-12T10:13:26.22 8.16
2025-03-12T10:13:27.22 8.17
2025-03-12T10:13:28.22 8.17
2025-03-12T10:13:29.22 8.17
2025-03-12T10:13:30.22 8.16
2025-03-12T10:13:31.22 8.17
2025-03-12T10:13:32.22 8.16
2025-03-12T10:13:33.22 8.17
2025-03-12T10:13:34.22 8.16
2025-03-12T10:13:35.22 8.19
2025-03-12T10:13:36.22 8.18
2025-03-12T10:13:37.22 8.16
2025-03-12T10:13:38.22 8.17
2025-03-12T10:13:39.22 8.17
2025-03-12T10:13:40.22 8.19
2025-03-12T10:13:41.22 8.16
2025-03-12T10:13:42.23 8.19
2025-03-12T10:13:43.22 8.15
2025-03-12T10:13:44.22 8.18
2025-03-12T10:13:45.22 8.16
2025-03-12T10:13:46.22 8.16
2025-03-12T10:13:47.22 8.17
2025-03-12T10:13:48.22 8.19
2025-03-12T10:13:49.22 8.17
2025-03-12T10:13:50.22 8.19
2025-03-12T10:13:51.22 8.19
2025-03-12T10:13:52.22 8.17
2025-03-12T10:13:53.22 8.20
2025-03-12T10:13:54.22 8.17
2025-03-12T10:13:55.22 8.19
2025-03-12T10:13:56.22 8.19
2025-03-12T10:13:57.22 8.17
2025-03-12T10:13:58.22 8.17
2025-03-12T10:13:59.22 8.20
2025-03-12T10:14:00.22 8.17
2025-03-12T10:14:01.22 8.17
2025-03-12T10:14:02.22 8.17
2025-03-12T10:14:03.22 8.20
2025-03-12T10:14:04.22 8.17
2025-03-12T10:14:05.22 8.17
2025-03-12T10:14:06.22 8.21
2025-03-12T10:14:07.22 8.16
2025-03-12T10:14:08.22 8.19
2025-03-12T10:14:09.22 8.17
2025-03-12T10:14:10.22 8.16
2025-03-12T10:14:11.22 8.19
2025-03-12T10:14:12.22 8.17
2025-03-12T10:14:13.22 8.19
2025-03-12T10:14:14.22 8.17
2025-03-12T10:14:15.22 8.17
2025-03-12T10:14:16.22 8.17
2025-03-12T10:14:17.22 8.19
2025-03-12T10:14:18.22 8.16
2025-03-12T10:14:19.22 8.16
2025-03-12T10:14:20.22 8.17
2025-03-12T10:14:21.22 8.18
2025-03-12T10:14:22.22 8.17
2025-03-12T10:14:23.22 8.17
2025-03-12T10:14:24.22 8.17
2025-03-12T10:14:25.22 8.16
2025-03-12T10:14:26.22 8.19
2025-03-12T10:14:27.22 8.16
2025-03-12T10:14:28.22 8.17
2025-03-12T10:14:29.22 8.18
2025-03-12T10:14:30.22 8.16
2025-03-12T10:14:31.22 8.19
2025-03-12T10:14:32.23 8.17
2025-03-12T10:14:33.23 8.19
2025-03-12T10:14:34.23 8.18
2025-03-12T10:14:35.23 8.19
2025-03-12T10:14:36.23 8.16
2025-03-12T10:14:37.23 8.16
2025-03-12T10:14:38.23 8.19
2025-03-12T10:14:39.23 8.20
2025-03-12T10:14:40.23 8.16
2025-03-12T10:14:41.23 8.16
2025-03-12T10:14:42.23 8.18
2025-03-12T10:14:43.23 8.17
2025-03-12T10:14:44.23 8.19
2025-03-12T10:14:45.23 8.19
2025-03-12T10:14:46.23 8.19
2025-03-12T10:14:47.23 8.17
2025-03-12T10:14:48.23 8.18
2025-03-12T10:14:49.23 8.16
2025-03-12T10:14:50.23 8.16
2025-03-12T10:14:51.23 8.17
2025-03-12T10:14:52.23 8.16
2025-03-12T10:14:53.23 8.16
2025-03-12T10:14:54.23 8.17
2025-03-12T10:14:55.23 8.17
2025-03-12T10:14:56.23 8.16
2025-03-12T10:14:57.23 8.18
2025-03-12T10:14:58.23 8.18
2025-03-12T10:14:59.23 8.19
2025-03-12T10:15:00.23 8.18
2025-03-12T10:15:01.23 8.18
2025-03-12T10:15:02.23 8.16
2025-03-12T10:15:03.23 8.16
2025-03-12T10:15:04.23 8.18
2025-03-12T10:15:05.23 8.16
2025-03-12T10:15:06.23 8.18
2025-03-12T10:15:07.23 8.17
2025-03-12T10:15:08.23 8.18
2025-03-12T10:15:09.23 8.18
2025-03-12T10:15:10.23 8.16
2025-03-12T10:15:11.23 8.17
2025-03-12T10:15:12.23 8.16
2025-03-12T10:15:13.23 8.17
2025-03-12T10:15:14.23 8.18
2025-03-12T10:15:15.23 8.15
2025-03-12T10:15:16.23 8.18
2025-03-12T10:15:17.23 8.18
2025-03-12T10:15:18.23 8.19
2025-03-12T10:15:19.23 8.17
2025-03-12T10:15:20.23 8.16
2025-03-12T10:15:21.23 8.17
2025-03-12T10:15:22.23 8.16
2025-03-12T10:15:23.23 8.19
2025-03-12T10:15:24.23 8.19
2025-03-12T10:15:25.23 8.19
2025-03-12T10:15:26.23 8.16
2025-03-12T10:15:27.23 8.18
2025-03-12T10:15:28.23 8.17
2025-03-12T10:15:29.23 8.19
2025-03-12T10:15:30.23 8.17
2025-03-12T10:15:31.23 8.17
2025-03-12T10:15:32.24 8.16
2025-03-12T10:15:33.23 8.14
2025-03-12T10:15:34.23 8.19
2025-03-12T10:15:35.23 8.17
2025-03-12T10:15:36.23 8.17
2025-03-12T10:15:37.23 8.16
2025-03-12T10:15:38.23 8.17
2025-03-12T10:15:39.23 8.17
2025-03-12T10:15:40.23 8.16
2025-03-12T10:15:41.23 8.18
2025-03-12T10:15:42.23 8.16
2025-03-12T10:15:43.23 8.16
2025-03-12T10:15:44.23 8.17
2025-03-12T10:15:45.23 8.18
2025-03-12T10:15:46.23 8.17
2025-03-12T10:15:47.23 8.19
2025-03-12T10:15:48.23 8.17
2025-03-12T10:15:49.23 8.19
2025-03-12T10:15:50.23 8.19
2025-03-12T10:15:51.23 8.17
2025-03-12T10:15:52.23 8.17
2025-03-12T10:15:53.23 8.17
2025-03-12T10:15:54.23 8.19
2025-03-12T10:15:55.23 8.18
2025-03-12T10:15:56.23 8.16
2025-03-12T10:15:57.23 8.20
2025-03-12T10:15:58.23 8.16
2025-03-12T10:15:59.23 8.17
2025-03-12T10:16:00.23 8.17
2025-03-12T10:16:01.23 8.17
2025-03-12T10:16:02.23 8.19
2025-03-12T10:16:03.23 8.16
2025-03-12T10:16:04.23 8.19
2025-03-12T10:16:05.23 8.18
2025-03-12T10:16:06.23 8.20
2025-03-12T10:16:07.23 8.18
2025-03-12T10:16:08.23 8.17
2025-03-12T10:16:09.23 8.18
2025-03-12T10:16:10.23 8.15
2025-03-12T10:16:11.23 8.17
2025-03-12T10:16:12.23 8.16
2025-03-12T10:16:13.23 8.17
2025-03-12T10:16:14.23 8.17
2025-03-12T10:16:15.23 8.17
2025-03-12T10:16:16.23 8.16
2025-03-12T10:16:17.23 8.20
2025-03-12T10:16:18.23 8.16
2025-03-12T10:16:19.23 8.17
2025-03-12T10:16:20.23 8.18
2025-03-12T10:16:21.23 8.16
2025-03-12T10:16:22.23 8.16
2025-03-12T10:16:23.23 8.17
2025-03-12T10:16:24.23 8.18
2025-03-12T10:16:25.23 8.17
2025-03-12T10:16:26.23 8.17
2025-03-12T10:16:27.23 8.17
2025-03-12T10:16:28.23 8.17
2025-03-12T10:16:29.23 8.17
2025-03-12T10:16:30.23 8.16
2025-03-12T10:16:31.23 8.17
2025-03-12T10:16:32.24 8.17
2025-03-12T10:16:33.24 8.18
2025-03-12T10:16:34.24 8.17
2025-03-12T10:16:35.24 8.18
2025-03-12T10:16:36.24 8.17
2025-03-12T10:16:37.24 8.17
2025-03-12T10:16:38.24 8.18
2025-03-12T10:16:39.24 8.16
2025-03-12T10:16:40.24 8.16
2025-03-12T10:16:41.24 8.16
2025-03-12T10:16:42.24 8.16
2025-03-12T10:16:43.24 8.15
2025-03-12T10:16:44.24 8.19
2025-03-12T10:16:45.24 8.18
2025-03-12T10:16:46.24 8.16
2025-03-12T10:16:47.24 8.19
2025-03-12T10:16:48.24 8.17
2025-03-12T10:16:49.24 8.18
2025-03-12T10:16:50.24 8.17
2025-03-12T10:16:51.24 8.16
2025-03-12T10:16:52.24 8.19
2025-03-12T10:16:53.24 8.18
2025-03-12T10:16:54.24 8.17
2025-03-12T10:16:55.24 8.15
2025-03-12T10:16:56.24 8.17
2025-03-12T10:16:57.24 8.17
2025-03-12T10:16:58.24 8.17
2025-03-12T10:16:59.24 8.17
2025-03-12T10:17:00.24 8.17
2025-03-12T10:17:01.24 8.17
2025-03-12T10:17:02.24 8.20
2025-03-12T10:17:03.24 8.17
2025-03-12T10:17:04.24 8.19
2025-03-12T10:17:05.24 8.17
2025-03-12T10:17:06.24 8.16
2025-03-12T10:17:07.24 8.16
2025-03-12T10:17:08.24 8.17
2025-03-12T10:17:09.24 8.16
2025-03-12T10:17:10.24 8.14
2025-03-12T10:17:11.24 8.19
2025-03-12T10:17:12.24 8.17
2025-03-12T10:17:13.24 8.16
2025-03-12T10:17:14.24 8.16
2025-03-12T10:17:15.24 8.15
2025-03-12T10:17:16.24 8.17
2025-03-12T10:17:17.24 8.16
2025-03-12T10:17:18.24 8.17
2025-03-12T10:17:19.24 8.16
2025-03-12T10:17:20.24 8.14
2025-03-12T10:17:21.24 8.17
2025-03-12T10:17:22.24 8.17
2025-03-12T10:17:23.24 8.14
2025-03-12T10:17:24.24 8.16
2025-03-12T10:17:25.24 8.16
2025-03-12T10:17:26.24 8.16
2025-03-12T10:17:27.24 8.16
2025-03-12T10:17:28.24 8.14
2025-03-12T10:17:29.24 8.17
2025-03-12T10:17:30.24 8.17
2025-03-12T10:17:31.24 8.15
2025-03-12T10:17:32.28 8.17
2025-03-12T10:17:33.23 8.18
2025-03-12T10:17:34.23 8.17
2025-03-12T10:17:35.23 8.18
2025-03-12T10:17:36.23 8.17
2025-03-12T10:17:37.23 8.14
2025-03-12T10:17:38.23 8.17
2025-03-12T10:17:39.23 8.18
2025-03-12T10:17:40.23 8.16
2025-03-12T10:17:41.23 8.18
2025-03-12T10:17:42.23 8.17
2025-03-12T10:17:43.23 8.17
2025-03-12T10:17:44.23 8.16
2025-03-12T10:17:45.23 8.20
2025-03-12T10:17:46.23 8.19
2025-03-12T10:17:47.23 8.17
2025-03-12T10:17:48.23 8.17
2025-03-12T10:17:49.23 8.16
2025-03-12T10:17:50.23 8.16
2025-03-12T10:17:51.23 8.17
2025-03-12T10:17:52.23 8.17
2025-03-12T10:17:53.23 8.15
2025-03-12T10:17:54.23 8.18
2025-03-12T10:17:55.23 8.18
2025-03-12T10:17:56.23 8.17
2025-03-12T10:17:57.23 8.17
2025-03-12T10:17:58.23 8.16
2025-03-12T10:17:59.23 8.16
2025-03-12T10:18:00.23 8.18
2025-03-12T10:18:01.23 8.16
2025-03-12T10:18:02.23 8.17
2025-03-12T10:18:03.23 8.16
2025-03-12T10:18:04.23 8.16
2025-03-12T10:18:05.23 8.16
2025-03-12T10:18:06.23 8.17
2025-03-12T10:18:07.23 8.17
2025-03-12T10:18:08.23 8.16
2025-03-12T10:18:09.23 8.15
2025-03-12T10:18:10.23 8.16
2025-03-12T10:18:11.23 8.17
2025-03-12T10:18:12.30 8.17
2025-03-12T10:18:13.23 8.16
2025-03-12T10:18:14.23 8.17
2025-03-12T10:18:15.23 8.15
2025-03-12T10:18:16.23 8.16
2025-03-12T10:18:17.23 8.17
2025-03-12T10:18:18.23 8.16
2025-03-12T10:18:19.23 8.17
2025-03-12T10:18:20.23 8.17
2025-03-12T10:18:21.23 8.16
2025-03-12T10:18:22.23 8.18
2025-03-12T10:18:23.23 8.17
2025-03-12T10:18:24.23 8.17
2025-03-12T10:18:25.23 8.18
2025-03-12T10:18:26.23 8.17
2025-03-12T10:18:27.23 8.17
2025-03-12T10:18:28.23 8.16
2025-03-12T10:18:29.23 8.16
2025-03-12T10:18:30.23 8.18
2025-03-12T10:18:31.23 8.18
2025-03-12T10:18:32.23 8.15
2025-03-12T10:18:33.23 8.16
2025-03-12T10:18:34.23 8.17
2025-03-12T10:18:35.23 8.17
2025-03-12T10:18:36.23 8.18
2025-03-12T10:18:37.23 8.16
2025-03-12T10:18:38.23 8.16
2025-03-12T10:18:39.23 8.19
2025-03-12T10:18:40.24 8.16
2025-03-12T10:18:41.22 8.17
2025-03-12T10:18:42.22 8.17
2025-03-12T10:18:43.22 8.18
2025-03-12T10:18:44.22 8.17
2025-03-12T10:18:45.22 8.17
2025-03-12T10:18:46.22 8.17
2025-03-12T10:18:47.22 8.17
2025-03-12T10:18:48.22 8.17
2025-03-12T10:18:49.22 8.17
2025-03-12T10:18:50.22 8.19
2025-03-12T10:18:51.22 8.16
2025-03-12T10:18:52.22 8.19
2025-03-12T10:18:53.22 8.20
2025-03-12T10:18:54.22 8.18
2025-03-12T10:18:55.22 8.19
2025-03-12T10:18:56.22 8.16
2025-03-12T10:18:57.22 8.17
2025-03-12T10:18:58.22 8.17
2025-03-12T10:18:59.22 8.17
2025-03-12T10:19:00.22 8.17
2025-03-12T10:19:01.22 8.16
2025-03-12T10:19:02.22 8.16
2025-03-12T10:19:03.22 8.16
2025-03-12T10:19:04.22 8.17
2025-03-12T10:19:05.22 8.15
2025-03-12T10:19:06.22 8.17
2025-03-12T10:19:07.22 8.16
2025-03-12T10:19:08.22 8.15
2025-03-12T10:19:09.22 8.16
2025-03-12T10:19:10.22 8.18
2025-03-12T10:19:11.22 8.17
2025-03-12T10:19:12.22 8.18
2025-03-12T10:19:13.22 8.19
2025-03-12T10:19:14.22 8.17
2025-03-12T10:19:15.22 8.17
2025-03-12T10:19:16.22 8.17
2025-03-12T10:19:17.22 8.18
2025-03-12T10:19:18.22 8.17
2025-03-12T10:19:19.22 8.16
2025-03-12T10:19:20.22 8.17
2025-03-12T10:19:21.22 8.16
2025-03-12T10:19:22.22 8.18
2025-03-12T10:19:23.22 8.16
2025-03-12T10:19:24.22 8.19
2025-03-12T10:19:25.22 8.17
2025-03-12T10:19:26.22 8.17
2025-03-12T10:19:27.22 8.16
2025-03-12T10:19:28.22 8.19
2025-03-12T10:19:29.22 8.14
2025-03-12T10:19:30.22 8.18
2025-03-12T10:19:31.22 8.17
2025-03-12T10:19:32.23 8.17
2025-03-12T10:19:33.23 8.16
2025-03-12T10:19:34.23 8.19
2025-03-12T10:19:35.23 8.16
2025-03-12T10:19:36.23 8.18
2025-03-12T10:19:37.23 8.16
2025-03-12T10:19:38.23 8.18
2025-03-12T10:19:39.23 8.16
2025-03-12T10:19:40.23 8.16
2025-03-12T10:19:41.23 8.16
2025-03-12T10:19:42.31 8.17
2025-03-12T10:19:43.22 8.15
2025-03-12T10:19:44.22 8.16
2025-03-12T10:19:45.22 8.17
2025-03-12T10:19:46.22 8.17
2025-03-12T10:19:47.22 8.16
2025-03-12T10:19:48.22 8.16
2025-03-12T10:19:49.22 8.17
2025-03-12T10:19:50.22 8.17
2025-03-12T10:19:51.22 8.16
2025-03-12T10:19:52.22 8.17
2025-03-12T10:19:53.22 8.14
2025-03-12T10:19:54.22 8.19
2025-03-12T10:19:55.22 8.16
2025-03-12T10:19:56.22 8.19
2025-03-12T10:19:57.22 8.16
2025-03-12T10:19:58.22 8.17
2025-03-12T10:19:59.22 8.16
2025-03-12T10:20:00.22 8.16
2025-03-12T10:20:01.22 8.19
2025-03-12T10:20:02.22 8.19
2025-03-12T10:20:03.22 8.17
2025-03-12T10:20:04.22 8.19
2025-03-12T10:20:05.22 8.19
2025-03-12T10:20:06.22 8.16
2025-03-12T10:20:07.22 8.16
2025-03-12T10:20:08.22 8.17
2025-03-12T10:20:09.22 8.19
2025-03-12T10:20:10.22 8.19
2025-03-12T10:20:11.22 8.16
2025-03-12T10:20:12.22 8.16
2025-03-12T10:20:13.22 8.14
2025-03-12T10:20:14.22 8.18
2025-03-12T10:20:15.22 8.16
2025-03-12T10:20:16.22 8.16
2025-03-12T10:20:17.22 8.17
2025-03-12T10:20:18.22 8.17
2025-03-12T10:20:19.22 8.17
2025-03-12T10:20:20.22 8.16
2025-03-12T10:20:21.22 8.16
2025-03-12T10:20:22.22 8.19
2025-03-12T10:20:23.22 8.19
2025-03-12T10:20:24.22 8.17
2025-03-12T10:20:25.22 8.17
2025-03-12T10:20:26.22 8.16
2025-03-12T10:20:27.22 8.19
2025-03-12T10:20:28.22 8.17
2025-03-12T10:20:29.22 8.18
2025-03-12T10:20:30.22 8.17
2025-03-12T10:20:31.22 8.17
2025-03-12T10:20:32.23 8.15
2025-03-12T10:20:33.23 8.17
2025-03-12T10:20:34.23 8.18
2025-03-12T10:20:35.23 8.20
2025-03-12T10:20:36.23 8.19
2025-03-12T10:20:37.23 8.19
2025-03-12T10:20:38.23 8.17
2025-03-12T10:20:39.23 8.17
2025-03-12T10:20:40.23 8.17
2025-03-12T10:20:41.23 8.17
2025-03-12T10:20:42.23 8.17
2025-03-12T10:20:43.23 8.18
2025-03-12T10:20:44.23 8.19
2025-03-12T10:20:45.23 8.17
2025-03-12T10:20:46.23 8.19
2025-03-12T10:20:47.23 8.18
2025-03-12T10:20:48.23 8.17
2025-03-12T10:20:49.23 8.16
2025-03-12T10:20:50.23 8.16
2025-03-12T10:20:51.23 8.17
2025-03-12T10:20:52.23 8.17
2025-03-12T10:20:53.23 8.18
2025-03-12T10:20:54.23 8.17
2025-03-12T10:20:55.23 8.17
2025-03-12T10:20:56.23 8.17
2025-03-12T10:20:57.23 8.18
2025-03-12T10:20:58.23 8.18
2025-03-12T10:20:59.23 8.16
2025-03-12T10:21:00.23 8.16
2025-03-12T10:21:01.23 8.16
2025-03-12T10:21:02.23 8.16
2025-03-12T10:21:03.23 8.17
2025-03-12T10:21:04.23 8.18
2025-03-12T10:21:05.23 8.17
2025-03-12T10:21:06.23 8.18
2025-03-12T10:21:07.23 8.20
2025-03-12T10:21:08.23 8.17
2025-03-12T10:21:09.23 8.19
2025-03-12T10:21:10.23 8.18
2025-03-12T10:21:11.23 8.17
2025-03-12T10:21:12.23 8.18
2025-03-12T10:21:13.23 8.18
2025-03-12T10:21:14.23 8.19
2025-03-12T10:21:15.23 8.19
2025-03-12T10:21:16.23 8.17
2025-03-12T10:21:17.23 8.17
2025-03-12T10:21:18.23 8.17
2025-03-12T10:21:19.23 8.17
2025-03-12T10:21:20.23 8.16
2025-03-12T10:21:21.23 8.17
2025-03-12T10:21:22.23 8.17
2025-03-12T10:21:23.23 8.16
2025-03-12T10:21:24.23 8.17
2025-03-12T10:21:25.23 8.17
2025-03-12T10:21:26.23 8.18
2025-03-12T10:21:27.23 8.16
2025-03-12T10:21:28.23 8.18
2025-03-12T10:21:29.23 8.18
2025-03-12T10:21:30.23 8.19
2025-03-12T10:21:31.23 8.14
2025-03-12T10:21:32.24 8.16
2025-03-12T10:21:33.23 8.15
2025-03-12T10:21:34.23 8.16
2025-03-12T10:21:35.23 8.17
2025-03-12T10:21:36.23 8.18
2025-03-12T10:21:37.23 8.17
2025-03-12T10:21:38.23 8.18
2025-03-12T10:21:39.23 8.17
2025-03-12T10:21:40.23 8.16
2025-03-12T10:21:41.23 8.17
2025-03-12T10:21:42.23 8.17
2025-03-12T10:21:43.23 8.19
2025-03-12T10:21:44.23 8.16
2025-03-12T10:21:45.23 8.17
2025-03-12T10:21:46.23 8.16
2025-03-12T10:21:47.23 8.19
2025-03-12T10:21:48.23 8.20
2025-03-12T10:21:49.23 8.18
2025-03-12T10:21:50.23 8.18
2025-03-12T10:21:51.24 8.19
2025-03-12T10:21:52.24 8.16
2025-03-12T10:21:53.24 8.17
2025-03-12T10:21:54.24 8.18
2025-03-12T10:21:55.24 8.14
2025-03-12T10:21:56.24 8.16
2025-03-12T10:21:57.24 8.16
2025-03-12T10:21:58.24 8.16
2025-03-12T10:21:59.24 8.16
2025-03-12T10:22:00.24 8.17
2025-03-12T10:22:01.24 8.16
2025-03-12T10:22:02.24 8.14
2025-03-12T10:22:03.24 8.16
2025-03-12T10:22:04.24 8.18
2025-03-12T10:22:05.24 8.14
2025-03-12T10:22:06.24 8.16
2025-03-12T10:22:07.24 8.16
2025-03-12T10:22:08.24 8.17
2025-03-12T10:22:09.24 8.17
2025-03-12T10:22:10.24 8.17
2025-03-12T10:22:11.24 8.17
2025-03-12T10:22:12.24 8.19
2025-03-12T10:22:13.24 8.17
2025-03-12T10:22:14.24 8.16
2025-03-12T10:22:15.24 8.17
2025-03-12T10:22:16.24 8.17
2025-03-12T10:22:17.24 8.17
2025-03-12T10:22:18.24 8.16
2025-03-12T10:22:19.24 8.19
2025-03-12T10:22:20.24 8.17
2025-03-12T10:22:21.24 8.20
2025-03-12T10:22:22.24 8.18
2025-03-12T10:22:23.24 8.16
2025-03-12T10:22:24.24 8.17
2025-03-12T10:22:25.24 8.19
2025-03-12T10:22:26.24 8.16
2025-03-12T10:22:27.24 8.17
2025-03-12T10:22:28.24 8.16
2025-03-12T10:22:29.24 8.19
2025-03-12T10:22:30.24 8.19
2025-03-12T10:22:31.24 8.19
2025-03-12T10:22:32.25 8.16
2025-03-12T10:22:33.23 8.19
2025-03-12T10:22:34.23 8.17
2025-03-12T10:22:35.23 8.16
2025-03-12T10:22:36.23 8.16
2025-03-12T10:22:37.23 8.16
2025-03-12T10:22:38.23 8.16
2025-03-12T10:22:39.23 8.17
2025-03-12T10:22:40.23 8.16
2025-03-12T10:22:41.23 8.17
2025-03-12T10:22:42.29 8.17
2025-03-12T10:22:43.22 8.17
2025-03-12T10:22:44.22 8.17
2025-03-12T10:22:45.22 8.17
2025-03-12T10:22:46.22 8.16
2025-03-12T10:22:47.22 8.18
2025-03-12T10:22:48.22 8.16
2025-03-12T10:22:49.22 8.15
2025-03-12T10:22:50.22 8.16
2025-03-12T10:22:51.22 8.19
2025-03-12T10:22:52.22 8.15
2025-03-12T10:22:53.22 8.17
2025-03-12T10:22:54.22 8.17
2025-03-12T10:22:55.22 8.16
2025-03-12T10:22:56.22 8.17
2025-03-12T10:22:57.22 8.18
2025-03-12T10:22:58.22 8.17
2025-03-12T10:22:59.22 8.18
2025-03-12T10:23:00.22 8.15
2025-03-12T10:23:01.22 8.17
2025-03-12T10:23:02.22 8.20
2025-03-12T10:23:03.22 8.17
2025-03-12T10:23:04.22 8.16
2025-03-12T10:23:05.22 8.17
2025-03-12T10:23:06.22 8.18
2025-03-12T10:23:07.22 8.16
2025-03-12T10:23:08.22 8.17
2025-03-12T10:23:09.22 8.18
2025-03-12T10:23:10.22 8.17
2025-03-12T10:23:11.22 8.15
2025-03-12T10:23:12.22 8.16
2025-03-12T10:23:13.22 8.17
2025-03-12T10:23:14.22 8.17
2025-03-12T10:23:15.22 8.17
2025-03-12T10:23:16.22 8.16
2025-03-12T10:23:17.22 8.17
2025-03-12T10:23:18.22 8.17
2025-03-12T10:23:19.22 8.14
2025-03-12T10:23:20.22 8.17
2025-03-12T10:23:21.22 8.16
2025-03-12T10:23:22.27 8.17
2025-03-12T10:23:23.21 8.17
2025-03-12T10:23:24.21 8.18
2025-03-12T10:23:25.21 8.18
2025-03-12T10:23:26.21 8.17
2025-03-12T10:23:27.21 8.17
2025-03-12T10:23:28.21 8.16
2025-03-12T10:23:29.21 8.16
2025-03-12T10:23:30.21 8.19
2025-03-12T10:23:31.21 8.16
2025-03-12T10:23:32.21 8.17
2025-03-12T10:23:33.21 8.16
2025-03-12T10:23:34.21 8.16
2025-03-12T10:23:35.21 8.16
2025-03-12T10:23:36.21 8.16
2025-03-12T10:23:37.21 8.17
2025-03-12T10:23:38.21 8.17
2025-03-12T10:23:39.21 8.18
2025-03-12T10:23:40.21 8.17
2025-03-12T10:23:41.21 8.19
2025-03-12T10:23:42.21 8.17
2025-03-12T10:23:43.21 8.14
2025-03-12T10:23:44.21 8.17
2025-03-12T10:23:45.21 8.16
2025-03-12T10:23:46.21 8.16
2025-03-12T10:23:47.21 8.16
2025-03-12T10:23:48.21 8.17
2025-03-12T10:23:49.21 8.17
2025-03-12T10:23:50.21 8.17
2025-03-12T10:23:51.21 8.17
2025-03-12T10:23:52.21 8.18
2025-03-12T10:23:53.21 8.19
2025-03-12T10:23:54.21 8.17
2025-03-12T10:23:55.21 8.17
2025-03-12T10:23:56.21 8.17
2025-03-12T10:23:57.21 8.19
2025-03-12T10:23:58.21 8.18
2025-03-12T10:23:59.21 8.16
2025-03-12T10:24:00.21 8.17
2025-03-12T10:24:01.21 8.19
2025-03-12T10:24:02.21 8.18
2025-03-12T10:24:03.21 8.20
2025-03-12T10:24:04.21 8.17
2025-03-12T10:24:05.21 8.16
2025-03-12T10:24:06.21 8.20
2025-03-12T10:24:07.21 8.16
2025-03-12T10:24:08.21 8.18
2025-03-12T10:24:09.21 8.16
2025-03-12T10:24:10.21 8.17
2025-03-12T10:24:11.21 8.18
2025-03-12T10:24:12.21 8.16
2025-03-12T10:24:13.21 8.14
2025-03-12T10:24:14.21 8.17
2025-03-12T10:24:15.21 8.19
2025-03-12T10:24:16.21 8.18
2025-03-12T10:24:17.21 8.17
2025-03-12T10:24:18.21 8.20
2025-03-12T10:24:19.21 8.17
2025-03-12T10:24:20.21 8.19
2025-03-12T10:24:21.21 8.17
2025-03-12T10:24:22.21 8.16
2025-03-12T10:24:23.21 8.18
2025-03-12T10:24:24.21 8.19
2025-03-12T10:24:25.21 8.16
2025-03-12T10:24:26.21 8.17
2025-03-12T10:24:27.21 8.18
2025-03-12T10:24:28.21 8.19
2025-03-12T10:24:29.21 8.17
2025-03-12T10:24:30.21 8.17
2025-03-12T10:24:31.21 8.17
2025-03-12T10:24:32.21 8.17
2025-03-12T10:24:33.21 8.18
2025-03-12T10:24:34.21 8.16
2025-03-12T10:24:35.21 8.19
2025-03-12T10:24:36.21 8.19
2025-03-12T10:24:37.21 8.16
2025-03-12T10:24:38.21 8.16
2025-03-12T10:24:39.21 8.18
2025-03-12T10:24:40.21 8.16
2025-03-12T10:24:41.21 8.18
2025-03-12T10:24:42.21 8.17
2025-03-12T10:24:43.21 8.17
2025-03-12T10:24:44.21 8.18
2025-03-12T10:24:45.21 8.18
2025-03-12T10:24:46.21 8.17
2025-03-12T10:24:47.21 8.15
2025-03-12T10:24:48.21 8.18
2025-03-12T10:24:49.21 8.14
2025-03-12T10:24:50.21 8.16
2025-03-12T10:24:51.21 8.16
2025-03-12T10:24:52.21 8.17
2025-03-12T10:24:53.21 8.19
2025-03-12T10:24:54.21 8.16
2025-03-12T10:24:55.21 8.16
2025-03-12T10:24:56.21 8.17
2025-03-12T10:24:57.21 8.16
2025-03-12T10:24:58.21 8.15
2025-03-12T10:24:59.21 8.18
2025-03-12T10:25:00.21 8.16
2025-03-12T10:25:01.21 8.16
2025-03-12T10:25:02.21 8.16
2025-03-12T10:25:03.21 8.16
2025-03-12T10:25:04.21 8.17
2025-03-12T10:25:05.21 8.16
2025-03-12T10:25:06.21 8.18
2025-03-12T10:25:07.21 8.17
2025-03-12T10:25:08.21 8.17
2025-03-12T10:25:09.21 8.17
2025-03-12T10:25:10.21 8.19
2025-03-12T10:25:11.21 8.19
2025-03-12T10:25:12.21 8.17
2025-03-12T10:25:13.21 8.17
2025-03-12T10:25:14.21 8.14
2025-03-12T10:25:15.21 8.17
2025-03-12T10:25:16.21 8.17
2025-03-12T10:25:17.21 8.16
2025-03-12T10:25:18.21 8.17
2025-03-12T10:25:19.21 8.16
2025-03-12T10:25:20.21 8.17
2025-03-12T10:25:21.21 8.16
2025-03-12T10:25:22.21 8.16
2025-03-12T10:25:23.21 8.16
2025-03-12T10:25:24.21 8.18
2025-03-12T10:25:25.21 8.17
2025-03-12T10:25:26.21 8.19
2025-03-12T10:25:27.21 8.17
2025-03-12T10:25:28.21 8.16
2025-03-12T10:25:29.21 8.16
2025-03-12T10:25:30.21 8.17
2025-03-12T10:25:31.21 8.17
2025-03-12T10:25:32.22 8.17
2025-03-12T10:25:33.22 8.16
2025-03-12T10:25:34.22 8.17
2025-03-12T10:25:35.22 8.17
2025-03-12T10:25:36.22 8.16
2025-03-12T10:25:37.22 8.17
2025-03-12T10:25:38.22 8.16
2025-03-12T10:25:39.22 8.17
2025-03-12T10:25:40.22 8.18
2025-03-12T10:25:41.22 8.19
2025-03-12T10:25:42.22 8.16
2025-03-12T10:25:43.22 8.19
2025-03-12T10:25:44.22 8.16
2025-03-12T10:25:45.22 8.16
2025-03-12T10:25:46.22 8.18
2025-03-12T10:25:47.22 8.19
2025-03-12T10:25:48.22 8.17
2025-03-12T10:25:49.22 8.17
2025-03-12T10:25:50.22 8.17
2025-03-12T10:25:51.22 8.16
2025-03-12T10:25:52.22 8.16
2025-03-12T10:25:53.22 8.16
2025-03-12T10:25:54.22 8.17
2025-03-12T10:25:55.22 8.20
2025-03-12T10:25:56.22 8.17
2025-03-12T10:25:57.22 8.16
2025-03-12T10:25:58.22 8.18
2025-03-12T10:25:59.22 8.20
2025-03-12T10:26:00.22 8.17
2025-03-12T10:26:01.22 8.17
2025-03-12T10:26:02.22 8.14
2025-03-12T10:26:03.22 8.20
2025-03-12T10:26:04.22 8.17
2025-03-12T10:26:05.22 8.17
2025-03-12T10:26:06.22 8.18
2025-03-12T10:26:07.22 8.17
2025-03-12T10:26:08.22 8.19
2025-03-12T10:26:09.22 8.18
2025-03-12T10:26:10.22 8.14
2025-03-12T10:26:11.22 8.14
2025-03-12T10:26:12.22 8.16
2025-03-12T10:26:13.22 8.19
2025-03-12T10:26:14.22 8.17
2025-03-12T10:26:15.22 8.17
2025-03-12T10:26:16.22 8.19
2025-03-12T10:26:17.22 8.18
2025-03-12T10:26:18.22 8.18
2025-03-12T10:26:19.22 8.19
2025-03-12T10:26:20.22 8.18
2025-03-12T10:26:21.22 8.18
2025-03-12T10:26:22.22 8.16
2025-03-12T10:26:23.22 8.16
2025-03-12T10:26:24.25 8.18
2025-03-12T10:26:25.21 8.18
2025-03-12T10:26:26.21 8.19
2025-03-12T10:26:27.21 8.16
2025-03-12T10:26:28.21 8.16
2025-03-12T10:26:29.22 8.17
2025-03-12T10:26:30.20 8.16
2025-03-12T10:26:31.20 8.17
2025-03-12T10:26:32.24 8.17
2025-03-12T10:26:33.19 8.16
2025-03-12T10:26:34.19 8.16
2025-03-12T10:26:35.19 8.19
2025-03-12T10:26:36.19 8.16
2025-03-12T10:26:37.19 8.18
2025-03-12T10:26:38.19 8.16
2025-03-12T10:26:39.19 8.16
2025-03-12T10:26:40.19 8.19
2025-03-12T10:26:41.19 8.19
2025-03-12T10:26:42.19 8.18
2025-03-12T10:26:43.19 8.16
2025-03-12T10:26:44.19 8.17
2025-03-12T10:26:45.19 8.17
2025-03-12T10:26:46.19 8.16
2025-03-12T10:26:47.19 8.17
2025-03-12T10:26:48.19 8.16
2025-03-12T10:26:49.19 8.17
2025-03-12T10:26:50.19 8.16
2025-03-12T10:26:51.19 8.17
2025-03-12T10:26:52.19 8.18
2025-03-12T10:26:53.19 8.16
2025-03-12T10:26:54.19 8.17
2025-03-12T10:26:55.19 8.19
2025-03-12T10:26:56.19 8.16
2025-03-12T10:26:57.19 8.18
2025-03-12T10:26:58.19 8.19
2025-03-12T10:26:59.19 8.18
2025-03-12T10:27:00.20 8.17
2025-03-12T10:27:01.19 8.17
2025-03-12T10:27:02.19 8.17
2025-03-12T10:27:03.19 8.17
2025-03-12T10:27:04.20 8.16
2025-03-12T10:27:05.19 8.16
2025-03-12T10:27:06.19 8.17
2025-03-12T10:27:07.19 8.16
2025-03-12T10:27:08.19 8.17
2025-03-12T10:27:09.20 8.16
2025-03-12T10:27:10.20 8.19
2025-03-12T10:27:11.20 8.16
2025-03-12T10:27:12.20 8.17
2025-03-12T10:27:13.20 8.16
2025-03-12T10:27:14.20 8.17
2025-03-12T10:27:15.20 8.17
2025-03-12T10:27:16.20 8.17
2025-03-12T10:27:17.20 8.17
2025-03-12T10:27:18.20 8.17
2025-03-12T10:27:19.20 8.19
2025-03-12T10:27:20.20 8.17
2025-03-12T10:27:21.20 8.17
2025-03-12T10:27:22.20 8.17
2025-03-12T10:27:23.20 8.16
2025-03-12T10:27:24.20 8.19
2025-03-12T10:27:25.20 8.17
2025-03-12T10:27:26.20 8.19
2025-03-12T10:27:27.20 8.17
2025-03-12T10:27:28.20 8.18
2025-03-12T10:27:29.20 8.19
2025-03-12T10:27:30.20 8.17
2025-03-12T10:27:31.20 8.17
2025-03-12T10:27:32.20 8.18
2025-03-12T10:27:33.20 8.17
2025-03-12T10:27:34.20 8.18
2025-03-12T10:27:35.20 8.17
2025-03-12T10:27:36.20 8.18
2025-03-12T10:27:37.20 8.16
2025-03-12T10:27:38.20 8.19
2025-03-12T10:27:39.20 8.20
2025-03-12T10:27:40.20 8.17
2025-03-12T10:27:41.20 8.15
2025-03-12T10:27:42.20 8.17
2025-03-12T10:27:43.20 8.17
2025-03-12T10:27:44.20 8.19
2025-03-12T10:27:45.20 8.18
2025-03-12T10:27:46.20 8.19
2025-03-12T10:27:47.20 8.17
2025-03-12T10:27:48.20 8.17
2025-03-12T10:27:49.20 8.18
2025-03-12T10:27:50.20 8.18
2025-03-12T10:27:51.20 8.19
2025-03-12T10:27:52.20 8.18
2025-03-12T10:27:53.20 8.17
2025-03-12T10:27:54.20 8.16
2025-03-12T10:27:55.20 8.18
2025-03-12T10:27:56.20 8.17
2025-03-12T10:27:57.20 8.16
2025-03-12T10:27:58.20 8.17
2025-03-12T10:27:59.20 8.13
2025-03-12T10:28:00.20 8.16
2025-03-12T10:28:01.20 8.17
2025-03-12T10:28:02.20 8.19
2025-03-12T10:28:03.20 8.17
2025-03-12T10:28:04.20 8.17
2025-03-12T10:28:05.20 8.16
2025-03-12T10:28:06.20 8.17
2025-03-12T10:28:07.20 8.16
2025-03-12T10:28:08.20 8.17
2025-03-12T10:28:09.20 8.18
2025-03-12T10:28:10.20 8.19
2025-03-12T10:28:11.20 8.18
2025-03-12T10:28:12.20 8.17
2025-03-12T10:28:13.20 8.17
2025-03-12T10:28:14.20 8.16
2025-03-12T10:28:15.20 8.17
2025-03-12T10:28:16.20 8.17
2025-03-12T10:28:17.20 8.19
2025-03-12T10:28:18.20 8.18
2025-03-12T10:28:19.20 8.15
2025-03-12T10:28:20.20 8.15
2025-03-12T10:28:21.20 8.14
2025-03-12T10:28:22.20 8.17
2025-03-12T10:28:23.20 8.17
2025-03-12T10:28:24.20 8.16
2025-03-12T10:28:25.20 8.16
2025-03-12T10:28:26.20 8.16
2025-03-12T10:28:27.20 8.18
2025-03-12T10:28:28.20 8.17
2025-03-12T10:28:29.20 8.17
2025-03-12T10:28:30.20 8.17
2025-03-12T10:28:31.20 8.17
2025-03-12T10:28:32.20 8.16
2025-03-12T10:28:33.20 8.17
2025-03-12T10:28:34.20 8.19
2025-03-12T10:28:35.20 8.17
2025-03-12T10:28:36.20 8.19
2025-03-12T10:28:37.20 8.16
2025-03-12T10:28:38.20 8.19
2025-03-12T10:28:39.20 8.17
2025-03-12T10:28:40.20 8.17
2025-03-12T10:28:41.20 8.19
2025-03-12T10:28:42.24 8.16
2025-03-12T10:28:43.20 8.20
2025-03-12T10:28:44.20 8.18
2025-03-12T10:28:45.20 8.18
2025-03-12T10:28:46.20 8.18
2025-03-12T10:28:47.20 8.17
2025-03-12T10:28:48.20 8.17
2025-03-12T10:28:49.20 8.16
2025-03-12T10:28:50.20 8.19
2025-03-12T10:28:51.20 8.18
2025-03-12T10:28:52.20 8.19
2025-03-12T10:28:53.20 8.18
2025-03-12T10:28:54.20 8.17
2025-03-12T10:28:55.20 8.18
2025-03-12T10:28:56.20 8.19
2025-03-12T10:28:57.20 8.18
2025-03-12T10:28:58.20 8.17
2025-03-12T10:28:59.20 8.18
2025-03-12T10:29:00.20 8.19
2025-03-12T10:29:01.20 8.16
2025-03-12T10:29:02.20 8.16
2025-03-12T10:29:03.20 8.16
2025-03-12T10:29:04.20 8.16
2025-03-12T10:29:05.20 8.17
2025-03-12T10:29:06.20 8.18
2025-03-12T10:29:07.20 8.17
2025-03-12T10:29:08.20 8.17
2025-03-12T10:29:09.20 8.17
2025-03-12T10:29:10.20 8.19
2025-03-12T10:29:11.20 8.17
2025-03-12T10:29:12.20 8.16
2025-03-12T10:29:13.20 8.18
2025-03-12T10:29:14.20 8.16
2025-03-12T10:29:15.20 8.16
2025-03-12T10:29:16.20 8.18
2025-03-12T10:29:17.20 8.18
2025-03-12T10:29:18.20 8.17
2025-03-12T10:29:19.20 8.17
2025-03-12T10:29:20.20 8.20
2025-03-12T10:29:21.20 8.17
2025-03-12T10:29:22.20 8.16
2025-03-12T10:29:23.20 8.17
2025-03-12T10:29:24.20 8.19
2025-03-12T10:29:25.20 8.15
2025-03-12T10:29:26.20 8.17
2025-03-12T10:29:27.20 8.16
2025-03-12T10:29:28.20 8.18
2025-03-12T10:29:29.20 8.19
2025-03-12T10:29:30.20 8.18
2025-03-12T10:29:31.21 8.16
2025-03-12T10:29:32.20 8.17
2025-03-12T10:29:33.20 8.17
2025-03-12T10:29:34.20 8.17
2025-03-12T10:29:35.20 8.17
2025-03-12T10:29:36.20 8.16
2025-03-12T10:29:37.20 8.17
2025-03-12T10:29:38.20 8.17
2025-03-12T10:29:39.20 8.16
2025-03-12T10:29:40.20 8.17
2025-03-12T10:29:41.20 8.17
2025-03-12T10:29:42.20 8.18
2025-03-12T10:29:43.20 8.18
2025-03-12T10:29:44.20 8.17
2025-03-12T10:29:45.20 8.18
2025-03-12T10:29:46.20 8.16
2025-03-12T10:29:47.20 8.18
2025-03-12T10:29:48.20 8.18
2025-03-12T10:29:49.20 8.16
2025-03-12T10:29:50.20 8.17
2025-03-12T10:29:51.20 8.17
2025-03-12T10:29:52.20 8.17
2025-03-12T10:29:53.20 8.17
2025-03-12T10:29:54.20 8.17
2025-03-12T10:29:55.20 8.17
2025-03-12T10:29:56.20 8.18
2025-03-12T10:29:57.20 8.17
2025-03-12T10:29:58.20 8.18
2025-03-12T10:29:59.20 8.20
2025-03-12T10:30:00.20 8.19
2025-03-12T10:30:01.20 8.17
2025-03-12T10:30:02.20 8.15
2025-03-12T10:30:03.20 8.18
2025-03-12T10:30:04.20 8.17
2025-03-12T10:30:05.20 8.17
2025-03-12T10:30:06.20 8.17
2025-03-12T10:30:07.20 8.19
2025-03-12T10:30:08.20 8.17
2025-03-12T10:30:09.20 8.19
2025-03-12T10:30:10.20 8.17
2025-03-12T10:30:11.20 8.18
2025-03-12T10:30:12.20 8.17
2025-03-12T10:30:13.20 8.16
2025-03-12T10:30:14.20 8.16
2025-03-12T10:30:15.20 8.19
2025-03-12T10:30:16.20 8.16
2025-03-12T10:30:17.20 8.15
2025-03-12T10:30:18.20 8.16
2025-03-12T10:30:19.20 8.19
2025-03-12T10:30:20.20 8.17
2025-03-12T10:30:21.20 8.18
2025-03-12T10:30:22.20 8.16
2025-03-12T10:30:23.20 8.17
2025-03-12T10:30:24.20 8.18
2025-03-12T10:30:25.20 8.18
2025-03-12T10:30:26.20 8.17
2025-03-12T10:30:27.20 8.16
2025-03-12T10:30:28.20 8.19
2025-03-12T10:30:29.20 8.16
2025-03-12T10:30:30.20 8.19
2025-03-12T10:30:31.20 8.16
2025-03-12T10:30:32.20 8.19
2025-03-12T10:30:33.20 8.17
2025-03-12T10:30:34.20 8.18
2025-03-12T10:30:35.20 8.16
2025-03-12T10:30:36.20 8.16
2025-03-12T10:30:37.20 8.18
2025-03-12T10:30:38.20 8.17
2025-03-12T10:30:39.20 8.18
2025-03-12T10:30:40.20 8.17
2025-03-12T10:30:41.20 8.17
2025-03-12T10:30:42.20 8.17
2025-03-12T10:30:43.20 8.18
2025-03-12T10:30:44.20 8.17
2025-03-12T10:30:45.20 8.19
2025-03-12T10:30:46.20 8.17
2025-03-12T10:30:47.20 8.19
2025-03-12T10:30:48.20 8.18
2025-03-12T10:30:49.20 8.17
2025-03-12T10:30:50.20 8.17
2025-03-12T10:30:51.20 8.17
2025-03-12T10:30:52.21 8.17
2025-03-12T10:30:53.19 8.17
2025-03-12T10:30:54.19 8.19
2025-03-12T10:30:55.19 8.18
2025-03-12T10:30:56.19 8.17
2025-03-12T10:30:57.19 8.16
2025-03-12T10:30:58.19 8.19
2025-03-12T10:30:59.19 8.16
2025-03-12T10:31:00.19 8.17
2025-03-12T10:31:01.19 8.16
2025-03-12T10:31:02.19 8.18
2025-03-12T10:31:03.19 8.17
2025-03-12T10:31:04.19 8.17
2025-03-12T10:31:05.19 8.17
2025-03-12T10:31:06.19 8.17
2025-03-12T10:31:07.19 8.17
2025-03-12T10:31:08.19 8.17
2025-03-12T10:31:09.19 8.15
2025-03-12T10:31:10.19 8.16
2025-03-12T10:31:11.19 8.17
2025-03-12T10:31:12.19 8.16
2025-03-12T10:31:13.19 8.18
2025-03-12T10:31:14.19 8.17
2025-03-12T10:31:15.19 8.19
2025-03-12T10:31:16.19 8.17
2025-03-12T10:31:17.19 8.19
2025-03-12T10:31:18.19 8.18
2025-03-12T10:31:19.19 8.18
2025-03-12T10:31:20.19 8.18
2025-03-12T10:31:21.19 8.19
2025-03-12T10:31:22.19 8.16
2025-03-12T10:31:23.19 8.16
2025-03-12T10:31:24.19 8.15
2025-03-12T10:31:25.19 8.19
2025-03-12T10:31:26.19 8.17
2025-03-12T10:31:27.19 8.16
2025-03-12T10:31:28.19 8.17
2025-03-12T10:31:29.19 8.16
2025-03-12T10:31:30.19 8.16
2025-03-12T10:31:31.19 8.17
2025-03-12T10:31:32.19 8.16
2025-03-12T10:31:33.19 8.17
2025-03-12T10:31:34.19 8.17
2025-03-12T10:31:35.19 8.16
2025-03-12T10:31:36.19 8.16
2025-03-12T10:31:37.19 8.17
2025-03-12T10:31:38.19 8.16
2025-03-12T10:31:39.19 8.16
2025-03-12T10:31:40.19 8.16
2025-03-12T10:31:41.19 8.17
2025-03-12T10:31:42.19 8.16
2025-03-12T10:31:43.19 8.16
2025-03-12T10:31:44.19 8.17
2025-03-12T10:31:45.19 8.16
2025-03-12T10:31:46.19 8.17
2025-03-12T10:31:47.19 8.16
2025-03-12T10:31:48.19 8.17
2025-03-12T10:31:49.19 8.17
2025-03-12T10:31:50.19 8.17
2025-03-12T10:31:51.19 8.18
2025-03-12T10:31:52.19 8.16
2025-03-12T10:31:53.19 8.16
2025-03-12T10:31:54.19 8.16
2025-03-12T10:31:55.19 8.17
2025-03-12T10:31:56.19 8.18
2025-03-12T10:31:57.19 8.19
2025-03-12T10:31:58.19 8.17
2025-03-12T10:31:59.19 8.17
2025-03-12T10:32:00.19 8.16
2025-03-12T10:32:01.19 8.19
2025-03-12T10:32:02.19 8.18
2025-03-12T10:32:03.19 8.16
2025-03-12T10:32:04.19 8.17
2025-03-12T10:32:05.19 8.17
2025-03-12T10:32:06.19 8.17
2025-03-12T10:32:07.19 8.14
2025-03-12T10:32:08.19 8.17
2025-03-12T10:32:09.19 8.16
2025-03-12T10:32:10.19 8.17
2025-03-12T10:32:11.19 8.17
2025-03-12T10:32:12.19 8.17
2025-03-12T10:32:13.19 8.17
2025-03-12T10:32:14.19 8.16
2025-03-12T10:32:15.19 8.16
2025-03-12T10:32:16.19 8.17
2025-03-12T10:32:17.19 8.17
2025-03-12T10:32:18.19 8.17
2025-03-12T10:32:19.19 8.16
2025-03-12T10:32:20.19 8.18
2025-03-12T10:32:21.19 8.17
2025-03-12T10:32:22.23 8.16
2025-03-12T10:32:23.18 8.16
2025-03-12T10:32:24.18 8.16
2025-03-12T10:32:25.18 8.18
2025-03-12T10:32:26.19 8.16
2025-03-12T10:32:27.18 8.16
2025-03-12T10:32:28.19 8.19
2025-03-12T10:32:29.19 8.17
2025-03-12T10:32:30.19 8.16
2025-03-12T10:32:31.19 8.16
2025-03-12T10:32:32.19 8.16
2025-03-12T10:32:33.20 8.16
2025-03-12T10:32:34.18 8.17
2025-03-12T10:32:35.18 8.18
2025-03-12T10:32:36.18 8.19
2025-03-12T10:32:37.18 8.17
2025-03-12T10:32:38.18 8.20
2025-03-12T10:32:39.18 8.16
2025-03-12T10:32:40.18 8.18
2025-03-12T10:32:41.18 8.16
2025-03-12T10:32:42.18 8.16
2025-03-12T10:32:43.18 8.17
2025-03-12T10:32:44.18 8.19
2025-03-12T10:32:45.18 8.17
2025-03-12T10:32:46.18 8.16
2025-03-12T10:32:47.18 8.16
2025-03-12T10:32:48.18 8.16
2025-03-12T10:32:49.18 8.19
2025-03-12T10:32:50.18 8.16
2025-03-12T10:32:51.18 8.20
2025-03-12T10:32:52.18 8.17
2025-03-12T10:32:53.18 8.17
2025-03-12T10:32:54.18 8.17
2025-03-12T10:32:55.18 8.16
2025-03-12T10:32:56.18 8.16
2025-03-12T10:32:57.18 8.17
2025-03-12T10:32:58.18 8.17
2025-03-12T10:32:59.18 8.17
2025-03-12T10:33:00.18 8.17
2025-03-12T10:33:01.18 8.16
2025-03-12T10:33:02.22 8.20
2025-03-12T10:33:03.17 8.19
2025-03-12T10:33:04.17 8.16
2025-03-12T10:33:05.17 8.19
2025-03-12T10:33:06.17 8.16
2025-03-12T10:33:07.17 8.17
2025-03-12T10:33:08.17 8.20
2025-03-12T10:33:09.17 8.17
2025-03-12T10:33:10.17 8.17
2025-03-12T10:33:11.17 8.17
2025-03-12T10:33:12.17 8.18
2025-03-12T10:33:13.17 8.17
2025-03-12T10:33:14.17 8.19
2025-03-12T10:33:15.17 8.18
2025-03-12T10:33:16.17 8.17
2025-03-12T10:33:17.17 8.17
2025-03-12T10:33:18.17 8.14
2025-03-12T10:33:19.17 8.17
2025-03-12T10:33:20.17 8.18
2025-03-12T10:33:21.17 8.17
2025-03-12T10:33:22.17 8.16
2025-03-12T10:33:23.17 8.16
2025-03-12T10:33:24.17 8.17
2025-03-12T10:33:25.17 8.16
2025-03-12T10:33:26.17 8.17
2025-03-12T10:33:27.17 8.17
2025-03-12T10:33:28.17 8.16
2025-03-12T10:33:29.17 8.16
2025-03-12T10:33:30.17 8.18
2025-03-12T10:33:31.17 8.17
2025-03-12T10:33:32.17 8.16
2025-03-12T10:33:33.17 8.17
2025-03-12T10:33:34.17 8.16
2025-03-12T10:33:35.17 8.16
2025-03-12T10:33:36.17 8.17
2025-03-12T10:33:37.17 8.16
2025-03-12T10:33:38.17 8.14
2025-03-12T10:33:39.17 8.18
2025-03-12T10:33:40.17 8.16
2025-03-12T10:33:41.17 8.16
2025-03-12T10:33:42.17 8.18
2025-03-12T10:33:43.17 8.17
2025-03-12T10:33:44.17 8.17
2025-03-12T10:33:45.17 8.15
2025-03-12T10:33:46.17 8.20
2025-03-12T10:33:47.17 8.17
2025-03-12T10:33:48.17 8.16
2025-03-12T10:33:49.17 8.17
2025-03-12T10:33:50.17 8.18
2025-03-12T10:33:51.17 8.17
2025-03-12T10:33:52.17 8.17
2025-03-12T10:33:53.17 8.18
2025-03-12T10:33:54.17 8.19
2025-03-12T10:33:55.17 8.19
2025-03-12T10:33:56.17 8.17
2025-03-12T10:33:57.17 8.19
2025-03-12T10:33:58.17 8.17
2025-03-12T10:33:59.17 8.16
2025-03-12T10:34:00.17 8.18
2025-03-12T10:34:01.17 8.19
2025-03-12T10:34:02.17 8.17
2025-03-12T10:34:03.17 8.19
2025-03-12T10:34:04.17 8.19
2025-03-12T10:34:05.17 8.16
2025-03-12T10:34:06.17 8.18
2025-03-12T10:34:07.17 8.19
2025-03-12T10:34:08.17 8.17
2025-03-12T10:34:09.17 8.16
2025-03-12T10:34:10.17 8.17
2025-03-12T10:34:11.17 8.16
2025-03-12T10:34:12.17 8.16
2025-03-12T10:34:13.17 8.15
2025-03-12T10:34:14.17 8.17
2025-03-12T10:34:15.17 8.16
2025-03-12T10:34:16.17 8.17
2025-03-12T10:34:17.17 8.17
2025-03-12T10:34:18.17 8.17
2025-03-12T10:34:19.17 8.18
2025-03-12T10:34:20.17 8.19
2025-03-12T10:34:21.17 8.16
2025-03-12T10:34:22.17 8.18
2025-03-12T10:34:23.17 8.16
2025-03-12T10:34:24.17 8.17
2025-03-12T10:34:25.17 8.16
2025-03-12T10:34:26.17 8.16
2025-03-12T10:34:27.17 8.17
2025-03-12T10:34:28.17 8.16
2025-03-12T10:34:29.17 8.17
2025-03-12T10:34:30.17 8.17
2025-03-12T10:34:31.17 8.16
2025-03-12T10:34:32.17 8.19
2025-03-12T10:34:33.17 8.18
2025-03-12T10:34:34.17 8.16
2025-03-12T10:34:35.17 8.17
2025-03-12T10:34:36.17 8.17
2025-03-12T10:34:37.17 8.17
2025-03-12T10:34:38.17 8.17
2025-03-12T10:34:39.17 8.19
2025-03-12T10:34:40.17 8.16
2025-03-12T10:34:41.17 8.16
2025-03-12T10:34:42.17 8.17
2025-03-12T10:34:43.17 8.18
2025-03-12T10:34:44.17 8.19
2025-03-12T10:34:45.17 8.17
2025-03-12T10:34:46.17 8.17
2025-03-12T10:34:47.17 8.17
2025-03-12T10:34:48.17 8.18
2025-03-12T10:34:49.17 8.17
2025-03-12T10:34:50.17 8.17
2025-03-12T10:34:51.17 8.17
2025-03-12T10:34:52.17 8.17
2025-03-12T10:34:53.17 8.17
2025-03-12T10:34:54.17 8.16
2025-03-12T10:34:55.17 8.17
2025-03-12T10:34:56.17 8.17
2025-03-12T10:34:57.17 8.17
2025-03-12T10:34:58.17 8.18
2025-03-12T10:34:59.17 8.16
2025-03-12T10:35:00.17 8.17
2025-03-12T10:35:01.17 8.17
2025-03-12T10:35:02.17 8.17
2025-03-12T10:35:03.17 8.19
2025-03-12T10:35:04.17 8.15
2025-03-12T10:35:05.17 8.17
2025-03-12T10:35:06.17 8.17
2025-03-12T10:35:07.17 8.14
2025-03-12T10:35:08.17 8.17
2025-03-12T10:35:09.17 8.17
2025-03-12T10:35:10.17 8.17
2025-03-12T10:35:11.17 8.17
2025-03-12T10:35:12.17 8.17
2025-03-12T10:35:13.17 8.17
2025-03-12T10:35:14.17 8.17
2025-03-12T10:35:15.17 8.15
2025-03-12T10:35:16.17 8.19
2025-03-12T10:35:17.17 8.19
2025-03-12T10:35:18.17 8.19
2025-03-12T10:35:19.17 8.16
2025-03-12T10:35:20.17 8.18
2025-03-12T10:35:21.17 8.17
2025-03-12T10:35:22.17 8.18
2025-03-12T10:35:23.17 8.16
2025-03-12T10:35:24.17 8.16
2025-03-12T10:35:25.17 8.16
2025-03-12T10:35:26.17 8.17
2025-03-12T10:35:27.17 8.18
2025-03-12T10:35:28.17 8.16
2025-03-12T10:35:29.17 8.17
2025-03-12T10:35:30.17 8.19
2025-03-12T10:35:31.17 8.18
2025-03-12T10:35:32.17 8.20
2025-03-12T10:35:33.17 8.17
2025-03-12T10:35:34.17 8.17
2025-03-12T10:35:35.17 8.17
2025-03-12T10:35:36.17 8.19
2025-03-12T10:35:37.17 8.17
2025-03-12T10:35:38.17 8.18
2025-03-12T10:35:39.17 8.19
2025-03-12T10:35:40.17 8.15
2025-03-12T10:35:41.17 8.16
2025-03-12T10:35:42.17 8.17
2025-03-12T10:35:43.17 8.17
2025-03-12T10:35:44.17 8.17
2025-03-12T10:35:45.17 8.17
2025-03-12T10:35:46.17 8.19
2025-03-12T10:35:47.17 8.16
2025-03-12T10:35:48.17 8.18
2025-03-12T10:35:49.17 8.19
2025-03-12T10:35:50.17 8.16
2025-03-12T10:35:51.17 8.19
2025-03-12T10:35:52.17 8.17
2025-03-12T10:35:53.17 8.16
2025-03-12T10:35:54.17 8.15
2025-03-12T10:35:55.17 8.14
2025-03-12T10:35:56.17 8.17
2025-03-12T10:35:57.17 8.16
2025-03-12T10:35:58.17 8.13
2025-03-12T10:35:59.17 8.16
2025-03-12T10:36:00.17 8.17
2025-03-12T10:36:01.17 8.20
2025-03-12T10:36:02.17 8.16
2025-03-12T10:36:03.17 8.16
2025-03-12T10:36:04.17 8.19
2025-03-12T10:36:05.17 8.17
2025-03-12T10:36:06.17 8.16
2025-03-12T10:36:07.17 8.17
2025-03-12T10:36:08.17 8.17
2025-03-12T10:36:09.17 8.17
2025-03-12T10:36:10.17 8.16
2025-03-12T10:36:11.17 8.17
2025-03-12T10:36:12.17 8.18
2025-03-12T10:36:13.17 8.14
2025-03-12T10:36:14.17 8.17
2025-03-12T10:36:15.17 8.16
2025-03-12T10:36:16.17 8.14
2025-03-12T10:36:17.17 8.16
2025-03-12T10:36:18.17 8.16
2025-03-12T10:36:19.17 8.18
2025-03-12T10:36:20.17 8.17
2025-03-12T10:36:21.17 8.16
2025-03-12T10:36:22.17 8.15
2025-03-12T10:36:23.17 8.17
2025-03-12T10:36:24.17 8.16
2025-03-12T10:36:25.17 8.16
2025-03-12T10:36:26.17 8.19
2025-03-12T10:36:27.17 8.16
2025-03-12T10:36:28.17 8.16
2025-03-12T10:36:29.17 8.17
2025-03-12T10:36:30.17 8.19
2025-03-12T10:36:31.17 8.19
2025-03-12T10:36:32.17 8.18
2025-03-12T10:36:33.17 8.16
2025-03-12T10:36:34.17 8.17
2025-03-12T10:36:35.17 8.19
2025-03-12T10:36:36.17 8.17
2025-03-12T10:36:37.17 8.17
2025-03-12T10:36:38.17 8.18
2025-03-12T10:36:39.17 8.19
2025-03-12T10:36:40.17 8.16
2025-03-12T10:36:41.17 8.17
2025-03-12T10:36:42.17 8.17
2025-03-12T10:36:43.17 8.18
2025-03-12T10:36:44.17 8.16
2025-03-12T10:36:45.17 8.16
2025-03-12T10:36:46.17 8.17
2025-03-12T10:36:47.17 8.16
2025-03-12T10:36:48.17 8.16
2025-03-12T10:36:49.17 8.18
2025-03-12T10:36:50.17 8.17
2025-03-12T10:36:51.17 8.18
2025-03-12T10:36:52.17 8.17
2025-03-12T10:36:53.17 8.16
2025-03-12T10:36:54.17 8.19
2025-03-12T10:36:55.17 8.17
2025-03-12T10:36:56.17 8.17
2025-03-12T10:36:57.17 8.19
2025-03-12T10:36:58.17 8.20
2025-03-12T10:36:59.17 8.17
2025-03-12T10:37:00.17 8.19
2025-03-12T10:37:01.17 8.17
2025-03-12T10:37:02.17 8.17
2025-03-12T10:37:03.17 8.18
2025-03-12T10:37:04.17 8.17
2025-03-12T10:37:05.17 8.19
2025-03-12T10:37:06.17 8.19
2025-03-12T10:37:07.17 8.16
2025-03-12T10:37:08.17 8.16
2025-03-12T10:37:09.17 8.14
2025-03-12T10:37:10.17 8.17
2025-03-12T10:37:11.17 8.17
2025-03-12T10:37:12.17 8.18
2025-03-12T10:37:13.17 8.15
2025-03-12T10:37:14.17 8.17
2025-03-12T10:37:15.17 8.18
2025-03-12T10:37:16.17 8.17
2025-03-12T10:37:17.17 8.17
2025-03-12T10:37:18.17 8.17
2025-03-12T10:37:19.17 8.19
2025-03-12T10:37:20.17 8.18
2025-03-12T10:37:21.17 8.18
2025-03-12T10:37:22.17 8.21
2025-03-12T10:37:23.17 8.18
2025-03-12T10:37:24.17 8.18
2025-03-12T10:37:25.17 8.18
2025-03-12T10:37:26.17 8.19
2025-03-12T10:37:27.17 8.17
2025-03-12T10:37:28.17 8.17
2025-03-12T10:37:29.17 8.17
2025-03-12T10:37:30.17 8.19
2025-03-12T10:37:31.17 8.19
2025-03-12T10:37:32.17 8.18
2025-03-12T10:37:33.17 8.18
2025-03-12T10:37:34.17 8.17
2025-03-12T10:37:35.17 8.17
2025-03-12T10:37:36.17 8.17
2025-03-12T10:37:37.17 8.17
2025-03-12T10:37:38.17 8.18
2025-03-12T10:37:39.17 8.17
2025-03-12T10:37:40.17 8.17
2025-03-12T10:37:41.17 8.16
2025-03-12T10:37:42.17 8.17
2025-03-12T10:37:43.17 8.17
2025-03-12T10:37:44.17 8.19
2025-03-12T10:37:45.17 8.19
2025-03-12T10:37:46.18 8.17
2025-03-12T10:37:47.18 8.16
2025-03-12T10:37:48.18 8.19
2025-03-12T10:37:49.18 8.17
2025-03-12T10:37:50.18 8.18
2025-03-12T10:37:51.18 8.17
2025-03-12T10:37:52.18 8.16
2025-03-12T10:37:53.18 8.17
2025-03-12T10:37:54.18 8.18
2025-03-12T10:37:55.18 8.16
2025-03-12T10:37:56.18 8.18
2025-03-12T10:37:57.18 8.18
2025-03-12T10:37:58.18 8.16
2025-03-12T10:37:59.18 8.16
2025-03-12T10:38:00.18 8.17
2025-03-12T10:38:01.18 8.18
2025-03-12T10:38:02.18 8.16
2025-03-12T10:38:03.18 8.19
2025-03-12T10:38:04.18 8.21
2025-03-12T10:38:05.18 8.18
2025-03-12T10:38:06.18 8.17
2025-03-12T10:38:07.18 8.17
2025-03-12T10:38:08.18 8.17
2025-03-12T10:38:09.18 8.17
2025-03-12T10:38:10.18 8.17
2025-03-12T10:38:11.18 8.16
2025-03-12T10:38:12.18 8.17
2025-03-12T10:38:13.18 8.17
2025-03-12T10:38:14.18 8.17
2025-03-12T10:38:15.18 8.17
2025-03-12T10:38:16.18 8.16
2025-03-12T10:38:17.18 8.18
2025-03-12T10:38:18.18 8.17
2025-03-12T10:38:19.18 8.18
2025-03-12T10:38:20.18 8.16
2025-03-12T10:38:21.18 8.17
2025-03-12T10:38:22.18 8.17
2025-03-12T10:38:23.18 8.18
2025-03-12T10:38:24.18 8.18
2025-03-12T10:38:25.18 8.17
2025-03-12T10:38:26.18 8.16
2025-03-12T10:38:27.18 8.15
2025-03-12T10:38:28.18 8.18
2025-03-12T10:38:29.18 8.16
2025-03-12T10:38:30.18 8.16
2025-03-12T10:38:31.18 8.19
2025-03-12T10:38:32.18 8.17
2025-03-12T10:38:33.18 8.18
2025-03-12T10:38:34.18 8.18
2025-03-12T10:38:35.18 8.19
2025-03-12T10:38:36.18 8.17
2025-03-12T10:38:37.18 8.17
2025-03-12T10:38:38.18 8.21
2025-03-12T10:38:39.18 8.19
2025-03-12T10:38:40.18 8.17
2025-03-12T10:38:41.18 8.16
2025-03-12T10:38:42.18 8.17
2025-03-12T10:38:43.18 8.20
2025-03-12T10:38:44.18 8.17
2025-03-12T10:38:45.18 8.17
2025-03-12T10:38:46.18 8.17
2025-03-12T10:38:47.18 8.15
2025-03-12T10:38:48.18 8.19
2025-03-12T10:38:49.18 8.14
2025-03-12T10:38:50.18 8.15
2025-03-12T10:38:51.18 8.16
2025-03-12T10:38:52.18 8.17
2025-03-12T10:38:53.18 8.17
2025-03-12T10:38:54.18 8.16
2025-03-12T10:38:55.18 8.14
2025-03-12T10:38:56.18 8.16
2025-03-12T10:38:57.18 8.17
2025-03-12T10:38:58.18 8.18
2025-03-12T10:38:59.18 8.18
2025-03-12T10:39:00.18 8.17
2025-03-12T10:39:01.18 8.17
2025-03-12T10:39:02.18 8.16
2025-03-12T10:39:03.18 8.16
2025-03-12T10:39:04.18 8.19
2025-03-12T10:39:05.18 8.16
2025-03-12T10:39:06.18 8.17
2025-03-12T10:39:07.18 8.20
2025-03-12T10:39:08.18 8.16
2025-03-12T10:39:09.18 8.19
2025-03-12T10:39:10.18 8.17
2025-03-12T10:39:11.18 8.19
2025-03-12T10:39:12.18 8.17
2025-03-12T10:39:13.18 8.16
2025-03-12T10:39:14.18 8.19
2025-03-12T10:39:15.18 8.19
2025-03-12T10:39:16.18 8.18
2025-03-12T10:39:17.18 8.17
2025-03-12T10:39:18.18 8.17
2025-03-12T10:39:19.18 8.16
2025-03-12T10:39:20.18 8.16
2025-03-12T10:39:21.18 8.16
2025-03-12T10:39:22.18 8.18
2025-03-12T10:39:23.18 8.17
2025-03-12T10:39:24.18 8.16
2025-03-12T10:39:25.18 8.17
2025-03-12T10:39:26.18 8.17
2025-03-12T10:39:27.18 8.18
2025-03-12T10:39:28.18 8.17
2025-03-12T10:39:29.18 8.16
2025-03-12T10:39:30.18 8.17
2025-03-12T10:39:31.18 8.15
2025-03-12T10:39:32.18 8.17
2025-03-12T10:39:33.18 8.16
2025-03-12T10:39:34.18 8.16
2025-03-12T10:39:35.18 8.18
2025-03-12T10:39:36.18 8.18
2025-03-12T10:39:37.18 8.16
2025-03-12T10:39:38.18 8.17
2025-03-12T10:39:39.18 8.17
2025-03-12T10:39:40.18 8.16
2025-03-12T10:39:41.18 8.14
2025-03-12T10:39:42.18 8.19
2025-03-12T10:39:43.18 8.16
2025-03-12T10:39:44.18 8.17
2025-03-12T10:39:45.18 8.16
2025-03-12T10:39:46.18 8.17
2025-03-12T10:39:47.18 8.16
2025-03-12T10:39:48.18 8.19
2025-03-12T10:39:49.18 8.17
2025-03-12T10:39:50.18 8.16
2025-03-12T10:39:51.18 8.15
2025-03-12T10:39:52.18 8.17
2025-03-12T10:39:53.18 8.19
2025-03-12T10:39:54.18 8.17
2025-03-12T10:39:55.18 8.17
2025-03-12T10:39:56.18 8.18
2025-03-12T10:39:57.18 8.19
2025-03-12T10:39:58.18 8.18
2025-03-12T10:39:59.18 8.19
2025-03-12T10:40:00.18 8.18
2025-03-12T10:40:01.18 8.19
2025-03-12T10:40:02.18 8.19
2025-03-12T10:40:03.18 8.16
2025-03-12T10:40:04.18 8.18
2025-03-12T10:40:05.18 8.17
2025-03-12T10:40:06.18 8.17
2025-03-12T10:40:07.18 8.17
2025-03-12T10:40:08.18 8.16
2025-03-12T10:40:09.18 8.17
2025-03-12T10:40:10.18 8.18
2025-03-12T10:40:11.18 8.18
2025-03-12T10:40:12.18 8.19
2025-03-12T10:40:13.18 8.16
2025-03-12T10:40:14.18 8.20
2025-03-12T10:40:15.18 8.18
2025-03-12T10:40:16.18 8.16
2025-03-12T10:40:17.18 8.17
2025-03-12T10:40:18.18 8.18
2025-03-12T10:40:19.18 8.17
2025-03-12T10:40:20.18 8.17
2025-03-12T10:40:21.18 8.19
2025-03-12T10:40:22.18 8.18
2025-03-12T10:40:23.18 8.16
2025-03-12T10:40:24.18 8.19
2025-03-12T10:40:25.18 8.19
2025-03-12T10:40:26.18 8.19
2025-03-12T10:40:27.18 8.17
2025-03-12T10:40:28.18 8.17
2025-03-12T10:40:29.18 8.17
2025-03-12T10:40:30.18 8.19
2025-03-12T10:40:31.18 8.18
2025-03-12T10:40:32.18 8.19
2025-03-12T10:40:33.18 8.17
2025-03-12T10:40:34.18 8.17
2025-03-12T10:40:35.18 8.17
2025-03-12T10:40:36.18 8.19
2025-03-12T10:40:37.18 8.17
2025-03-12T10:40:38.18 8.17
2025-03-12T10:40:39.18 8.16
2025-03-12T10:40:40.18 8.18
2025-03-12T10:40:41.18 8.18
2025-03-12T10:40:42.18 8.17
2025-03-12T10:40:43.18 8.16
2025-03-12T10:40:44.18 8.18
2025-03-12T10:40:45.18 8.17
2025-03-12T10:40:46.18 8.19
2025-03-12T10:40:47.18 8.19
2025-03-12T10:40:48.18 8.16
2025-03-12T10:40:49.18 8.18
2025-03-12T10:40:50.18 8.17
2025-03-12T10:40:51.18 8.15
2025-03-12T10:40:52.18 8.18
2025-03-12T10:40:53.18 8.17
2025-03-12T10:40:54.18 8.16
2025-03-12T10:40:55.18 8.17
2025-03-12T10:40:56.18 8.16
2025-03-12T10:40:57.18 8.17
2025-03-12T10:40:58.18 8.18
2025-03-12T10:40:59.18 8.17
2025-03-12T10:41:00.18 8.18
2025-03-12T10:41:01.18 8.19
2025-03-12T10:41:02.18 8.16
2025-03-12T10:41:03.18 8.17
2025-03-12T10:41:04.18 8.17
2025-03-12T10:41:05.18 8.18
2025-03-12T10:41:06.18 8.16
2025-03-12T10:41:07.18 8.17
2025-03-12T10:41:08.18 8.16
2025-03-12T10:41:09.18 8.16
2025-03-12T10:41:10.18 8.17
2025-03-12T10:41:11.18 8.17
2025-03-12T10:41:12.18 8.18
2025-03-12T10:41:13.18 8.16
2025-03-12T10:41:14.18 8.17
2025-03-12T10:41:15.18 8.17
2025-03-12T10:41:16.18 8.17
2025-03-12T10:41:17.18 8.16
2025-03-12T10:41:18.18 8.19
2025-03-12T10:41:19.18 8.16
2025-03-12T10:41:20.18 8.16
2025-03-12T10:41:21.18 8.19
2025-03-12T10:41:22.18 8.17
2025-03-12T10:41:23.18 8.18
2025-03-12T10:41:24.18 8.18
2025-03-12T10:41:25.18 8.18
2025-03-12T10:41:26.18 8.17
2025-03-12T10:41:27.18 8.17
2025-03-12T10:41:28.18 8.18
2025-03-12T10:41:29.18 8.16
2025-03-12T10:41:30.18 8.18
2025-03-12T10:41:31.18 8.17
2025-03-12T10:41:32.18 8.17
2025-03-12T10:41:33.18 8.15
2025-03-12T10:41:34.18 8.18
2025-03-12T10:41:35.18 8.19
2025-03-12T10:41:36.18 8.15
2025-03-12T10:41:37.18 8.18
2025-03-12T10:41:38.18 8.18
2025-03-12T10:41:39.18 8.19
2025-03-12T10:41:40.18 8.17
2025-03-12T10:41:41.18 8.17
2025-03-12T10:41:42.18 8.16
2025-03-12T10:41:43.18 8.17
2025-03-12T10:41:44.18 8.14
2025-03-12T10:41:45.18 8.18
2025-03-12T10:41:46.18 8.18
2025-03-12T10:41:47.18 8.16
2025-03-12T10:41:48.18 8.18
2025-03-12T10:41:49.18 8.17
2025-03-12T10:41:50.18 8.18
2025-03-12T10:41:51.18 8.17
2025-03-12T10:41:52.18 8.16
2025-03-12T10:41:53.18 8.18
2025-03-12T10:41:54.18 8.19
2025-03-12T10:41:55.18 8.17
2025-03-12T10:41:56.18 8.19
2025-03-12T10:41:57.18 8.16
2025-03-12T10:41:58.18 8.19
2025-03-12T10:41:59.18 8.18
2025-03-12T10:42:00.18 8.17
2025-03-12T10:42:01.18 8.19
2025-03-12T10:42:02.18 8.17
2025-03-12T10:42:03.18 8.18
2025-03-12T10:42:04.18 8.16
2025-03-12T10:42:05.18 8.16
2025-03-12T10:42:06.18 8.16
2025-03-12T10:42:07.18 8.17
2025-03-12T10:42:08.18 8.16
2025-03-12T10:42:09.18 8.19
2025-03-12T10:42:10.18 8.17
2025-03-12T10:42:11.18 8.16
2025-03-12T10:42:12.18 8.16
2025-03-12T10:42:13.18 8.16
2025-03-12T10:42:14.18 8.17
2025-03-12T10:42:15.18 8.19
2025-03-12T10:42:16.18 8.17
2025-03-12T10:42:17.18 8.18
2025-03-12T10:42:18.18 8.18
2025-03-12T10:42:19.18 8.18
2025-03-12T10:42:20.18 8.19
2025-03-12T10:42:21.18 8.17
2025-03-12T10:42:22.18 8.16
2025-03-12T10:42:23.18 8.18
2025-03-12T10:42:24.18 8.17
2025-03-12T10:42:25.18 8.17
2025-03-12T10:42:26.18 8.15
2025-03-12T10:42:27.18 8.17
2025-03-12T10:42:28.18 8.16
2025-03-12T10:42:29.18 8.16
2025-03-12T10:42:30.18 8.17
2025-03-12T10:42:31.18 8.17
2025-03-12T10:42:32.18 8.19
2025-03-12T10:42:33.18 8.15
2025-03-12T10:42:34.18 8.17
2025-03-12T10:42:35.18 8.17
2025-03-12T10:42:36.18 8.16
2025-03-12T10:42:37.18 8.17
2025-03-12T10:42:38.18 8.20
2025-03-12T10:42:39.18 8.14
2025-03-12T10:42:40.18 8.17
2025-03-12T10:42:41.18 8.18
2025-03-12T10:42:42.18 8.16
2025-03-12T10:42:43.18 8.17
2025-03-12T10:42:44.18 8.19
2025-03-12T10:42:45.18 8.17
2025-03-12T10:42:46.18 8.15
2025-03-12T10:42:47.18 8.17
2025-03-12T10:42:48.18 8.16
2025-03-12T10:42:49.18 8.18
2025-03-12T10:42:50.18 8.16
2025-03-12T10:42:51.18 8.17
2025-03-12T10:42:52.18 8.17
2025-03-12T10:42:53.18 8.17
2025-03-12T10:42:54.18 8.17
2025-03-12T10:42:55.18 8.18
2025-03-12T10:42:56.18 8.19
2025-03-12T10:42:57.18 8.16
2025-03-12T10:42:58.18 8.19
2025-03-12T10:42:59.18 8.17
2025-03-12T10:43:00.18 8.19
2025-03-12T10:43:01.18 8.17
2025-03-12T10:43:02.18 8.17
2025-03-12T10:43:03.18 8.16
2025-03-12T10:43:04.18 8.17
2025-03-12T10:43:05.19 8.18
2025-03-12T10:43:06.19 8.17
2025-03-12T10:43:07.19 8.18
2025-03-12T10:43:08.19 8.19
2025-03-12T10:43:09.19 8.16
2025-03-12T10:43:10.19 8.19
2025-03-12T10:43:11.19 8.14
2025-03-12T10:43:12.19 8.18
2025-03-12T10:43:13.19 8.17
2025-03-12T10:43:14.19 8.18
2025-03-12T10:43:15.19 8.16
2025-03-12T10:43:16.19 8.19
2025-03-12T10:43:17.19 8.17
2025-03-12T10:43:18.19 8.18
2025-03-12T10:43:19.19 8.17
2025-03-12T10:43:20.19 8.15
2025-03-12T10:43:21.19 8.17
2025-03-12T10:43:22.19 8.17
2025-03-12T10:43:23.19 8.17
2025-03-12T10:43:24.19 8.17
2025-03-12T10:43:25.19 8.16
2025-03-12T10:43:26.19 8.15
2025-03-12T10:43:27.19 8.16
2025-03-12T10:43:28.19 8.18
2025-03-12T10:43:29.19 8.16
2025-03-12T10:43:30.19 8.18
2025-03-12T10:43:31.19 8.16
2025-03-12T10:43:32.19 8.19
2025-03-12T10:43:33.19 8.18
2025-03-12T10:43:34.19 8.18
2025-03-12T10:43:35.19 8.17
2025-03-12T10:43:36.19 8.18
2025-03-12T10:43:37.19 8.17
2025-03-12T10:43:38.19 8.16
2025-03-12T10:43:39.19 8.16
2025-03-12T10:43:40.19 8.18
2025-03-12T10:43:41.19 8.17
2025-03-12T10:43:42.19 8.17
2025-03-12T10:43:43.19 8.19
2025-03-12T10:43:44.19 8.18
2025-03-12T10:43:45.19 8.18
2025-03-12T10:43:46.19 8.18
2025-03-12T10:43:47.19 8.19
2025-03-12T10:43:48.19 8.17
2025-03-12T10:43:49.19 8.17
2025-03-12T10:43:50.19 8.15
2025-03-12T10:43:51.19 8.19
2025-03-12T10:43:52.19 8.18
2025-03-12T10:43:53.19 8.17
2025-03-12T10:43:54.19 8.17
2025-03-12T10:43:55.19 8.18
2025-03-12T10:43:56.19 8.17
2025-03-12T10:43:57.19 8.16
2025-03-12T10:43:58.19 8.17
2025-03-12T10:43:59.19 8.15
2025-03-12T10:44:00.19 8.17
2025-03-12T10:44:01.19 8.17
2025-03-12T10:44:02.19 8.17
2025-03-12T10:44:03.19 8.16
2025-03-12T10:44:04.19 8.18
2025-03-12T10:44:05.19 8.17
2025-03-12T10:44:06.19 8.18
2025-03-12T10:44:07.19 8.16
2025-03-12T10:44:08.19 8.16
2025-03-12T10:44:09.19 8.18
2025-03-12T10:44:10.19 8.19
2025-03-12T10:44:11.19 8.17
2025-03-12T10:44:12.19 8.18
2025-03-12T10:44:13.19 8.17
2025-03-12T10:44:14.19 8.16
2025-03-12T10:44:15.19 8.19
2025-03-12T10:44:16.19 8.19
2025-03-12T10:44:17.19 8.17
2025-03-12T10:44:18.19 8.16
2025-03-12T10:44:19.19 8.17
2025-03-12T10:44:20.19 8.17
2025-03-12T10:44:21.19 8.17
2025-03-12T10:44:22.19 8.15
2025-03-12T10:44:23.19 8.18
2025-03-12T10:44:24.19 8.16
2025-03-12T10:44:25.19 8.20
2025-03-12T10:44:26.19 8.17
2025-03-12T10:44:27.19 8.17
2025-03-12T10:44:28.19 8.18
2025-03-12T10:44:29.19 8.18
2025-03-12T10:44:30.19 8.18
2025-03-12T10:44:31.19 8.19
2025-03-12T10:44:32.19 8.17
2025-03-12T10:44:33.19 8.20
2025-03-12T10:44:34.19 8.16
2025-03-12T10:44:35.19 8.18
2025-03-12T10:44:36.19 8.19
2025-03-12T10:44:37.19 8.18
2025-03-12T10:44:38.19 8.17
2025-03-12T10:44:39.19 8.18
2025-03-12T10:44:40.19 8.16
2025-03-12T10:44:41.19 8.17
2025-03-12T10:44:42.19 8.17
2025-03-12T10:44:43.19 8.16
2025-03-12T10:44:44.19 8.16
2025-03-12T10:44:45.19 8.17
2025-03-12T10:44:46.19 8.15
2025-03-12T10:44:47.19 8.17
2025-03-12T10:44:48.19 8.16
2025-03-12T10:44:49.19 8.18
2025-03-12T10:44:50.19 8.17
2025-03-12T10:44:51.19 8.17
2025-03-12T10:44:52.19 8.16
2025-03-12T10:44:53.19 8.16
2025-03-12T10:44:54.19 8.17
2025-03-12T10:44:55.19 8.16
2025-03-12T10:44:56.19 8.17
2025-03-12T10:44:57.19 8.17
2025-03-12T10:44:58.19 8.16
2025-03-12T10:44:59.19 8.19
2025-03-12T10:45:00.19 8.19
2025-03-12T10:45:01.19 8.17
2025-03-12T10:45:02.19 8.19
2025-03-12T10:45:03.19 8.16
2025-03-12T10:45:04.19 8.17
2025-03-12T10:45:05.19 8.16
2025-03-12T10:45:06.19 8.19
2025-03-12T10:45:07.19 8.16
2025-03-12T10:45:08.19 8.15
2025-03-12T10:45:09.19 8.18
2025-03-12T10:45:10.19 8.17
2025-03-12T10:45:11.19 8.17
2025-03-12T10:45:12.19 8.16
2025-03-12T10:45:13.19 8.16
2025-03-12T10:45:14.19 8.18
2025-03-12T10:45:15.19 8.18
2025-03-12T10:45:16.19 8.18
2025-03-12T10:45:17.19 8.18
2025-03-12T10:45:18.19 8.16
2025-03-12T10:45:19.19 8.19
2025-03-12T10:45:20.19 8.17
2025-03-12T10:45:21.19 8.19
2025-03-12T10:45:22.19 8.17
2025-03-12T10:45:23.19 8.17
2025-03-12T10:45:24.19 8.16
2025-03-12T10:45:25.19 8.19
2025-03-12T10:45:26.19 8.16
2025-03-12T10:45:27.19 8.16
2025-03-12T10:45:28.19 8.17
2025-03-12T10:45:29.19 8.15
2025-03-12T10:45:30.19 8.17
2025-03-12T10:45:31.19 8.17
2025-03-12T10:45:32.19 8.17
2025-03-12T10:45:33.19 8.16
2025-03-12T10:45:34.19 8.17
2025-03-12T10:45:35.19 8.16
2025-03-12T10:45:36.19 8.17
2025-03-12T10:45:37.19 8.16
2025-03-12T10:45:38.19 8.17
2025-03-12T10:45:39.19 8.17
2025-03-12T10:45:40.19 8.19
2025-03-12T10:45:41.19 8.15
2025-03-12T10:45:42.19 8.16
2025-03-12T10:45:43.19 8.16
2025-03-12T10:45:44.20 8.18
2025-03-12T10:45:45.18 8.16
2025-03-12T10:45:46.18 8.19
2025-03-12T10:45:47.18 8.17
2025-03-12T10:45:48.18 8.19
2025-03-12T10:45:49.18 8.16
2025-03-12T10:45:50.18 8.17
2025-03-12T10:45:51.18 8.19
2025-03-12T10:45:52.18 8.17
2025-03-12T10:45:53.18 8.16
2025-03-12T10:45:54.18 8.17
2025-03-12T10:45:55.18 8.17
2025-03-12T10:45:56.18 8.16
2025-03-12T10:45:57.18 8.19
2025-03-12T10:45:58.18 8.17
2025-03-12T10:45:59.18 8.16
2025-03-12T10:46:00.18 8.18
2025-03-12T10:46:01.18 8.20
2025-03-12T10:46:02.18 8.17
2025-03-12T10:46:03.18 8.19
2025-03-12T10:46:04.18 8.17
2025-03-12T10:46:05.18 8.17
2025-03-12T10:46:06.18 8.16
2025-03-12T10:46:07.18 8.17
2025-03-12T10:46:08.18 8.19
2025-03-12T10:46:09.18 8.17
2025-03-12T10:46:10.18 8.19
2025-03-12T10:46:11.18 8.16
2025-03-12T10:46:12.18 8.17
2025-03-12T10:46:13.18 8.19
2025-03-12T10:46:14.18 8.17
2025-03-12T10:46:15.18 8.17
2025-03-12T10:46:16.18 8.17
2025-03-12T10:46:17.18 8.18
2025-03-12T10:46:18.18 8.21
2025-03-12T10:46:19.18 8.17
2025-03-12T10:46:20.18 8.19
2025-03-12T10:46:21.18 8.17
2025-03-12T10:46:22.18 8.15
2025-03-12T10:46:23.18 8.17
2025-03-12T10:46:24.18 8.17
2025-03-12T10:46:25.18 8.16
2025-03-12T10:46:26.18 8.18
2025-03-12T10:46:27.18 8.19
2025-03-12T10:46:28.18 8.19
2025-03-12T10:46:29.18 8.19
2025-03-12T10:46:30.18 8.15
2025-03-12T10:46:31.18 8.19
2025-03-12T10:46:32.18 8.17
2025-03-12T10:46:33.18 8.19
2025-03-12T10:46:34.18 8.19
2025-03-12T10:46:35.18 8.17
2025-03-12T10:46:36.18 8.16
2025-03-12T10:46:37.18 8.17
2025-03-12T10:46:38.18 8.18
2025-03-12T10:46:39.18 8.18
2025-03-12T10:46:40.18 8.17
2025-03-12T10:46:41.18 8.19
2025-03-12T10:46:42.18 8.19
2025-03-12T10:46:43.18 8.17
2025-03-12T10:46:44.18 8.19
2025-03-12T10:46:45.18 8.20
2025-03-12T10:46:46.18 8.17
2025-03-12T10:46:47.18 8.19
2025-03-12T10:46:48.18 8.16
2025-03-12T10:46:49.18 8.19
2025-03-12T10:46:50.18 8.17
2025-03-12T10:46:51.18 8.17
2025-03-12T10:46:52.18 8.17
2025-03-12T10:46:53.18 8.19
2025-03-12T10:46:54.18 8.17
2025-03-12T10:46:55.18 8.19
2025-03-12T10:46:56.18 8.16
2025-03-12T10:46:57.18 8.16
2025-03-12T10:46:58.18 8.17
2025-03-12T10:46:59.18 8.17
2025-03-12T10:47:00.18 8.17
2025-03-12T10:47:01.18 8.17
2025-03-12T10:47:02.18 8.16
2025-03-12T10:47:03.18 8.16
2025-03-12T10:47:04.18 8.18
2025-03-12T10:47:05.18 8.17
2025-03-12T10:47:06.18 8.17
2025-03-12T10:47:07.18 8.17
2025-03-12T10:47:08.18 8.17
2025-03-12T10:47:09.18 8.18
2025-03-12T10:47:10.18 8.18
2025-03-12T10:47:11.18 8.17
2025-03-12T10:47:12.18 8.15
2025-03-12T10:47:13.18 8.16
2025-03-12T10:47:14.18 8.16
2025-03-12T10:47:15.18 8.16
2025-03-12T10:47:16.18 8.17
2025-03-12T10:47:17.18 8.15
2025-03-12T10:47:18.18 8.18
2025-03-12T10:47:19.18 8.17
2025-03-12T10:47:20.18 8.17
2025-03-12T10:47:21.18 8.17
2025-03-12T10:47:22.18 8.17
2025-03-12T10:47:23.18 8.17
2025-03-12T10:47:24.18 8.17
2025-03-12T10:47:25.18 8.17
2025-03-12T10:47:26.18 8.16
2025-03-12T10:47:27.18 8.17
2025-03-12T10:47:28.18 8.17
2025-03-12T10:47:29.18 8.17
2025-03-12T10:47:30.18 8.17
2025-03-12T10:47:31.18 8.17
2025-03-12T10:47:32.18 8.17
2025-03-12T10:47:33.18 8.19
2025-03-12T10:47:34.18 8.18
2025-03-12T10:47:35.18 8.17
2025-03-12T10:47:36.18 8.19
2025-03-12T10:47:37.18 8.18
2025-03-12T10:47:38.18 8.16
2025-03-12T10:47:39.18 8.18
2025-03-12T10:47:40.18 8.16
2025-03-12T10:47:41.18 8.19
2025-03-12T10:47:42.18 8.16
2025-03-12T10:47:43.18 8.17
2025-03-12T10:47:44.18 8.16
2025-03-12T10:47:45.18 8.17
2025-03-12T10:47:46.18 8.17
2025-03-12T10:47:47.18 8.16
2025-03-12T10:47:48.18 8.16
2025-03-12T10:47:49.18 8.16
2025-03-12T10:47:50.18 8.17
2025-03-12T10:47:51.18 8.16
2025-03-12T10:47:52.18 8.16
2025-03-12T10:47:53.18 8.17
2025-03-12T10:47:54.18 8.19
2025-03-12T10:47:55.18 8.16
2025-03-12T10:47:56.18 8.17
2025-03-12T10:47:57.18 8.19
2025-03-12T10:47:58.18 8.19
2025-03-12T10:47:59.18 8.17
2025-03-12T10:48:00.18 8.17
2025-03-12T10:48:01.18 8.17
2025-03-12T10:48:02.18 8.17
2025-03-12T10:48:03.18 8.17
2025-03-12T10:48:04.18 8.18
2025-03-12T10:48:05.18 8.18
2025-03-12T10:48:06.18 8.17
2025-03-12T10:48:07.18 8.17
2025-03-12T10:48:08.18 8.16
2025-03-12T10:48:09.18 8.17
2025-03-12T10:48:10.18 8.19
2025-03-12T10:48:11.18 8.16
2025-03-12T10:48:12.18 8.16
2025-03-12T10:48:13.18 8.18
2025-03-12T10:48:14.18 8.17
2025-03-12T10:48:15.18 8.18
2025-03-12T10:48:16.18 8.17
2025-03-12T10:48:17.18 8.18
2025-03-12T10:48:18.18 8.20
2025-03-12T10:48:19.18 8.17
2025-03-12T10:48:20.18 8.17
2025-03-12T10:48:21.18 8.17
2025-03-12T10:48:22.19 8.17
2025-03-12T10:48:23.19 8.16
2025-03-12T10:48:24.19 8.17
2025-03-12T10:48:25.19 8.17
2025-03-12T10:48:26.19 8.17
2025-03-12T10:48:27.19 8.17
2025-03-12T10:48:28.19 8.19
2025-03-12T10:48:29.19 8.19
2025-03-12T10:48:30.19 8.17
2025-03-12T10:48:31.19 8.17
2025-03-12T10:48:32.19 8.18
2025-03-12T10:48:33.19 8.17
2025-03-12T10:48:34.19 8.19
2025-03-12T10:48:35.19 8.17
2025-03-12T10:48:36.19 8.18
2025-03-12T10:48:37.19 8.19
2025-03-12T10:48:38.19 8.16
2025-03-12T10:48:39.19 8.15
2025-03-12T10:48:40.19 8.16
2025-03-12T10:48:41.19 8.17
2025-03-12T10:48:42.19 8.17
2025-03-12T10:48:43.19 8.19
2025-03-12T10:48:44.19 8.16
2025-03-12T10:48:45.19 8.17
2025-03-12T10:48:46.19 8.18
2025-03-12T10:48:47.19 8.17
2025-03-12T10:48:48.19 8.17
2025-03-12T10:48:49.19 8.19
2025-03-12T10:48:50.19 8.17
2025-03-12T10:48:51.19 8.16
2025-03-12T10:48:52.19 8.17
2025-03-12T10:48:53.19 8.17
2025-03-12T10:48:54.19 8.18
2025-03-12T10:48:55.19 8.15
2025-03-12T10:48:56.19 8.17
2025-03-12T10:48:57.19 8.17
2025-03-12T10:48:58.19 8.15
2025-03-12T10:48:59.19 8.17
2025-03-12T10:49:00.19 8.15
2025-03-12T10:49:01.19 8.17
2025-03-12T10:49:02.19 8.14
2025-03-12T10:49:03.19 8.17
2025-03-12T10:49:04.19 8.19
2025-03-12T10:49:05.19 8.19
2025-03-12T10:49:06.19 8.15
2025-03-12T10:49:07.19 8.16
2025-03-12T10:49:08.19 8.17
2025-03-12T10:49:09.19 8.16
2025-03-12T10:49:10.19 8.17
2025-03-12T10:49:11.19 8.17
2025-03-12T10:49:12.19 8.16
2025-03-12T10:49:13.19 8.17
2025-03-12T10:49:14.19 8.17
2025-03-12T10:49:15.19 8.17
2025-03-12T10:49:16.19 8.17
2025-03-12T10:49:17.19 8.17
2025-03-12T10:49:18.19 8.14
2025-03-12T10:49:19.19 8.16
2025-03-12T10:49:20.19 8.17
2025-03-12T10:49:21.19 8.16
2025-03-12T10:49:22.19 8.16
2025-03-12T10:49:23.19 8.18
2025-03-12T10:49:24.19 8.18
2025-03-12T10:49:25.19 8.17
2025-03-12T10:49:26.19 8.16
2025-03-12T10:49:27.19 8.17
2025-03-12T10:49:28.19 8.17
2025-03-12T10:49:29.19 8.16
2025-03-12T10:49:30.19 8.16
2025-03-12T10:49:31.19 8.18
2025-03-12T10:49:32.19 8.16
2025-03-12T10:49:33.19 8.16
2025-03-12T10:49:34.19 8.18
2025-03-12T10:49:35.19 8.17
2025-03-12T10:49:36.20 8.19
2025-03-12T10:49:37.18 8.19
2025-03-12T10:49:38.18 8.17
2025-03-12T10:49:39.18 8.16
2025-03-12T10:49:40.18 8.17
2025-03-12T10:49:41.18 8.17
2025-03-12T10:49:42.18 8.16
2025-03-12T10:49:43.18 8.18
2025-03-12T10:49:44.18 8.19
2025-03-12T10:49:45.18 8.17
2025-03-12T10:49:46.18 8.18
2025-03-12T10:49:47.18 8.16
2025-03-12T10:49:48.18 8.17
2025-03-12T10:49:49.18 8.17
2025-03-12T10:49:50.18 8.19
2025-03-12T10:49:51.18 8.18
2025-03-12T10:49:52.18 8.14
2025-03-12T10:49:53.18 8.17
2025-03-12T10:49:54.18 8.17
2025-03-12T10:49:55.18 8.17
2025-03-12T10:49:56.18 8.17
2025-03-12T10:49:57.18 8.16
2025-03-12T10:49:58.18 8.18
2025-03-12T10:49:59.18 8.15
2025-03-12T10:50:00.18 8.18
2025-03-12T10:50:01.18 8.17
2025-03-12T10:50:02.18 8.15
2025-03-12T10:50:03.18 8.17
2025-03-12T10:50:04.18 8.17
2025-03-12T10:50:05.18 8.17
2025-03-12T10:50:06.18 8.16
2025-03-12T10:50:07.18 8.19
2025-03-12T10:50:08.18 8.18
2025-03-12T10:50:09.18 8.17
2025-03-12T10:50:10.18 8.16
2025-03-12T10:50:11.18 8.18
2025-03-12T10:50:12.18 8.19
2025-03-12T10:50:13.18 8.17
2025-03-12T10:50:14.18 8.15
2025-03-12T10:50:15.18 8.17
2025-03-12T10:50:16.18 8.17
2025-03-12T10:50:17.18 8.17
2025-03-12T10:50:18.18 8.17
2025-03-12T10:50:19.18 8.19
2025-03-12T10:50:20.18 8.17
2025-03-12T10:50:21.18 8.17
2025-03-12T10:50:22.18 8.17
2025-03-12T10:50:23.18 8.17
2025-03-12T10:50:24.18 8.16
2025-03-12T10:50:25.18 8.16
2025-03-12T10:50:26.18 8.17
2025-03-12T10:50:27.18 8.15
2025-03-12T10:50:28.18 8.15
2025-03-12T10:50:29.18 8.18
2025-03-12T10:50:30.18 8.16
2025-03-12T10:50:31.18 8.17
2025-03-12T10:50:32.18 8.16
2025-03-12T10:50:33.18 8.17
2025-03-12T10:50:34.18 8.17
2025-03-12T10:50:35.18 8.18
2025-03-12T10:50:36.18 8.16
2025-03-12T10:50:37.18 8.19
2025-03-12T10:50:38.18 8.21
2025-03-12T10:50:39.18 8.19
2025-03-12T10:50:40.18 8.16
2025-03-12T10:50:41.18 8.17
2025-03-12T10:50:42.18 8.18
2025-03-12T10:50:43.18 8.17
2025-03-12T10:50:44.18 8.18
2025-03-12T10:50:45.18 8.18
2025-03-12T10:50:46.18 8.17
2025-03-12T10:50:47.18 8.17
2025-03-12T10:50:48.18 8.16
2025-03-12T10:50:49.18 8.17
2025-03-12T10:50:50.18 8.17
2025-03-12T10:50:51.18 8.19
2025-03-12T10:50:52.18 8.17
2025-03-12T10:50:53.18 8.16
2025-03-12T10:50:54.18 8.21
2025-03-12T10:50:55.18 8.19
2025-03-12T10:50:56.18 8.19
2025-03-12T10:50:57.18 8.17
2025-03-12T10:50:58.18 8.21
2025-03-12T10:50:59.18 8.18
2025-03-12T10:51:00.18 8.19
2025-03-12T10:51:01.18 8.18
2025-03-12T10:51:02.18 8.17
2025-03-12T10:51:03.18 8.17
2025-03-12T10:51:04.18 8.17
2025-03-12T10:51:05.18 8.17
2025-03-12T10:51:06.18 8.17
2025-03-12T10:51:07.18 8.16
2025-03-12T10:51:08.18 8.17
2025-03-12T10:51:09.18 8.18
2025-03-12T10:51:10.18 8.12
2025-03-12T10:51:11.18 8.16
2025-03-12T10:51:12.18 8.18
2025-03-12T10:51:13.18 8.17
2025-03-12T10:51:14.18 8.19
2025-03-12T10:51:15.18 8.19
2025-03-12T10:51:16.18 8.17
2025-03-12T10:51:17.18 8.17
2025-03-12T10:51:18.18 8.17
2025-03-12T10:51:19.18 8.17
2025-03-12T10:51:20.18 8.19
2025-03-12T10:51:21.18 8.19
2025-03-12T10:51:22.18 8.17
2025-03-12T10:51:23.18 8.19
2025-03-12T10:51:24.18 8.17
2025-03-12T10:51:25.18 8.16
2025-03-12T10:51:26.18 8.19
2025-03-12T10:51:27.18 8.18
2025-03-12T10:51:28.18 8.19
2025-03-12T10:51:29.18 8.16
2025-03-12T10:51:30.18 8.18
2025-03-12T10:51:31.18 8.14
2025-03-12T10:51:32.18 8.17
2025-03-12T10:51:33.18 8.17
2025-03-12T10:51:34.18 8.16
2025-03-12T10:51:35.18 8.18
2025-03-12T10:51:36.18 8.16
2025-03-12T10:51:37.18 8.18
2025-03-12T10:51:38.18 8.18
2025-03-12T10:51:39.18 8.17
2025-03-12T10:51:40.18 8.19
2025-03-12T10:51:41.18 8.17
2025-03-12T10:51:42.18 8.18
2025-03-12T10:51:43.18 8.17
2025-03-12T10:51:44.18 8.21
2025-03-12T10:51:45.18 8.16
2025-03-12T10:51:46.18 8.19
2025-03-12T10:51:47.18 8.19
2025-03-12T10:51:48.18 8.17
2025-03-12T10:51:49.18 8.17
2025-03-12T10:51:50.18 8.15
2025-03-12T10:51:51.18 8.18
2025-03-12T10:51:52.18 8.16
2025-03-12T10:51:53.18 8.16
2025-03-12T10:51:54.18 8.18
2025-03-12T10:51:55.18 8.17
2025-03-12T10:51:56.18 8.17
2025-03-12T10:51:57.18 8.17
2025-03-12T10:51:58.18 8.16
2025-03-12T10:51:59.18 8.17
2025-03-12T10:52:00.18 8.19
2025-03-12T10:52:01.18 8.16
2025-03-12T10:52:02.18 8.17
2025-03-12T10:52:03.18 8.17
2025-03-12T10:52:04.18 8.18
2025-03-12T10:52:05.18 8.18
2025-03-12T10:52:06.18 8.16
2025-03-12T10:52:07.18 8.19
2025-03-12T10:52:08.18 8.17
2025-03-12T10:52:09.18 8.17
2025-03-12T10:52:10.18 8.17
2025-03-12T10:52:11.18 8.18
2025-03-12T10:52:12.18 8.16
2025-03-12T10:52:13.18 8.19
2025-03-12T10:52:14.18 8.18
2025-03-12T10:52:15.18 8.17
2025-03-12T10:52:16.18 8.14
2025-03-12T10:52:17.18 8.17
2025-03-12T10:52:18.18 8.17
2025-03-12T10:52:19.18 8.17
2025-03-12T10:52:20.18 8.17
2025-03-12T10:52:21.18 8.17
2025-03-12T10:52:22.18 8.17
2025-03-12T10:52:23.18 8.16
2025-03-12T10:52:24.18 8.17
2025-03-12T10:52:25.18 8.16
2025-03-12T10:52:26.18 8.17
2025-03-12T10:52:27.18 8.17
2025-03-12T10:52:28.18 8.15
2025-03-12T10:52:29.18 8.14
2025-03-12T10:52:30.18 8.16
2025-03-12T10:52:31.18 8.16
2025-03-12T10:52:32.18 8.16
2025-03-12T10:52:33.18 8.16
2025-03-12T10:52:34.18 8.17
2025-03-12T10:52:35.18 8.16
2025-03-12T10:52:36.18 8.16
2025-03-12T10:52:37.18 8.18
2025-03-12T10:52:38.18 8.18
2025-03-12T10:52:39.18 8.16
2025-03-12T10:52:40.18 8.17
2025-03-12T10:52:41.18 8.19
2025-03-12T10:52:42.18 8.16
2025-03-12T10:52:43.18 8.17
2025-03-12T10:52:44.18 8.17
2025-03-12T10:52:45.18 8.17
2025-03-12T10:52:46.18 8.18
2025-03-12T10:52:47.18 8.16
2025-03-12T10:52:48.18 8.19
2025-03-12T10:52:49.18 8.16
2025-03-12T10:52:50.18 8.14
2025-03-12T10:52:51.18 8.17
2025-03-12T10:52:52.18 8.18
2025-03-12T10:52:53.18 8.17
2025-03-12T10:52:54.18 8.16
2025-03-12T10:52:55.18 8.19
2025-03-12T10:52:56.18 8.16
2025-03-12T10:52:57.18 8.17
2025-03-12T10:52:58.18 8.17
2025-03-12T10:52:59.18 8.16
2025-03-12T10:53:00.19 8.19
2025-03-12T10:53:01.18 8.16
2025-03-12T10:53:02.18 8.18
2025-03-12T10:53:03.18 8.17
2025-03-12T10:53:04.18 8.17
2025-03-12T10:53:05.18 8.17
2025-03-12T10:53:06.18 8.18
2025-03-12T10:53:07.18 8.17
2025-03-12T10:53:08.18 8.16
2025-03-12T10:53:09.18 8.19
2025-03-12T10:53:10.18 8.17
2025-03-12T10:53:11.18 8.17
2025-03-12T10:53:12.18 8.16
2025-03-12T10:53:13.18 8.18
2025-03-12T10:53:14.18 8.17
2025-03-12T10:53:15.18 8.19
2025-03-12T10:53:16.18 8.19
2025-03-12T10:53:17.18 8.18
2025-03-12T10:53:18.18 8.18
2025-03-12T10:53:19.18 8.19
2025-03-12T10:53:20.18 8.18
2025-03-12T10:53:21.18 8.19
2025-03-12T10:53:22.18 8.18
2025-03-12T10:53:23.18 8.21
2025-03-12T10:53:24.18 8.20
2025-03-12T10:53:25.18 8.17
2025-03-12T10:53:26.18 8.19
2025-03-12T10:53:27.18 8.20
2025-03-12T10:53:28.19 8.18
2025-03-12T10:53:29.17 8.16
2025-03-12T10:53:30.17 8.16
2025-03-12T10:53:31.17 8.16
2025-03-12T10:53:32.17 8.17
2025-03-12T10:53:33.17 8.17
2025-03-12T10:53:34.17 8.16
2025-03-12T10:53:35.17 8.20
2025-03-12T10:53:36.17 8.17
2025-03-12T10:53:37.17 8.15
2025-03-12T10:53:38.17 8.17
2025-03-12T10:53:39.17 8.16
2025-03-12T10:53:40.18 8.18
2025-03-12T10:53:41.18 8.18
2025-03-12T10:53:42.18 8.17
2025-03-12T10:53:43.18 8.19
2025-03-12T10:53:44.18 8.16
2025-03-12T10:53:45.18 8.16
2025-03-12T10:53:46.18 8.17
2025-03-12T10:53:47.18 8.18
2025-03-12T10:53:48.18 8.17
2025-03-12T10:53:49.18 8.18
2025-03-12T10:53:50.18 8.17
2025-03-12T10:53:51.18 8.21
2025-03-12T10:53:52.18 8.18
2025-03-12T10:53:53.18 8.17
2025-03-12T10:53:54.18 8.19
2025-03-12T10:53:55.18 8.17
2025-03-12T10:53:56.18 8.15
2025-03-12T10:53:57.18 8.15
2025-03-12T10:53:58.18 8.17
2025-03-12T10:53:59.18 8.17
2025-03-12T10:54:00.18 8.18
2025-03-12T10:54:01.18 8.18
2025-03-12T10:54:02.18 8.17
2025-03-12T10:54:03.18 8.17
2025-03-12T10:54:04.18 8.17
2025-03-12T10:54:05.18 8.18
2025-03-12T10:54:06.18 8.17
2025-03-12T10:54:07.18 8.16
2025-03-12T10:54:08.18 8.19
2025-03-12T10:54:09.18 8.17
2025-03-12T10:54:10.18 8.16
2025-03-12T10:54:11.18 8.15
2025-03-12T10:54:12.18 8.16
2025-03-12T10:54:13.18 8.17
2025-03-12T10:54:14.18 8.17
2025-03-12T10:54:15.18 8.15
2025-03-12T10:54:16.18 8.18
2025-03-12T10:54:17.18 8.17
2025-03-12T10:54:18.18 8.20
2025-03-12T10:54:19.18 8.17
2025-03-12T10:54:20.18 8.17
2025-03-12T10:54:21.18 8.16
2025-03-12T10:54:22.18 8.17
2025-03-12T10:54:23.18 8.17
2025-03-12T10:54:24.18 8.17
2025-03-12T10:54:25.18 8.17
2025-03-12T10:54:26.18 8.17
2025-03-12T10:54:27.18 8.17
2025-03-12T10:54:28.18 8.17
2025-03-12T10:54:29.18 8.18
2025-03-12T10:54:30.18 8.16
2025-03-12T10:54:31.18 8.17
2025-03-12T10:54:32.18 8.17
2025-03-12T10:54:33.18 8.19
2025-03-12T10:54:34.18 8.18
2025-03-12T10:54:35.18 8.17
2025-03-12T10:54:36.18 8.16
2025-03-12T10:54:37.18 8.16
2025-03-12T10:54:38.18 8.15
2025-03-12T10:54:39.18 8.17
2025-03-12T10:54:40.18 8.19
2025-03-12T10:54:41.18 8.18
2025-03-12T10:54:42.18 8.17
2025-03-12T10:54:43.18 8.17
2025-03-12T10:54:44.18 8.20
2025-03-12T10:54:45.18 8.17
2025-03-12T10:54:46.18 8.19
2025-03-12T10:54:47.18 8.17
2025-03-12T10:54:48.18 8.17
2025-03-12T10:54:49.18 8.17
2025-03-12T10:54:50.18 8.18
2025-03-12T10:54:51.18 8.17
2025-03-12T10:54:52.18 8.16
2025-03-12T10:54:53.18 8.16
2025-03-12T10:54:54.18 8.16
2025-03-12T10:54:55.18 8.17
2025-03-12T10:54:56.18 8.17
2025-03-12T10:54:57.18 8.16
2025-03-12T10:54:58.18 8.17
2025-03-12T10:54:59.18 8.18
2025-03-12T10:55:00.18 8.17
2025-03-12T10:55:01.18 8.17
2025-03-12T10:55:02.18 8.17
2025-03-12T10:55:03.18 8.18
2025-03-12T10:55:04.18 8.16
2025-03-12T10:55:05.18 8.17
2025-03-12T10:55:06.18 8.16
2025-03-12T10:55:07.18 8.19
2025-03-12T10:55:08.18 8.17
2025-03-12T10:55:09.18 8.19
2025-03-12T10:55:10.18 8.17
2025-03-12T10:55:11.18 8.16
2025-03-12T10:55:12.18 8.15
2025-03-12T10:55:13.18 8.17
2025-03-12T10:55:14.18 8.16
2025-03-12T10:55:15.18 8.14
2025-03-12T10:55:16.18 8.17
2025-03-12T10:55:17.18 8.18
2025-03-12T10:55:18.18 8.17
2025-03-12T10:55:19.18 8.18
2025-03-12T10:55:20.18 8.17
2025-03-12T10:55:21.18 8.19
2025-03-12T10:55:22.18 8.16
2025-03-12T10:55:23.18 8.18
2025-03-12T10:55:24.18 8.17
2025-03-12T10:55:25.18 8.18
2025-03-12T10:55:26.18 8.17
2025-03-12T10:55:27.18 8.16
2025-03-12T10:55:28.18 8.16
2025-03-12T10:55:29.18 8.17
2025-03-12T10:55:30.18 8.17
2025-03-12T10:55:31.18 8.17
2025-03-12T10:55:32.18 8.19
2025-03-12T10:55:33.18 8.18
2025-03-12T10:55:34.18 8.19
2025-03-12T10:55:35.18 8.19
2025-03-12T10:55:36.18 8.17
2025-03-12T10:55:37.18 8.17
2025-03-12T10:55:38.18 8.18
2025-03-12T10:55:39.18 8.17
2025-03-12T10:55:40.18 8.16
2025-03-12T10:55:41.18 8.16
2025-03-12T10:55:42.18 8.17
2025-03-12T10:55:43.18 8.18
2025-03-12T10:55:44.18 8.16
2025-03-12T10:55:45.18 8.16
2025-03-12T10:55:46.18 8.18
2025-03-12T10:55:47.18 8.17
2025-03-12T10:55:48.18 8.16
2025-03-12T10:55:49.18 8.16
2025-03-12T10:55:50.18 8.15
2025-03-12T10:55:51.18 8.20
2025-03-12T10:55:52.18 8.17
2025-03-12T10:55:53.18 8.16
2025-03-12T10:55:54.18 8.17
2025-03-12T10:55:55.18 8.18
2025-03-12T10:55:56.18 8.17
2025-03-12T10:55:57.18 8.17
2025-03-12T10:55:58.18 8.17
2025-03-12T10:55:59.18 8.16
2025-03-12T10:56:00.18 8.16
2025-03-12T10:56:01.18 8.17
2025-03-12T10:56:02.18 8.16
2025-03-12T10:56:03.18 8.17
2025-03-12T10:56:04.18 8.16
2025-03-12T10:56:05.18 8.16
2025-03-12T10:56:06.18 8.16
2025-03-12T10:56:07.18 8.17
2025-03-12T10:56:08.18 8.16
2025-03-12T10:56:09.18 8.18
2025-03-12T10:56:10.18 8.17
2025-03-12T10:56:11.18 8.17
2025-03-12T10:56:12.18 8.17
2025-03-12T10:56:13.18 8.17
2025-03-12T10:56:14.18 8.17
2025-03-12T10:56:15.18 8.18
2025-03-12T10:56:16.18 8.17
2025-03-12T10:56:17.18 8.16
2025-03-12T10:56:18.18 8.17
2025-03-12T10:56:19.18 8.17
2025-03-12T10:56:20.18 8.15
2025-03-12T10:56:21.18 8.17
2025-03-12T10:56:22.18 8.17
2025-03-12T10:56:23.18 8.17
2025-03-12T10:56:24.18 8.16
2025-03-12T10:56:25.18 8.17
2025-03-12T10:56:26.18 8.20
2025-03-12T10:56:27.18 8.16
2025-03-12T10:56:28.18 8.16
2025-03-12T10:56:29.18 8.17
2025-03-12T10:56:30.18 8.18
2025-03-12T10:56:31.18 8.18
2025-03-12T10:56:32.18 8.16
2025-03-12T10:56:33.18 8.17
2025-03-12T10:56:34.18 8.17
2025-03-12T10:56:35.18 8.15
2025-03-12T10:56:36.18 8.16
2025-03-12T10:56:37.18 8.16
2025-03-12T10:56:38.18 8.14
2025-03-12T10:56:39.18 8.17
2025-03-12T10:56:40.18 8.17
2025-03-12T10:56:41.18 8.15
2025-03-12T10:56:42.18 8.17
2025-03-12T10:56:43.18 8.17
2025-03-12T10:56:44.18 8.16
2025-03-12T10:56:45.18 8.18
2025-03-12T10:56:46.18 8.17
2025-03-12T10:56:47.18 8.17
2025-03-12T10:56:48.18 8.18
2025-03-12T10:56:49.18 8.16
2025-03-12T10:56:50.18 8.19
2025-03-12T10:56:51.18 8.17
2025-03-12T10:56:52.18 8.16
2025-03-12T10:56:53.18 8.17
2025-03-12T10:56:54.18 8.16
2025-03-12T10:56:55.18 8.16
2025-03-12T10:56:56.18 8.17
2025-03-12T10:56:57.18 8.16
2025-03-12T10:56:58.18 8.18
2025-03-12T10:56:59.18 8.17
2025-03-12T10:57:00.18 8.17
2025-03-12T10:57:01.18 8.19
2025-03-12T10:57:02.18 8.16
2025-03-12T10:57:03.18 8.17
2025-03-12T10:57:04.18 8.19
2025-03-12T10:57:05.18 8.17
2025-03-12T10:57:06.18 8.16
2025-03-12T10:57:07.18 8.18
2025-03-12T10:57:08.18 8.18
2025-03-12T10:57:09.18 8.19
2025-03-12T10:57:10.18 8.17
2025-03-12T10:57:11.18 8.17
2025-03-12T10:57:12.18 8.18
2025-03-12T10:57:13.18 8.17
2025-03-12T10:57:14.18 8.17
2025-03-12T10:57:15.18 8.17
2025-03-12T10:57:16.18 8.17
2025-03-12T10:57:17.18 8.19
2025-03-12T10:57:18.18 8.16
2025-03-12T10:57:19.18 8.16
2025-03-12T10:57:20.19 8.17
2025-03-12T10:57:21.17 8.18
2025-03-12T10:57:22.17 8.16
2025-03-12T10:57:23.17 8.17
2025-03-12T10:57:24.17 8.17
2025-03-12T10:57:25.17 8.16
2025-03-12T10:57:26.17 8.17
2025-03-12T10:57:27.17 8.17
2025-03-12T10:57:28.17 8.18
2025-03-12T10:57:29.17 8.18
2025-03-12T10:57:30.17 8.20
2025-03-12T10:57:31.17 8.16
2025-03-12T10:57:32.17 8.20
2025-03-12T10:57:33.17 8.19
2025-03-12T10:57:34.17 8.16
2025-03-12T10:57:35.17 8.19
2025-03-12T10:57:36.17 8.16
2025-03-12T10:57:37.17 8.16
2025-03-12T10:57:38.17 8.18
2025-03-12T10:57:39.17 8.17
2025-03-12T10:57:40.17 8.15
2025-03-12T10:57:41.17 8.14
2025-03-12T10:57:42.17 8.16
2025-03-12T10:57:43.17 8.17
2025-03-12T10:57:44.17 8.17
2025-03-12T10:57:45.17 8.16
2025-03-12T10:57:46.17 8.17
2025-03-12T10:57:47.17 8.15
2025-03-12T10:57:48.17 8.17
2025-03-12T10:57:49.17 8.18
2025-03-12T10:57:50.17 8.16
2025-03-12T10:57:51.17 8.17
2025-03-12T10:57:52.17 8.17
2025-03-12T10:57:53.17 8.17
2025-03-12T10:57:54.17 8.16
2025-03-12T10:57:55.17 8.17
2025-03-12T10:57:56.17 8.17
2025-03-12T10:57:57.17 8.19
2025-03-12T10:57:58.17 8.13
2025-03-12T10:57:59.17 8.15
2025-03-12T10:58:00.17 8.17
2025-03-12T10:58:01.17 8.15
2025-03-12T10:58:02.17 8.18
2025-03-12T10:58:03.17 8.19
2025-03-12T10:58:04.17 8.19
2025-03-12T10:58:05.17 8.16
2025-03-12T10:58:06.17 8.16
2025-03-12T10:58:07.17 8.16
2025-03-12T10:58:08.17 8.17
2025-03-12T10:58:09.17 8.17
2025-03-12T10:58:10.17 8.16
2025-03-12T10:58:11.17 8.19
2025-03-12T10:58:12.17 8.17
2025-03-12T10:58:13.17 8.18
2025-03-12T10:58:14.17 8.20
2025-03-12T10:58:15.17 8.19
2025-03-12T10:58:16.17 8.20
2025-03-12T10:58:17.17 8.18
2025-03-12T10:58:18.17 8.17
2025-03-12T10:58:19.17 8.19
2025-03-12T10:58:20.17 8.15
2025-03-12T10:58:21.17 8.19
2025-03-12T10:58:22.17 8.17
2025-03-12T10:58:23.17 8.17
2025-03-12T10:58:24.17 8.20
2025-03-12T10:58:25.17 8.18
2025-03-12T10:58:26.17 8.17
2025-03-12T10:58:27.17 8.17
2025-03-12T10:58:28.17 8.17
2025-03-12T10:58:29.17 8.16
2025-03-12T10:58:30.17 8.17
2025-03-12T10:58:31.17 8.16
2025-03-12T10:58:32.17 8.19
2025-03-12T10:58:33.17 8.17
2025-03-12T10:58:34.17 8.17
2025-03-12T10:58:35.17 8.17
2025-03-12T10:58:36.17 8.16
2025-03-12T10:58:37.17 8.16
2025-03-12T10:58:38.17 8.16
2025-03-12T10:58:39.17 8.16
2025-03-12T10:58:40.17 8.15
2025-03-12T10:58:41.17 8.17
2025-03-12T10:58:42.17 8.16
2025-03-12T10:58:43.17 8.17
2025-03-12T10:58:44.17 8.17
2025-03-12T10:58:45.17 8.17
2025-03-12T10:58:46.17 8.17
2025-03-12T10:58:47.17 8.16
2025-03-12T10:58:48.17 8.17
2025-03-12T10:58:49.17 8.16
2025-03-12T10:58:50.17 8.19
2025-03-12T10:58:51.17 8.17
2025-03-12T10:58:52.17 8.17
2025-03-12T10:58:53.17 8.18
2025-03-12T10:58:54.17 8.17
2025-03-12T10:58:55.17 8.17
2025-03-12T10:58:56.17 8.16
2025-03-12T10:58:57.17 8.19
2025-03-12T10:58:58.17 8.17
2025-03-12T10:58:59.17 8.15
2025-03-12T10:59:00.18 8.19
2025-03-12T10:59:01.18 8.17
2025-03-12T10:59:02.18 8.16
2025-03-12T10:59:03.18 8.16
2025-03-12T10:59:04.18 8.17
2025-03-12T10:59:05.18 8.16
2025-03-12T10:59:06.18 8.17
2025-03-12T10:59:07.18 8.16
2025-03-12T10:59:08.18 8.17
2025-03-12T10:59:09.18 8.19
2025-03-12T10:59:10.18 8.17
2025-03-12T10:59:11.18 8.16
2025-03-12T10:59:12.18 8.18
2025-03-12T10:59:13.18 8.18
2025-03-12T10:59:14.18 8.18
2025-03-12T10:59:15.18 8.18
2025-03-12T10:59:16.18 8.17
2025-03-12T10:59:17.18 8.16
2025-03-12T10:59:18.18 8.18
2025-03-12T10:59:19.18 8.15
2025-03-12T10:59:20.18 8.17
2025-03-12T10:59:21.18 8.17
2025-03-12T10:59:22.18 8.16
2025-03-12T10:59:23.18 8.18
2025-03-12T10:59:24.18 8.16
2025-03-12T10:59:25.18 8.16
2025-03-12T10:59:26.18 8.16
2025-03-12T10:59:27.18 8.17
2025-03-12T10:59:28.18 8.16
2025-03-12T10:59:29.18 8.17
2025-03-12T10:59:30.18 8.17
2025-03-12T10:59:31.18 8.14
2025-03-12T10:59:32.18 8.14
2025-03-12T10:59:33.18 8.16
2025-03-12T10:59:34.18 8.16
2025-03-12T10:59:35.18 8.16
2025-03-12T10:59:36.18 8.18
2025-03-12T10:59:37.18 8.16
2025-03-12T10:59:38.18 8.17
2025-03-12T10:59:39.18 8.16
2025-03-12T10:59:40.18 8.17
2025-03-12T10:59:41.18 8.18
2025-03-12T10:59:42.18 8.17
2025-03-12T10:59:43.18 8.18
2025-03-12T10:59:44.18 8.15
2025-03-12T10:59:45.18 8.18
2025-03-12T10:59:46.18 8.18
2025-03-12T10:59:47.18 8.17
2025-03-12T10:59:48.18 8.16
2025-03-12T10:59:49.18 8.16
2025-03-12T10:59:50.18 8.16
2025-03-12T10:59:51.18 8.17
2025-03-12T10:59:52.18 8.17
2025-03-12T10:59:53.18 8.14
2025-03-12T10:59:54.18 8.16
2025-03-12T10:59:55.18 8.14
2025-03-12T10:59:56.18 8.17
2025-03-12T10:59:57.18 8.17
2025-03-12T10:59:58.18 8.16
2025-03-12T10:59:59.18 8.16
