# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-15T18:00:00.56 8.14
2025-03-15T18:00:01.56 8.16
2025-03-15T18:00:02.56 8.14
2025-03-15T18:00:03.56 8.17
2025-03-15T18:00:04.56 8.16
2025-03-15T18:00:05.56 8.10
2025-03-15T18:00:06.56 8.16
2025-03-15T18:00:07.56 8.15
2025-03-15T18:00:08.56 8.14
2025-03-15T18:00:09.56 8.15
2025-03-15T18:00:10.56 8.15
2025-03-15T18:00:11.56 8.14
2025-03-15T18:00:12.59 8.14
2025-03-15T18:00:13.55 8.16
2025-03-15T18:00:14.55 8.13
2025-03-15T18:00:15.55 8.14
2025-03-15T18:00:16.55 8.13
2025-03-15T18:00:17.55 8.15
2025-03-15T18:00:18.55 8.14
2025-03-15T18:00:19.55 8.15
2025-03-15T18:00:20.55 8.13
2025-03-15T18:00:21.55 8.14
2025-03-15T18:00:22.55 8.16
2025-03-15T18:00:23.55 8.13
2025-03-15T18:00:24.55 8.15
2025-03-15T18:00:25.55 8.12
2025-03-15T18:00:26.55 8.12
2025-03-15T18:00:27.55 8.12
2025-03-15T18:00:28.55 8.16
2025-03-15T18:00:29.55 8.18
2025-03-15T18:00:30.55 8.14
2025-03-15T18:00:31.55 8.14
2025-03-15T18:00:32.55 8.16
2025-03-15T18:00:33.55 8.11
2025-03-15T18:00:34.55 8.16
2025-03-15T18:00:35.55 8.14
2025-03-15T18:00:36.55 8.15
2025-03-15T18:00:37.55 8.17
2025-03-15T18:00:38.55 8.17
2025-03-15T18:00:39.55 8.14
2025-03-15T18:00:40.55 8.17
2025-03-15T18:00:41.55 8.13
2025-03-15T18:00:42.55 8.12
2025-03-15T18:00:43.55 8.16
2025-03-15T18:00:44.55 8.15
2025-03-15T18:00:45.55 8.13
2025-03-15T18:00:46.55 8.16
2025-03-15T18:00:47.55 8.13
2025-03-15T18:00:48.55 8.16
2025-03-15T18:00:49.55 8.16
2025-03-15T18:00:50.55 8.12
2025-03-15T18:00:51.55 8.15
2025-03-15T18:00:52.55 8.14
2025-03-15T18:00:53.55 8.14
2025-03-15T18:00:54.55 8.16
2025-03-15T18:00:55.55 8.14
2025-03-15T18:00:56.55 8.12
2025-03-15T18:00:57.55 8.14
2025-03-15T18:00:58.55 8.16
2025-03-15T18:00:59.55 8.17
2025-03-15T18:01:00.55 8.15
2025-03-15T18:01:01.55 8.16
2025-03-15T18:01:02.55 8.13
2025-03-15T18:01:03.55 8.12
2025-03-15T18:01:04.55 8.17
2025-03-15T18:01:05.55 8.16
2025-03-15T18:01:06.55 8.13
2025-03-15T18:01:07.55 8.14
2025-03-15T18:01:08.55 8.13
2025-03-15T18:01:09.55 8.16
2025-03-15T18:01:10.55 8.14
2025-03-15T18:01:11.55 8.14
2025-03-15T18:01:12.55 8.16
2025-03-15T18:01:13.55 8.14
2025-03-15T18:01:14.55 8.14
2025-03-15T18:01:15.55 8.13
2025-03-15T18:01:16.55 8.14
2025-03-15T18:01:17.55 8.14
2025-03-15T18:01:18.55 8.15
2025-03-15T18:01:19.55 8.13
2025-03-15T18:01:20.55 8.12
2025-03-15T18:01:21.55 8.16
2025-03-15T18:01:22.55 8.14
2025-03-15T18:01:23.55 8.14
2025-03-15T18:01:24.55 8.14
2025-03-15T18:01:25.55 8.16
2025-03-15T18:01:26.55 8.14
2025-03-15T18:01:27.55 8.16
2025-03-15T18:01:28.55 8.15
2025-03-15T18:01:29.55 8.16
2025-03-15T18:01:30.55 8.14
2025-03-15T18:01:31.55 8.13
2025-03-15T18:01:32.55 8.15
2025-03-15T18:01:33.55 8.17
2025-03-15T18:01:34.55 8.15
2025-03-15T18:01:35.55 8.16
2025-03-15T18:01:36.55 8.16
2025-03-15T18:01:37.55 8.14
2025-03-15T18:01:38.55 8.15
2025-03-15T18:01:39.55 8.16
2025-03-15T18:01:40.55 8.17
2025-03-15T18:01:41.55 8.14
2025-03-15T18:01:42.55 8.15
2025-03-15T18:01:43.55 8.15
2025-03-15T18:01:44.55 8.14
2025-03-15T18:01:45.55 8.14
2025-03-15T18:01:46.55 8.14
2025-03-15T18:01:47.55 8.13
2025-03-15T18:01:48.55 8.14
2025-03-15T18:01:49.55 8.17
2025-03-15T18:01:50.55 8.14
2025-03-15T18:01:51.55 8.15
2025-03-15T18:01:52.55 8.17
2025-03-15T18:01:53.55 8.15
2025-03-15T18:01:54.55 8.17
2025-03-15T18:01:55.55 8.16
2025-03-15T18:01:56.55 8.14
2025-03-15T18:01:57.55 8.16
2025-03-15T18:01:58.55 8.15
2025-03-15T18:01:59.55 8.14
2025-03-15T18:02:00.55 8.15
2025-03-15T18:02:01.55 8.15
2025-03-15T18:02:02.55 8.14
2025-03-15T18:02:03.55 8.15
2025-03-15T18:02:04.55 8.16
2025-03-15T18:02:05.55 8.14
2025-03-15T18:02:06.55 8.14
2025-03-15T18:02:07.55 8.13
2025-03-15T18:02:08.55 8.16
2025-03-15T18:02:09.55 8.14
2025-03-15T18:02:10.55 8.14
2025-03-15T18:02:11.55 8.15
2025-03-15T18:02:12.55 8.16
2025-03-15T18:02:13.55 8.14
2025-03-15T18:02:14.55 8.14
2025-03-15T18:02:15.55 8.14
2025-03-15T18:02:16.55 8.16
2025-03-15T18:02:17.55 8.13
2025-03-15T18:02:18.55 8.15
2025-03-15T18:02:19.55 8.13
2025-03-15T18:02:20.55 8.14
2025-03-15T18:02:21.55 8.17
2025-03-15T18:02:22.55 8.14
2025-03-15T18:02:23.55 8.16
2025-03-15T18:02:24.55 8.14
2025-03-15T18:02:25.55 8.16
2025-03-15T18:02:26.55 8.16
2025-03-15T18:02:27.55 8.14
2025-03-15T18:02:28.55 8.14
2025-03-15T18:02:29.55 8.15
2025-03-15T18:02:30.55 8.14
2025-03-15T18:02:31.55 8.14
2025-03-15T18:02:32.55 8.14
2025-03-15T18:02:33.55 8.13
2025-03-15T18:02:34.55 8.14
2025-03-15T18:02:35.55 8.15
2025-03-15T18:02:36.55 8.13
2025-03-15T18:02:37.55 8.14
2025-03-15T18:02:38.55 8.12
2025-03-15T18:02:39.56 8.14
2025-03-15T18:02:40.54 8.12
2025-03-15T18:02:41.54 8.13
2025-03-15T18:02:42.54 8.15
2025-03-15T18:02:43.54 8.14
2025-03-15T18:02:44.54 8.13
2025-03-15T18:02:45.54 8.17
2025-03-15T18:02:46.54 8.14
2025-03-15T18:02:47.54 8.18
2025-03-15T18:02:48.54 8.14
2025-03-15T18:02:49.54 8.13
2025-03-15T18:02:50.54 8.12
2025-03-15T18:02:51.54 8.14
2025-03-15T18:02:52.54 8.13
2025-03-15T18:02:53.55 8.14
2025-03-15T18:02:54.54 8.14
2025-03-15T18:02:55.55 8.15
2025-03-15T18:02:56.55 8.15
2025-03-15T18:02:57.55 8.12
2025-03-15T18:02:58.55 8.14
2025-03-15T18:02:59.55 8.13
2025-03-15T18:03:00.55 8.15
2025-03-15T18:03:01.55 8.15
2025-03-15T18:03:02.55 8.15
2025-03-15T18:03:03.55 8.15
2025-03-15T18:03:04.55 8.15
2025-03-15T18:03:05.55 8.14
2025-03-15T18:03:06.55 8.14
2025-03-15T18:03:07.55 8.16
2025-03-15T18:03:08.55 8.15
2025-03-15T18:03:09.55 8.15
2025-03-15T18:03:10.55 8.14
2025-03-15T18:03:11.55 8.15
2025-03-15T18:03:12.55 8.13
2025-03-15T18:03:13.55 8.16
2025-03-15T18:03:14.55 8.13
2025-03-15T18:03:15.55 8.12
2025-03-15T18:03:16.55 8.16
2025-03-15T18:03:17.55 8.14
2025-03-15T18:03:18.55 8.15
2025-03-15T18:03:19.55 8.14
2025-03-15T18:03:20.55 8.15
2025-03-15T18:03:21.55 8.16
2025-03-15T18:03:22.55 8.16
2025-03-15T18:03:23.55 8.15
2025-03-15T18:03:24.55 8.16
2025-03-15T18:03:25.55 8.14
2025-03-15T18:03:26.55 8.14
2025-03-15T18:03:27.55 8.14
2025-03-15T18:03:28.55 8.14
2025-03-15T18:03:29.55 8.14
2025-03-15T18:03:30.55 8.13
2025-03-15T18:03:31.55 8.14
2025-03-15T18:03:32.55 8.15
2025-03-15T18:03:33.55 8.16
2025-03-15T18:03:34.55 8.16
2025-03-15T18:03:35.55 8.13
2025-03-15T18:03:36.55 8.12
2025-03-15T18:03:37.55 8.14
2025-03-15T18:03:38.55 8.16
2025-03-15T18:03:39.55 8.14
2025-03-15T18:03:40.55 8.14
2025-03-15T18:03:41.55 8.13
2025-03-15T18:03:42.55 8.15
2025-03-15T18:03:43.55 8.15
2025-03-15T18:03:44.55 8.13
2025-03-15T18:03:45.55 8.15
2025-03-15T18:03:46.55 8.12
2025-03-15T18:03:47.55 8.14
2025-03-15T18:03:48.55 8.14
2025-03-15T18:03:49.55 8.14
2025-03-15T18:03:50.55 8.14
2025-03-15T18:03:51.55 8.15
2025-03-15T18:03:52.55 8.14
2025-03-15T18:03:53.55 8.14
2025-03-15T18:03:54.55 8.14
2025-03-15T18:03:55.55 8.15
2025-03-15T18:03:56.55 8.15
2025-03-15T18:03:57.55 8.14
2025-03-15T18:03:58.55 8.14
2025-03-15T18:03:59.55 8.15
2025-03-15T18:04:00.55 8.16
2025-03-15T18:04:01.55 8.15
2025-03-15T18:04:02.57 8.12
2025-03-15T18:04:03.54 8.14
2025-03-15T18:04:04.54 8.16
2025-03-15T18:04:05.54 8.16
2025-03-15T18:04:06.54 8.15
2025-03-15T18:04:07.54 8.15
2025-03-15T18:04:08.54 8.15
2025-03-15T18:04:09.54 8.13
2025-03-15T18:04:10.54 8.16
2025-03-15T18:04:11.54 8.16
2025-03-15T18:04:12.54 8.14
2025-03-15T18:04:13.54 8.13
2025-03-15T18:04:14.54 8.14
2025-03-15T18:04:15.54 8.16
2025-03-15T18:04:16.54 8.16
2025-03-15T18:04:17.54 8.16
2025-03-15T18:04:18.54 8.14
2025-03-15T18:04:19.54 8.15
2025-03-15T18:04:20.54 8.14
2025-03-15T18:04:21.54 8.17
2025-03-15T18:04:22.54 8.14
2025-03-15T18:04:23.54 8.16
2025-03-15T18:04:24.54 8.16
2025-03-15T18:04:25.54 8.17
2025-03-15T18:04:26.54 8.15
2025-03-15T18:04:27.54 8.16
2025-03-15T18:04:28.54 8.16
2025-03-15T18:04:29.54 8.14
2025-03-15T18:04:30.54 8.14
2025-03-15T18:04:31.54 8.14
2025-03-15T18:04:32.54 8.14
2025-03-15T18:04:33.54 8.16
2025-03-15T18:04:34.54 8.13
2025-03-15T18:04:35.54 8.16
2025-03-15T18:04:36.54 8.14
2025-03-15T18:04:37.54 8.15
2025-03-15T18:04:38.54 8.15
2025-03-15T18:04:39.54 8.16
2025-03-15T18:04:40.54 8.14
2025-03-15T18:04:41.54 8.14
2025-03-15T18:04:42.54 8.14
2025-03-15T18:04:43.54 8.17
2025-03-15T18:04:44.54 8.14
2025-03-15T18:04:45.54 8.15
2025-03-15T18:04:46.54 8.16
2025-03-15T18:04:47.54 8.14
2025-03-15T18:04:48.54 8.12
2025-03-15T18:04:49.54 8.12
2025-03-15T18:04:50.54 8.12
2025-03-15T18:04:51.54 8.13
2025-03-15T18:04:52.54 8.13
2025-03-15T18:04:53.54 8.12
2025-03-15T18:04:54.54 8.15
2025-03-15T18:04:55.54 8.16
2025-03-15T18:04:56.54 8.15
2025-03-15T18:04:57.54 8.14
2025-03-15T18:04:58.54 8.14
2025-03-15T18:04:59.54 8.16
2025-03-15T18:05:00.54 8.14
2025-03-15T18:05:01.54 8.13
2025-03-15T18:05:02.54 8.14
2025-03-15T18:05:03.54 8.15
2025-03-15T18:05:04.54 8.14
2025-03-15T18:05:05.54 8.15
2025-03-15T18:05:06.54 8.15
2025-03-15T18:05:07.54 8.15
2025-03-15T18:05:08.54 8.14
2025-03-15T18:05:09.54 8.17
2025-03-15T18:05:10.54 8.12
2025-03-15T18:05:11.54 8.16
2025-03-15T18:05:12.54 8.16
2025-03-15T18:05:13.54 8.15
2025-03-15T18:05:14.54 8.13
2025-03-15T18:05:15.54 8.14
2025-03-15T18:05:16.54 8.16
2025-03-15T18:05:17.54 8.15
2025-03-15T18:05:18.54 8.16
2025-03-15T18:05:19.54 8.16
2025-03-15T18:05:20.54 8.14
2025-03-15T18:05:21.54 8.15
2025-03-15T18:05:22.54 8.16
2025-03-15T18:05:23.54 8.14
2025-03-15T18:05:24.54 8.15
2025-03-15T18:05:25.54 8.15
2025-03-15T18:05:26.54 8.14
2025-03-15T18:05:27.54 8.15
2025-03-15T18:05:28.54 8.14
2025-03-15T18:05:29.54 8.14
2025-03-15T18:05:30.54 8.13
2025-03-15T18:05:31.54 8.14
2025-03-15T18:05:32.58 8.14
2025-03-15T18:05:33.53 8.14
2025-03-15T18:05:34.53 8.13
2025-03-15T18:05:35.53 8.13
2025-03-15T18:05:36.53 8.15
2025-03-15T18:05:37.53 8.14
2025-03-15T18:05:38.53 8.16
2025-03-15T18:05:39.53 8.15
2025-03-15T18:05:40.53 8.16
2025-03-15T18:05:41.53 8.15
2025-03-15T18:05:42.53 8.16
2025-03-15T18:05:43.53 8.12
2025-03-15T18:05:44.53 8.15
2025-03-15T18:05:45.53 8.16
2025-03-15T18:05:46.53 8.14
2025-03-15T18:05:47.53 8.17
2025-03-15T18:05:48.53 8.14
2025-03-15T18:05:49.53 8.10
2025-03-15T18:05:50.53 8.16
2025-03-15T18:05:51.53 8.14
2025-03-15T18:05:52.53 8.12
2025-03-15T18:05:53.53 8.13
2025-03-15T18:05:54.53 8.12
2025-03-15T18:05:55.53 8.15
2025-03-15T18:05:56.53 8.16
2025-03-15T18:05:57.53 8.13
2025-03-15T18:05:58.53 8.11
2025-03-15T18:05:59.53 8.12
2025-03-15T18:06:00.53 8.12
2025-03-15T18:06:01.53 8.14
2025-03-15T18:06:02.53 8.14
2025-03-15T18:06:03.53 8.16
2025-03-15T18:06:04.53 8.16
2025-03-15T18:06:05.53 8.16
2025-03-15T18:06:06.53 8.16
2025-03-15T18:06:07.53 8.14
2025-03-15T18:06:08.53 8.14
2025-03-15T18:06:09.53 8.14
2025-03-15T18:06:10.53 8.14
2025-03-15T18:06:11.53 8.14
2025-03-15T18:06:12.53 8.15
2025-03-15T18:06:13.53 8.15
2025-03-15T18:06:14.53 8.16
2025-03-15T18:06:15.53 8.15
2025-03-15T18:06:16.53 8.16
2025-03-15T18:06:17.53 8.13
2025-03-15T18:06:18.53 8.16
2025-03-15T18:06:19.53 8.15
2025-03-15T18:06:20.53 8.14
2025-03-15T18:06:21.53 8.13
2025-03-15T18:06:22.53 8.13
2025-03-15T18:06:23.53 8.14
2025-03-15T18:06:24.53 8.15
2025-03-15T18:06:25.53 8.13
2025-03-15T18:06:26.53 8.16
2025-03-15T18:06:27.53 8.14
2025-03-15T18:06:28.53 8.17
2025-03-15T18:06:29.53 8.16
2025-03-15T18:06:30.53 8.15
2025-03-15T18:06:31.54 8.12
2025-03-15T18:06:32.52 8.16
2025-03-15T18:06:33.52 8.13
2025-03-15T18:06:34.52 8.12
2025-03-15T18:06:35.52 8.12
2025-03-15T18:06:36.52 8.12
2025-03-15T18:06:37.52 8.14
2025-03-15T18:06:38.52 8.11
2025-03-15T18:06:39.52 8.17
2025-03-15T18:06:40.52 8.15
2025-03-15T18:06:41.52 8.12
2025-03-15T18:06:42.52 8.16
2025-03-15T18:06:43.52 8.13
2025-03-15T18:06:44.52 8.15
2025-03-15T18:06:45.52 8.16
2025-03-15T18:06:46.52 8.14
2025-03-15T18:06:47.52 8.16
2025-03-15T18:06:48.52 8.17
2025-03-15T18:06:49.52 8.15
2025-03-15T18:06:50.52 8.14
2025-03-15T18:06:51.52 8.15
2025-03-15T18:06:52.52 8.14
2025-03-15T18:06:53.52 8.15
2025-03-15T18:06:54.52 8.14
2025-03-15T18:06:55.52 8.14
2025-03-15T18:06:56.52 8.14
2025-03-15T18:06:57.52 8.16
2025-03-15T18:06:58.52 8.13
2025-03-15T18:06:59.52 8.16
2025-03-15T18:07:00.52 8.14
2025-03-15T18:07:01.52 8.16
2025-03-15T18:07:02.59 8.16
2025-03-15T18:07:03.52 8.17
2025-03-15T18:07:04.52 8.15
2025-03-15T18:07:05.52 8.16
2025-03-15T18:07:06.52 8.15
2025-03-15T18:07:07.52 8.14
2025-03-15T18:07:08.52 8.16
2025-03-15T18:07:09.52 8.15
2025-03-15T18:07:10.52 8.14
2025-03-15T18:07:11.52 8.14
2025-03-15T18:07:12.52 8.15
2025-03-15T18:07:13.52 8.15
2025-03-15T18:07:14.52 8.15
2025-03-15T18:07:15.52 8.16
2025-03-15T18:07:16.52 8.14
2025-03-15T18:07:17.52 8.12
2025-03-15T18:07:18.52 8.17
2025-03-15T18:07:19.52 8.14
2025-03-15T18:07:20.52 8.16
2025-03-15T18:07:21.52 8.15
2025-03-15T18:07:22.52 8.15
2025-03-15T18:07:23.52 8.15
2025-03-15T18:07:24.52 8.17
2025-03-15T18:07:25.52 8.14
2025-03-15T18:07:26.52 8.16
2025-03-15T18:07:27.52 8.14
2025-03-15T18:07:28.52 8.17
2025-03-15T18:07:29.52 8.14
2025-03-15T18:07:30.52 8.15
2025-03-15T18:07:31.52 8.14
2025-03-15T18:07:32.52 8.16
2025-03-15T18:07:33.52 8.16
2025-03-15T18:07:34.52 8.14
2025-03-15T18:07:35.52 8.16
2025-03-15T18:07:36.52 8.14
2025-03-15T18:07:37.52 8.14
2025-03-15T18:07:38.52 8.14
2025-03-15T18:07:39.52 8.13
2025-03-15T18:07:40.52 8.17
2025-03-15T18:07:41.53 8.16
2025-03-15T18:07:42.53 8.13
2025-03-15T18:07:43.53 8.15
2025-03-15T18:07:44.53 8.14
2025-03-15T18:07:45.53 8.15
2025-03-15T18:07:46.53 8.15
2025-03-15T18:07:47.53 8.16
2025-03-15T18:07:48.53 8.14
2025-03-15T18:07:49.53 8.15
2025-03-15T18:07:50.53 8.15
2025-03-15T18:07:51.53 8.16
2025-03-15T18:07:52.53 8.16
2025-03-15T18:07:53.53 8.15
2025-03-15T18:07:54.53 8.14
2025-03-15T18:07:55.53 8.15
2025-03-15T18:07:56.53 8.14
2025-03-15T18:07:57.53 8.16
2025-03-15T18:07:58.53 8.16
2025-03-15T18:07:59.53 8.14
2025-03-15T18:08:00.53 8.14
2025-03-15T18:08:01.53 8.16
2025-03-15T18:08:02.53 8.17
2025-03-15T18:08:03.53 8.16
2025-03-15T18:08:04.53 8.16
2025-03-15T18:08:05.53 8.16
2025-03-15T18:08:06.53 8.15
2025-03-15T18:08:07.54 8.17
2025-03-15T18:08:08.53 8.16
2025-03-15T18:08:09.53 8.14
2025-03-15T18:08:10.53 8.14
2025-03-15T18:08:11.53 8.14
2025-03-15T18:08:12.53 8.15
2025-03-15T18:08:13.54 8.16
2025-03-15T18:08:14.54 8.16
2025-03-15T18:08:15.54 8.14
2025-03-15T18:08:16.54 8.14
2025-03-15T18:08:17.54 8.12
2025-03-15T18:08:18.54 8.14
2025-03-15T18:08:19.54 8.14
2025-03-15T18:08:20.54 8.16
2025-03-15T18:08:21.54 8.16
2025-03-15T18:08:22.54 8.15
2025-03-15T18:08:23.54 8.16
2025-03-15T18:08:24.54 8.14
2025-03-15T18:08:25.54 8.15
2025-03-15T18:08:26.54 8.16
2025-03-15T18:08:27.54 8.15
2025-03-15T18:08:28.54 8.16
2025-03-15T18:08:29.54 8.16
2025-03-15T18:08:30.54 8.18
2025-03-15T18:08:31.54 8.14
2025-03-15T18:08:32.54 8.14
2025-03-15T18:08:33.54 8.14
2025-03-15T18:08:34.54 8.15
2025-03-15T18:08:35.54 8.16
2025-03-15T18:08:36.54 8.16
2025-03-15T18:08:37.54 8.12
2025-03-15T18:08:38.54 8.15
2025-03-15T18:08:39.54 8.13
2025-03-15T18:08:40.54 8.14
2025-03-15T18:08:41.54 8.16
2025-03-15T18:08:42.54 8.16
2025-03-15T18:08:43.54 8.16
2025-03-15T18:08:44.54 8.17
2025-03-15T18:08:45.54 8.16
2025-03-15T18:08:46.54 8.14
2025-03-15T18:08:47.54 8.16
2025-03-15T18:08:48.54 8.16
2025-03-15T18:08:49.54 8.16
2025-03-15T18:08:50.54 8.15
2025-03-15T18:08:51.54 8.15
2025-03-15T18:08:52.54 8.16
2025-03-15T18:08:53.54 8.14
2025-03-15T18:08:54.54 8.17
2025-03-15T18:08:55.54 8.16
2025-03-15T18:08:56.54 8.14
2025-03-15T18:08:57.54 8.14
2025-03-15T18:08:58.54 8.15
2025-03-15T18:08:59.54 8.16
2025-03-15T18:09:00.54 8.16
2025-03-15T18:09:01.54 8.15
2025-03-15T18:09:02.54 8.16
2025-03-15T18:09:03.54 8.16
2025-03-15T18:09:04.54 8.17
2025-03-15T18:09:05.54 8.14
2025-03-15T18:09:06.54 8.17
2025-03-15T18:09:07.54 8.16
2025-03-15T18:09:08.54 8.16
2025-03-15T18:09:09.54 8.17
2025-03-15T18:09:10.54 8.15
2025-03-15T18:09:11.54 8.16
2025-03-15T18:09:12.54 8.14
2025-03-15T18:09:13.54 8.15
2025-03-15T18:09:14.54 8.15
2025-03-15T18:09:15.54 8.15
2025-03-15T18:09:16.54 8.17
2025-03-15T18:09:17.54 8.16
2025-03-15T18:09:18.54 8.14
2025-03-15T18:09:19.55 8.17
2025-03-15T18:09:20.53 8.12
2025-03-15T18:09:21.53 8.15
2025-03-15T18:09:22.53 8.15
2025-03-15T18:09:23.53 8.15
2025-03-15T18:09:24.53 8.16
2025-03-15T18:09:25.53 8.15
2025-03-15T18:09:26.53 8.15
2025-03-15T18:09:27.53 8.15
2025-03-15T18:09:28.53 8.16
2025-03-15T18:09:29.53 8.14
2025-03-15T18:09:30.53 8.15
2025-03-15T18:09:31.53 8.13
2025-03-15T18:09:32.53 8.16
2025-03-15T18:09:33.53 8.15
2025-03-15T18:09:34.53 8.13
2025-03-15T18:09:35.53 8.14
2025-03-15T18:09:36.53 8.13
2025-03-15T18:09:37.53 8.16
2025-03-15T18:09:38.53 8.13
2025-03-15T18:09:39.53 8.15
2025-03-15T18:09:40.53 8.14
2025-03-15T18:09:41.53 8.17
2025-03-15T18:09:42.53 8.12
2025-03-15T18:09:43.53 8.14
2025-03-15T18:09:44.53 8.16
2025-03-15T18:09:45.53 8.15
2025-03-15T18:09:46.53 8.16
2025-03-15T18:09:47.53 8.16
2025-03-15T18:09:48.53 8.13
2025-03-15T18:09:49.53 8.14
2025-03-15T18:09:50.53 8.15
2025-03-15T18:09:51.53 8.14
2025-03-15T18:09:52.53 8.14
2025-03-15T18:09:53.53 8.16
2025-03-15T18:09:54.53 8.13
2025-03-15T18:09:55.53 8.14
2025-03-15T18:09:56.53 8.16
2025-03-15T18:09:57.53 8.15
2025-03-15T18:09:58.53 8.16
2025-03-15T18:09:59.53 8.16
2025-03-15T18:10:00.53 8.18
2025-03-15T18:10:01.53 8.14
2025-03-15T18:10:02.58 8.15
2025-03-15T18:10:03.53 8.17
2025-03-15T18:10:04.53 8.14
2025-03-15T18:10:05.53 8.16
2025-03-15T18:10:06.53 8.15
2025-03-15T18:10:07.53 8.15
2025-03-15T18:10:08.53 8.14
2025-03-15T18:10:09.53 8.16
2025-03-15T18:10:10.53 8.14
2025-03-15T18:10:11.53 8.14
2025-03-15T18:10:12.53 8.14
2025-03-15T18:10:13.53 8.14
2025-03-15T18:10:14.53 8.13
2025-03-15T18:10:15.53 8.16
2025-03-15T18:10:16.53 8.16
2025-03-15T18:10:17.53 8.16
2025-03-15T18:10:18.53 8.16
2025-03-15T18:10:19.53 8.14
2025-03-15T18:10:20.53 8.17
2025-03-15T18:10:21.53 8.16
2025-03-15T18:10:22.53 8.16
2025-03-15T18:10:23.53 8.14
2025-03-15T18:10:24.53 8.17
2025-03-15T18:10:25.54 8.15
2025-03-15T18:10:26.54 8.15
2025-03-15T18:10:27.54 8.16
2025-03-15T18:10:28.54 8.14
2025-03-15T18:10:29.54 8.17
2025-03-15T18:10:30.54 8.15
2025-03-15T18:10:31.54 8.16
2025-03-15T18:10:32.54 8.15
2025-03-15T18:10:33.54 8.14
2025-03-15T18:10:34.54 8.14
2025-03-15T18:10:35.54 8.15
2025-03-15T18:10:36.54 8.16
2025-03-15T18:10:37.54 8.16
2025-03-15T18:10:38.54 8.16
2025-03-15T18:10:39.54 8.14
2025-03-15T18:10:40.54 8.15
2025-03-15T18:10:41.54 8.16
2025-03-15T18:10:42.54 8.12
2025-03-15T18:10:43.54 8.15
2025-03-15T18:10:44.54 8.16
2025-03-15T18:10:45.54 8.15
2025-03-15T18:10:46.54 8.15
2025-03-15T18:10:47.54 8.14
2025-03-15T18:10:48.54 8.14
2025-03-15T18:10:49.54 8.15
2025-03-15T18:10:50.54 8.12
2025-03-15T18:10:51.54 8.15
2025-03-15T18:10:52.54 8.16
2025-03-15T18:10:53.54 8.13
2025-03-15T18:10:54.54 8.15
2025-03-15T18:10:55.54 8.17
2025-03-15T18:10:56.54 8.15
2025-03-15T18:10:57.54 8.16
2025-03-15T18:10:58.54 8.15
2025-03-15T18:10:59.54 8.16
2025-03-15T18:11:00.54 8.16
2025-03-15T18:11:01.54 8.16
2025-03-15T18:11:02.54 8.16
2025-03-15T18:11:03.54 8.12
2025-03-15T18:11:04.54 8.17
2025-03-15T18:11:05.54 8.16
2025-03-15T18:11:06.54 8.16
2025-03-15T18:11:07.54 8.16
2025-03-15T18:11:08.54 8.13
2025-03-15T18:11:09.54 8.14
2025-03-15T18:11:10.54 8.17
2025-03-15T18:11:11.54 8.16
2025-03-15T18:11:12.54 8.16
2025-03-15T18:11:13.54 8.15
2025-03-15T18:11:14.54 8.16
2025-03-15T18:11:15.54 8.14
2025-03-15T18:11:16.54 8.16
2025-03-15T18:11:17.54 8.14
2025-03-15T18:11:18.54 8.16
2025-03-15T18:11:19.54 8.14
2025-03-15T18:11:20.54 8.17
2025-03-15T18:11:21.54 8.14
2025-03-15T18:11:22.54 8.15
2025-03-15T18:11:23.54 8.14
2025-03-15T18:11:24.54 8.15
2025-03-15T18:11:25.54 8.14
2025-03-15T18:11:26.54 8.16
2025-03-15T18:11:27.54 8.14
2025-03-15T18:11:28.54 8.13
2025-03-15T18:11:29.54 8.17
2025-03-15T18:11:30.54 8.16
2025-03-15T18:11:31.54 8.17
2025-03-15T18:11:32.54 8.16
2025-03-15T18:11:33.54 8.16
2025-03-15T18:11:34.54 8.14
2025-03-15T18:11:35.54 8.14
2025-03-15T18:11:36.54 8.15
2025-03-15T18:11:37.54 8.16
2025-03-15T18:11:38.54 8.16
2025-03-15T18:11:39.54 8.16
2025-03-15T18:11:40.54 8.19
2025-03-15T18:11:41.54 8.17
2025-03-15T18:11:42.54 8.15
2025-03-15T18:11:43.54 8.17
2025-03-15T18:11:44.54 8.15
2025-03-15T18:11:45.54 8.14
2025-03-15T18:11:46.54 8.14
2025-03-15T18:11:47.54 8.15
2025-03-15T18:11:48.54 8.16
2025-03-15T18:11:49.54 8.16
2025-03-15T18:11:50.54 8.15
2025-03-15T18:11:51.54 8.14
2025-03-15T18:11:52.54 8.16
2025-03-15T18:11:53.54 8.14
2025-03-15T18:11:54.54 8.16
2025-03-15T18:11:55.54 8.16
2025-03-15T18:11:56.54 8.15
2025-03-15T18:11:57.54 8.14
2025-03-15T18:11:58.54 8.17
2025-03-15T18:11:59.54 8.14
2025-03-15T18:12:00.54 8.16
2025-03-15T18:12:01.54 8.13
2025-03-15T18:12:02.54 8.16
2025-03-15T18:12:03.54 8.17
2025-03-15T18:12:04.54 8.14
2025-03-15T18:12:05.54 8.15
2025-03-15T18:12:06.54 8.17
2025-03-15T18:12:07.54 8.17
2025-03-15T18:12:08.54 8.15
2025-03-15T18:12:09.54 8.14
2025-03-15T18:12:10.54 8.15
2025-03-15T18:12:11.54 8.15
2025-03-15T18:12:12.54 8.15
2025-03-15T18:12:13.54 8.15
2025-03-15T18:12:14.54 8.17
2025-03-15T18:12:15.54 8.17
2025-03-15T18:12:16.54 8.16
2025-03-15T18:12:17.54 8.14
2025-03-15T18:12:18.54 8.17
2025-03-15T18:12:19.54 8.16
2025-03-15T18:12:20.54 8.17
2025-03-15T18:12:21.54 8.16
2025-03-15T18:12:22.60 8.17
2025-03-15T18:12:23.54 8.17
2025-03-15T18:12:24.54 8.16
2025-03-15T18:12:25.54 8.16
2025-03-15T18:12:26.54 8.17
2025-03-15T18:12:27.54 8.16
2025-03-15T18:12:28.54 8.16
2025-03-15T18:12:29.54 8.14
2025-03-15T18:12:30.54 8.16
2025-03-15T18:12:31.54 8.16
2025-03-15T18:12:32.54 8.15
2025-03-15T18:12:33.54 8.16
2025-03-15T18:12:34.54 8.16
2025-03-15T18:12:35.54 8.14
2025-03-15T18:12:36.54 8.16
2025-03-15T18:12:37.54 8.14
2025-03-15T18:12:38.54 8.16
2025-03-15T18:12:39.54 8.16
2025-03-15T18:12:40.54 8.13
2025-03-15T18:12:41.54 8.15
2025-03-15T18:12:42.54 8.15
2025-03-15T18:12:43.54 8.14
2025-03-15T18:12:44.54 8.14
2025-03-15T18:12:45.54 8.15
2025-03-15T18:12:46.54 8.16
2025-03-15T18:12:47.54 8.14
2025-03-15T18:12:48.54 8.14
2025-03-15T18:12:49.54 8.12
2025-03-15T18:12:50.54 8.17
2025-03-15T18:12:51.54 8.16
2025-03-15T18:12:52.54 8.14
2025-03-15T18:12:53.54 8.14
2025-03-15T18:12:54.54 8.15
2025-03-15T18:12:55.54 8.16
2025-03-15T18:12:56.54 8.15
2025-03-15T18:12:57.54 8.16
2025-03-15T18:12:58.54 8.16
2025-03-15T18:12:59.54 8.17
2025-03-15T18:13:00.54 8.16
2025-03-15T18:13:01.54 8.14
2025-03-15T18:13:02.54 8.16
2025-03-15T18:13:03.54 8.14
2025-03-15T18:13:04.54 8.14
2025-03-15T18:13:05.54 8.16
2025-03-15T18:13:06.54 8.14
2025-03-15T18:13:07.54 8.12
2025-03-15T18:13:08.54 8.16
2025-03-15T18:13:09.54 8.14
2025-03-15T18:13:10.54 8.15
2025-03-15T18:13:11.54 8.14
2025-03-15T18:13:12.54 8.16
2025-03-15T18:13:13.54 8.15
2025-03-15T18:13:14.54 8.13
2025-03-15T18:13:15.54 8.14
2025-03-15T18:13:16.54 8.16
2025-03-15T18:13:17.54 8.16
2025-03-15T18:13:18.54 8.14
2025-03-15T18:13:19.54 8.14
2025-03-15T18:13:20.54 8.17
2025-03-15T18:13:21.54 8.16
2025-03-15T18:13:22.54 8.16
2025-03-15T18:13:23.54 8.14
2025-03-15T18:13:24.54 8.14
2025-03-15T18:13:25.54 8.14
2025-03-15T18:13:26.54 8.15
2025-03-15T18:13:27.54 8.14
2025-03-15T18:13:28.54 8.15
2025-03-15T18:13:29.54 8.15
2025-03-15T18:13:30.54 8.14
2025-03-15T18:13:31.55 8.15
2025-03-15T18:13:32.55 8.14
2025-03-15T18:13:33.55 8.16
2025-03-15T18:13:34.55 8.16
2025-03-15T18:13:35.55 8.14
2025-03-15T18:13:36.55 8.15
2025-03-15T18:13:37.55 8.13
2025-03-15T18:13:38.55 8.16
2025-03-15T18:13:39.55 8.16
2025-03-15T18:13:40.55 8.14
2025-03-15T18:13:41.55 8.15
2025-03-15T18:13:42.55 8.13
2025-03-15T18:13:43.55 8.17
2025-03-15T18:13:44.55 8.13
2025-03-15T18:13:45.55 8.15
2025-03-15T18:13:46.55 8.14
2025-03-15T18:13:47.55 8.15
2025-03-15T18:13:48.55 8.15
2025-03-15T18:13:49.55 8.16
2025-03-15T18:13:50.55 8.16
2025-03-15T18:13:51.55 8.14
2025-03-15T18:13:52.60 8.14
2025-03-15T18:13:53.54 8.16
2025-03-15T18:13:54.54 8.16
2025-03-15T18:13:55.54 8.14
2025-03-15T18:13:56.54 8.16
2025-03-15T18:13:57.54 8.14
2025-03-15T18:13:58.54 8.17
2025-03-15T18:13:59.54 8.16
2025-03-15T18:14:00.54 8.16
2025-03-15T18:14:01.54 8.15
2025-03-15T18:14:02.54 8.15
2025-03-15T18:14:03.54 8.16
2025-03-15T18:14:04.54 8.15
2025-03-15T18:14:05.54 8.19
2025-03-15T18:14:06.54 8.14
2025-03-15T18:14:07.54 8.16
2025-03-15T18:14:08.54 8.15
2025-03-15T18:14:09.54 8.16
2025-03-15T18:14:10.54 8.16
2025-03-15T18:14:11.54 8.16
2025-03-15T18:14:12.54 8.14
2025-03-15T18:14:13.54 8.17
2025-03-15T18:14:14.54 8.14
2025-03-15T18:14:15.54 8.15
2025-03-15T18:14:16.54 8.15
2025-03-15T18:14:17.54 8.17
2025-03-15T18:14:18.54 8.14
2025-03-15T18:14:19.54 8.14
2025-03-15T18:14:20.54 8.14
2025-03-15T18:14:21.54 8.15
2025-03-15T18:14:22.54 8.15
2025-03-15T18:14:23.54 8.14
2025-03-15T18:14:24.54 8.14
2025-03-15T18:14:25.54 8.16
2025-03-15T18:14:26.54 8.16
2025-03-15T18:14:27.54 8.16
2025-03-15T18:14:28.54 8.16
2025-03-15T18:14:29.54 8.16
2025-03-15T18:14:30.54 8.14
2025-03-15T18:14:31.54 8.17
2025-03-15T18:14:32.54 8.15
2025-03-15T18:14:33.54 8.13
2025-03-15T18:14:34.54 8.13
2025-03-15T18:14:35.54 8.15
2025-03-15T18:14:36.54 8.14
2025-03-15T18:14:37.54 8.16
2025-03-15T18:14:38.54 8.14
2025-03-15T18:14:39.54 8.14
2025-03-15T18:14:40.54 8.15
2025-03-15T18:14:41.54 8.13
2025-03-15T18:14:42.54 8.15
2025-03-15T18:14:43.54 8.14
2025-03-15T18:14:44.54 8.14
2025-03-15T18:14:45.54 8.14
2025-03-15T18:14:46.54 8.16
2025-03-15T18:14:47.54 8.14
2025-03-15T18:14:48.54 8.15
2025-03-15T18:14:49.54 8.15
2025-03-15T18:14:50.54 8.15
2025-03-15T18:14:51.54 8.15
2025-03-15T18:14:52.54 8.12
2025-03-15T18:14:53.54 8.13
2025-03-15T18:14:54.54 8.14
2025-03-15T18:14:55.54 8.16
2025-03-15T18:14:56.54 8.15
2025-03-15T18:14:57.54 8.16
2025-03-15T18:14:58.54 8.14
2025-03-15T18:14:59.54 8.16
2025-03-15T18:15:00.54 8.14
2025-03-15T18:15:01.54 8.15
2025-03-15T18:15:02.54 8.14
2025-03-15T18:15:03.54 8.15
2025-03-15T18:15:04.54 8.14
2025-03-15T18:15:05.54 8.16
2025-03-15T18:15:06.54 8.16
2025-03-15T18:15:07.54 8.15
2025-03-15T18:15:08.54 8.14
2025-03-15T18:15:09.54 8.15
2025-03-15T18:15:10.54 8.12
2025-03-15T18:15:11.54 8.14
2025-03-15T18:15:12.54 8.16
2025-03-15T18:15:13.54 8.14
2025-03-15T18:15:14.54 8.14
2025-03-15T18:15:15.54 8.14
2025-03-15T18:15:16.54 8.15
2025-03-15T18:15:17.54 8.17
2025-03-15T18:15:18.54 8.16
2025-03-15T18:15:19.54 8.17
2025-03-15T18:15:20.54 8.15
2025-03-15T18:15:21.54 8.16
2025-03-15T18:15:22.57 8.14
2025-03-15T18:15:23.53 8.17
2025-03-15T18:15:24.53 8.14
2025-03-15T18:15:25.53 8.15
2025-03-15T18:15:26.53 8.15
2025-03-15T18:15:27.53 8.14
2025-03-15T18:15:28.53 8.15
2025-03-15T18:15:29.53 8.17
2025-03-15T18:15:30.53 8.16
2025-03-15T18:15:31.53 8.15
2025-03-15T18:15:32.53 8.13
2025-03-15T18:15:33.53 8.15
2025-03-15T18:15:34.53 8.16
2025-03-15T18:15:35.53 8.15
2025-03-15T18:15:36.53 8.16
2025-03-15T18:15:37.53 8.13
2025-03-15T18:15:38.53 8.14
2025-03-15T18:15:39.53 8.14
2025-03-15T18:15:40.53 8.12
2025-03-15T18:15:41.53 8.14
2025-03-15T18:15:42.53 8.16
2025-03-15T18:15:43.53 8.16
2025-03-15T18:15:44.53 8.14
2025-03-15T18:15:45.53 8.16
2025-03-15T18:15:46.53 8.16
2025-03-15T18:15:47.53 8.15
2025-03-15T18:15:48.53 8.16
2025-03-15T18:15:49.53 8.15
2025-03-15T18:15:50.53 8.14
2025-03-15T18:15:51.53 8.15
2025-03-15T18:15:52.53 8.14
2025-03-15T18:15:53.53 8.14
2025-03-15T18:15:54.53 8.16
2025-03-15T18:15:55.53 8.14
2025-03-15T18:15:56.53 8.16
2025-03-15T18:15:57.53 8.16
2025-03-15T18:15:58.53 8.14
2025-03-15T18:15:59.53 8.16
2025-03-15T18:16:00.53 8.12
2025-03-15T18:16:01.53 8.13
2025-03-15T18:16:02.53 8.14
2025-03-15T18:16:03.53 8.14
2025-03-15T18:16:04.53 8.15
2025-03-15T18:16:05.53 8.12
2025-03-15T18:16:06.53 8.14
2025-03-15T18:16:07.53 8.14
2025-03-15T18:16:08.53 8.13
2025-03-15T18:16:09.53 8.15
2025-03-15T18:16:10.53 8.16
2025-03-15T18:16:11.53 8.15
2025-03-15T18:16:12.53 8.16
2025-03-15T18:16:13.53 8.17
2025-03-15T18:16:14.53 8.14
2025-03-15T18:16:15.53 8.16
2025-03-15T18:16:16.53 8.17
2025-03-15T18:16:17.53 8.14
2025-03-15T18:16:18.53 8.15
2025-03-15T18:16:19.53 8.16
2025-03-15T18:16:20.53 8.14
2025-03-15T18:16:21.53 8.14
2025-03-15T18:16:22.53 8.14
2025-03-15T18:16:23.53 8.14
2025-03-15T18:16:24.53 8.13
2025-03-15T18:16:25.53 8.14
2025-03-15T18:16:26.53 8.14
2025-03-15T18:16:27.53 8.13
2025-03-15T18:16:28.53 8.14
2025-03-15T18:16:29.53 8.16
2025-03-15T18:16:30.53 8.16
2025-03-15T18:16:31.53 8.16
2025-03-15T18:16:32.53 8.14
2025-03-15T18:16:33.53 8.14
2025-03-15T18:16:34.53 8.16
2025-03-15T18:16:35.53 8.16
2025-03-15T18:16:36.53 8.16
2025-03-15T18:16:37.53 8.16
2025-03-15T18:16:38.53 8.15
2025-03-15T18:16:39.53 8.14
2025-03-15T18:16:40.53 8.16
2025-03-15T18:16:41.53 8.15
2025-03-15T18:16:42.53 8.14
2025-03-15T18:16:43.53 8.16
2025-03-15T18:16:44.53 8.14
2025-03-15T18:16:45.53 8.14
2025-03-15T18:16:46.53 8.14
2025-03-15T18:16:47.53 8.14
2025-03-15T18:16:48.53 8.14
2025-03-15T18:16:49.53 8.14
2025-03-15T18:16:50.53 8.16
2025-03-15T18:16:51.53 8.16
2025-03-15T18:16:52.56 8.16
2025-03-15T18:16:53.52 8.14
2025-03-15T18:16:54.52 8.14
2025-03-15T18:16:55.52 8.14
2025-03-15T18:16:56.52 8.14
2025-03-15T18:16:57.52 8.16
2025-03-15T18:16:58.52 8.14
2025-03-15T18:16:59.52 8.17
2025-03-15T18:17:00.52 8.16
2025-03-15T18:17:01.52 8.15
2025-03-15T18:17:02.52 8.16
2025-03-15T18:17:03.52 8.17
2025-03-15T18:17:04.52 8.16
2025-03-15T18:17:05.52 8.15
2025-03-15T18:17:06.52 8.12
2025-03-15T18:17:07.52 8.17
2025-03-15T18:17:08.52 8.14
2025-03-15T18:17:09.52 8.14
2025-03-15T18:17:10.52 8.14
2025-03-15T18:17:11.52 8.16
2025-03-15T18:17:12.52 8.13
2025-03-15T18:17:13.52 8.15
2025-03-15T18:17:14.52 8.14
2025-03-15T18:17:15.52 8.15
2025-03-15T18:17:16.52 8.14
2025-03-15T18:17:17.52 8.16
2025-03-15T18:17:18.52 8.14
2025-03-15T18:17:19.52 8.17
2025-03-15T18:17:20.52 8.12
2025-03-15T18:17:21.52 8.12
2025-03-15T18:17:22.52 8.17
2025-03-15T18:17:23.52 8.13
2025-03-15T18:17:24.52 8.16
2025-03-15T18:17:25.52 8.15
2025-03-15T18:17:26.52 8.15
2025-03-15T18:17:27.52 8.16
2025-03-15T18:17:28.52 8.14
2025-03-15T18:17:29.52 8.14
2025-03-15T18:17:30.52 8.16
2025-03-15T18:17:31.52 8.15
2025-03-15T18:17:32.52 8.15
2025-03-15T18:17:33.52 8.15
2025-03-15T18:17:34.52 8.16
2025-03-15T18:17:35.52 8.14
2025-03-15T18:17:36.52 8.15
2025-03-15T18:17:37.52 8.14
2025-03-15T18:17:38.53 8.14
2025-03-15T18:17:39.52 8.15
2025-03-15T18:17:40.52 8.13
2025-03-15T18:17:41.52 8.16
2025-03-15T18:17:42.52 8.16
2025-03-15T18:17:43.52 8.16
2025-03-15T18:17:44.52 8.14
2025-03-15T18:17:45.52 8.14
2025-03-15T18:17:46.52 8.14
2025-03-15T18:17:47.52 8.15
2025-03-15T18:17:48.52 8.15
2025-03-15T18:17:49.52 8.15
2025-03-15T18:17:50.52 8.14
2025-03-15T18:17:51.52 8.14
2025-03-15T18:17:52.52 8.13
2025-03-15T18:17:53.52 8.16
2025-03-15T18:17:54.52 8.16
2025-03-15T18:17:55.52 8.13
2025-03-15T18:17:56.52 8.15
2025-03-15T18:17:57.52 8.14
2025-03-15T18:17:58.52 8.17
2025-03-15T18:17:59.52 8.14
2025-03-15T18:18:00.52 8.17
2025-03-15T18:18:01.52 8.14
2025-03-15T18:18:02.52 8.12
2025-03-15T18:18:03.52 8.14
2025-03-15T18:18:04.52 8.14
2025-03-15T18:18:05.52 8.14
2025-03-15T18:18:06.52 8.16
2025-03-15T18:18:07.53 8.14
2025-03-15T18:18:08.53 8.13
2025-03-15T18:18:09.53 8.16
2025-03-15T18:18:10.53 8.16
2025-03-15T18:18:11.53 8.12
2025-03-15T18:18:12.53 8.15
2025-03-15T18:18:13.53 8.16
2025-03-15T18:18:14.53 8.15
2025-03-15T18:18:15.53 8.15
2025-03-15T18:18:16.53 8.14
2025-03-15T18:18:17.53 8.14
2025-03-15T18:18:18.53 8.15
2025-03-15T18:18:19.53 8.14
2025-03-15T18:18:20.53 8.17
2025-03-15T18:18:21.53 8.16
2025-03-15T18:18:22.53 8.14
2025-03-15T18:18:23.53 8.16
2025-03-15T18:18:24.57 8.15
2025-03-15T18:18:25.53 8.16
2025-03-15T18:18:26.53 8.16
2025-03-15T18:18:27.53 8.14
2025-03-15T18:18:28.53 8.16
2025-03-15T18:18:29.53 8.12
2025-03-15T18:18:30.53 8.15
2025-03-15T18:18:31.53 8.16
2025-03-15T18:18:32.53 8.14
2025-03-15T18:18:33.53 8.14
2025-03-15T18:18:34.53 8.12
2025-03-15T18:18:35.53 8.16
2025-03-15T18:18:36.53 8.14
2025-03-15T18:18:37.53 8.16
2025-03-15T18:18:38.53 8.14
2025-03-15T18:18:39.53 8.13
2025-03-15T18:18:40.53 8.16
2025-03-15T18:18:41.53 8.15
2025-03-15T18:18:42.53 8.16
2025-03-15T18:18:43.53 8.16
2025-03-15T18:18:44.53 8.16
2025-03-15T18:18:45.53 8.15
2025-03-15T18:18:46.53 8.14
2025-03-15T18:18:47.53 8.15
2025-03-15T18:18:48.54 8.14
2025-03-15T18:18:49.54 8.16
2025-03-15T18:18:50.54 8.15
2025-03-15T18:18:51.54 8.16
2025-03-15T18:18:52.54 8.17
2025-03-15T18:18:53.54 8.16
2025-03-15T18:18:54.54 8.14
2025-03-15T18:18:55.54 8.15
2025-03-15T18:18:56.54 8.15
2025-03-15T18:18:57.54 8.15
2025-03-15T18:18:58.54 8.14
2025-03-15T18:18:59.54 8.15
2025-03-15T18:19:00.54 8.16
2025-03-15T18:19:01.54 8.16
2025-03-15T18:19:02.54 8.14
2025-03-15T18:19:03.54 8.14
2025-03-15T18:19:04.54 8.16
2025-03-15T18:19:05.54 8.16
2025-03-15T18:19:06.54 8.15
2025-03-15T18:19:07.54 8.15
2025-03-15T18:19:08.54 8.13
2025-03-15T18:19:09.54 8.14
2025-03-15T18:19:10.54 8.17
2025-03-15T18:19:11.54 8.15
2025-03-15T18:19:12.54 8.14
2025-03-15T18:19:13.54 8.16
2025-03-15T18:19:14.54 8.14
2025-03-15T18:19:15.54 8.16
2025-03-15T18:19:16.54 8.16
2025-03-15T18:19:17.54 8.14
2025-03-15T18:19:18.54 8.15
2025-03-15T18:19:19.54 8.16
2025-03-15T18:19:20.54 8.16
2025-03-15T18:19:21.54 8.14
2025-03-15T18:19:22.54 8.17
2025-03-15T18:19:23.54 8.16
2025-03-15T18:19:24.54 8.15
2025-03-15T18:19:25.54 8.15
2025-03-15T18:19:26.54 8.16
2025-03-15T18:19:27.54 8.16
2025-03-15T18:19:28.54 8.14
2025-03-15T18:19:29.54 8.12
2025-03-15T18:19:30.54 8.16
2025-03-15T18:19:31.54 8.17
2025-03-15T18:19:32.54 8.14
2025-03-15T18:19:33.54 8.13
2025-03-15T18:19:34.54 8.15
2025-03-15T18:19:35.54 8.14
2025-03-15T18:19:36.54 8.15
2025-03-15T18:19:37.54 8.17
2025-03-15T18:19:38.54 8.16
2025-03-15T18:19:39.54 8.16
2025-03-15T18:19:40.54 8.14
2025-03-15T18:19:41.54 8.17
2025-03-15T18:19:42.54 8.14
2025-03-15T18:19:43.54 8.15
2025-03-15T18:19:44.54 8.14
2025-03-15T18:19:45.54 8.15
2025-03-15T18:19:46.54 8.15
2025-03-15T18:19:47.54 8.17
2025-03-15T18:19:48.54 8.16
2025-03-15T18:19:49.54 8.14
2025-03-15T18:19:50.54 8.16
2025-03-15T18:19:51.54 8.14
2025-03-15T18:19:52.54 8.16
2025-03-15T18:19:53.54 8.16
2025-03-15T18:19:54.54 8.14
2025-03-15T18:19:55.54 8.16
2025-03-15T18:19:56.54 8.16
2025-03-15T18:19:57.54 8.16
2025-03-15T18:19:58.54 8.16
2025-03-15T18:19:59.54 8.14
2025-03-15T18:20:00.54 8.16
2025-03-15T18:20:01.54 8.12
2025-03-15T18:20:02.54 8.14
2025-03-15T18:20:03.54 8.14
2025-03-15T18:20:04.54 8.17
2025-03-15T18:20:05.54 8.14
2025-03-15T18:20:06.54 8.13
2025-03-15T18:20:07.54 8.15
2025-03-15T18:20:08.54 8.15
2025-03-15T18:20:09.54 8.16
2025-03-15T18:20:10.54 8.14
2025-03-15T18:20:11.54 8.14
2025-03-15T18:20:12.54 8.16
2025-03-15T18:20:13.54 8.15
2025-03-15T18:20:14.54 8.16
2025-03-15T18:20:15.54 8.13
2025-03-15T18:20:16.54 8.14
2025-03-15T18:20:17.54 8.14
2025-03-15T18:20:18.54 8.14
2025-03-15T18:20:19.54 8.14
2025-03-15T18:20:20.54 8.16
2025-03-15T18:20:21.54 8.16
2025-03-15T18:20:22.54 8.12
2025-03-15T18:20:23.54 8.16
2025-03-15T18:20:24.54 8.14
2025-03-15T18:20:25.54 8.14
2025-03-15T18:20:26.54 8.12
2025-03-15T18:20:27.54 8.14
2025-03-15T18:20:28.54 8.15
2025-03-15T18:20:29.54 8.14
2025-03-15T18:20:30.54 8.16
2025-03-15T18:20:31.54 8.16
2025-03-15T18:20:32.54 8.15
2025-03-15T18:20:33.54 8.16
2025-03-15T18:20:34.54 8.16
2025-03-15T18:20:35.54 8.14
2025-03-15T18:20:36.54 8.16
2025-03-15T18:20:37.54 8.14
2025-03-15T18:20:38.54 8.13
2025-03-15T18:20:39.54 8.14
2025-03-15T18:20:40.54 8.14
2025-03-15T18:20:41.54 8.14
2025-03-15T18:20:42.57 8.16
2025-03-15T18:20:43.53 8.16
2025-03-15T18:20:44.53 8.16
2025-03-15T18:20:45.53 8.17
2025-03-15T18:20:46.53 8.16
2025-03-15T18:20:47.53 8.16
2025-03-15T18:20:48.53 8.16
2025-03-15T18:20:49.53 8.16
2025-03-15T18:20:50.53 8.15
2025-03-15T18:20:51.53 8.18
2025-03-15T18:20:52.53 8.15
2025-03-15T18:20:53.53 8.14
2025-03-15T18:20:54.53 8.16
2025-03-15T18:20:55.53 8.17
2025-03-15T18:20:56.53 8.15
2025-03-15T18:20:57.53 8.16
2025-03-15T18:20:58.53 8.16
2025-03-15T18:20:59.53 8.16
2025-03-15T18:21:00.53 8.14
2025-03-15T18:21:01.53 8.13
2025-03-15T18:21:02.53 8.16
2025-03-15T18:21:03.53 8.14
2025-03-15T18:21:04.53 8.14
2025-03-15T18:21:05.53 8.15
2025-03-15T18:21:06.53 8.16
2025-03-15T18:21:07.53 8.16
2025-03-15T18:21:08.53 8.14
2025-03-15T18:21:09.53 8.14
2025-03-15T18:21:10.53 8.14
2025-03-15T18:21:11.53 8.16
2025-03-15T18:21:12.53 8.14
2025-03-15T18:21:13.53 8.14
2025-03-15T18:21:14.53 8.12
2025-03-15T18:21:15.53 8.12
2025-03-15T18:21:16.53 8.16
2025-03-15T18:21:17.53 8.15
2025-03-15T18:21:18.53 8.15
2025-03-15T18:21:19.53 8.16
2025-03-15T18:21:20.53 8.16
2025-03-15T18:21:21.53 8.16
2025-03-15T18:21:22.53 8.15
2025-03-15T18:21:23.53 8.14
2025-03-15T18:21:24.53 8.16
2025-03-15T18:21:25.53 8.14
2025-03-15T18:21:26.53 8.15
2025-03-15T18:21:27.53 8.14
2025-03-15T18:21:28.53 8.16
2025-03-15T18:21:29.53 8.16
2025-03-15T18:21:30.53 8.14
2025-03-15T18:21:31.53 8.14
2025-03-15T18:21:32.53 8.14
2025-03-15T18:21:33.53 8.13
2025-03-15T18:21:34.53 8.13
2025-03-15T18:21:35.53 8.15
2025-03-15T18:21:36.53 8.15
2025-03-15T18:21:37.53 8.15
2025-03-15T18:21:38.53 8.15
2025-03-15T18:21:39.53 8.17
2025-03-15T18:21:40.53 8.16
2025-03-15T18:21:41.53 8.17
2025-03-15T18:21:42.53 8.13
2025-03-15T18:21:43.53 8.15
2025-03-15T18:21:44.53 8.15
2025-03-15T18:21:45.53 8.14
2025-03-15T18:21:46.53 8.17
2025-03-15T18:21:47.53 8.14
2025-03-15T18:21:48.53 8.14
2025-03-15T18:21:49.53 8.16
2025-03-15T18:21:50.53 8.14
2025-03-15T18:21:51.53 8.15
2025-03-15T18:21:52.53 8.15
2025-03-15T18:21:53.53 8.12
2025-03-15T18:21:54.53 8.16
2025-03-15T18:21:55.53 8.17
2025-03-15T18:21:56.53 8.16
2025-03-15T18:21:57.53 8.14
2025-03-15T18:21:58.53 8.16
2025-03-15T18:21:59.54 8.15
2025-03-15T18:22:00.54 8.14
2025-03-15T18:22:01.54 8.14
2025-03-15T18:22:02.54 8.16
2025-03-15T18:22:03.54 8.14
2025-03-15T18:22:04.54 8.17
2025-03-15T18:22:05.54 8.14
2025-03-15T18:22:06.54 8.16
2025-03-15T18:22:07.54 8.16
2025-03-15T18:22:08.54 8.16
2025-03-15T18:22:09.54 8.15
2025-03-15T18:22:10.54 8.14
2025-03-15T18:22:11.54 8.16
2025-03-15T18:22:12.54 8.14
2025-03-15T18:22:13.54 8.16
2025-03-15T18:22:14.54 8.14
2025-03-15T18:22:15.54 8.15
2025-03-15T18:22:16.54 8.14
2025-03-15T18:22:17.54 8.14
2025-03-15T18:22:18.54 8.17
2025-03-15T18:22:19.54 8.14
2025-03-15T18:22:20.54 8.14
2025-03-15T18:22:21.54 8.14
2025-03-15T18:22:22.54 8.14
2025-03-15T18:22:23.54 8.16
2025-03-15T18:22:24.54 8.14
2025-03-15T18:22:25.54 8.15
2025-03-15T18:22:26.54 8.16
2025-03-15T18:22:27.54 8.15
2025-03-15T18:22:28.54 8.15
2025-03-15T18:22:29.54 8.15
2025-03-15T18:22:30.54 8.15
2025-03-15T18:22:31.54 8.14
2025-03-15T18:22:32.54 8.14
2025-03-15T18:22:33.54 8.16
2025-03-15T18:22:34.54 8.12
2025-03-15T18:22:35.54 8.16
2025-03-15T18:22:36.54 8.15
2025-03-15T18:22:37.54 8.16
2025-03-15T18:22:38.54 8.16
2025-03-15T18:22:39.54 8.14
2025-03-15T18:22:40.54 8.15
2025-03-15T18:22:41.54 8.12
2025-03-15T18:22:42.54 8.16
2025-03-15T18:22:43.54 8.16
2025-03-15T18:22:44.54 8.12
2025-03-15T18:22:45.54 8.14
2025-03-15T18:22:46.54 8.15
2025-03-15T18:22:47.54 8.12
2025-03-15T18:22:48.54 8.15
2025-03-15T18:22:49.54 8.16
2025-03-15T18:22:50.54 8.16
2025-03-15T18:22:51.54 8.16
2025-03-15T18:22:52.54 8.14
2025-03-15T18:22:53.54 8.17
2025-03-15T18:22:54.54 8.16
2025-03-15T18:22:55.54 8.14
2025-03-15T18:22:56.54 8.16
2025-03-15T18:22:57.54 8.14
2025-03-15T18:22:58.54 8.15
2025-03-15T18:22:59.54 8.16
2025-03-15T18:23:00.54 8.15
2025-03-15T18:23:01.54 8.16
2025-03-15T18:23:02.63 8.14
2025-03-15T18:23:03.54 8.14
2025-03-15T18:23:04.54 8.16
2025-03-15T18:23:05.54 8.16
2025-03-15T18:23:06.54 8.16
2025-03-15T18:23:07.54 8.16
2025-03-15T18:23:08.54 8.16
2025-03-15T18:23:09.54 8.15
2025-03-15T18:23:10.54 8.17
2025-03-15T18:23:11.54 8.16
2025-03-15T18:23:12.54 8.14
2025-03-15T18:23:13.54 8.16
2025-03-15T18:23:14.54 8.15
2025-03-15T18:23:15.54 8.14
2025-03-15T18:23:16.54 8.15
2025-03-15T18:23:17.54 8.13
2025-03-15T18:23:18.54 8.16
2025-03-15T18:23:19.54 8.15
2025-03-15T18:23:20.54 8.16
2025-03-15T18:23:21.54 8.16
2025-03-15T18:23:22.54 8.14
2025-03-15T18:23:23.54 8.15
2025-03-15T18:23:24.54 8.15
2025-03-15T18:23:25.54 8.15
2025-03-15T18:23:26.54 8.16
2025-03-15T18:23:27.54 8.16
2025-03-15T18:23:28.54 8.14
2025-03-15T18:23:29.54 8.16
2025-03-15T18:23:30.54 8.15
2025-03-15T18:23:31.54 8.14
2025-03-15T18:23:32.54 8.15
2025-03-15T18:23:33.54 8.15
2025-03-15T18:23:34.54 8.14
2025-03-15T18:23:35.54 8.16
2025-03-15T18:23:36.54 8.14
2025-03-15T18:23:37.54 8.16
2025-03-15T18:23:38.54 8.13
2025-03-15T18:23:39.54 8.16
2025-03-15T18:23:40.54 8.14
2025-03-15T18:23:41.54 8.16
2025-03-15T18:23:42.54 8.16
2025-03-15T18:23:43.54 8.14
2025-03-15T18:23:44.54 8.14
2025-03-15T18:23:45.54 8.15
2025-03-15T18:23:46.54 8.15
2025-03-15T18:23:47.54 8.14
2025-03-15T18:23:48.54 8.13
2025-03-15T18:23:49.54 8.14
2025-03-15T18:23:50.54 8.16
2025-03-15T18:23:51.54 8.15
2025-03-15T18:23:52.54 8.15
2025-03-15T18:23:53.54 8.15
2025-03-15T18:23:54.54 8.16
2025-03-15T18:23:55.54 8.12
2025-03-15T18:23:56.54 8.16
2025-03-15T18:23:57.54 8.15
2025-03-15T18:23:58.54 8.17
2025-03-15T18:23:59.54 8.16
2025-03-15T18:24:00.54 8.14
2025-03-15T18:24:01.54 8.13
2025-03-15T18:24:02.54 8.15
2025-03-15T18:24:03.54 8.12
2025-03-15T18:24:04.54 8.13
2025-03-15T18:24:05.54 8.16
2025-03-15T18:24:06.54 8.17
2025-03-15T18:24:07.54 8.16
2025-03-15T18:24:08.55 8.15
2025-03-15T18:24:09.55 8.17
2025-03-15T18:24:10.55 8.16
2025-03-15T18:24:11.55 8.14
2025-03-15T18:24:12.55 8.14
2025-03-15T18:24:13.55 8.15
2025-03-15T18:24:14.55 8.15
2025-03-15T18:24:15.55 8.16
2025-03-15T18:24:16.55 8.16
2025-03-15T18:24:17.55 8.14
2025-03-15T18:24:18.55 8.14
2025-03-15T18:24:19.55 8.16
2025-03-15T18:24:20.55 8.15
2025-03-15T18:24:21.55 8.14
2025-03-15T18:24:22.55 8.15
2025-03-15T18:24:23.55 8.16
2025-03-15T18:24:24.55 8.15
2025-03-15T18:24:25.55 8.14
2025-03-15T18:24:26.55 8.14
2025-03-15T18:24:27.55 8.13
2025-03-15T18:24:28.55 8.16
2025-03-15T18:24:29.55 8.15
2025-03-15T18:24:30.55 8.17
2025-03-15T18:24:31.55 8.15
2025-03-15T18:24:32.55 8.14
2025-03-15T18:24:33.55 8.15
2025-03-15T18:24:34.55 8.15
2025-03-15T18:24:35.55 8.15
2025-03-15T18:24:36.55 8.14
2025-03-15T18:24:37.55 8.14
2025-03-15T18:24:38.55 8.16
2025-03-15T18:24:39.55 8.14
2025-03-15T18:24:40.55 8.14
2025-03-15T18:24:41.55 8.14
2025-03-15T18:24:42.55 8.14
2025-03-15T18:24:43.55 8.14
2025-03-15T18:24:44.55 8.15
2025-03-15T18:24:45.55 8.14
2025-03-15T18:24:46.55 8.16
2025-03-15T18:24:47.55 8.14
2025-03-15T18:24:48.55 8.15
2025-03-15T18:24:49.55 8.14
2025-03-15T18:24:50.55 8.14
2025-03-15T18:24:51.55 8.13
2025-03-15T18:24:52.55 8.15
2025-03-15T18:24:53.55 8.16
2025-03-15T18:24:54.55 8.14
2025-03-15T18:24:55.55 8.14
2025-03-15T18:24:56.55 8.16
2025-03-15T18:24:57.55 8.15
2025-03-15T18:24:58.55 8.16
2025-03-15T18:24:59.55 8.16
2025-03-15T18:25:00.55 8.16
2025-03-15T18:25:01.55 8.15
2025-03-15T18:25:02.55 8.17
2025-03-15T18:25:03.55 8.13
2025-03-15T18:25:04.55 8.14
2025-03-15T18:25:05.55 8.17
2025-03-15T18:25:06.55 8.14
2025-03-15T18:25:07.55 8.14
2025-03-15T18:25:08.55 8.16
2025-03-15T18:25:09.55 8.16
2025-03-15T18:25:10.55 8.16
2025-03-15T18:25:11.55 8.16
2025-03-15T18:25:12.55 8.15
2025-03-15T18:25:13.55 8.14
2025-03-15T18:25:14.55 8.15
2025-03-15T18:25:15.55 8.12
2025-03-15T18:25:16.55 8.17
2025-03-15T18:25:17.55 8.15
2025-03-15T18:25:18.55 8.13
2025-03-15T18:25:19.55 8.16
2025-03-15T18:25:20.55 8.14
2025-03-15T18:25:21.55 8.15
2025-03-15T18:25:22.55 8.14
2025-03-15T18:25:23.55 8.14
2025-03-15T18:25:24.55 8.16
2025-03-15T18:25:25.55 8.16
2025-03-15T18:25:26.55 8.14
2025-03-15T18:25:27.55 8.13
2025-03-15T18:25:28.55 8.16
2025-03-15T18:25:29.55 8.15
2025-03-15T18:25:30.55 8.14
2025-03-15T18:25:31.55 8.17
2025-03-15T18:25:32.55 8.13
2025-03-15T18:25:33.55 8.17
2025-03-15T18:25:34.55 8.16
2025-03-15T18:25:35.55 8.13
2025-03-15T18:25:36.55 8.14
2025-03-15T18:25:37.55 8.15
2025-03-15T18:25:38.55 8.14
2025-03-15T18:25:39.55 8.14
2025-03-15T18:25:40.55 8.16
2025-03-15T18:25:41.55 8.14
2025-03-15T18:25:42.55 8.14
2025-03-15T18:25:43.55 8.13
2025-03-15T18:25:44.55 8.15
2025-03-15T18:25:45.55 8.16
2025-03-15T18:25:46.55 8.12
2025-03-15T18:25:47.55 8.14
2025-03-15T18:25:48.55 8.14
2025-03-15T18:25:49.55 8.14
2025-03-15T18:25:50.55 8.15
2025-03-15T18:25:51.56 8.12
2025-03-15T18:25:52.54 8.16
2025-03-15T18:25:53.54 8.14
2025-03-15T18:25:54.54 8.16
2025-03-15T18:25:55.54 8.16
2025-03-15T18:25:56.54 8.15
2025-03-15T18:25:57.54 8.14
2025-03-15T18:25:58.54 8.15
2025-03-15T18:25:59.54 8.16
2025-03-15T18:26:00.54 8.16
2025-03-15T18:26:01.54 8.16
2025-03-15T18:26:02.54 8.18
2025-03-15T18:26:03.54 8.17
2025-03-15T18:26:04.54 8.17
2025-03-15T18:26:05.54 8.16
2025-03-15T18:26:06.54 8.16
2025-03-15T18:26:07.54 8.14
2025-03-15T18:26:08.54 8.16
2025-03-15T18:26:09.54 8.14
2025-03-15T18:26:10.54 8.14
2025-03-15T18:26:11.54 8.15
2025-03-15T18:26:12.54 8.14
2025-03-15T18:26:13.54 8.16
2025-03-15T18:26:14.54 8.15
2025-03-15T18:26:15.54 8.16
2025-03-15T18:26:16.54 8.16
2025-03-15T18:26:17.54 8.14
2025-03-15T18:26:18.54 8.14
2025-03-15T18:26:19.54 8.15
2025-03-15T18:26:20.54 8.16
2025-03-15T18:26:21.54 8.15
2025-03-15T18:26:22.54 8.12
2025-03-15T18:26:23.54 8.14
2025-03-15T18:26:24.54 8.14
2025-03-15T18:26:25.54 8.14
2025-03-15T18:26:26.54 8.16
2025-03-15T18:26:27.54 8.16
2025-03-15T18:26:28.54 8.16
2025-03-15T18:26:29.54 8.16
2025-03-15T18:26:30.54 8.14
2025-03-15T18:26:31.54 8.14
2025-03-15T18:26:32.54 8.14
2025-03-15T18:26:33.54 8.16
2025-03-15T18:26:34.54 8.14
2025-03-15T18:26:35.54 8.15
2025-03-15T18:26:36.54 8.15
2025-03-15T18:26:37.54 8.14
2025-03-15T18:26:38.54 8.15
2025-03-15T18:26:39.54 8.14
2025-03-15T18:26:40.54 8.16
2025-03-15T18:26:41.54 8.14
2025-03-15T18:26:42.54 8.16
2025-03-15T18:26:43.54 8.19
2025-03-15T18:26:44.54 8.14
2025-03-15T18:26:45.54 8.15
2025-03-15T18:26:46.54 8.16
2025-03-15T18:26:47.54 8.15
2025-03-15T18:26:48.54 8.15
2025-03-15T18:26:49.54 8.14
2025-03-15T18:26:50.54 8.14
2025-03-15T18:26:51.54 8.14
2025-03-15T18:26:52.54 8.14
2025-03-15T18:26:53.54 8.14
2025-03-15T18:26:54.54 8.15
2025-03-15T18:26:55.54 8.14
2025-03-15T18:26:56.54 8.14
2025-03-15T18:26:57.54 8.16
2025-03-15T18:26:58.54 8.14
2025-03-15T18:26:59.54 8.13
2025-03-15T18:27:00.54 8.16
2025-03-15T18:27:01.54 8.15
2025-03-15T18:27:02.54 8.17
2025-03-15T18:27:03.54 8.15
2025-03-15T18:27:04.54 8.14
2025-03-15T18:27:05.54 8.14
2025-03-15T18:27:06.54 8.14
2025-03-15T18:27:07.54 8.13
2025-03-15T18:27:08.54 8.14
2025-03-15T18:27:09.54 8.14
2025-03-15T18:27:10.54 8.16
2025-03-15T18:27:11.54 8.15
2025-03-15T18:27:12.54 8.15
2025-03-15T18:27:13.54 8.14
2025-03-15T18:27:14.54 8.14
2025-03-15T18:27:15.54 8.14
2025-03-15T18:27:16.54 8.14
2025-03-15T18:27:17.54 8.17
2025-03-15T18:27:18.54 8.14
2025-03-15T18:27:19.54 8.16
2025-03-15T18:27:20.54 8.16
2025-03-15T18:27:21.54 8.14
2025-03-15T18:27:22.54 8.12
2025-03-15T18:27:23.54 8.15
2025-03-15T18:27:24.54 8.16
2025-03-15T18:27:25.54 8.14
2025-03-15T18:27:26.54 8.14
2025-03-15T18:27:27.54 8.16
2025-03-15T18:27:28.54 8.15
2025-03-15T18:27:29.54 8.16
2025-03-15T18:27:30.54 8.14
2025-03-15T18:27:31.54 8.13
2025-03-15T18:27:32.54 8.15
2025-03-15T18:27:33.54 8.16
2025-03-15T18:27:34.54 8.14
2025-03-15T18:27:35.54 8.16
2025-03-15T18:27:36.54 8.15
2025-03-15T18:27:37.54 8.15
2025-03-15T18:27:38.54 8.16
2025-03-15T18:27:39.54 8.15
2025-03-15T18:27:40.54 8.13
2025-03-15T18:27:41.54 8.16
2025-03-15T18:27:42.64 8.16
2025-03-15T18:27:43.54 8.14
2025-03-15T18:27:44.54 8.15
2025-03-15T18:27:45.54 8.14
2025-03-15T18:27:46.54 8.14
2025-03-15T18:27:47.54 8.16
2025-03-15T18:27:48.54 8.16
2025-03-15T18:27:49.54 8.15
2025-03-15T18:27:50.54 8.15
2025-03-15T18:27:51.54 8.14
2025-03-15T18:27:52.54 8.14
2025-03-15T18:27:53.54 8.13
2025-03-15T18:27:54.54 8.13
2025-03-15T18:27:55.54 8.14
2025-03-15T18:27:56.54 8.16
2025-03-15T18:27:57.54 8.14
2025-03-15T18:27:58.54 8.15
2025-03-15T18:27:59.54 8.16
2025-03-15T18:28:00.54 8.16
2025-03-15T18:28:01.54 8.13
2025-03-15T18:28:02.54 8.14
2025-03-15T18:28:03.54 8.14
2025-03-15T18:28:04.54 8.16
2025-03-15T18:28:05.54 8.16
2025-03-15T18:28:06.54 8.16
2025-03-15T18:28:07.54 8.14
2025-03-15T18:28:08.54 8.19
2025-03-15T18:28:09.54 8.13
2025-03-15T18:28:10.54 8.14
2025-03-15T18:28:11.54 8.14
2025-03-15T18:28:12.54 8.16
2025-03-15T18:28:13.54 8.14
2025-03-15T18:28:14.54 8.16
2025-03-15T18:28:15.54 8.13
2025-03-15T18:28:16.54 8.17
2025-03-15T18:28:17.54 8.14
2025-03-15T18:28:18.54 8.13
2025-03-15T18:28:19.54 8.15
2025-03-15T18:28:20.54 8.14
2025-03-15T18:28:21.54 8.17
2025-03-15T18:28:22.54 8.15
2025-03-15T18:28:23.54 8.14
2025-03-15T18:28:24.54 8.15
2025-03-15T18:28:25.54 8.14
2025-03-15T18:28:26.54 8.16
2025-03-15T18:28:27.54 8.14
2025-03-15T18:28:28.54 8.14
2025-03-15T18:28:29.54 8.16
2025-03-15T18:28:30.54 8.14
2025-03-15T18:28:31.54 8.16
2025-03-15T18:28:32.54 8.15
2025-03-15T18:28:33.54 8.14
2025-03-15T18:28:34.54 8.16
2025-03-15T18:28:35.54 8.12
2025-03-15T18:28:36.54 8.16
2025-03-15T18:28:37.54 8.16
2025-03-15T18:28:38.54 8.14
2025-03-15T18:28:39.54 8.14
2025-03-15T18:28:40.54 8.14
2025-03-15T18:28:41.54 8.17
2025-03-15T18:28:42.54 8.15
2025-03-15T18:28:43.54 8.16
2025-03-15T18:28:44.54 8.14
2025-03-15T18:28:45.54 8.16
2025-03-15T18:28:46.54 8.14
2025-03-15T18:28:47.54 8.17
2025-03-15T18:28:48.54 8.17
2025-03-15T18:28:49.54 8.15
2025-03-15T18:28:50.54 8.16
2025-03-15T18:28:51.54 8.14
2025-03-15T18:28:52.54 8.15
2025-03-15T18:28:53.54 8.15
2025-03-15T18:28:54.54 8.14
2025-03-15T18:28:55.54 8.14
2025-03-15T18:28:56.54 8.15
2025-03-15T18:28:57.54 8.16
2025-03-15T18:28:58.54 8.14
2025-03-15T18:28:59.54 8.17
2025-03-15T18:29:00.54 8.15
2025-03-15T18:29:01.54 8.15
2025-03-15T18:29:02.54 8.15
2025-03-15T18:29:03.54 8.16
2025-03-15T18:29:04.54 8.14
2025-03-15T18:29:05.54 8.17
2025-03-15T18:29:06.54 8.16
2025-03-15T18:29:07.54 8.14
2025-03-15T18:29:08.54 8.12
2025-03-15T18:29:09.54 8.14
2025-03-15T18:29:10.54 8.13
2025-03-15T18:29:11.54 8.14
2025-03-15T18:29:12.54 8.14
2025-03-15T18:29:13.54 8.15
2025-03-15T18:29:14.54 8.15
2025-03-15T18:29:15.54 8.13
2025-03-15T18:29:16.54 8.14
2025-03-15T18:29:17.54 8.14
2025-03-15T18:29:18.54 8.16
2025-03-15T18:29:19.54 8.16
2025-03-15T18:29:20.54 8.16
2025-03-15T18:29:21.54 8.15
2025-03-15T18:29:22.54 8.15
2025-03-15T18:29:23.54 8.15
2025-03-15T18:29:24.54 8.15
2025-03-15T18:29:25.54 8.14
2025-03-15T18:29:26.55 8.10
2025-03-15T18:29:27.55 8.14
2025-03-15T18:29:28.55 8.15
2025-03-15T18:29:29.55 8.17
2025-03-15T18:29:30.55 8.13
2025-03-15T18:29:31.55 8.15
2025-03-15T18:29:32.55 8.15
2025-03-15T18:29:33.55 8.16
2025-03-15T18:29:34.55 8.14
2025-03-15T18:29:35.55 8.15
2025-03-15T18:29:36.55 8.15
2025-03-15T18:29:37.55 8.14
2025-03-15T18:29:38.55 8.15
2025-03-15T18:29:39.55 8.16
2025-03-15T18:29:40.55 8.13
2025-03-15T18:29:41.55 8.14
2025-03-15T18:29:42.55 8.14
2025-03-15T18:29:43.55 8.13
2025-03-15T18:29:44.55 8.13
2025-03-15T18:29:45.55 8.14
2025-03-15T18:29:46.55 8.14
2025-03-15T18:29:47.55 8.16
2025-03-15T18:29:48.55 8.14
2025-03-15T18:29:49.55 8.15
2025-03-15T18:29:50.55 8.14
2025-03-15T18:29:51.55 8.14
2025-03-15T18:29:52.55 8.14
2025-03-15T18:29:53.55 8.15
2025-03-15T18:29:54.55 8.14
2025-03-15T18:29:55.55 8.14
2025-03-15T18:29:56.55 8.14
2025-03-15T18:29:57.55 8.15
2025-03-15T18:29:58.55 8.12
2025-03-15T18:29:59.56 8.15
2025-03-15T18:30:00.54 8.16
2025-03-15T18:30:01.54 8.14
2025-03-15T18:30:02.54 8.13
2025-03-15T18:30:03.54 8.16
2025-03-15T18:30:04.54 8.14
2025-03-15T18:30:05.54 8.16
2025-03-15T18:30:06.54 8.13
2025-03-15T18:30:07.54 8.14
2025-03-15T18:30:08.54 8.15
2025-03-15T18:30:09.54 8.14
2025-03-15T18:30:10.54 8.17
2025-03-15T18:30:11.54 8.15
2025-03-15T18:30:12.54 8.16
2025-03-15T18:30:13.54 8.15
2025-03-15T18:30:14.54 8.16
2025-03-15T18:30:15.54 8.14
2025-03-15T18:30:16.54 8.16
2025-03-15T18:30:17.54 8.19
2025-03-15T18:30:18.54 8.14
2025-03-15T18:30:19.54 8.16
2025-03-15T18:30:20.54 8.17
2025-03-15T18:30:21.54 8.14
2025-03-15T18:30:22.54 8.14
2025-03-15T18:30:23.54 8.15
2025-03-15T18:30:24.54 8.16
2025-03-15T18:30:25.54 8.12
2025-03-15T18:30:26.54 8.16
2025-03-15T18:30:27.54 8.17
2025-03-15T18:30:28.54 8.16
2025-03-15T18:30:29.54 8.14
2025-03-15T18:30:30.54 8.16
2025-03-15T18:30:31.54 8.14
2025-03-15T18:30:32.54 8.16
2025-03-15T18:30:33.54 8.14
2025-03-15T18:30:34.54 8.18
2025-03-15T18:30:35.54 8.14
2025-03-15T18:30:36.54 8.14
2025-03-15T18:30:37.54 8.12
2025-03-15T18:30:38.54 8.16
2025-03-15T18:30:39.54 8.15
2025-03-15T18:30:40.54 8.15
2025-03-15T18:30:41.54 8.16
2025-03-15T18:30:42.56 8.12
2025-03-15T18:30:43.53 8.12
2025-03-15T18:30:44.53 8.13
2025-03-15T18:30:45.53 8.14
2025-03-15T18:30:46.53 8.15
2025-03-15T18:30:47.53 8.16
2025-03-15T18:30:48.53 8.15
2025-03-15T18:30:49.53 8.14
2025-03-15T18:30:50.53 8.14
2025-03-15T18:30:51.53 8.13
2025-03-15T18:30:52.53 8.14
2025-03-15T18:30:53.53 8.14
2025-03-15T18:30:54.53 8.14
2025-03-15T18:30:55.53 8.14
2025-03-15T18:30:56.53 8.13
2025-03-15T18:30:57.53 8.14
2025-03-15T18:30:58.53 8.14
2025-03-15T18:30:59.53 8.16
2025-03-15T18:31:00.53 8.14
2025-03-15T18:31:01.53 8.14
2025-03-15T18:31:02.53 8.14
2025-03-15T18:31:03.53 8.15
2025-03-15T18:31:04.53 8.15
2025-03-15T18:31:05.53 8.16
2025-03-15T18:31:06.53 8.14
2025-03-15T18:31:07.53 8.14
2025-03-15T18:31:08.53 8.15
2025-03-15T18:31:09.53 8.14
2025-03-15T18:31:10.53 8.16
2025-03-15T18:31:11.53 8.16
2025-03-15T18:31:12.53 8.12
2025-03-15T18:31:13.53 8.17
2025-03-15T18:31:14.53 8.14
2025-03-15T18:31:15.53 8.15
2025-03-15T18:31:16.53 8.16
2025-03-15T18:31:17.53 8.15
2025-03-15T18:31:18.53 8.16
2025-03-15T18:31:19.53 8.14
2025-03-15T18:31:20.53 8.15
2025-03-15T18:31:21.53 8.17
2025-03-15T18:31:22.53 8.14
2025-03-15T18:31:23.53 8.15
2025-03-15T18:31:24.53 8.14
2025-03-15T18:31:25.53 8.14
2025-03-15T18:31:26.53 8.16
2025-03-15T18:31:27.53 8.14
2025-03-15T18:31:28.53 8.16
2025-03-15T18:31:29.53 8.15
2025-03-15T18:31:30.53 8.12
2025-03-15T18:31:31.53 8.14
2025-03-15T18:31:32.53 8.13
2025-03-15T18:31:33.53 8.16
2025-03-15T18:31:34.53 8.14
2025-03-15T18:31:35.53 8.14
2025-03-15T18:31:36.53 8.15
2025-03-15T18:31:37.53 8.16
2025-03-15T18:31:38.53 8.14
2025-03-15T18:31:39.53 8.16
2025-03-15T18:31:40.53 8.15
2025-03-15T18:31:41.53 8.15
2025-03-15T18:31:42.53 8.14
2025-03-15T18:31:43.53 8.16
2025-03-15T18:31:44.53 8.16
2025-03-15T18:31:45.53 8.16
2025-03-15T18:31:46.53 8.14
2025-03-15T18:31:47.53 8.16
2025-03-15T18:31:48.53 8.15
2025-03-15T18:31:49.53 8.15
2025-03-15T18:31:50.53 8.18
2025-03-15T18:31:51.53 8.14
2025-03-15T18:31:52.53 8.16
2025-03-15T18:31:53.53 8.14
2025-03-15T18:31:54.53 8.17
2025-03-15T18:31:55.53 8.14
2025-03-15T18:31:56.53 8.16
2025-03-15T18:31:57.53 8.15
2025-03-15T18:31:58.53 8.16
2025-03-15T18:31:59.53 8.17
2025-03-15T18:32:00.53 8.16
2025-03-15T18:32:01.53 8.16
2025-03-15T18:32:02.53 8.16
2025-03-15T18:32:03.53 8.16
2025-03-15T18:32:04.53 8.13
2025-03-15T18:32:05.53 8.16
2025-03-15T18:32:06.53 8.17
2025-03-15T18:32:07.53 8.15
2025-03-15T18:32:08.53 8.16
2025-03-15T18:32:09.53 8.12
2025-03-15T18:32:10.53 8.16
2025-03-15T18:32:11.53 8.15
2025-03-15T18:32:12.53 8.16
2025-03-15T18:32:13.53 8.15
2025-03-15T18:32:14.53 8.14
2025-03-15T18:32:15.53 8.17
2025-03-15T18:32:16.53 8.16
2025-03-15T18:32:17.53 8.17
2025-03-15T18:32:18.53 8.14
2025-03-15T18:32:19.53 8.14
2025-03-15T18:32:20.53 8.19
2025-03-15T18:32:21.53 8.14
2025-03-15T18:32:22.53 8.16
2025-03-15T18:32:23.53 8.14
2025-03-15T18:32:24.53 8.14
2025-03-15T18:32:25.53 8.17
2025-03-15T18:32:26.53 8.13
2025-03-15T18:32:27.53 8.16
2025-03-15T18:32:28.53 8.16
2025-03-15T18:32:29.53 8.14
2025-03-15T18:32:30.53 8.16
2025-03-15T18:32:31.53 8.15
2025-03-15T18:32:32.53 8.15
2025-03-15T18:32:33.53 8.14
2025-03-15T18:32:34.53 8.16
2025-03-15T18:32:35.53 8.16
2025-03-15T18:32:36.53 8.15
2025-03-15T18:32:37.53 8.14
2025-03-15T18:32:38.53 8.15
2025-03-15T18:32:39.53 8.15
2025-03-15T18:32:40.53 8.16
2025-03-15T18:32:41.53 8.16
2025-03-15T18:32:42.53 8.14
2025-03-15T18:32:43.53 8.14
2025-03-15T18:32:44.53 8.16
2025-03-15T18:32:45.53 8.15
2025-03-15T18:32:46.53 8.14
2025-03-15T18:32:47.53 8.14
2025-03-15T18:32:48.53 8.14
2025-03-15T18:32:49.53 8.14
2025-03-15T18:32:50.53 8.16
2025-03-15T18:32:51.53 8.15
2025-03-15T18:32:52.53 8.16
2025-03-15T18:32:53.53 8.14
2025-03-15T18:32:54.53 8.15
2025-03-15T18:32:55.53 8.14
2025-03-15T18:32:56.53 8.15
2025-03-15T18:32:57.53 8.13
2025-03-15T18:32:58.53 8.13
2025-03-15T18:32:59.53 8.15
2025-03-15T18:33:00.53 8.16
2025-03-15T18:33:01.58 8.16
2025-03-15T18:33:02.52 8.15
2025-03-15T18:33:03.52 8.14
2025-03-15T18:33:04.52 8.14
2025-03-15T18:33:05.52 8.14
2025-03-15T18:33:06.52 8.14
2025-03-15T18:33:07.52 8.14
2025-03-15T18:33:08.52 8.16
2025-03-15T18:33:09.52 8.16
2025-03-15T18:33:10.52 8.16
2025-03-15T18:33:11.52 8.14
2025-03-15T18:33:12.52 8.15
2025-03-15T18:33:13.52 8.14
2025-03-15T18:33:14.52 8.14
2025-03-15T18:33:15.52 8.14
2025-03-15T18:33:16.52 8.14
2025-03-15T18:33:17.52 8.16
2025-03-15T18:33:18.52 8.15
2025-03-15T18:33:19.52 8.16
2025-03-15T18:33:20.52 8.14
2025-03-15T18:33:21.52 8.15
2025-03-15T18:33:22.52 8.14
2025-03-15T18:33:23.52 8.13
2025-03-15T18:33:24.52 8.13
2025-03-15T18:33:25.52 8.15
2025-03-15T18:33:26.52 8.13
2025-03-15T18:33:27.52 8.17
2025-03-15T18:33:28.52 8.15
2025-03-15T18:33:29.52 8.16
2025-03-15T18:33:30.52 8.17
2025-03-15T18:33:31.52 8.15
2025-03-15T18:33:32.52 8.15
2025-03-15T18:33:33.52 8.14
2025-03-15T18:33:34.52 8.16
2025-03-15T18:33:35.53 8.14
2025-03-15T18:33:36.51 8.15
2025-03-15T18:33:37.51 8.17
2025-03-15T18:33:38.51 8.15
2025-03-15T18:33:39.51 8.15
2025-03-15T18:33:40.51 8.16
2025-03-15T18:33:41.51 8.15
2025-03-15T18:33:42.51 8.14
2025-03-15T18:33:43.51 8.15
2025-03-15T18:33:44.51 8.14
2025-03-15T18:33:45.51 8.14
2025-03-15T18:33:46.51 8.16
2025-03-15T18:33:47.51 8.15
2025-03-15T18:33:48.51 8.13
2025-03-15T18:33:49.51 8.14
2025-03-15T18:33:50.51 8.14
2025-03-15T18:33:51.51 8.17
2025-03-15T18:33:52.51 8.16
2025-03-15T18:33:53.51 8.16
2025-03-15T18:33:54.51 8.17
2025-03-15T18:33:55.51 8.16
2025-03-15T18:33:56.51 8.18
2025-03-15T18:33:57.51 8.14
2025-03-15T18:33:58.51 8.14
2025-03-15T18:33:59.51 8.15
2025-03-15T18:34:00.51 8.16
2025-03-15T18:34:01.51 8.16
2025-03-15T18:34:02.51 8.15
2025-03-15T18:34:03.51 8.14
2025-03-15T18:34:04.51 8.17
2025-03-15T18:34:05.51 8.15
2025-03-15T18:34:06.51 8.17
2025-03-15T18:34:07.51 8.14
2025-03-15T18:34:08.51 8.16
2025-03-15T18:34:09.51 8.15
2025-03-15T18:34:10.51 8.17
2025-03-15T18:34:11.51 8.13
2025-03-15T18:34:12.51 8.15
2025-03-15T18:34:13.51 8.14
2025-03-15T18:34:14.51 8.15
2025-03-15T18:34:15.51 8.17
2025-03-15T18:34:16.51 8.16
2025-03-15T18:34:17.51 8.16
2025-03-15T18:34:18.51 8.14
2025-03-15T18:34:19.51 8.14
2025-03-15T18:34:20.51 8.15
2025-03-15T18:34:21.51 8.16
2025-03-15T18:34:22.51 8.15
2025-03-15T18:34:23.51 8.14
2025-03-15T18:34:24.51 8.16
2025-03-15T18:34:25.51 8.14
2025-03-15T18:34:26.51 8.14
2025-03-15T18:34:27.51 8.15
2025-03-15T18:34:28.51 8.13
2025-03-15T18:34:29.51 8.16
2025-03-15T18:34:30.51 8.14
2025-03-15T18:34:31.51 8.12
2025-03-15T18:34:32.55 8.15
2025-03-15T18:34:33.51 8.14
2025-03-15T18:34:34.51 8.16
2025-03-15T18:34:35.51 8.15
2025-03-15T18:34:36.51 8.14
2025-03-15T18:34:37.51 8.13
2025-03-15T18:34:38.51 8.16
2025-03-15T18:34:39.51 8.16
2025-03-15T18:34:40.51 8.14
2025-03-15T18:34:41.52 8.16
2025-03-15T18:34:42.51 8.15
2025-03-15T18:34:43.51 8.16
2025-03-15T18:34:44.51 8.15
2025-03-15T18:34:45.52 8.14
2025-03-15T18:34:46.52 8.14
2025-03-15T18:34:47.52 8.16
2025-03-15T18:34:48.52 8.13
2025-03-15T18:34:49.52 8.15
2025-03-15T18:34:50.52 8.15
2025-03-15T18:34:51.52 8.14
2025-03-15T18:34:52.52 8.14
2025-03-15T18:34:53.52 8.16
2025-03-15T18:34:54.52 8.17
2025-03-15T18:34:55.52 8.14
2025-03-15T18:34:56.52 8.16
2025-03-15T18:34:57.52 8.16
2025-03-15T18:34:58.52 8.15
2025-03-15T18:34:59.52 8.14
2025-03-15T18:35:00.52 8.13
2025-03-15T18:35:01.52 8.16
2025-03-15T18:35:02.52 8.15
2025-03-15T18:35:03.52 8.14
2025-03-15T18:35:04.52 8.14
2025-03-15T18:35:05.52 8.14
2025-03-15T18:35:06.52 8.14
2025-03-15T18:35:07.52 8.16
2025-03-15T18:35:08.52 8.15
2025-03-15T18:35:09.52 8.15
2025-03-15T18:35:10.52 8.15
2025-03-15T18:35:11.52 8.16
2025-03-15T18:35:12.52 8.16
2025-03-15T18:35:13.52 8.16
2025-03-15T18:35:14.52 8.15
2025-03-15T18:35:15.52 8.16
2025-03-15T18:35:16.52 8.16
2025-03-15T18:35:17.52 8.14
2025-03-15T18:35:18.52 8.16
2025-03-15T18:35:19.52 8.14
2025-03-15T18:35:20.52 8.16
2025-03-15T18:35:21.52 8.14
2025-03-15T18:35:22.52 8.17
2025-03-15T18:35:23.52 8.15
2025-03-15T18:35:24.52 8.14
2025-03-15T18:35:25.52 8.15
2025-03-15T18:35:26.52 8.16
2025-03-15T18:35:27.52 8.15
2025-03-15T18:35:28.52 8.15
2025-03-15T18:35:29.52 8.14
2025-03-15T18:35:30.52 8.16
2025-03-15T18:35:31.52 8.17
2025-03-15T18:35:32.52 8.15
2025-03-15T18:35:33.52 8.17
2025-03-15T18:35:34.52 8.16
2025-03-15T18:35:35.52 8.16
2025-03-15T18:35:36.52 8.12
2025-03-15T18:35:37.52 8.16
2025-03-15T18:35:38.52 8.16
2025-03-15T18:35:39.52 8.17
2025-03-15T18:35:40.52 8.17
2025-03-15T18:35:41.52 8.13
2025-03-15T18:35:42.52 8.16
2025-03-15T18:35:43.52 8.13
2025-03-15T18:35:44.52 8.16
2025-03-15T18:35:45.52 8.16
2025-03-15T18:35:46.52 8.14
2025-03-15T18:35:47.52 8.14
2025-03-15T18:35:48.52 8.13
2025-03-15T18:35:49.52 8.15
2025-03-15T18:35:50.52 8.15
2025-03-15T18:35:51.52 8.16
2025-03-15T18:35:52.52 8.14
2025-03-15T18:35:53.52 8.16
2025-03-15T18:35:54.52 8.15
2025-03-15T18:35:55.52 8.14
2025-03-15T18:35:56.52 8.15
2025-03-15T18:35:57.52 8.17
2025-03-15T18:35:58.52 8.14
2025-03-15T18:35:59.52 8.14
2025-03-15T18:36:00.52 8.16
2025-03-15T18:36:01.52 8.16
2025-03-15T18:36:02.53 8.16
2025-03-15T18:36:03.53 8.17
2025-03-15T18:36:04.53 8.15
2025-03-15T18:36:05.53 8.14
2025-03-15T18:36:06.53 8.17
2025-03-15T18:36:07.53 8.14
2025-03-15T18:36:08.54 8.14
2025-03-15T18:36:09.52 8.16
2025-03-15T18:36:10.52 8.16
2025-03-15T18:36:11.52 8.15
2025-03-15T18:36:12.52 8.14
2025-03-15T18:36:13.52 8.15
2025-03-15T18:36:14.52 8.16
2025-03-15T18:36:15.52 8.12
2025-03-15T18:36:16.52 8.16
2025-03-15T18:36:17.52 8.14
2025-03-15T18:36:18.52 8.17
2025-03-15T18:36:19.52 8.15
2025-03-15T18:36:20.52 8.16
2025-03-15T18:36:21.52 8.15
2025-03-15T18:36:22.52 8.15
2025-03-15T18:36:23.52 8.14
2025-03-15T18:36:24.52 8.15
2025-03-15T18:36:25.52 8.16
2025-03-15T18:36:26.52 8.17
2025-03-15T18:36:27.52 8.19
2025-03-15T18:36:28.52 8.15
2025-03-15T18:36:29.52 8.17
2025-03-15T18:36:30.52 8.12
2025-03-15T18:36:31.52 8.14
2025-03-15T18:36:32.52 8.15
2025-03-15T18:36:33.52 8.15
2025-03-15T18:36:34.52 8.14
2025-03-15T18:36:35.52 8.14
2025-03-15T18:36:36.52 8.15
2025-03-15T18:36:37.52 8.14
2025-03-15T18:36:38.52 8.13
2025-03-15T18:36:39.52 8.14
2025-03-15T18:36:40.52 8.14
2025-03-15T18:36:41.52 8.14
2025-03-15T18:36:42.52 8.17
2025-03-15T18:36:43.52 8.14
2025-03-15T18:36:44.52 8.16
2025-03-15T18:36:45.52 8.12
2025-03-15T18:36:46.52 8.14
2025-03-15T18:36:47.52 8.14
2025-03-15T18:36:48.52 8.13
2025-03-15T18:36:49.52 8.16
2025-03-15T18:36:50.52 8.12
2025-03-15T18:36:51.52 8.13
2025-03-15T18:36:52.63 8.13
2025-03-15T18:36:53.51 8.13
2025-03-15T18:36:54.51 8.16
2025-03-15T18:36:55.51 8.13
2025-03-15T18:36:56.51 8.14
2025-03-15T18:36:57.51 8.17
2025-03-15T18:36:58.51 8.14
2025-03-15T18:36:59.51 8.15
2025-03-15T18:37:00.51 8.16
2025-03-15T18:37:01.51 8.14
2025-03-15T18:37:02.51 8.16
2025-03-15T18:37:03.51 8.15
2025-03-15T18:37:04.51 8.16
2025-03-15T18:37:05.51 8.14
2025-03-15T18:37:06.51 8.16
2025-03-15T18:37:07.51 8.15
2025-03-15T18:37:08.51 8.17
2025-03-15T18:37:09.51 8.13
2025-03-15T18:37:10.51 8.16
2025-03-15T18:37:11.51 8.14
2025-03-15T18:37:12.51 8.14
2025-03-15T18:37:13.51 8.12
2025-03-15T18:37:14.51 8.14
2025-03-15T18:37:15.51 8.14
2025-03-15T18:37:16.51 8.14
2025-03-15T18:37:17.51 8.14
2025-03-15T18:37:18.51 8.12
2025-03-15T18:37:19.51 8.16
2025-03-15T18:37:20.51 8.14
2025-03-15T18:37:21.51 8.17
2025-03-15T18:37:22.51 8.16
2025-03-15T18:37:23.51 8.15
2025-03-15T18:37:24.51 8.14
2025-03-15T18:37:25.51 8.15
2025-03-15T18:37:26.51 8.15
2025-03-15T18:37:27.51 8.13
2025-03-15T18:37:28.51 8.16
2025-03-15T18:37:29.51 8.15
2025-03-15T18:37:30.51 8.11
2025-03-15T18:37:31.51 8.15
2025-03-15T18:37:32.52 8.14
2025-03-15T18:37:33.52 8.12
2025-03-15T18:37:34.52 8.15
2025-03-15T18:37:35.52 8.16
2025-03-15T18:37:36.52 8.17
2025-03-15T18:37:37.52 8.14
2025-03-15T18:37:38.52 8.18
2025-03-15T18:37:39.52 8.16
2025-03-15T18:37:40.52 8.15
2025-03-15T18:37:41.52 8.15
2025-03-15T18:37:42.52 8.12
2025-03-15T18:37:43.52 8.15
2025-03-15T18:37:44.52 8.13
2025-03-15T18:37:45.52 8.17
2025-03-15T18:37:46.52 8.13
2025-03-15T18:37:47.52 8.16
2025-03-15T18:37:48.52 8.15
2025-03-15T18:37:49.52 8.16
2025-03-15T18:37:50.52 8.14
2025-03-15T18:37:51.52 8.15
2025-03-15T18:37:52.52 8.15
2025-03-15T18:37:53.52 8.16
2025-03-15T18:37:54.52 8.17
2025-03-15T18:37:55.52 8.12
2025-03-15T18:37:56.52 8.16
2025-03-15T18:37:57.52 8.15
2025-03-15T18:37:58.52 8.13
2025-03-15T18:37:59.52 8.15
2025-03-15T18:38:00.52 8.16
2025-03-15T18:38:01.52 8.17
2025-03-15T18:38:02.52 8.14
2025-03-15T18:38:03.52 8.15
2025-03-15T18:38:04.52 8.17
2025-03-15T18:38:05.52 8.16
2025-03-15T18:38:06.52 8.12
2025-03-15T18:38:07.52 8.16
2025-03-15T18:38:08.52 8.17
2025-03-15T18:38:09.52 8.14
2025-03-15T18:38:10.52 8.16
2025-03-15T18:38:11.52 8.14
2025-03-15T18:38:12.52 8.15
2025-03-15T18:38:13.52 8.16
2025-03-15T18:38:14.52 8.16
2025-03-15T18:38:15.52 8.14
2025-03-15T18:38:16.52 8.17
2025-03-15T18:38:17.52 8.16
2025-03-15T18:38:18.52 8.14
2025-03-15T18:38:19.53 8.15
2025-03-15T18:38:20.52 8.13
2025-03-15T18:38:21.52 8.14
2025-03-15T18:38:22.52 8.16
2025-03-15T18:38:23.52 8.16
2025-03-15T18:38:24.52 8.17
2025-03-15T18:38:25.52 8.15
2025-03-15T18:38:26.52 8.17
2025-03-15T18:38:27.52 8.13
2025-03-15T18:38:28.52 8.15
2025-03-15T18:38:29.52 8.15
2025-03-15T18:38:30.52 8.14
2025-03-15T18:38:31.52 8.14
2025-03-15T18:38:32.52 8.16
2025-03-15T18:38:33.52 8.14
2025-03-15T18:38:34.52 8.14
2025-03-15T18:38:35.52 8.14
2025-03-15T18:38:36.52 8.14
2025-03-15T18:38:37.52 8.14
2025-03-15T18:38:38.52 8.16
2025-03-15T18:38:39.52 8.15
2025-03-15T18:38:40.52 8.16
2025-03-15T18:38:41.52 8.16
2025-03-15T18:38:42.52 8.16
2025-03-15T18:38:43.52 8.14
2025-03-15T18:38:44.52 8.16
2025-03-15T18:38:45.52 8.13
2025-03-15T18:38:46.52 8.14
2025-03-15T18:38:47.52 8.15
2025-03-15T18:38:48.52 8.16
2025-03-15T18:38:49.52 8.15
2025-03-15T18:38:50.52 8.15
2025-03-15T18:38:51.52 8.16
2025-03-15T18:38:52.52 8.16
2025-03-15T18:38:53.52 8.14
2025-03-15T18:38:54.52 8.15
2025-03-15T18:38:55.52 8.15
2025-03-15T18:38:56.52 8.16
2025-03-15T18:38:57.52 8.16
2025-03-15T18:38:58.52 8.16
2025-03-15T18:38:59.52 8.16
2025-03-15T18:39:00.52 8.15
2025-03-15T18:39:01.52 8.14
2025-03-15T18:39:02.52 8.14
2025-03-15T18:39:03.52 8.14
2025-03-15T18:39:04.52 8.16
2025-03-15T18:39:05.52 8.13
2025-03-15T18:39:06.52 8.15
2025-03-15T18:39:07.52 8.16
2025-03-15T18:39:08.52 8.15
2025-03-15T18:39:09.52 8.15
2025-03-15T18:39:10.52 8.15
2025-03-15T18:39:11.52 8.12
2025-03-15T18:39:12.52 8.14
2025-03-15T18:39:13.52 8.14
2025-03-15T18:39:14.52 8.17
2025-03-15T18:39:15.52 8.16
2025-03-15T18:39:16.52 8.15
2025-03-15T18:39:17.52 8.14
2025-03-15T18:39:18.52 8.14
2025-03-15T18:39:19.52 8.14
2025-03-15T18:39:20.52 8.16
2025-03-15T18:39:21.52 8.16
2025-03-15T18:39:22.52 8.14
2025-03-15T18:39:23.52 8.13
2025-03-15T18:39:24.52 8.15
2025-03-15T18:39:25.52 8.16
2025-03-15T18:39:26.52 8.15
2025-03-15T18:39:27.52 8.16
2025-03-15T18:39:28.52 8.17
2025-03-15T18:39:29.52 8.15
2025-03-15T18:39:30.52 8.14
2025-03-15T18:39:31.52 8.14
2025-03-15T18:39:32.52 8.16
2025-03-15T18:39:33.52 8.15
2025-03-15T18:39:34.52 8.15
2025-03-15T18:39:35.52 8.17
2025-03-15T18:39:36.52 8.16
2025-03-15T18:39:37.52 8.16
2025-03-15T18:39:38.52 8.14
2025-03-15T18:39:39.52 8.14
2025-03-15T18:39:40.52 8.16
2025-03-15T18:39:41.53 8.14
2025-03-15T18:39:42.52 8.13
2025-03-15T18:39:43.52 8.15
2025-03-15T18:39:44.52 8.14
2025-03-15T18:39:45.52 8.13
2025-03-15T18:39:46.52 8.13
2025-03-15T18:39:47.52 8.13
2025-03-15T18:39:48.52 8.13
2025-03-15T18:39:49.52 8.12
2025-03-15T18:39:50.52 8.15
2025-03-15T18:39:51.52 8.16
2025-03-15T18:39:52.59 8.12
2025-03-15T18:39:53.51 8.14
2025-03-15T18:39:54.51 8.15
2025-03-15T18:39:55.51 8.14
2025-03-15T18:39:56.51 8.11
2025-03-15T18:39:57.51 8.15
2025-03-15T18:39:58.51 8.14
2025-03-15T18:39:59.51 8.17
2025-03-15T18:40:00.52 8.14
2025-03-15T18:40:01.52 8.16
2025-03-15T18:40:02.51 8.15
2025-03-15T18:40:03.52 8.16
2025-03-15T18:40:04.52 8.15
2025-03-15T18:40:05.52 8.14
2025-03-15T18:40:06.52 8.14
2025-03-15T18:40:07.52 8.14
2025-03-15T18:40:08.52 8.13
2025-03-15T18:40:09.52 8.15
2025-03-15T18:40:10.52 8.15
2025-03-15T18:40:11.52 8.16
2025-03-15T18:40:12.52 8.16
2025-03-15T18:40:13.52 8.16
2025-03-15T18:40:14.52 8.16
2025-03-15T18:40:15.52 8.17
2025-03-15T18:40:16.52 8.16
2025-03-15T18:40:17.52 8.15
2025-03-15T18:40:18.52 8.14
2025-03-15T18:40:19.52 8.14
2025-03-15T18:40:20.52 8.16
2025-03-15T18:40:21.52 8.12
2025-03-15T18:40:22.52 8.16
2025-03-15T18:40:23.52 8.16
2025-03-15T18:40:24.52 8.16
2025-03-15T18:40:25.52 8.16
2025-03-15T18:40:26.52 8.15
2025-03-15T18:40:27.52 8.14
2025-03-15T18:40:28.52 8.16
2025-03-15T18:40:29.52 8.16
2025-03-15T18:40:30.52 8.14
2025-03-15T18:40:31.52 8.13
2025-03-15T18:40:32.52 8.14
2025-03-15T18:40:33.52 8.14
2025-03-15T18:40:34.52 8.16
2025-03-15T18:40:35.52 8.14
2025-03-15T18:40:36.52 8.14
2025-03-15T18:40:37.52 8.14
2025-03-15T18:40:38.52 8.15
2025-03-15T18:40:39.52 8.15
2025-03-15T18:40:40.52 8.14
2025-03-15T18:40:41.52 8.14
2025-03-15T18:40:42.52 8.14
2025-03-15T18:40:43.52 8.14
2025-03-15T18:40:44.52 8.15
2025-03-15T18:40:45.52 8.16
2025-03-15T18:40:46.52 8.16
2025-03-15T18:40:47.52 8.14
2025-03-15T18:40:48.52 8.14
2025-03-15T18:40:49.52 8.12
2025-03-15T18:40:50.52 8.14
2025-03-15T18:40:51.52 8.14
2025-03-15T18:40:52.52 8.14
2025-03-15T18:40:53.52 8.16
2025-03-15T18:40:54.52 8.16
2025-03-15T18:40:55.52 8.14
2025-03-15T18:40:56.52 8.16
2025-03-15T18:40:57.52 8.15
2025-03-15T18:40:58.52 8.17
2025-03-15T18:40:59.52 8.14
2025-03-15T18:41:00.52 8.14
2025-03-15T18:41:01.52 8.17
2025-03-15T18:41:02.52 8.16
2025-03-15T18:41:03.52 8.14
2025-03-15T18:41:04.52 8.15
2025-03-15T18:41:05.52 8.16
2025-03-15T18:41:06.52 8.15
2025-03-15T18:41:07.52 8.14
2025-03-15T18:41:08.52 8.14
2025-03-15T18:41:09.52 8.13
2025-03-15T18:41:10.52 8.13
2025-03-15T18:41:11.52 8.17
2025-03-15T18:41:12.52 8.11
2025-03-15T18:41:13.52 8.17
2025-03-15T18:41:14.52 8.16
2025-03-15T18:41:15.52 8.15
2025-03-15T18:41:16.52 8.14
2025-03-15T18:41:17.52 8.14
2025-03-15T18:41:18.52 8.14
2025-03-15T18:41:19.53 8.14
2025-03-15T18:41:20.51 8.12
2025-03-15T18:41:21.51 8.12
2025-03-15T18:41:22.51 8.17
2025-03-15T18:41:23.51 8.14
2025-03-15T18:41:24.51 8.16
2025-03-15T18:41:25.51 8.14
2025-03-15T18:41:26.51 8.14
2025-03-15T18:41:27.51 8.15
2025-03-15T18:41:28.51 8.17
2025-03-15T18:41:29.51 8.16
2025-03-15T18:41:30.51 8.16
2025-03-15T18:41:31.51 8.13
2025-03-15T18:41:32.51 8.14
2025-03-15T18:41:33.51 8.16
2025-03-15T18:41:34.51 8.14
2025-03-15T18:41:35.51 8.15
2025-03-15T18:41:36.51 8.12
2025-03-15T18:41:37.51 8.14
2025-03-15T18:41:38.51 8.14
2025-03-15T18:41:39.51 8.14
2025-03-15T18:41:40.51 8.14
2025-03-15T18:41:41.51 8.15
2025-03-15T18:41:42.51 8.14
2025-03-15T18:41:43.51 8.16
2025-03-15T18:41:44.51 8.14
2025-03-15T18:41:45.51 8.17
2025-03-15T18:41:46.51 8.16
2025-03-15T18:41:47.51 8.14
2025-03-15T18:41:48.51 8.17
2025-03-15T18:41:49.51 8.15
2025-03-15T18:41:50.51 8.14
2025-03-15T18:41:51.51 8.14
2025-03-15T18:41:52.51 8.17
2025-03-15T18:41:53.51 8.14
2025-03-15T18:41:54.51 8.14
2025-03-15T18:41:55.51 8.14
2025-03-15T18:41:56.51 8.16
2025-03-15T18:41:57.51 8.16
2025-03-15T18:41:58.51 8.16
2025-03-15T18:41:59.51 8.14
2025-03-15T18:42:00.51 8.17
2025-03-15T18:42:01.51 8.15
2025-03-15T18:42:02.51 8.17
2025-03-15T18:42:03.51 8.15
2025-03-15T18:42:04.51 8.14
2025-03-15T18:42:05.51 8.16
2025-03-15T18:42:06.51 8.17
2025-03-15T18:42:07.51 8.14
2025-03-15T18:42:08.51 8.14
2025-03-15T18:42:09.51 8.15
2025-03-15T18:42:10.51 8.12
2025-03-15T18:42:11.51 8.16
2025-03-15T18:42:12.51 8.14
2025-03-15T18:42:13.51 8.13
2025-03-15T18:42:14.51 8.15
2025-03-15T18:42:15.51 8.15
2025-03-15T18:42:16.51 8.14
2025-03-15T18:42:17.51 8.14
2025-03-15T18:42:18.51 8.16
2025-03-15T18:42:19.51 8.15
2025-03-15T18:42:20.51 8.14
2025-03-15T18:42:21.51 8.15
2025-03-15T18:42:22.51 8.15
2025-03-15T18:42:23.51 8.14
2025-03-15T18:42:24.51 8.16
2025-03-15T18:42:25.51 8.15
2025-03-15T18:42:26.51 8.16
2025-03-15T18:42:27.51 8.16
2025-03-15T18:42:28.51 8.12
2025-03-15T18:42:29.51 8.16
2025-03-15T18:42:30.51 8.13
2025-03-15T18:42:31.51 8.17
2025-03-15T18:42:32.51 8.15
2025-03-15T18:42:33.51 8.14
2025-03-15T18:42:34.51 8.15
2025-03-15T18:42:35.51 8.15
2025-03-15T18:42:36.51 8.16
2025-03-15T18:42:37.51 8.15
2025-03-15T18:42:38.51 8.14
2025-03-15T18:42:39.51 8.14
2025-03-15T18:42:40.51 8.14
2025-03-15T18:42:41.51 8.15
2025-03-15T18:42:42.51 8.14
2025-03-15T18:42:43.51 8.14
2025-03-15T18:42:44.51 8.14
2025-03-15T18:42:45.51 8.14
2025-03-15T18:42:46.51 8.17
2025-03-15T18:42:47.51 8.16
2025-03-15T18:42:48.51 8.15
2025-03-15T18:42:49.51 8.16
2025-03-15T18:42:50.51 8.13
2025-03-15T18:42:51.51 8.14
2025-03-15T18:42:52.51 8.13
2025-03-15T18:42:53.51 8.14
2025-03-15T18:42:54.51 8.14
2025-03-15T18:42:55.51 8.14
2025-03-15T18:42:56.51 8.15
2025-03-15T18:42:57.51 8.14
2025-03-15T18:42:58.51 8.14
2025-03-15T18:42:59.51 8.14
2025-03-15T18:43:00.51 8.16
2025-03-15T18:43:01.51 8.14
2025-03-15T18:43:02.51 8.14
2025-03-15T18:43:03.51 8.16
2025-03-15T18:43:04.51 8.13
2025-03-15T18:43:05.51 8.12
2025-03-15T18:43:06.51 8.16
2025-03-15T18:43:07.51 8.15
2025-03-15T18:43:08.51 8.14
2025-03-15T18:43:09.51 8.14
2025-03-15T18:43:10.51 8.15
2025-03-15T18:43:11.51 8.15
2025-03-15T18:43:12.51 8.16
2025-03-15T18:43:13.51 8.16
2025-03-15T18:43:14.51 8.13
2025-03-15T18:43:15.51 8.15
2025-03-15T18:43:16.51 8.14
2025-03-15T18:43:17.51 8.14
2025-03-15T18:43:18.51 8.15
2025-03-15T18:43:19.51 8.15
2025-03-15T18:43:20.51 8.14
2025-03-15T18:43:21.51 8.15
2025-03-15T18:43:22.51 8.16
2025-03-15T18:43:23.51 8.15
2025-03-15T18:43:24.51 8.15
2025-03-15T18:43:25.51 8.13
2025-03-15T18:43:26.51 8.15
2025-03-15T18:43:27.51 8.14
2025-03-15T18:43:28.51 8.14
2025-03-15T18:43:29.51 8.16
2025-03-15T18:43:30.51 8.13
2025-03-15T18:43:31.51 8.16
2025-03-15T18:43:32.51 8.16
2025-03-15T18:43:33.51 8.16
2025-03-15T18:43:34.51 8.13
2025-03-15T18:43:35.51 8.16
2025-03-15T18:43:36.51 8.14
2025-03-15T18:43:37.51 8.14
2025-03-15T18:43:38.51 8.14
2025-03-15T18:43:39.51 8.12
2025-03-15T18:43:40.51 8.15
2025-03-15T18:43:41.51 8.16
2025-03-15T18:43:42.55 8.14
2025-03-15T18:43:43.51 8.14
2025-03-15T18:43:44.51 8.14
2025-03-15T18:43:45.51 8.12
2025-03-15T18:43:46.51 8.16
2025-03-15T18:43:47.51 8.16
2025-03-15T18:43:48.51 8.16
2025-03-15T18:43:49.51 8.16
2025-03-15T18:43:50.51 8.15
2025-03-15T18:43:51.51 8.16
2025-03-15T18:43:52.51 8.14
2025-03-15T18:43:53.51 8.14
2025-03-15T18:43:54.51 8.14
2025-03-15T18:43:55.51 8.16
2025-03-15T18:43:56.51 8.14
2025-03-15T18:43:57.51 8.14
2025-03-15T18:43:58.51 8.13
2025-03-15T18:43:59.51 8.16
2025-03-15T18:44:00.51 8.14
2025-03-15T18:44:01.51 8.17
2025-03-15T18:44:02.51 8.17
2025-03-15T18:44:03.51 8.17
2025-03-15T18:44:04.51 8.16
2025-03-15T18:44:05.51 8.16
2025-03-15T18:44:06.51 8.15
2025-03-15T18:44:07.51 8.16
2025-03-15T18:44:08.51 8.15
2025-03-15T18:44:09.51 8.17
2025-03-15T18:44:10.51 8.14
2025-03-15T18:44:11.51 8.14
2025-03-15T18:44:12.51 8.15
2025-03-15T18:44:13.51 8.15
2025-03-15T18:44:14.51 8.15
2025-03-15T18:44:15.51 8.12
2025-03-15T18:44:16.51 8.16
2025-03-15T18:44:17.51 8.14
2025-03-15T18:44:18.51 8.14
2025-03-15T18:44:19.51 8.13
2025-03-15T18:44:20.51 8.14
2025-03-15T18:44:21.51 8.16
2025-03-15T18:44:22.51 8.14
2025-03-15T18:44:23.51 8.14
2025-03-15T18:44:24.51 8.15
2025-03-15T18:44:25.51 8.12
2025-03-15T18:44:26.51 8.14
2025-03-15T18:44:27.51 8.16
2025-03-15T18:44:28.51 8.16
2025-03-15T18:44:29.51 8.14
2025-03-15T18:44:30.51 8.16
2025-03-15T18:44:31.51 8.15
2025-03-15T18:44:32.61 8.13
2025-03-15T18:44:33.50 8.16
2025-03-15T18:44:34.50 8.14
2025-03-15T18:44:35.50 8.14
2025-03-15T18:44:36.50 8.15
2025-03-15T18:44:37.50 8.14
2025-03-15T18:44:38.50 8.14
2025-03-15T18:44:39.50 8.16
2025-03-15T18:44:40.50 8.13
2025-03-15T18:44:41.50 8.15
2025-03-15T18:44:42.50 8.15
2025-03-15T18:44:43.50 8.15
2025-03-15T18:44:44.50 8.15
2025-03-15T18:44:45.50 8.14
2025-03-15T18:44:46.50 8.15
2025-03-15T18:44:47.50 8.16
2025-03-15T18:44:48.50 8.17
2025-03-15T18:44:49.50 8.16
2025-03-15T18:44:50.50 8.16
2025-03-15T18:44:51.50 8.14
2025-03-15T18:44:52.50 8.16
2025-03-15T18:44:53.50 8.16
2025-03-15T18:44:54.50 8.16
2025-03-15T18:44:55.50 8.16
2025-03-15T18:44:56.50 8.15
2025-03-15T18:44:57.50 8.16
2025-03-15T18:44:58.50 8.15
2025-03-15T18:44:59.50 8.15
2025-03-15T18:45:00.50 8.16
2025-03-15T18:45:01.50 8.14
2025-03-15T18:45:02.50 8.16
2025-03-15T18:45:03.50 8.16
2025-03-15T18:45:04.50 8.16
2025-03-15T18:45:05.50 8.16
2025-03-15T18:45:06.50 8.14
2025-03-15T18:45:07.50 8.14
2025-03-15T18:45:08.51 8.15
2025-03-15T18:45:09.50 8.15
2025-03-15T18:45:10.50 8.16
2025-03-15T18:45:11.55 8.15
2025-03-15T18:45:12.49 8.14
2025-03-15T18:45:13.49 8.15
2025-03-15T18:45:14.49 8.15
2025-03-15T18:45:15.49 8.13
2025-03-15T18:45:16.49 8.15
2025-03-15T18:45:17.49 8.17
2025-03-15T18:45:18.49 8.14
2025-03-15T18:45:19.49 8.14
2025-03-15T18:45:20.49 8.15
2025-03-15T18:45:21.50 8.14
2025-03-15T18:45:22.50 8.16
2025-03-15T18:45:23.50 8.14
2025-03-15T18:45:24.50 8.17
2025-03-15T18:45:25.50 8.15
2025-03-15T18:45:26.50 8.14
2025-03-15T18:45:27.50 8.17
2025-03-15T18:45:28.50 8.15
2025-03-15T18:45:29.50 8.13
2025-03-15T18:45:30.50 8.16
2025-03-15T18:45:31.50 8.16
2025-03-15T18:45:32.50 8.15
2025-03-15T18:45:33.50 8.15
2025-03-15T18:45:34.50 8.16
2025-03-15T18:45:35.50 8.15
2025-03-15T18:45:36.50 8.14
2025-03-15T18:45:37.50 8.16
2025-03-15T18:45:38.50 8.16
2025-03-15T18:45:39.50 8.16
2025-03-15T18:45:40.50 8.17
2025-03-15T18:45:41.50 8.17
2025-03-15T18:45:42.50 8.16
2025-03-15T18:45:43.50 8.16
2025-03-15T18:45:44.50 8.17
2025-03-15T18:45:45.50 8.16
2025-03-15T18:45:46.50 8.14
2025-03-15T18:45:47.50 8.16
2025-03-15T18:45:48.50 8.15
2025-03-15T18:45:49.50 8.15
2025-03-15T18:45:50.50 8.16
2025-03-15T18:45:51.50 8.16
2025-03-15T18:45:52.50 8.16
2025-03-15T18:45:53.50 8.17
2025-03-15T18:45:54.50 8.15
2025-03-15T18:45:55.50 8.16
2025-03-15T18:45:56.50 8.12
2025-03-15T18:45:57.50 8.12
2025-03-15T18:45:58.50 8.14
2025-03-15T18:45:59.50 8.15
2025-03-15T18:46:00.50 8.14
2025-03-15T18:46:01.50 8.13
2025-03-15T18:46:02.50 8.15
2025-03-15T18:46:03.50 8.14
2025-03-15T18:46:04.50 8.15
2025-03-15T18:46:05.50 8.15
2025-03-15T18:46:06.50 8.14
2025-03-15T18:46:07.50 8.13
2025-03-15T18:46:08.50 8.16
2025-03-15T18:46:09.50 8.14
2025-03-15T18:46:10.50 8.13
2025-03-15T18:46:11.50 8.12
2025-03-15T18:46:12.50 8.17
2025-03-15T18:46:13.50 8.12
2025-03-15T18:46:14.50 8.14
2025-03-15T18:46:15.50 8.14
2025-03-15T18:46:16.50 8.14
2025-03-15T18:46:17.50 8.13
2025-03-15T18:46:18.50 8.14
2025-03-15T18:46:19.50 8.13
2025-03-15T18:46:20.50 8.13
2025-03-15T18:46:21.50 8.14
2025-03-15T18:46:22.50 8.14
2025-03-15T18:46:23.50 8.16
2025-03-15T18:46:24.50 8.16
2025-03-15T18:46:25.50 8.14
2025-03-15T18:46:26.50 8.16
2025-03-15T18:46:27.50 8.13
2025-03-15T18:46:28.50 8.14
2025-03-15T18:46:29.50 8.16
2025-03-15T18:46:30.50 8.14
2025-03-15T18:46:31.50 8.16
2025-03-15T18:46:32.50 8.16
2025-03-15T18:46:33.50 8.15
2025-03-15T18:46:34.50 8.16
2025-03-15T18:46:35.50 8.14
2025-03-15T18:46:36.50 8.13
2025-03-15T18:46:37.50 8.15
2025-03-15T18:46:38.50 8.14
2025-03-15T18:46:39.50 8.15
2025-03-15T18:46:40.50 8.14
2025-03-15T18:46:41.50 8.14
2025-03-15T18:46:42.50 8.16
2025-03-15T18:46:43.50 8.14
2025-03-15T18:46:44.50 8.16
2025-03-15T18:46:45.50 8.15
2025-03-15T18:46:46.50 8.15
2025-03-15T18:46:47.50 8.16
2025-03-15T18:46:48.50 8.14
2025-03-15T18:46:49.50 8.16
2025-03-15T18:46:50.50 8.14
2025-03-15T18:46:51.50 8.16
2025-03-15T18:46:52.58 8.14
2025-03-15T18:46:53.49 8.14
2025-03-15T18:46:54.49 8.15
2025-03-15T18:46:55.49 8.15
2025-03-15T18:46:56.49 8.16
2025-03-15T18:46:57.49 8.13
2025-03-15T18:46:58.49 8.15
2025-03-15T18:46:59.49 8.14
2025-03-15T18:47:00.49 8.14
2025-03-15T18:47:01.49 8.15
2025-03-15T18:47:02.49 8.14
2025-03-15T18:47:03.49 8.17
2025-03-15T18:47:04.49 8.15
2025-03-15T18:47:05.49 8.15
2025-03-15T18:47:06.49 8.16
2025-03-15T18:47:07.49 8.12
2025-03-15T18:47:08.49 8.15
2025-03-15T18:47:09.49 8.16
2025-03-15T18:47:10.49 8.15
2025-03-15T18:47:11.49 8.17
2025-03-15T18:47:12.49 8.14
2025-03-15T18:47:13.49 8.14
2025-03-15T18:47:14.49 8.16
2025-03-15T18:47:15.49 8.15
2025-03-15T18:47:16.49 8.16
2025-03-15T18:47:17.49 8.13
2025-03-15T18:47:18.49 8.12
2025-03-15T18:47:19.49 8.14
2025-03-15T18:47:20.49 8.14
2025-03-15T18:47:21.49 8.16
2025-03-15T18:47:22.49 8.16
2025-03-15T18:47:23.49 8.15
2025-03-15T18:47:24.49 8.14
2025-03-15T18:47:25.49 8.15
2025-03-15T18:47:26.49 8.16
2025-03-15T18:47:27.49 8.15
2025-03-15T18:47:28.49 8.16
2025-03-15T18:47:29.49 8.15
2025-03-15T18:47:30.49 8.14
2025-03-15T18:47:31.49 8.16
2025-03-15T18:47:32.49 8.16
2025-03-15T18:47:33.49 8.15
2025-03-15T18:47:34.49 8.16
2025-03-15T18:47:35.49 8.13
2025-03-15T18:47:36.49 8.15
2025-03-15T18:47:37.49 8.14
2025-03-15T18:47:38.49 8.15
2025-03-15T18:47:39.49 8.16
2025-03-15T18:47:40.49 8.14
2025-03-15T18:47:41.49 8.16
2025-03-15T18:47:42.49 8.16
2025-03-15T18:47:43.49 8.16
2025-03-15T18:47:44.49 8.16
2025-03-15T18:47:45.49 8.16
2025-03-15T18:47:46.49 8.15
2025-03-15T18:47:47.49 8.13
2025-03-15T18:47:48.49 8.15
2025-03-15T18:47:49.49 8.14
2025-03-15T18:47:50.49 8.16
2025-03-15T18:47:51.49 8.14
2025-03-15T18:47:52.49 8.16
2025-03-15T18:47:53.49 8.14
2025-03-15T18:47:54.49 8.14
2025-03-15T18:47:55.49 8.14
2025-03-15T18:47:56.49 8.14
2025-03-15T18:47:57.49 8.14
2025-03-15T18:47:58.49 8.15
2025-03-15T18:47:59.49 8.14
2025-03-15T18:48:00.49 8.15
2025-03-15T18:48:01.49 8.16
2025-03-15T18:48:02.49 8.16
2025-03-15T18:48:03.49 8.16
2025-03-15T18:48:04.49 8.14
2025-03-15T18:48:05.49 8.16
2025-03-15T18:48:06.49 8.16
2025-03-15T18:48:07.49 8.14
2025-03-15T18:48:08.49 8.15
2025-03-15T18:48:09.49 8.16
2025-03-15T18:48:10.49 8.17
2025-03-15T18:48:11.49 8.16
2025-03-15T18:48:12.49 8.15
2025-03-15T18:48:13.49 8.16
2025-03-15T18:48:14.49 8.16
2025-03-15T18:48:15.49 8.14
2025-03-15T18:48:16.49 8.16
2025-03-15T18:48:17.49 8.17
2025-03-15T18:48:18.49 8.14
2025-03-15T18:48:19.49 8.16
2025-03-15T18:48:20.49 8.15
2025-03-15T18:48:21.49 8.15
2025-03-15T18:48:22.49 8.16
2025-03-15T18:48:23.49 8.15
2025-03-15T18:48:24.49 8.16
2025-03-15T18:48:25.49 8.15
2025-03-15T18:48:26.49 8.15
2025-03-15T18:48:27.49 8.14
2025-03-15T18:48:28.49 8.16
2025-03-15T18:48:29.49 8.15
2025-03-15T18:48:30.49 8.16
2025-03-15T18:48:31.49 8.14
2025-03-15T18:48:32.49 8.15
2025-03-15T18:48:33.49 8.15
2025-03-15T18:48:34.49 8.16
2025-03-15T18:48:35.49 8.15
2025-03-15T18:48:36.49 8.16
2025-03-15T18:48:37.49 8.14
2025-03-15T18:48:38.49 8.15
2025-03-15T18:48:39.49 8.16
2025-03-15T18:48:40.49 8.15
2025-03-15T18:48:41.49 8.14
2025-03-15T18:48:42.49 8.14
2025-03-15T18:48:43.49 8.15
2025-03-15T18:48:44.49 8.14
2025-03-15T18:48:45.49 8.14
2025-03-15T18:48:46.49 8.14
2025-03-15T18:48:47.49 8.16
2025-03-15T18:48:48.49 8.14
2025-03-15T18:48:49.49 8.12
2025-03-15T18:48:50.49 8.15
2025-03-15T18:48:51.49 8.16
2025-03-15T18:48:52.49 8.14
2025-03-15T18:48:53.49 8.16
2025-03-15T18:48:54.49 8.16
2025-03-15T18:48:55.49 8.16
2025-03-15T18:48:56.49 8.14
2025-03-15T18:48:57.49 8.15
2025-03-15T18:48:58.49 8.14
2025-03-15T18:48:59.49 8.14
2025-03-15T18:49:00.49 8.14
2025-03-15T18:49:01.49 8.17
2025-03-15T18:49:02.49 8.16
2025-03-15T18:49:03.51 8.16
2025-03-15T18:49:04.48 8.19
2025-03-15T18:49:05.48 8.13
2025-03-15T18:49:06.48 8.14
2025-03-15T18:49:07.48 8.16
2025-03-15T18:49:08.48 8.16
2025-03-15T18:49:09.48 8.15
2025-03-15T18:49:10.48 8.14
2025-03-15T18:49:11.48 8.15
2025-03-15T18:49:12.48 8.14
2025-03-15T18:49:13.48 8.14
2025-03-15T18:49:14.48 8.13
2025-03-15T18:49:15.48 8.15
2025-03-15T18:49:16.48 8.16
2025-03-15T18:49:17.48 8.15
2025-03-15T18:49:18.48 8.17
2025-03-15T18:49:19.48 8.14
2025-03-15T18:49:20.48 8.14
2025-03-15T18:49:21.48 8.14
2025-03-15T18:49:22.48 8.16
2025-03-15T18:49:23.48 8.16
2025-03-15T18:49:24.48 8.15
2025-03-15T18:49:25.48 8.15
2025-03-15T18:49:26.48 8.15
2025-03-15T18:49:27.48 8.16
2025-03-15T18:49:28.48 8.16
2025-03-15T18:49:29.48 8.14
2025-03-15T18:49:30.48 8.15
2025-03-15T18:49:31.48 8.16
2025-03-15T18:49:32.48 8.16
2025-03-15T18:49:33.48 8.16
2025-03-15T18:49:34.48 8.15
2025-03-15T18:49:35.48 8.16
2025-03-15T18:49:36.48 8.15
2025-03-15T18:49:37.48 8.14
2025-03-15T18:49:38.48 8.16
2025-03-15T18:49:39.48 8.14
2025-03-15T18:49:40.48 8.16
2025-03-15T18:49:41.48 8.14
2025-03-15T18:49:42.48 8.14
2025-03-15T18:49:43.48 8.15
2025-03-15T18:49:44.48 8.14
2025-03-15T18:49:45.48 8.14
2025-03-15T18:49:46.48 8.14
2025-03-15T18:49:47.48 8.14
2025-03-15T18:49:48.48 8.15
2025-03-15T18:49:49.48 8.14
2025-03-15T18:49:50.48 8.14
2025-03-15T18:49:51.48 8.15
2025-03-15T18:49:52.50 8.13
2025-03-15T18:49:53.47 8.14
2025-03-15T18:49:54.47 8.15
2025-03-15T18:49:55.47 8.17
2025-03-15T18:49:56.47 8.16
2025-03-15T18:49:57.47 8.17
2025-03-15T18:49:58.47 8.16
2025-03-15T18:49:59.47 8.16
2025-03-15T18:50:00.47 8.16
2025-03-15T18:50:01.47 8.16
2025-03-15T18:50:02.47 8.14
2025-03-15T18:50:03.47 8.14
2025-03-15T18:50:04.47 8.14
2025-03-15T18:50:05.47 8.14
2025-03-15T18:50:06.47 8.16
2025-03-15T18:50:07.47 8.15
2025-03-15T18:50:08.47 8.12
2025-03-15T18:50:09.47 8.14
2025-03-15T18:50:10.47 8.16
2025-03-15T18:50:11.47 8.15
2025-03-15T18:50:12.47 8.16
2025-03-15T18:50:13.47 8.15
2025-03-15T18:50:14.47 8.16
2025-03-15T18:50:15.47 8.14
2025-03-15T18:50:16.47 8.14
2025-03-15T18:50:17.47 8.14
2025-03-15T18:50:18.47 8.15
2025-03-15T18:50:19.47 8.16
2025-03-15T18:50:20.47 8.15
2025-03-15T18:50:21.47 8.14
2025-03-15T18:50:22.47 8.15
2025-03-15T18:50:23.47 8.15
2025-03-15T18:50:24.47 8.14
2025-03-15T18:50:25.47 8.16
2025-03-15T18:50:26.47 8.14
2025-03-15T18:50:27.47 8.14
2025-03-15T18:50:28.47 8.14
2025-03-15T18:50:29.47 8.15
2025-03-15T18:50:30.47 8.14
2025-03-15T18:50:31.47 8.15
2025-03-15T18:50:32.47 8.16
2025-03-15T18:50:33.47 8.15
2025-03-15T18:50:34.47 8.16
2025-03-15T18:50:35.47 8.16
2025-03-15T18:50:36.47 8.14
2025-03-15T18:50:37.47 8.13
2025-03-15T18:50:38.48 8.14
2025-03-15T18:50:39.48 8.14
2025-03-15T18:50:40.48 8.15
2025-03-15T18:50:41.48 8.16
2025-03-15T18:50:42.48 8.17
2025-03-15T18:50:43.48 8.12
2025-03-15T18:50:44.48 8.16
2025-03-15T18:50:45.48 8.16
2025-03-15T18:50:46.48 8.16
2025-03-15T18:50:47.48 8.12
2025-03-15T18:50:48.48 8.15
2025-03-15T18:50:49.48 8.16
2025-03-15T18:50:50.48 8.16
2025-03-15T18:50:51.48 8.17
2025-03-15T18:50:52.48 8.14
2025-03-15T18:50:53.48 8.16
2025-03-15T18:50:54.48 8.16
2025-03-15T18:50:55.48 8.14
2025-03-15T18:50:56.48 8.15
2025-03-15T18:50:57.48 8.16
2025-03-15T18:50:58.48 8.12
2025-03-15T18:50:59.48 8.13
2025-03-15T18:51:00.48 8.12
2025-03-15T18:51:01.48 8.12
2025-03-15T18:51:02.48 8.14
2025-03-15T18:51:03.48 8.14
2025-03-15T18:51:04.48 8.14
2025-03-15T18:51:05.48 8.15
2025-03-15T18:51:06.48 8.14
2025-03-15T18:51:07.48 8.15
2025-03-15T18:51:08.48 8.15
2025-03-15T18:51:09.48 8.14
2025-03-15T18:51:10.48 8.15
2025-03-15T18:51:11.48 8.14
2025-03-15T18:51:12.48 8.12
2025-03-15T18:51:13.48 8.16
2025-03-15T18:51:14.48 8.16
2025-03-15T18:51:15.48 8.14
2025-03-15T18:51:16.48 8.15
2025-03-15T18:51:17.48 8.14
2025-03-15T18:51:18.48 8.12
2025-03-15T18:51:19.48 8.12
2025-03-15T18:51:20.48 8.14
2025-03-15T18:51:21.48 8.16
2025-03-15T18:51:22.48 8.14
2025-03-15T18:51:23.48 8.16
2025-03-15T18:51:24.48 8.14
2025-03-15T18:51:25.48 8.14
2025-03-15T18:51:26.48 8.15
2025-03-15T18:51:27.48 8.15
2025-03-15T18:51:28.48 8.13
2025-03-15T18:51:29.48 8.14
2025-03-15T18:51:30.48 8.16
2025-03-15T18:51:31.48 8.13
2025-03-15T18:51:32.48 8.16
2025-03-15T18:51:33.48 8.13
2025-03-15T18:51:34.48 8.13
2025-03-15T18:51:35.48 8.15
2025-03-15T18:51:36.48 8.15
2025-03-15T18:51:37.48 8.14
2025-03-15T18:51:38.48 8.14
2025-03-15T18:51:39.48 8.15
2025-03-15T18:51:40.48 8.14
2025-03-15T18:51:41.48 8.15
2025-03-15T18:51:42.48 8.14
2025-03-15T18:51:43.48 8.12
2025-03-15T18:51:44.48 8.14
2025-03-15T18:51:45.48 8.14
2025-03-15T18:51:46.48 8.12
2025-03-15T18:51:47.48 8.13
2025-03-15T18:51:48.48 8.13
2025-03-15T18:51:49.48 8.16
2025-03-15T18:51:50.48 8.16
2025-03-15T18:51:51.48 8.15
2025-03-15T18:51:52.48 8.16
2025-03-15T18:51:53.48 8.14
2025-03-15T18:51:54.48 8.17
2025-03-15T18:51:55.48 8.17
2025-03-15T18:51:56.48 8.15
2025-03-15T18:51:57.48 8.16
2025-03-15T18:51:58.48 8.14
2025-03-15T18:51:59.48 8.14
2025-03-15T18:52:00.48 8.14
2025-03-15T18:52:01.48 8.14
2025-03-15T18:52:02.48 8.17
2025-03-15T18:52:03.48 8.14
2025-03-15T18:52:04.48 8.14
2025-03-15T18:52:05.48 8.14
2025-03-15T18:52:06.48 8.14
2025-03-15T18:52:07.48 8.13
2025-03-15T18:52:08.48 8.13
2025-03-15T18:52:09.48 8.11
2025-03-15T18:52:10.48 8.14
2025-03-15T18:52:11.48 8.14
2025-03-15T18:52:12.51 8.16
2025-03-15T18:52:13.47 8.16
2025-03-15T18:52:14.47 8.14
2025-03-15T18:52:15.47 8.14
2025-03-15T18:52:16.47 8.14
2025-03-15T18:52:17.47 8.14
2025-03-15T18:52:18.47 8.15
2025-03-15T18:52:19.47 8.14
2025-03-15T18:52:20.47 8.15
2025-03-15T18:52:21.47 8.16
2025-03-15T18:52:22.47 8.16
2025-03-15T18:52:23.47 8.15
2025-03-15T18:52:24.47 8.14
2025-03-15T18:52:25.47 8.15
2025-03-15T18:52:26.47 8.13
2025-03-15T18:52:27.47 8.13
2025-03-15T18:52:28.47 8.14
2025-03-15T18:52:29.47 8.14
2025-03-15T18:52:30.47 8.14
2025-03-15T18:52:31.47 8.14
2025-03-15T18:52:32.47 8.17
2025-03-15T18:52:33.47 8.16
2025-03-15T18:52:34.47 8.12
2025-03-15T18:52:35.47 8.13
2025-03-15T18:52:36.47 8.17
2025-03-15T18:52:37.47 8.14
2025-03-15T18:52:38.47 8.12
2025-03-15T18:52:39.47 8.16
2025-03-15T18:52:40.47 8.14
2025-03-15T18:52:41.47 8.13
2025-03-15T18:52:42.47 8.14
2025-03-15T18:52:43.47 8.13
2025-03-15T18:52:44.47 8.15
2025-03-15T18:52:45.47 8.15
2025-03-15T18:52:46.47 8.13
2025-03-15T18:52:47.47 8.16
2025-03-15T18:52:48.47 8.15
2025-03-15T18:52:49.47 8.16
2025-03-15T18:52:50.47 8.12
2025-03-15T18:52:51.47 8.14
2025-03-15T18:52:52.47 8.14
2025-03-15T18:52:53.47 8.13
2025-03-15T18:52:54.47 8.16
2025-03-15T18:52:55.48 8.16
2025-03-15T18:52:56.46 8.16
2025-03-15T18:52:57.46 8.15
2025-03-15T18:52:58.46 8.16
2025-03-15T18:52:59.46 8.15
2025-03-15T18:53:00.46 8.14
2025-03-15T18:53:01.46 8.15
2025-03-15T18:53:02.46 8.14
2025-03-15T18:53:03.46 8.15
2025-03-15T18:53:04.46 8.14
2025-03-15T18:53:05.46 8.15
2025-03-15T18:53:06.46 8.13
2025-03-15T18:53:07.46 8.14
2025-03-15T18:53:08.46 8.16
2025-03-15T18:53:09.46 8.15
2025-03-15T18:53:10.46 8.14
2025-03-15T18:53:11.46 8.15
2025-03-15T18:53:12.46 8.14
2025-03-15T18:53:13.46 8.14
2025-03-15T18:53:14.46 8.15
2025-03-15T18:53:15.46 8.12
2025-03-15T18:53:16.46 8.14
2025-03-15T18:53:17.46 8.13
2025-03-15T18:53:18.46 8.14
2025-03-15T18:53:19.46 8.14
2025-03-15T18:53:20.46 8.16
2025-03-15T18:53:21.46 8.14
2025-03-15T18:53:22.46 8.14
2025-03-15T18:53:23.46 8.16
2025-03-15T18:53:24.46 8.15
2025-03-15T18:53:25.46 8.14
2025-03-15T18:53:26.46 8.16
2025-03-15T18:53:27.46 8.14
2025-03-15T18:53:28.46 8.14
2025-03-15T18:53:29.46 8.15
2025-03-15T18:53:30.46 8.14
2025-03-15T18:53:31.46 8.14
2025-03-15T18:53:32.46 8.16
2025-03-15T18:53:33.46 8.14
2025-03-15T18:53:34.46 8.14
2025-03-15T18:53:35.46 8.16
2025-03-15T18:53:36.46 8.16
2025-03-15T18:53:37.46 8.13
2025-03-15T18:53:38.46 8.16
2025-03-15T18:53:39.46 8.16
2025-03-15T18:53:40.46 8.16
2025-03-15T18:53:41.46 8.15
2025-03-15T18:53:42.49 8.15
2025-03-15T18:53:43.45 8.17
2025-03-15T18:53:44.45 8.13
2025-03-15T18:53:45.45 8.14
2025-03-15T18:53:46.45 8.16
2025-03-15T18:53:47.45 8.14
2025-03-15T18:53:48.45 8.17
2025-03-15T18:53:49.45 8.16
2025-03-15T18:53:50.45 8.16
2025-03-15T18:53:51.45 8.14
2025-03-15T18:53:52.45 8.16
2025-03-15T18:53:53.45 8.14
2025-03-15T18:53:54.45 8.11
2025-03-15T18:53:55.45 8.14
2025-03-15T18:53:56.45 8.15
2025-03-15T18:53:57.45 8.16
2025-03-15T18:53:58.45 8.17
2025-03-15T18:53:59.45 8.16
2025-03-15T18:54:00.45 8.15
2025-03-15T18:54:01.45 8.17
2025-03-15T18:54:02.45 8.16
2025-03-15T18:54:03.45 8.15
2025-03-15T18:54:04.45 8.16
2025-03-15T18:54:05.45 8.16
2025-03-15T18:54:06.45 8.16
2025-03-15T18:54:07.45 8.17
2025-03-15T18:54:08.45 8.16
2025-03-15T18:54:09.45 8.14
2025-03-15T18:54:10.45 8.16
2025-03-15T18:54:11.45 8.16
2025-03-15T18:54:12.45 8.14
2025-03-15T18:54:13.45 8.17
2025-03-15T18:54:14.45 8.14
2025-03-15T18:54:15.45 8.14
2025-03-15T18:54:16.45 8.16
2025-03-15T18:54:17.45 8.16
2025-03-15T18:54:18.45 8.17
2025-03-15T18:54:19.45 8.15
2025-03-15T18:54:20.45 8.15
2025-03-15T18:54:21.45 8.16
2025-03-15T18:54:22.45 8.14
2025-03-15T18:54:23.45 8.15
2025-03-15T18:54:24.45 8.16
2025-03-15T18:54:25.45 8.15
2025-03-15T18:54:26.45 8.16
2025-03-15T18:54:27.45 8.14
2025-03-15T18:54:28.45 8.15
2025-03-15T18:54:29.45 8.16
2025-03-15T18:54:30.45 8.17
2025-03-15T18:54:31.45 8.16
2025-03-15T18:54:32.45 8.12
2025-03-15T18:54:33.45 8.15
2025-03-15T18:54:34.45 8.16
2025-03-15T18:54:35.45 8.16
2025-03-15T18:54:36.45 8.12
2025-03-15T18:54:37.45 8.15
2025-03-15T18:54:38.45 8.17
2025-03-15T18:54:39.45 8.14
2025-03-15T18:54:40.45 8.15
2025-03-15T18:54:41.45 8.14
2025-03-15T18:54:42.45 8.14
2025-03-15T18:54:43.45 8.14
2025-03-15T18:54:44.45 8.14
2025-03-15T18:54:45.45 8.15
2025-03-15T18:54:46.45 8.16
2025-03-15T18:54:47.45 8.14
2025-03-15T18:54:48.45 8.17
2025-03-15T18:54:49.45 8.16
2025-03-15T18:54:50.45 8.12
2025-03-15T18:54:51.45 8.16
2025-03-15T18:54:52.45 8.17
2025-03-15T18:54:53.45 8.14
2025-03-15T18:54:54.45 8.13
2025-03-15T18:54:55.45 8.15
2025-03-15T18:54:56.45 8.14
2025-03-15T18:54:57.45 8.13
2025-03-15T18:54:58.45 8.16
2025-03-15T18:54:59.45 8.16
2025-03-15T18:55:00.45 8.16
2025-03-15T18:55:01.45 8.16
2025-03-15T18:55:02.45 8.17
2025-03-15T18:55:03.45 8.14
2025-03-15T18:55:04.45 8.13
2025-03-15T18:55:05.45 8.16
2025-03-15T18:55:06.45 8.13
2025-03-15T18:55:07.45 8.15
2025-03-15T18:55:08.45 8.16
2025-03-15T18:55:09.45 8.16
2025-03-15T18:55:10.45 8.13
2025-03-15T18:55:11.45 8.14
2025-03-15T18:55:12.45 8.14
2025-03-15T18:55:13.45 8.16
2025-03-15T18:55:14.45 8.16
2025-03-15T18:55:15.45 8.14
2025-03-15T18:55:16.45 8.15
2025-03-15T18:55:17.45 8.12
2025-03-15T18:55:18.45 8.16
2025-03-15T18:55:19.45 8.15
2025-03-15T18:55:20.45 8.17
2025-03-15T18:55:21.45 8.17
2025-03-15T18:55:22.45 8.14
2025-03-15T18:55:23.45 8.14
2025-03-15T18:55:24.45 8.16
2025-03-15T18:55:25.45 8.16
2025-03-15T18:55:26.45 8.16
2025-03-15T18:55:27.45 8.16
2025-03-15T18:55:28.45 8.13
2025-03-15T18:55:29.45 8.17
2025-03-15T18:55:30.45 8.14
2025-03-15T18:55:31.45 8.14
2025-03-15T18:55:32.45 8.16
2025-03-15T18:55:33.45 8.14
2025-03-15T18:55:34.45 8.14
2025-03-15T18:55:35.45 8.16
2025-03-15T18:55:36.45 8.14
2025-03-15T18:55:37.45 8.16
2025-03-15T18:55:38.45 8.15
2025-03-15T18:55:39.45 8.17
2025-03-15T18:55:40.45 8.16
2025-03-15T18:55:41.45 8.14
2025-03-15T18:55:42.45 8.14
2025-03-15T18:55:43.45 8.15
2025-03-15T18:55:44.45 8.17
2025-03-15T18:55:45.45 8.13
2025-03-15T18:55:46.45 8.16
2025-03-15T18:55:47.45 8.13
2025-03-15T18:55:48.45 8.17
2025-03-15T18:55:49.45 8.14
2025-03-15T18:55:50.45 8.14
2025-03-15T18:55:51.45 8.16
2025-03-15T18:55:52.45 8.15
2025-03-15T18:55:53.45 8.15
2025-03-15T18:55:54.45 8.15
2025-03-15T18:55:55.45 8.15
2025-03-15T18:55:56.46 8.14
2025-03-15T18:55:57.46 8.16
2025-03-15T18:55:58.46 8.16
2025-03-15T18:55:59.46 8.14
2025-03-15T18:56:00.46 8.15
2025-03-15T18:56:01.46 8.14
2025-03-15T18:56:02.52 8.14
2025-03-15T18:56:03.46 8.14
2025-03-15T18:56:04.46 8.14
2025-03-15T18:56:05.46 8.16
2025-03-15T18:56:06.46 8.16
2025-03-15T18:56:07.46 8.15
2025-03-15T18:56:08.46 8.12
2025-03-15T18:56:09.46 8.14
2025-03-15T18:56:10.46 8.15
2025-03-15T18:56:11.46 8.16
2025-03-15T18:56:12.46 8.16
2025-03-15T18:56:13.46 8.12
2025-03-15T18:56:14.46 8.16
2025-03-15T18:56:15.46 8.14
2025-03-15T18:56:16.46 8.16
2025-03-15T18:56:17.46 8.14
2025-03-15T18:56:18.46 8.16
2025-03-15T18:56:19.46 8.15
2025-03-15T18:56:20.46 8.15
2025-03-15T18:56:21.46 8.12
2025-03-15T18:56:22.46 8.16
2025-03-15T18:56:23.46 8.15
2025-03-15T18:56:24.46 8.13
2025-03-15T18:56:25.46 8.16
2025-03-15T18:56:26.46 8.14
2025-03-15T18:56:27.46 8.16
2025-03-15T18:56:28.46 8.14
2025-03-15T18:56:29.46 8.15
2025-03-15T18:56:30.46 8.16
2025-03-15T18:56:31.46 8.13
2025-03-15T18:56:32.46 8.16
2025-03-15T18:56:33.46 8.12
2025-03-15T18:56:34.46 8.16
2025-03-15T18:56:35.46 8.13
2025-03-15T18:56:36.46 8.16
2025-03-15T18:56:37.46 8.14
2025-03-15T18:56:38.46 8.15
2025-03-15T18:56:39.46 8.14
2025-03-15T18:56:40.46 8.14
2025-03-15T18:56:41.46 8.16
2025-03-15T18:56:42.46 8.14
2025-03-15T18:56:43.46 8.17
2025-03-15T18:56:44.46 8.15
2025-03-15T18:56:45.46 8.14
2025-03-15T18:56:46.46 8.16
2025-03-15T18:56:47.48 8.14
2025-03-15T18:56:48.45 8.17
2025-03-15T18:56:49.45 8.18
2025-03-15T18:56:50.45 8.16
2025-03-15T18:56:51.45 8.16
2025-03-15T18:56:52.45 8.12
2025-03-15T18:56:53.45 8.12
2025-03-15T18:56:54.45 8.13
2025-03-15T18:56:55.45 8.12
2025-03-15T18:56:56.45 8.14
2025-03-15T18:56:57.45 8.16
2025-03-15T18:56:58.45 8.15
2025-03-15T18:56:59.45 8.14
2025-03-15T18:57:00.45 8.14
2025-03-15T18:57:01.45 8.14
2025-03-15T18:57:02.45 8.12
2025-03-15T18:57:03.45 8.16
2025-03-15T18:57:04.45 8.15
2025-03-15T18:57:05.45 8.16
2025-03-15T18:57:06.45 8.14
2025-03-15T18:57:07.45 8.17
2025-03-15T18:57:08.45 8.14
2025-03-15T18:57:09.45 8.13
2025-03-15T18:57:10.45 8.16
2025-03-15T18:57:11.45 8.14
2025-03-15T18:57:12.45 8.12
2025-03-15T18:57:13.45 8.12
2025-03-15T18:57:14.45 8.14
2025-03-15T18:57:15.45 8.13
2025-03-15T18:57:16.45 8.12
2025-03-15T18:57:17.45 8.14
2025-03-15T18:57:18.45 8.15
2025-03-15T18:57:19.45 8.13
2025-03-15T18:57:20.45 8.15
2025-03-15T18:57:21.45 8.13
2025-03-15T18:57:22.45 8.15
2025-03-15T18:57:23.45 8.15
2025-03-15T18:57:24.45 8.13
2025-03-15T18:57:25.45 8.14
2025-03-15T18:57:26.45 8.16
2025-03-15T18:57:27.45 8.16
2025-03-15T18:57:28.45 8.15
2025-03-15T18:57:29.45 8.16
2025-03-15T18:57:30.45 8.16
2025-03-15T18:57:31.45 8.16
2025-03-15T18:57:32.54 8.15
2025-03-15T18:57:33.44 8.14
2025-03-15T18:57:34.44 8.15
2025-03-15T18:57:35.44 8.13
2025-03-15T18:57:36.44 8.15
2025-03-15T18:57:37.44 8.16
2025-03-15T18:57:38.44 8.13
2025-03-15T18:57:39.44 8.13
2025-03-15T18:57:40.44 8.16
2025-03-15T18:57:41.44 8.13
2025-03-15T18:57:42.44 8.16
2025-03-15T18:57:43.44 8.14
2025-03-15T18:57:44.44 8.16
2025-03-15T18:57:45.44 8.12
2025-03-15T18:57:46.44 8.15
2025-03-15T18:57:47.44 8.14
2025-03-15T18:57:48.44 8.14
2025-03-15T18:57:49.44 8.16
2025-03-15T18:57:50.44 8.15
2025-03-15T18:57:51.44 8.15
2025-03-15T18:57:52.44 8.15
2025-03-15T18:57:53.44 8.16
2025-03-15T18:57:54.44 8.14
2025-03-15T18:57:55.44 8.15
2025-03-15T18:57:56.44 8.15
2025-03-15T18:57:57.44 8.14
2025-03-15T18:57:58.44 8.15
2025-03-15T18:57:59.44 8.15
2025-03-15T18:58:00.44 8.15
2025-03-15T18:58:01.44 8.14
2025-03-15T18:58:02.44 8.14
2025-03-15T18:58:03.44 8.16
2025-03-15T18:58:04.44 8.16
2025-03-15T18:58:05.44 8.15
2025-03-15T18:58:06.44 8.14
2025-03-15T18:58:07.44 8.14
2025-03-15T18:58:08.44 8.15
2025-03-15T18:58:09.44 8.15
2025-03-15T18:58:10.44 8.18
2025-03-15T18:58:11.44 8.15
2025-03-15T18:58:12.44 8.16
2025-03-15T18:58:13.44 8.15
2025-03-15T18:58:14.44 8.16
2025-03-15T18:58:15.44 8.14
2025-03-15T18:58:16.44 8.14
2025-03-15T18:58:17.44 8.15
2025-03-15T18:58:18.44 8.16
2025-03-15T18:58:19.44 8.16
2025-03-15T18:58:20.44 8.15
2025-03-15T18:58:21.44 8.17
2025-03-15T18:58:22.44 8.15
2025-03-15T18:58:23.44 8.14
2025-03-15T18:58:24.44 8.15
2025-03-15T18:58:25.44 8.14
2025-03-15T18:58:26.44 8.17
2025-03-15T18:58:27.44 8.15
2025-03-15T18:58:28.44 8.14
2025-03-15T18:58:29.44 8.15
2025-03-15T18:58:30.44 8.14
2025-03-15T18:58:31.44 8.14
2025-03-15T18:58:32.44 8.14
2025-03-15T18:58:33.44 8.15
2025-03-15T18:58:34.44 8.16
2025-03-15T18:58:35.44 8.12
2025-03-15T18:58:36.44 8.14
2025-03-15T18:58:37.44 8.14
2025-03-15T18:58:38.44 8.15
2025-03-15T18:58:39.44 8.14
2025-03-15T18:58:40.44 8.14
2025-03-15T18:58:41.44 8.15
2025-03-15T18:58:42.44 8.16
2025-03-15T18:58:43.44 8.17
2025-03-15T18:58:44.44 8.15
2025-03-15T18:58:45.44 8.16
2025-03-15T18:58:46.44 8.16
2025-03-15T18:58:47.44 8.16
2025-03-15T18:58:48.44 8.16
2025-03-15T18:58:49.44 8.14
2025-03-15T18:58:50.44 8.16
2025-03-15T18:58:51.44 8.14
2025-03-15T18:58:52.44 8.15
2025-03-15T18:58:53.44 8.15
2025-03-15T18:58:54.44 8.15
2025-03-15T18:58:55.44 8.16
2025-03-15T18:58:56.44 8.16
2025-03-15T18:58:57.44 8.14
2025-03-15T18:58:58.44 8.14
2025-03-15T18:58:59.44 8.16
2025-03-15T18:59:00.44 8.16
2025-03-15T18:59:01.44 8.13
2025-03-15T18:59:02.44 8.15
2025-03-15T18:59:03.44 8.16
2025-03-15T18:59:04.44 8.14
2025-03-15T18:59:05.44 8.13
2025-03-15T18:59:06.44 8.14
2025-03-15T18:59:07.44 8.17
2025-03-15T18:59:08.44 8.14
2025-03-15T18:59:09.44 8.14
2025-03-15T18:59:10.44 8.12
2025-03-15T18:59:11.44 8.14
2025-03-15T18:59:12.44 8.17
2025-03-15T18:59:13.44 8.14
2025-03-15T18:59:14.44 8.16
2025-03-15T18:59:15.44 8.16
2025-03-15T18:59:16.44 8.14
2025-03-15T18:59:17.44 8.14
2025-03-15T18:59:18.44 8.15
2025-03-15T18:59:19.44 8.15
2025-03-15T18:59:20.44 8.14
2025-03-15T18:59:21.44 8.16
2025-03-15T18:59:22.44 8.15
2025-03-15T18:59:23.44 8.14
2025-03-15T18:59:24.44 8.14
2025-03-15T18:59:25.44 8.15
2025-03-15T18:59:26.44 8.14
2025-03-15T18:59:27.44 8.15
2025-03-15T18:59:28.44 8.16
2025-03-15T18:59:29.44 8.17
2025-03-15T18:59:30.44 8.13
2025-03-15T18:59:31.44 8.16
2025-03-15T18:59:32.44 8.14
2025-03-15T18:59:33.44 8.14
2025-03-15T18:59:34.44 8.14
2025-03-15T18:59:35.44 8.14
2025-03-15T18:59:36.44 8.13
2025-03-15T18:59:37.44 8.16
2025-03-15T18:59:38.44 8.16
2025-03-15T18:59:39.44 8.16
2025-03-15T18:59:40.44 8.14
2025-03-15T18:59:41.44 8.14
2025-03-15T18:59:42.44 8.13
2025-03-15T18:59:43.44 8.14
2025-03-15T18:59:44.44 8.16
2025-03-15T18:59:45.44 8.12
2025-03-15T18:59:46.44 8.17
2025-03-15T18:59:47.44 8.15
2025-03-15T18:59:48.44 8.14
2025-03-15T18:59:49.44 8.16
2025-03-15T18:59:50.44 8.14
2025-03-15T18:59:51.44 8.12
2025-03-15T18:59:52.44 8.14
2025-03-15T18:59:53.44 8.14
2025-03-15T18:59:54.44 8.14
2025-03-15T18:59:55.44 8.15
2025-03-15T18:59:56.44 8.14
2025-03-15T18:59:57.44 8.16
2025-03-15T18:59:58.44 8.15
2025-03-15T18:59:59.44 8.14
