# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B207 madisn207bwy2007
# Latitude     : +44.6190 degrees (WGS-84)
# Longitude    : -110.8485 degrees (WGS-84)
# Elevation    : 2182 meters (WGS-84)
# Sensor Depth : 24.99 meters
# SEED Codes   : PB B207 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-12T17:00:00.14 13.11
2025-03-12T17:00:01.14 13.10
2025-03-12T17:00:02.14 13.11
2025-03-12T17:00:03.14 13.12
2025-03-12T17:00:04.14 13.10
2025-03-12T17:00:05.14 13.10
2025-03-12T17:00:06.14 13.11
2025-03-12T17:00:07.14 13.09
2025-03-12T17:00:08.14 13.08
2025-03-12T17:00:09.14 13.11
2025-03-12T17:00:10.14 13.11
2025-03-12T17:00:11.14 13.09
2025-03-12T17:00:12.14 13.11
2025-03-12T17:00:13.14 13.10
2025-03-12T17:00:14.14 13.11
2025-03-12T17:00:15.14 13.11
2025-03-12T17:00:16.14 13.11
2025-03-12T17:00:17.14 13.11
2025-03-12T17:00:18.14 13.10
2025-03-12T17:00:19.14 13.09
2025-03-12T17:00:20.14 13.11
2025-03-12T17:00:21.14 13.09
2025-03-12T17:00:22.14 13.11
2025-03-12T17:00:23.14 13.10
2025-03-12T17:00:24.14 13.09
2025-03-12T17:00:25.14 13.12
2025-03-12T17:00:26.14 13.11
2025-03-12T17:00:27.14 13.12
2025-03-12T17:00:28.14 13.13
2025-03-12T17:00:29.14 13.12
2025-03-12T17:00:30.14 13.10
2025-03-12T17:00:31.14 13.10
2025-03-12T17:00:32.14 13.10
2025-03-12T17:00:33.14 13.10
2025-03-12T17:00:34.14 13.10
2025-03-12T17:00:35.14 13.10
2025-03-12T17:00:36.14 13.12
2025-03-12T17:00:37.14 13.10
2025-03-12T17:00:38.14 13.14
2025-03-12T17:00:39.14 13.12
2025-03-12T17:00:40.14 13.10
2025-03-12T17:00:41.14 13.10
2025-03-12T17:00:42.14 13.10
2025-03-12T17:00:43.14 13.10
2025-03-12T17:00:44.14 13.11
2025-03-12T17:00:45.15 13.10
2025-03-12T17:00:46.13 13.09
2025-03-12T17:00:47.13 13.08
2025-03-12T17:00:48.13 13.10
2025-03-12T17:00:49.13 13.07
2025-03-12T17:00:50.13 13.09
2025-03-12T17:00:51.13 13.08
2025-03-12T17:00:52.13 13.10
2025-03-12T17:00:53.13 13.08
2025-03-12T17:00:54.13 13.12
2025-03-12T17:00:55.13 13.12
2025-03-12T17:00:56.13 13.10
2025-03-12T17:00:57.13 13.10
2025-03-12T17:00:58.13 13.10
2025-03-12T17:00:59.13 13.10
2025-03-12T17:01:00.13 13.10
2025-03-12T17:01:01.13 13.10
2025-03-12T17:01:02.13 13.10
2025-03-12T17:01:03.13 13.10
2025-03-12T17:01:04.13 13.10
2025-03-12T17:01:05.13 13.09
2025-03-12T17:01:06.13 13.12
2025-03-12T17:01:07.13 13.10
2025-03-12T17:01:08.13 13.09
2025-03-12T17:01:09.13 13.10
2025-03-12T17:01:10.13 13.10
2025-03-12T17:01:11.13 13.10
2025-03-12T17:01:12.13 13.09
2025-03-12T17:01:13.13 13.11
2025-03-12T17:01:14.13 13.10
2025-03-12T17:01:15.13 13.10
2025-03-12T17:01:16.13 13.10
2025-03-12T17:01:17.13 13.10
2025-03-12T17:01:18.15 13.10
2025-03-12T17:01:19.12 13.10
2025-03-12T17:01:20.12 13.11
2025-03-12T17:01:21.12 13.10
2025-03-12T17:01:22.12 13.11
2025-03-12T17:01:23.12 13.10
2025-03-12T17:01:24.12 13.11
2025-03-12T17:01:25.12 13.12
2025-03-12T17:01:26.12 13.12
2025-03-12T17:01:27.12 13.09
2025-03-12T17:01:28.12 13.09
2025-03-12T17:01:29.12 13.10
2025-03-12T17:01:30.12 13.12
2025-03-12T17:01:31.12 13.11
2025-03-12T17:01:32.12 13.10
2025-03-12T17:01:33.12 13.12
2025-03-12T17:01:34.12 13.09
2025-03-12T17:01:35.12 13.12
2025-03-12T17:01:36.12 13.10
2025-03-12T17:01:37.12 13.11
2025-03-12T17:01:38.12 13.13
2025-03-12T17:01:39.12 13.08
2025-03-12T17:01:40.12 13.12
2025-03-12T17:01:41.12 13.10
2025-03-12T17:01:42.12 13.12
2025-03-12T17:01:43.12 13.09
2025-03-12T17:01:44.12 13.10
2025-03-12T17:01:45.12 13.08
2025-03-12T17:01:46.12 13.11
2025-03-12T17:01:47.12 13.10
2025-03-12T17:01:48.12 13.10
2025-03-12T17:01:49.12 13.10
2025-03-12T17:01:50.12 13.10
2025-03-12T17:01:51.12 13.11
2025-03-12T17:01:52.12 13.10
2025-03-12T17:01:53.12 13.10
2025-03-12T17:01:54.12 13.12
2025-03-12T17:01:55.12 13.11
2025-03-12T17:01:56.12 13.10
2025-03-12T17:01:57.12 13.10
2025-03-12T17:01:58.12 13.09
2025-03-12T17:01:59.12 13.11
2025-03-12T17:02:00.12 13.08
2025-03-12T17:02:01.12 13.10
2025-03-12T17:02:02.12 13.11
2025-03-12T17:02:03.12 13.10
2025-03-12T17:02:04.12 13.08
2025-03-12T17:02:05.12 13.12
2025-03-12T17:02:06.12 13.10
2025-03-12T17:02:07.12 13.10
2025-03-12T17:02:08.12 13.10
2025-03-12T17:02:09.12 13.10
2025-03-12T17:02:10.12 13.08
2025-03-12T17:02:11.12 13.10
2025-03-12T17:02:12.12 13.08
2025-03-12T17:02:13.12 13.12
2025-03-12T17:02:14.12 13.10
2025-03-12T17:02:15.12 13.12
2025-03-12T17:02:16.12 13.11
2025-03-12T17:02:17.12 13.10
2025-03-12T17:02:18.12 13.11
2025-03-12T17:02:19.12 13.08
2025-03-12T17:02:20.12 13.12
2025-03-12T17:02:21.12 13.10
2025-03-12T17:02:22.12 13.08
2025-03-12T17:02:23.12 13.10
2025-03-12T17:02:24.12 13.10
2025-03-12T17:02:25.12 13.10
2025-03-12T17:02:26.13 13.11
2025-03-12T17:02:27.12 13.13
2025-03-12T17:02:28.12 13.12
2025-03-12T17:02:29.12 13.12
2025-03-12T17:02:30.13 13.10
2025-03-12T17:02:31.12 13.12
2025-03-12T17:02:32.12 13.10
2025-03-12T17:02:33.12 13.10
2025-03-12T17:02:34.12 13.10
2025-03-12T17:02:35.12 13.10
2025-03-12T17:02:36.13 13.10
2025-03-12T17:02:37.13 13.11
2025-03-12T17:02:38.12 13.10
2025-03-12T17:02:39.13 13.11
2025-03-12T17:02:40.13 13.12
2025-03-12T17:02:41.13 13.10
2025-03-12T17:02:42.13 13.08
2025-03-12T17:02:43.13 13.11
2025-03-12T17:02:44.13 13.10
2025-03-12T17:02:45.13 13.10
2025-03-12T17:02:46.13 13.08
2025-03-12T17:02:47.13 13.10
2025-03-12T17:02:48.13 13.10
2025-03-12T17:02:49.13 13.10
2025-03-12T17:02:50.13 13.12
2025-03-12T17:02:51.13 13.11
2025-03-12T17:02:52.13 13.11
2025-03-12T17:02:53.13 13.12
2025-03-12T17:02:54.13 13.10
2025-03-12T17:02:55.13 13.10
2025-03-12T17:02:56.13 13.09
2025-03-12T17:02:57.13 13.08
2025-03-12T17:02:58.13 13.08
2025-03-12T17:02:59.13 13.11
2025-03-12T17:03:00.13 13.10
2025-03-12T17:03:01.13 13.14
2025-03-12T17:03:02.13 13.11
2025-03-12T17:03:03.13 13.10
2025-03-12T17:03:04.13 13.11
2025-03-12T17:03:05.13 13.08
2025-03-12T17:03:06.13 13.11
2025-03-12T17:03:07.13 13.11
2025-03-12T17:03:08.13 13.12
2025-03-12T17:03:09.13 13.11
2025-03-12T17:03:10.13 13.10
2025-03-12T17:03:11.13 13.10
2025-03-12T17:03:12.13 13.10
2025-03-12T17:03:13.13 13.12
2025-03-12T17:03:14.13 13.10
2025-03-12T17:03:15.13 13.10
2025-03-12T17:03:16.13 13.10
2025-03-12T17:03:17.13 13.12
2025-03-12T17:03:18.13 13.13
2025-03-12T17:03:19.13 13.11
2025-03-12T17:03:20.13 13.10
2025-03-12T17:03:21.13 13.12
2025-03-12T17:03:22.13 13.12
2025-03-12T17:03:23.13 13.10
2025-03-12T17:03:24.13 13.10
2025-03-12T17:03:25.13 13.12
2025-03-12T17:03:26.13 13.12
2025-03-12T17:03:27.13 13.11
2025-03-12T17:03:28.13 13.10
2025-03-12T17:03:29.13 13.09
2025-03-12T17:03:30.13 13.10
2025-03-12T17:03:31.13 13.10
2025-03-12T17:03:32.13 13.10
2025-03-12T17:03:33.13 13.13
2025-03-12T17:03:34.13 13.11
2025-03-12T17:03:35.13 13.10
2025-03-12T17:03:36.13 13.10
2025-03-12T17:03:37.13 13.08
2025-03-12T17:03:38.13 13.10
2025-03-12T17:03:39.13 13.12
2025-03-12T17:03:40.13 13.12
2025-03-12T17:03:41.13 13.10
2025-03-12T17:03:42.13 13.09
2025-03-12T17:03:43.13 13.11
2025-03-12T17:03:44.13 13.11
2025-03-12T17:03:45.13 13.09
2025-03-12T17:03:46.13 13.11
2025-03-12T17:03:47.13 13.11
2025-03-12T17:03:48.13 13.09
2025-03-12T17:03:49.13 13.12
2025-03-12T17:03:50.13 13.10
2025-03-12T17:03:51.13 13.08
2025-03-12T17:03:52.13 13.10
2025-03-12T17:03:53.13 13.10
2025-03-12T17:03:54.13 13.10
2025-03-12T17:03:55.13 13.11
2025-03-12T17:03:56.13 13.11
2025-03-12T17:03:57.13 13.11
2025-03-12T17:03:58.13 13.12
2025-03-12T17:03:59.13 13.10
2025-03-12T17:04:00.13 13.10
2025-03-12T17:04:01.13 13.11
2025-03-12T17:04:02.13 13.10
2025-03-12T17:04:03.13 13.10
2025-03-12T17:04:04.13 13.12
2025-03-12T17:04:05.13 13.12
2025-03-12T17:04:06.13 13.12
2025-03-12T17:04:07.13 13.10
2025-03-12T17:04:08.13 13.10
2025-03-12T17:04:09.13 13.08
2025-03-12T17:04:10.13 13.11
2025-03-12T17:04:11.13 13.10
2025-03-12T17:04:12.13 13.11
2025-03-12T17:04:13.13 13.12
2025-03-12T17:04:14.13 13.11
2025-03-12T17:04:15.13 13.10
2025-03-12T17:04:16.13 13.09
2025-03-12T17:04:17.13 13.11
2025-03-12T17:04:18.13 13.10
2025-03-12T17:04:19.13 13.10
2025-03-12T17:04:20.13 13.11
2025-03-12T17:04:21.13 13.12
2025-03-12T17:04:22.13 13.11
2025-03-12T17:04:23.13 13.10
2025-03-12T17:04:24.13 13.10
2025-03-12T17:04:25.13 13.10
2025-03-12T17:04:26.13 13.10
2025-03-12T17:04:27.13 13.12
2025-03-12T17:04:28.13 13.10
2025-03-12T17:04:29.13 13.11
2025-03-12T17:04:30.13 13.08
2025-03-12T17:04:31.13 13.10
2025-03-12T17:04:32.13 13.12
2025-03-12T17:04:33.13 13.09
2025-03-12T17:04:34.13 13.05
2025-03-12T17:04:35.13 13.11
2025-03-12T17:04:36.13 13.11
2025-03-12T17:04:37.14 13.10
2025-03-12T17:04:38.12 13.12
2025-03-12T17:04:39.12 13.11
2025-03-12T17:04:40.12 13.10
2025-03-12T17:04:41.12 13.08
2025-03-12T17:04:42.12 13.11
2025-03-12T17:04:43.12 13.11
2025-03-12T17:04:44.12 13.10
2025-03-12T17:04:45.12 13.10
2025-03-12T17:04:46.12 13.12
2025-03-12T17:04:47.12 13.07
2025-03-12T17:04:48.12 13.12
2025-03-12T17:04:49.12 13.12
2025-03-12T17:04:50.12 13.08
2025-03-12T17:04:51.12 13.11
2025-03-12T17:04:52.12 13.08
2025-03-12T17:04:53.12 13.12
2025-03-12T17:04:54.12 13.10
2025-03-12T17:04:55.12 13.10
2025-03-12T17:04:56.12 13.10
2025-03-12T17:04:57.12 13.08
2025-03-12T17:04:58.12 13.10
2025-03-12T17:04:59.12 13.09
2025-03-12T17:05:00.12 13.09
2025-03-12T17:05:01.12 13.08
2025-03-12T17:05:02.12 13.10
2025-03-12T17:05:03.12 13.08
2025-03-12T17:05:04.12 13.10
2025-03-12T17:05:05.12 13.10
2025-03-12T17:05:06.12 13.10
2025-03-12T17:05:07.12 13.11
2025-03-12T17:05:08.12 13.11
2025-03-12T17:05:09.12 13.09
2025-03-12T17:05:10.12 13.09
2025-03-12T17:05:11.12 13.10
2025-03-12T17:05:12.12 13.09
2025-03-12T17:05:13.12 13.10
2025-03-12T17:05:14.12 13.11
2025-03-12T17:05:15.12 13.09
2025-03-12T17:05:16.12 13.12
2025-03-12T17:05:17.12 13.08
2025-03-12T17:05:18.12 13.11
2025-03-12T17:05:19.12 13.10
2025-03-12T17:05:20.12 13.11
2025-03-12T17:05:21.12 13.11
2025-03-12T17:05:22.12 13.10
2025-03-12T17:05:23.12 13.13
2025-03-12T17:05:24.12 13.10
2025-03-12T17:05:25.12 13.10
2025-03-12T17:05:26.12 13.11
2025-03-12T17:05:27.12 13.10
2025-03-12T17:05:28.12 13.08
2025-03-12T17:05:29.12 13.10
2025-03-12T17:05:30.12 13.12
2025-03-12T17:05:31.12 13.10
2025-03-12T17:05:32.12 13.10
2025-03-12T17:05:33.12 13.08
2025-03-12T17:05:34.12 13.10
2025-03-12T17:05:35.12 13.10
2025-03-12T17:05:36.12 13.10
2025-03-12T17:05:37.12 13.10
2025-03-12T17:05:38.12 13.10
2025-03-12T17:05:39.12 13.11
2025-03-12T17:05:40.12 13.12
2025-03-12T17:05:41.12 13.11
2025-03-12T17:05:42.12 13.10
2025-03-12T17:05:43.12 13.10
2025-03-12T17:05:44.12 13.12
2025-03-12T17:05:45.12 13.10
2025-03-12T17:05:46.12 13.11
2025-03-12T17:05:47.12 13.10
2025-03-12T17:05:48.12 13.12
2025-03-12T17:05:49.12 13.11
2025-03-12T17:05:50.12 13.10
2025-03-12T17:05:51.12 13.08
2025-03-12T17:05:52.12 13.10
2025-03-12T17:05:53.12 13.10
2025-03-12T17:05:54.12 13.12
2025-03-12T17:05:55.12 13.08
2025-03-12T17:05:56.12 13.08
2025-03-12T17:05:57.12 13.12
2025-03-12T17:05:58.12 13.12
2025-03-12T17:05:59.12 13.09
2025-03-12T17:06:00.12 13.09
2025-03-12T17:06:01.12 13.10
2025-03-12T17:06:02.12 13.09
2025-03-12T17:06:03.12 13.11
2025-03-12T17:06:04.12 13.08
2025-03-12T17:06:05.12 13.12
2025-03-12T17:06:06.12 13.12
2025-03-12T17:06:07.12 13.11
2025-03-12T17:06:08.12 13.10
2025-03-12T17:06:09.12 13.10
2025-03-12T17:06:10.12 13.10
2025-03-12T17:06:11.12 13.10
2025-03-12T17:06:12.12 13.09
2025-03-12T17:06:13.12 13.10
2025-03-12T17:06:14.12 13.10
2025-03-12T17:06:15.12 13.12
2025-03-12T17:06:16.12 13.07
2025-03-12T17:06:17.12 13.09
2025-03-12T17:06:18.12 13.08
2025-03-12T17:06:19.12 13.10
2025-03-12T17:06:20.12 13.10
2025-03-12T17:06:21.12 13.10
2025-03-12T17:06:22.12 13.11
2025-03-12T17:06:23.12 13.11
2025-03-12T17:06:24.12 13.10
2025-03-12T17:06:25.12 13.09
2025-03-12T17:06:26.12 13.08
2025-03-12T17:06:27.12 13.10
2025-03-12T17:06:28.12 13.09
2025-03-12T17:06:29.12 13.10
2025-03-12T17:06:30.12 13.12
2025-03-12T17:06:31.12 13.12
2025-03-12T17:06:32.12 13.10
2025-03-12T17:06:33.12 13.11
2025-03-12T17:06:34.12 13.09
2025-03-12T17:06:35.12 13.11
2025-03-12T17:06:36.12 13.10
2025-03-12T17:06:37.12 13.10
2025-03-12T17:06:38.12 13.07
2025-03-12T17:06:39.12 13.07
2025-03-12T17:06:40.12 13.12
2025-03-12T17:06:41.12 13.08
2025-03-12T17:06:42.12 13.11
2025-03-12T17:06:43.12 13.10
2025-03-12T17:06:44.12 13.09
2025-03-12T17:06:45.12 13.06
2025-03-12T17:06:46.12 13.10
2025-03-12T17:06:47.12 13.10
2025-03-12T17:06:48.12 13.09
2025-03-12T17:06:49.12 13.09
2025-03-12T17:06:50.12 13.12
2025-03-12T17:06:51.12 13.10
2025-03-12T17:06:52.14 13.08
2025-03-12T17:06:53.11 13.11
2025-03-12T17:06:54.11 13.12
2025-03-12T17:06:55.11 13.10
2025-03-12T17:06:56.11 13.10
2025-03-12T17:06:57.11 13.08
2025-03-12T17:06:58.11 13.09
2025-03-12T17:06:59.11 13.12
2025-03-12T17:07:00.11 13.10
2025-03-12T17:07:01.11 13.09
2025-03-12T17:07:02.11 13.10
2025-03-12T17:07:03.11 13.12
2025-03-12T17:07:04.11 13.09
2025-03-12T17:07:05.11 13.11
2025-03-12T17:07:06.11 13.10
2025-03-12T17:07:07.11 13.10
2025-03-12T17:07:08.11 13.11
2025-03-12T17:07:09.11 13.10
2025-03-12T17:07:10.11 13.10
2025-03-12T17:07:11.11 13.12
2025-03-12T17:07:12.11 13.09
2025-03-12T17:07:13.11 13.10
2025-03-12T17:07:14.11 13.12
2025-03-12T17:07:15.11 13.12
2025-03-12T17:07:16.11 13.10
2025-03-12T17:07:17.11 13.09
2025-03-12T17:07:18.11 13.12
2025-03-12T17:07:19.11 13.09
2025-03-12T17:07:20.11 13.11
2025-03-12T17:07:21.11 13.11
2025-03-12T17:07:22.11 13.12
2025-03-12T17:07:23.11 13.12
2025-03-12T17:07:24.11 13.10
2025-03-12T17:07:25.11 13.12
2025-03-12T17:07:26.11 13.10
2025-03-12T17:07:27.11 13.13
2025-03-12T17:07:28.11 13.10
2025-03-12T17:07:29.11 13.11
2025-03-12T17:07:30.11 13.13
2025-03-12T17:07:31.11 13.12
2025-03-12T17:07:32.11 13.11
2025-03-12T17:07:33.11 13.08
2025-03-12T17:07:34.11 13.08
2025-03-12T17:07:35.11 13.12
2025-03-12T17:07:36.11 13.10
2025-03-12T17:07:37.11 13.10
2025-03-12T17:07:38.13 13.10
2025-03-12T17:07:39.10 13.12
2025-03-12T17:07:40.10 13.10
2025-03-12T17:07:41.10 13.10
2025-03-12T17:07:42.10 13.10
2025-03-12T17:07:43.10 13.11
2025-03-12T17:07:44.10 13.12
2025-03-12T17:07:45.10 13.11
2025-03-12T17:07:46.10 13.11
2025-03-12T17:07:47.10 13.09
2025-03-12T17:07:48.10 13.11
2025-03-12T17:07:49.10 13.12
2025-03-12T17:07:50.10 13.09
2025-03-12T17:07:51.10 13.09
2025-03-12T17:07:52.10 13.10
2025-03-12T17:07:53.10 13.10
2025-03-12T17:07:54.10 13.12
2025-03-12T17:07:55.10 13.10
2025-03-12T17:07:56.10 13.10
2025-03-12T17:07:57.10 13.13
2025-03-12T17:07:58.10 13.10
2025-03-12T17:07:59.10 13.11
2025-03-12T17:08:00.10 13.09
2025-03-12T17:08:01.10 13.11
2025-03-12T17:08:02.10 13.10
2025-03-12T17:08:03.10 13.10
2025-03-12T17:08:04.10 13.10
2025-03-12T17:08:05.10 13.09
2025-03-12T17:08:06.10 13.11
2025-03-12T17:08:07.10 13.09
2025-03-12T17:08:08.10 13.10
2025-03-12T17:08:09.10 13.10
2025-03-12T17:08:10.10 13.11
2025-03-12T17:08:11.10 13.11
2025-03-12T17:08:12.10 13.12
2025-03-12T17:08:13.10 13.11
2025-03-12T17:08:14.10 13.10
2025-03-12T17:08:15.10 13.10
2025-03-12T17:08:16.10 13.11
2025-03-12T17:08:17.10 13.10
2025-03-12T17:08:18.11 13.10
2025-03-12T17:08:19.11 13.08
2025-03-12T17:08:20.11 13.10
2025-03-12T17:08:21.11 13.11
2025-03-12T17:08:22.12 13.10
2025-03-12T17:08:23.11 13.12
2025-03-12T17:08:24.11 13.08
2025-03-12T17:08:25.11 13.11
2025-03-12T17:08:26.11 13.12
2025-03-12T17:08:27.11 13.11
2025-03-12T17:08:28.11 13.08
2025-03-12T17:08:29.11 13.09
2025-03-12T17:08:30.11 13.10
2025-03-12T17:08:31.11 13.12
2025-03-12T17:08:32.11 13.13
2025-03-12T17:08:33.11 13.10
2025-03-12T17:08:34.11 13.11
2025-03-12T17:08:35.11 13.10
2025-03-12T17:08:36.11 13.10
2025-03-12T17:08:37.11 13.12
2025-03-12T17:08:38.11 13.10
2025-03-12T17:08:39.11 13.12
2025-03-12T17:08:40.11 13.10
2025-03-12T17:08:41.11 13.10
2025-03-12T17:08:42.11 13.09
2025-03-12T17:08:43.11 13.12
2025-03-12T17:08:44.11 13.08
2025-03-12T17:08:45.11 13.10
2025-03-12T17:08:46.11 13.12
2025-03-12T17:08:47.11 13.10
2025-03-12T17:08:48.11 13.10
2025-03-12T17:08:49.11 13.11
2025-03-12T17:08:50.11 13.11
2025-03-12T17:08:51.11 13.11
2025-03-12T17:08:52.11 13.10
2025-03-12T17:08:53.11 13.11
2025-03-12T17:08:54.11 13.12
2025-03-12T17:08:55.11 13.10
2025-03-12T17:08:56.11 13.10
2025-03-12T17:08:57.11 13.10
2025-03-12T17:08:58.11 13.10
2025-03-12T17:08:59.11 13.07
2025-03-12T17:09:00.11 13.11
2025-03-12T17:09:01.11 13.10
2025-03-12T17:09:02.11 13.10
2025-03-12T17:09:03.11 13.10
2025-03-12T17:09:04.11 13.10
2025-03-12T17:09:05.11 13.10
2025-03-12T17:09:06.11 13.11
2025-03-12T17:09:07.11 13.11
2025-03-12T17:09:08.11 13.12
2025-03-12T17:09:09.11 13.11
2025-03-12T17:09:10.11 13.09
2025-03-12T17:09:11.11 13.10
2025-03-12T17:09:12.11 13.12
2025-03-12T17:09:13.11 13.11
2025-03-12T17:09:14.11 13.10
2025-03-12T17:09:15.11 13.10
2025-03-12T17:09:16.11 13.10
2025-03-12T17:09:17.11 13.10
2025-03-12T17:09:18.11 13.12
2025-03-12T17:09:19.11 13.09
2025-03-12T17:09:20.11 13.10
2025-03-12T17:09:21.11 13.10
2025-03-12T17:09:22.11 13.10
2025-03-12T17:09:23.11 13.12
2025-03-12T17:09:24.11 13.10
2025-03-12T17:09:25.11 13.08
2025-03-12T17:09:26.11 13.07
2025-03-12T17:09:27.11 13.12
2025-03-12T17:09:28.11 13.09
2025-03-12T17:09:29.11 13.10
2025-03-12T17:09:30.11 13.11
2025-03-12T17:09:31.11 13.11
2025-03-12T17:09:32.11 13.10
2025-03-12T17:09:33.11 13.12
2025-03-12T17:09:34.11 13.11
2025-03-12T17:09:35.11 13.08
2025-03-12T17:09:36.11 13.08
2025-03-12T17:09:37.11 13.10
2025-03-12T17:09:38.11 13.12
2025-03-12T17:09:39.11 13.11
2025-03-12T17:09:40.11 13.11
2025-03-12T17:09:41.11 13.10
2025-03-12T17:09:42.11 13.11
2025-03-12T17:09:43.11 13.10
2025-03-12T17:09:44.11 13.12
2025-03-12T17:09:45.11 13.12
2025-03-12T17:09:46.11 13.09
2025-03-12T17:09:47.11 13.09
2025-03-12T17:09:48.11 13.09
2025-03-12T17:09:49.11 13.10
2025-03-12T17:09:50.11 13.12
2025-03-12T17:09:51.11 13.09
2025-03-12T17:09:52.11 13.09
2025-03-12T17:09:53.11 13.10
2025-03-12T17:09:54.11 13.10
2025-03-12T17:09:55.11 13.12
2025-03-12T17:09:56.11 13.11
2025-03-12T17:09:57.11 13.09
2025-03-12T17:09:58.11 13.13
2025-03-12T17:09:59.11 13.10
2025-03-12T17:10:00.11 13.10
2025-03-12T17:10:01.11 13.11
2025-03-12T17:10:02.11 13.13
2025-03-12T17:10:03.11 13.11
2025-03-12T17:10:04.11 13.10
2025-03-12T17:10:05.11 13.10
2025-03-12T17:10:06.11 13.11
2025-03-12T17:10:07.11 13.12
2025-03-12T17:10:08.11 13.14
2025-03-12T17:10:09.11 13.11
2025-03-12T17:10:10.11 13.10
2025-03-12T17:10:11.11 13.10
2025-03-12T17:10:12.11 13.09
2025-03-12T17:10:13.11 13.10
2025-03-12T17:10:14.11 13.10
2025-03-12T17:10:15.11 13.10
2025-03-12T17:10:16.11 13.10
2025-03-12T17:10:17.11 13.09
2025-03-12T17:10:18.11 13.09
2025-03-12T17:10:19.11 13.12
2025-03-12T17:10:20.11 13.08
2025-03-12T17:10:21.11 13.10
2025-03-12T17:10:22.11 13.10
2025-03-12T17:10:23.11 13.13
2025-03-12T17:10:24.11 13.10
2025-03-12T17:10:25.11 13.12
2025-03-12T17:10:26.11 13.10
2025-03-12T17:10:27.11 13.11
2025-03-12T17:10:28.11 13.12
2025-03-12T17:10:29.11 13.12
2025-03-12T17:10:30.11 13.11
2025-03-12T17:10:31.11 13.09
2025-03-12T17:10:32.11 13.12
2025-03-12T17:10:33.11 13.12
2025-03-12T17:10:34.11 13.10
2025-03-12T17:10:35.11 13.10
2025-03-12T17:10:36.11 13.10
2025-03-12T17:10:37.11 13.12
2025-03-12T17:10:38.11 13.12
2025-03-12T17:10:39.11 13.10
2025-03-12T17:10:40.11 13.12
2025-03-12T17:10:41.11 13.11
2025-03-12T17:10:42.11 13.12
2025-03-12T17:10:43.11 13.10
2025-03-12T17:10:44.11 13.10
2025-03-12T17:10:45.11 13.11
2025-03-12T17:10:46.11 13.10
2025-03-12T17:10:47.11 13.10
2025-03-12T17:10:48.11 13.12
2025-03-12T17:10:49.11 13.12
2025-03-12T17:10:50.11 13.12
2025-03-12T17:10:51.11 13.11
2025-03-12T17:10:52.11 13.11
2025-03-12T17:10:53.11 13.12
2025-03-12T17:10:54.12 13.10
2025-03-12T17:10:55.11 13.08
2025-03-12T17:10:56.11 13.12
2025-03-12T17:10:57.11 13.11
2025-03-12T17:10:58.11 13.10
2025-03-12T17:10:59.13 13.10
2025-03-12T17:11:00.10 13.08
2025-03-12T17:11:01.11 13.11
2025-03-12T17:11:02.10 13.10
2025-03-12T17:11:03.11 13.12
2025-03-12T17:11:04.10 13.12
2025-03-12T17:11:05.10 13.12
2025-03-12T17:11:06.10 13.13
2025-03-12T17:11:07.10 13.10
2025-03-12T17:11:08.10 13.11
2025-03-12T17:11:09.10 13.10
2025-03-12T17:11:10.11 13.11
2025-03-12T17:11:11.11 13.10
2025-03-12T17:11:12.11 13.08
2025-03-12T17:11:13.11 13.09
2025-03-12T17:11:14.11 13.07
2025-03-12T17:11:15.11 13.10
2025-03-12T17:11:16.11 13.11
2025-03-12T17:11:17.11 13.10
2025-03-12T17:11:18.11 13.12
2025-03-12T17:11:19.11 13.10
2025-03-12T17:11:20.11 13.11
2025-03-12T17:11:21.11 13.12
2025-03-12T17:11:22.11 13.09
2025-03-12T17:11:23.11 13.10
2025-03-12T17:11:24.11 13.10
2025-03-12T17:11:25.11 13.12
2025-03-12T17:11:26.11 13.10
2025-03-12T17:11:27.11 13.12
2025-03-12T17:11:28.11 13.09
2025-03-12T17:11:29.11 13.11
2025-03-12T17:11:30.11 13.10
2025-03-12T17:11:31.11 13.11
2025-03-12T17:11:32.11 13.10
2025-03-12T17:11:33.11 13.12
2025-03-12T17:11:34.11 13.10
2025-03-12T17:11:35.11 13.09
2025-03-12T17:11:36.11 13.09
2025-03-12T17:11:37.11 13.11
2025-03-12T17:11:38.11 13.09
2025-03-12T17:11:39.11 13.11
2025-03-12T17:11:40.11 13.08
2025-03-12T17:11:41.11 13.10
2025-03-12T17:11:42.11 13.11
2025-03-12T17:11:43.11 13.10
2025-03-12T17:11:44.11 13.10
2025-03-12T17:11:45.11 13.07
2025-03-12T17:11:46.11 13.09
2025-03-12T17:11:47.11 13.12
2025-03-12T17:11:48.11 13.10
2025-03-12T17:11:49.11 13.11
2025-03-12T17:11:50.11 13.10
2025-03-12T17:11:51.11 13.12
2025-03-12T17:11:52.11 13.12
2025-03-12T17:11:53.11 13.11
2025-03-12T17:11:54.11 13.12
2025-03-12T17:11:55.11 13.10
2025-03-12T17:11:56.11 13.11
2025-03-12T17:11:57.11 13.08
2025-03-12T17:11:58.11 13.12
2025-03-12T17:11:59.11 13.09
2025-03-12T17:12:00.11 13.10
2025-03-12T17:12:01.11 13.11
2025-03-12T17:12:02.11 13.11
2025-03-12T17:12:03.11 13.10
2025-03-12T17:12:04.11 13.09
2025-03-12T17:12:05.11 13.11
2025-03-12T17:12:06.11 13.10
2025-03-12T17:12:07.11 13.12
2025-03-12T17:12:08.11 13.12
2025-03-12T17:12:09.11 13.10
2025-03-12T17:12:10.11 13.08
2025-03-12T17:12:11.11 13.10
2025-03-12T17:12:12.11 13.08
2025-03-12T17:12:13.11 13.10
2025-03-12T17:12:14.11 13.11
2025-03-12T17:12:15.11 13.10
2025-03-12T17:12:16.11 13.10
2025-03-12T17:12:17.11 13.11
2025-03-12T17:12:18.11 13.10
2025-03-12T17:12:19.11 13.12
2025-03-12T17:12:20.11 13.07
2025-03-12T17:12:21.12 13.11
2025-03-12T17:12:22.10 13.10
2025-03-12T17:12:23.10 13.12
2025-03-12T17:12:24.10 13.10
2025-03-12T17:12:25.10 13.10
2025-03-12T17:12:26.10 13.11
2025-03-12T17:12:27.10 13.10
2025-03-12T17:12:28.10 13.08
2025-03-12T17:12:29.10 13.12
2025-03-12T17:12:30.10 13.10
2025-03-12T17:12:31.10 13.12
2025-03-12T17:12:32.10 13.11
2025-03-12T17:12:33.10 13.09
2025-03-12T17:12:34.10 13.12
2025-03-12T17:12:35.10 13.11
2025-03-12T17:12:36.10 13.10
2025-03-12T17:12:37.10 13.09
2025-03-12T17:12:38.10 13.11
2025-03-12T17:12:39.10 13.09
2025-03-12T17:12:40.10 13.10
2025-03-12T17:12:41.10 13.10
2025-03-12T17:12:42.10 13.10
2025-03-12T17:12:43.10 13.09
2025-03-12T17:12:44.10 13.11
2025-03-12T17:12:45.10 13.11
2025-03-12T17:12:46.10 13.11
2025-03-12T17:12:47.10 13.11
2025-03-12T17:12:48.10 13.09
2025-03-12T17:12:49.10 13.09
2025-03-12T17:12:50.10 13.10
2025-03-12T17:12:51.10 13.11
2025-03-12T17:12:52.10 13.10
2025-03-12T17:12:53.10 13.11
2025-03-12T17:12:54.10 13.07
2025-03-12T17:12:55.10 13.12
2025-03-12T17:12:56.10 13.12
2025-03-12T17:12:57.10 13.08
2025-03-12T17:12:58.10 13.08
2025-03-12T17:12:59.10 13.12
2025-03-12T17:13:00.10 13.08
2025-03-12T17:13:01.10 13.09
2025-03-12T17:13:02.10 13.10
2025-03-12T17:13:03.10 13.10
2025-03-12T17:13:04.10 13.11
2025-03-12T17:13:05.10 13.10
2025-03-12T17:13:06.10 13.12
2025-03-12T17:13:07.10 13.10
2025-03-12T17:13:08.10 13.05
2025-03-12T17:13:09.10 13.13
2025-03-12T17:13:10.10 13.10
2025-03-12T17:13:11.10 13.10
2025-03-12T17:13:12.10 13.10
2025-03-12T17:13:13.10 13.09
2025-03-12T17:13:14.10 13.10
2025-03-12T17:13:15.10 13.10
2025-03-12T17:13:16.10 13.08
2025-03-12T17:13:17.10 13.12
2025-03-12T17:13:18.10 13.09
2025-03-12T17:13:19.10 13.10
2025-03-12T17:13:20.10 13.10
2025-03-12T17:13:21.10 13.12
2025-03-12T17:13:22.10 13.10
2025-03-12T17:13:23.10 13.11
2025-03-12T17:13:24.10 13.10
2025-03-12T17:13:25.10 13.10
2025-03-12T17:13:26.10 13.10
2025-03-12T17:13:27.10 13.09
2025-03-12T17:13:28.10 13.10
2025-03-12T17:13:29.10 13.11
2025-03-12T17:13:30.10 13.10
2025-03-12T17:13:31.10 13.10
2025-03-12T17:13:32.10 13.10
2025-03-12T17:13:33.10 13.09
2025-03-12T17:13:34.10 13.10
2025-03-12T17:13:35.10 13.08
2025-03-12T17:13:36.10 13.10
2025-03-12T17:13:37.10 13.09
2025-03-12T17:13:38.10 13.11
2025-03-12T17:13:39.10 13.10
2025-03-12T17:13:40.10 13.10
2025-03-12T17:13:41.10 13.10
2025-03-12T17:13:42.10 13.12
2025-03-12T17:13:43.10 13.09
2025-03-12T17:13:44.10 13.10
2025-03-12T17:13:45.10 13.10
2025-03-12T17:13:46.10 13.11
2025-03-12T17:13:47.10 13.12
2025-03-12T17:13:48.10 13.10
2025-03-12T17:13:49.10 13.12
2025-03-12T17:13:50.10 13.10
2025-03-12T17:13:51.10 13.13
2025-03-12T17:13:52.10 13.10
2025-03-12T17:13:53.10 13.12
2025-03-12T17:13:54.10 13.11
2025-03-12T17:13:55.10 13.11
2025-03-12T17:13:56.10 13.12
2025-03-12T17:13:57.10 13.10
2025-03-12T17:13:58.10 13.10
2025-03-12T17:13:59.10 13.12
2025-03-12T17:14:00.10 13.10
2025-03-12T17:14:01.10 13.10
2025-03-12T17:14:02.10 13.09
2025-03-12T17:14:03.10 13.10
2025-03-12T17:14:04.10 13.10
2025-03-12T17:14:05.10 13.13
2025-03-12T17:14:06.10 13.10
2025-03-12T17:14:07.10 13.12
2025-03-12T17:14:08.10 13.12
2025-03-12T17:14:09.10 13.10
2025-03-12T17:14:10.10 13.10
2025-03-12T17:14:11.10 13.12
2025-03-12T17:14:12.10 13.12
2025-03-12T17:14:13.10 13.10
2025-03-12T17:14:14.10 13.10
2025-03-12T17:14:15.10 13.12
2025-03-12T17:14:16.10 13.11
2025-03-12T17:14:17.10 13.11
2025-03-12T17:14:18.10 13.13
2025-03-12T17:14:19.10 13.10
2025-03-12T17:14:20.10 13.12
2025-03-12T17:14:21.10 13.10
2025-03-12T17:14:22.10 13.10
2025-03-12T17:14:23.10 13.12
2025-03-12T17:14:24.10 13.12
2025-03-12T17:14:25.10 13.10
2025-03-12T17:14:26.10 13.08
2025-03-12T17:14:27.10 13.10
2025-03-12T17:14:28.10 13.09
2025-03-12T17:14:29.10 13.09
2025-03-12T17:14:30.10 13.10
2025-03-12T17:14:31.10 13.13
2025-03-12T17:14:32.10 13.11
2025-03-12T17:14:33.10 13.10
2025-03-12T17:14:34.10 13.10
2025-03-12T17:14:35.10 13.11
2025-03-12T17:14:36.10 13.11
2025-03-12T17:14:37.10 13.10
2025-03-12T17:14:38.10 13.10
2025-03-12T17:14:39.10 13.13
2025-03-12T17:14:40.10 13.10
2025-03-12T17:14:41.10 13.12
2025-03-12T17:14:42.10 13.10
2025-03-12T17:14:43.10 13.12
2025-03-12T17:14:44.10 13.12
2025-03-12T17:14:45.10 13.12
2025-03-12T17:14:46.10 13.11
2025-03-12T17:14:47.10 13.10
2025-03-12T17:14:48.10 13.12
2025-03-12T17:14:49.10 13.12
2025-03-12T17:14:50.10 13.12
2025-03-12T17:14:51.10 13.10
2025-03-12T17:14:52.10 13.12
2025-03-12T17:14:53.10 13.11
2025-03-12T17:14:54.10 13.12
2025-03-12T17:14:55.10 13.08
2025-03-12T17:14:56.10 13.10
2025-03-12T17:14:57.10 13.10
2025-03-12T17:14:58.10 13.08
2025-03-12T17:14:59.10 13.08
2025-03-12T17:15:00.10 13.10
2025-03-12T17:15:01.10 13.11
2025-03-12T17:15:02.10 13.10
2025-03-12T17:15:03.10 13.11
2025-03-12T17:15:04.10 13.12
2025-03-12T17:15:05.10 13.11
2025-03-12T17:15:06.10 13.12
2025-03-12T17:15:07.10 13.12
2025-03-12T17:15:08.10 13.12
2025-03-12T17:15:09.10 13.08
2025-03-12T17:15:10.10 13.10
2025-03-12T17:15:11.10 13.12
2025-03-12T17:15:12.10 13.10
2025-03-12T17:15:13.10 13.10
2025-03-12T17:15:14.10 13.10
2025-03-12T17:15:15.10 13.10
2025-03-12T17:15:16.10 13.10
2025-03-12T17:15:17.10 13.10
2025-03-12T17:15:18.10 13.13
2025-03-12T17:15:19.10 13.11
2025-03-12T17:15:20.10 13.11
2025-03-12T17:15:21.10 13.10
2025-03-12T17:15:22.10 13.08
2025-03-12T17:15:23.10 13.11
2025-03-12T17:15:24.10 13.10
2025-03-12T17:15:25.10 13.11
2025-03-12T17:15:26.15 13.10
2025-03-12T17:15:27.09 13.12
2025-03-12T17:15:28.09 13.10
2025-03-12T17:15:29.09 13.10
2025-03-12T17:15:30.09 13.11
2025-03-12T17:15:31.09 13.08
2025-03-12T17:15:32.09 13.09
2025-03-12T17:15:33.09 13.10
2025-03-12T17:15:34.09 13.10
2025-03-12T17:15:35.09 13.12
2025-03-12T17:15:36.09 13.12
2025-03-12T17:15:37.09 13.10
2025-03-12T17:15:38.09 13.07
2025-03-12T17:15:39.09 13.10
2025-03-12T17:15:40.09 13.10
2025-03-12T17:15:41.09 13.12
2025-03-12T17:15:42.09 13.11
2025-03-12T17:15:43.09 13.11
2025-03-12T17:15:44.09 13.11
2025-03-12T17:15:45.09 13.10
2025-03-12T17:15:46.09 13.10
2025-03-12T17:15:47.09 13.10
2025-03-12T17:15:48.09 13.10
2025-03-12T17:15:49.09 13.11
2025-03-12T17:15:50.09 13.08
2025-03-12T17:15:51.09 13.11
2025-03-12T17:15:52.11 13.11
2025-03-12T17:15:53.08 13.10
2025-03-12T17:15:54.08 13.12
2025-03-12T17:15:55.08 13.11
2025-03-12T17:15:56.08 13.10
2025-03-12T17:15:57.08 13.10
2025-03-12T17:15:58.08 13.11
2025-03-12T17:15:59.08 13.11
2025-03-12T17:16:00.08 13.11
2025-03-12T17:16:01.08 13.09
2025-03-12T17:16:02.08 13.11
2025-03-12T17:16:03.08 13.10
2025-03-12T17:16:04.08 13.10
2025-03-12T17:16:05.08 13.12
2025-03-12T17:16:06.08 13.12
2025-03-12T17:16:07.08 13.10
2025-03-12T17:16:08.08 13.11
2025-03-12T17:16:09.08 13.12
2025-03-12T17:16:10.08 13.09
2025-03-12T17:16:11.08 13.12
2025-03-12T17:16:12.08 13.09
2025-03-12T17:16:13.09 13.12
2025-03-12T17:16:14.07 13.12
2025-03-12T17:16:15.07 13.10
2025-03-12T17:16:16.07 13.11
2025-03-12T17:16:17.07 13.10
2025-03-12T17:16:18.07 13.12
2025-03-12T17:16:19.07 13.10
2025-03-12T17:16:20.07 13.12
2025-03-12T17:16:21.07 13.10
2025-03-12T17:16:22.07 13.12
2025-03-12T17:16:23.07 13.10
2025-03-12T17:16:24.07 13.11
2025-03-12T17:16:25.07 13.09
2025-03-12T17:16:26.07 13.09
2025-03-12T17:16:27.07 13.12
2025-03-12T17:16:28.07 13.10
2025-03-12T17:16:29.07 13.13
2025-03-12T17:16:30.07 13.12
2025-03-12T17:16:31.07 13.11
2025-03-12T17:16:32.07 13.12
2025-03-12T17:16:33.07 13.12
2025-03-12T17:16:34.07 13.12
2025-03-12T17:16:35.07 13.11
2025-03-12T17:16:36.07 13.10
2025-03-12T17:16:37.07 13.10
2025-03-12T17:16:38.07 13.09
2025-03-12T17:16:39.07 13.10
2025-03-12T17:16:40.07 13.09
2025-03-12T17:16:41.07 13.10
2025-03-12T17:16:42.07 13.12
2025-03-12T17:16:43.07 13.10
2025-03-12T17:16:44.07 13.10
2025-03-12T17:16:45.07 13.09
2025-03-12T17:16:46.07 13.13
2025-03-12T17:16:47.07 13.10
2025-03-12T17:16:48.07 13.11
2025-03-12T17:16:49.07 13.14
2025-03-12T17:16:50.07 13.11
2025-03-12T17:16:51.07 13.12
2025-03-12T17:16:52.07 13.09
2025-03-12T17:16:53.07 13.11
2025-03-12T17:16:54.07 13.12
2025-03-12T17:16:55.07 13.11
2025-03-12T17:16:56.07 13.09
2025-03-12T17:16:57.07 13.12
2025-03-12T17:16:58.07 13.11
2025-03-12T17:16:59.07 13.09
2025-03-12T17:17:00.07 13.09
2025-03-12T17:17:01.07 13.12
2025-03-12T17:17:02.07 13.10
2025-03-12T17:17:03.07 13.11
2025-03-12T17:17:04.07 13.10
2025-03-12T17:17:05.07 13.10
2025-03-12T17:17:06.07 13.09
2025-03-12T17:17:07.07 13.11
2025-03-12T17:17:08.07 13.12
2025-03-12T17:17:09.07 13.11
2025-03-12T17:17:10.07 13.12
2025-03-12T17:17:11.07 13.11
2025-03-12T17:17:12.07 13.10
2025-03-12T17:17:13.07 13.11
2025-03-12T17:17:14.07 13.10
2025-03-12T17:17:15.07 13.10
2025-03-12T17:17:16.07 13.10
2025-03-12T17:17:17.07 13.08
2025-03-12T17:17:18.07 13.12
2025-03-12T17:17:19.07 13.10
2025-03-12T17:17:20.07 13.11
2025-03-12T17:17:21.07 13.10
2025-03-12T17:17:22.07 13.11
2025-03-12T17:17:23.07 13.12
2025-03-12T17:17:24.07 13.12
2025-03-12T17:17:25.07 13.10
2025-03-12T17:17:26.07 13.11
2025-03-12T17:17:27.07 13.10
2025-03-12T17:17:28.07 13.10
2025-03-12T17:17:29.07 13.10
2025-03-12T17:17:30.07 13.12
2025-03-12T17:17:31.07 13.12
2025-03-12T17:17:32.07 13.09
2025-03-12T17:17:33.07 13.10
2025-03-12T17:17:34.07 13.10
2025-03-12T17:17:35.07 13.10
2025-03-12T17:17:36.07 13.10
2025-03-12T17:17:37.07 13.12
2025-03-12T17:17:38.07 13.12
2025-03-12T17:17:39.07 13.10
2025-03-12T17:17:40.07 13.12
2025-03-12T17:17:41.07 13.09
2025-03-12T17:17:42.07 13.12
2025-03-12T17:17:43.07 13.08
2025-03-12T17:17:44.07 13.10
2025-03-12T17:17:45.07 13.10
2025-03-12T17:17:46.07 13.09
2025-03-12T17:17:47.07 13.09
2025-03-12T17:17:48.07 13.12
2025-03-12T17:17:49.07 13.11
2025-03-12T17:17:50.07 13.13
2025-03-12T17:17:51.07 13.11
2025-03-12T17:17:52.07 13.10
2025-03-12T17:17:53.07 13.10
2025-03-12T17:17:54.07 13.11
2025-03-12T17:17:55.07 13.10
2025-03-12T17:17:56.07 13.11
2025-03-12T17:17:57.07 13.10
2025-03-12T17:17:58.07 13.11
2025-03-12T17:17:59.07 13.13
2025-03-12T17:18:00.07 13.11
2025-03-12T17:18:01.07 13.10
2025-03-12T17:18:02.07 13.09
2025-03-12T17:18:03.07 13.10
2025-03-12T17:18:04.07 13.10
2025-03-12T17:18:05.07 13.10
2025-03-12T17:18:06.07 13.09
2025-03-12T17:18:07.07 13.10
2025-03-12T17:18:08.07 13.12
2025-03-12T17:18:09.07 13.10
2025-03-12T17:18:10.07 13.11
2025-03-12T17:18:11.07 13.13
2025-03-12T17:18:12.07 13.12
2025-03-12T17:18:13.07 13.10
2025-03-12T17:18:14.07 13.11
2025-03-12T17:18:15.07 13.08
2025-03-12T17:18:16.07 13.10
2025-03-12T17:18:17.07 13.12
2025-03-12T17:18:18.07 13.11
2025-03-12T17:18:19.07 13.10
2025-03-12T17:18:20.07 13.12
2025-03-12T17:18:21.07 13.09
2025-03-12T17:18:22.07 13.11
2025-03-12T17:18:23.07 13.12
2025-03-12T17:18:24.07 13.09
2025-03-12T17:18:25.07 13.12
2025-03-12T17:18:26.07 13.10
2025-03-12T17:18:27.07 13.10
2025-03-12T17:18:28.07 13.10
2025-03-12T17:18:29.07 13.11
2025-03-12T17:18:30.07 13.11
2025-03-12T17:18:31.07 13.13
2025-03-12T17:18:32.07 13.13
2025-03-12T17:18:33.07 13.10
2025-03-12T17:18:34.07 13.12
2025-03-12T17:18:35.07 13.12
2025-03-12T17:18:36.07 13.12
2025-03-12T17:18:37.07 13.13
2025-03-12T17:18:38.07 13.10
2025-03-12T17:18:39.07 13.11
2025-03-12T17:18:40.07 13.09
2025-03-12T17:18:41.07 13.10
2025-03-12T17:18:42.07 13.08
2025-03-12T17:18:43.07 13.10
2025-03-12T17:18:44.07 13.10
2025-03-12T17:18:45.07 13.10
2025-03-12T17:18:46.07 13.12
2025-03-12T17:18:47.07 13.09
2025-03-12T17:18:48.07 13.11
2025-03-12T17:18:49.07 13.12
2025-03-12T17:18:50.07 13.12
2025-03-12T17:18:51.07 13.10
2025-03-12T17:18:52.07 13.10
2025-03-12T17:18:53.07 13.11
2025-03-12T17:18:54.07 13.07
2025-03-12T17:18:55.07 13.12
2025-03-12T17:18:56.07 13.12
2025-03-12T17:18:57.07 13.11
2025-03-12T17:18:58.07 13.10
2025-03-12T17:18:59.07 13.12
2025-03-12T17:19:00.07 13.10
2025-03-12T17:19:01.07 13.10
2025-03-12T17:19:02.07 13.10
2025-03-12T17:19:03.07 13.10
2025-03-12T17:19:04.07 13.09
2025-03-12T17:19:05.07 13.11
2025-03-12T17:19:06.07 13.10
2025-03-12T17:19:07.07 13.10
2025-03-12T17:19:08.07 13.11
2025-03-12T17:19:09.07 13.10
2025-03-12T17:19:10.07 13.10
2025-03-12T17:19:11.07 13.11
2025-03-12T17:19:12.07 13.10
2025-03-12T17:19:13.07 13.10
2025-03-12T17:19:14.07 13.12
2025-03-12T17:19:15.07 13.11
2025-03-12T17:19:16.07 13.12
2025-03-12T17:19:17.07 13.10
2025-03-12T17:19:18.07 13.10
2025-03-12T17:19:19.07 13.11
2025-03-12T17:19:20.07 13.09
2025-03-12T17:19:21.07 13.11
2025-03-12T17:19:22.07 13.10
2025-03-12T17:19:23.07 13.11
2025-03-12T17:19:24.07 13.11
2025-03-12T17:19:25.07 13.09
2025-03-12T17:19:26.07 13.10
2025-03-12T17:19:27.07 13.12
2025-03-12T17:19:28.07 13.10
2025-03-12T17:19:29.07 13.12
2025-03-12T17:19:30.07 13.10
2025-03-12T17:19:31.07 13.10
2025-03-12T17:19:32.07 13.10
2025-03-12T17:19:33.07 13.12
2025-03-12T17:19:34.07 13.08
2025-03-12T17:19:35.07 13.12
2025-03-12T17:19:36.07 13.10
2025-03-12T17:19:37.07 13.10
2025-03-12T17:19:38.07 13.10
2025-03-12T17:19:39.07 13.11
2025-03-12T17:19:40.08 13.10
2025-03-12T17:19:41.07 13.10
2025-03-12T17:19:42.07 13.10
2025-03-12T17:19:43.07 13.10
2025-03-12T17:19:44.08 13.11
2025-03-12T17:19:45.07 13.10
2025-03-12T17:19:46.08 13.12
2025-03-12T17:19:47.08 13.11
2025-03-12T17:19:48.08 13.11
2025-03-12T17:19:49.08 13.10
2025-03-12T17:19:50.08 13.07
2025-03-12T17:19:51.08 13.09
2025-03-12T17:19:52.08 13.10
2025-03-12T17:19:53.08 13.07
2025-03-12T17:19:54.08 13.09
2025-03-12T17:19:55.08 13.10
2025-03-12T17:19:56.08 13.11
2025-03-12T17:19:57.08 13.10
2025-03-12T17:19:58.08 13.08
2025-03-12T17:19:59.08 13.10
2025-03-12T17:20:00.08 13.08
2025-03-12T17:20:01.08 13.10
2025-03-12T17:20:02.08 13.12
2025-03-12T17:20:03.08 13.12
2025-03-12T17:20:04.08 13.10
2025-03-12T17:20:05.08 13.11
2025-03-12T17:20:06.08 13.10
2025-03-12T17:20:07.08 13.10
2025-03-12T17:20:08.08 13.10
2025-03-12T17:20:09.08 13.09
2025-03-12T17:20:10.08 13.10
2025-03-12T17:20:11.08 13.11
2025-03-12T17:20:12.08 13.10
2025-03-12T17:20:13.08 13.12
2025-03-12T17:20:14.08 13.09
2025-03-12T17:20:15.08 13.09
2025-03-12T17:20:16.08 13.10
2025-03-12T17:20:17.08 13.11
2025-03-12T17:20:18.08 13.11
2025-03-12T17:20:19.08 13.10
2025-03-12T17:20:20.08 13.12
2025-03-12T17:20:21.08 13.09
2025-03-12T17:20:22.08 13.13
2025-03-12T17:20:23.08 13.11
2025-03-12T17:20:24.08 13.12
2025-03-12T17:20:25.08 13.08
2025-03-12T17:20:26.08 13.10
2025-03-12T17:20:27.08 13.07
2025-03-12T17:20:28.08 13.12
2025-03-12T17:20:29.08 13.08
2025-03-12T17:20:30.08 13.10
2025-03-12T17:20:31.08 13.09
2025-03-12T17:20:32.08 13.08
2025-03-12T17:20:33.08 13.10
2025-03-12T17:20:34.08 13.11
2025-03-12T17:20:35.08 13.10
2025-03-12T17:20:36.08 13.09
2025-03-12T17:20:37.08 13.11
2025-03-12T17:20:38.08 13.11
2025-03-12T17:20:39.08 13.10
2025-03-12T17:20:40.08 13.11
2025-03-12T17:20:41.08 13.10
2025-03-12T17:20:42.08 13.11
2025-03-12T17:20:43.08 13.10
2025-03-12T17:20:44.08 13.11
2025-03-12T17:20:45.08 13.08
2025-03-12T17:20:46.08 13.14
2025-03-12T17:20:47.08 13.11
2025-03-12T17:20:48.08 13.09
2025-03-12T17:20:49.09 13.09
2025-03-12T17:20:50.07 13.10
2025-03-12T17:20:51.07 13.10
2025-03-12T17:20:52.07 13.10
2025-03-12T17:20:53.07 13.10
2025-03-12T17:20:54.07 13.11
2025-03-12T17:20:55.07 13.10
2025-03-12T17:20:56.07 13.10
2025-03-12T17:20:57.07 13.08
2025-03-12T17:20:58.07 13.10
2025-03-12T17:20:59.07 13.12
2025-03-12T17:21:00.07 13.11
2025-03-12T17:21:01.07 13.10
2025-03-12T17:21:02.07 13.11
2025-03-12T17:21:03.07 13.10
2025-03-12T17:21:04.07 13.10
2025-03-12T17:21:05.07 13.10
2025-03-12T17:21:06.07 13.09
2025-03-12T17:21:07.07 13.12
2025-03-12T17:21:08.07 13.07
2025-03-12T17:21:09.07 13.12
2025-03-12T17:21:10.07 13.10
2025-03-12T17:21:11.07 13.10
2025-03-12T17:21:12.08 13.10
2025-03-12T17:21:13.06 13.13
2025-03-12T17:21:14.06 13.10
2025-03-12T17:21:15.06 13.11
2025-03-12T17:21:16.06 13.09
2025-03-12T17:21:17.06 13.08
2025-03-12T17:21:18.06 13.09
2025-03-12T17:21:19.06 13.11
2025-03-12T17:21:20.06 13.10
2025-03-12T17:21:21.06 13.10
2025-03-12T17:21:22.06 13.12
2025-03-12T17:21:23.06 13.12
2025-03-12T17:21:24.06 13.12
2025-03-12T17:21:25.06 13.11
2025-03-12T17:21:26.06 13.08
2025-03-12T17:21:27.06 13.10
2025-03-12T17:21:28.06 13.09
2025-03-12T17:21:29.06 13.10
2025-03-12T17:21:30.06 13.08
2025-03-12T17:21:31.06 13.07
2025-03-12T17:21:32.06 13.11
2025-03-12T17:21:33.06 13.10
2025-03-12T17:21:34.06 13.09
2025-03-12T17:21:35.06 13.11
2025-03-12T17:21:36.06 13.09
2025-03-12T17:21:37.06 13.11
2025-03-12T17:21:38.06 13.10
2025-03-12T17:21:39.06 13.10
2025-03-12T17:21:40.06 13.11
2025-03-12T17:21:41.06 13.12
2025-03-12T17:21:42.06 13.06
2025-03-12T17:21:43.06 13.11
2025-03-12T17:21:44.06 13.10
2025-03-12T17:21:45.06 13.10
2025-03-12T17:21:46.06 13.09
2025-03-12T17:21:47.06 13.12
2025-03-12T17:21:48.06 13.11
2025-03-12T17:21:49.06 13.11
2025-03-12T17:21:50.06 13.10
2025-03-12T17:21:51.06 13.08
2025-03-12T17:21:52.06 13.10
2025-03-12T17:21:53.06 13.10
2025-03-12T17:21:54.06 13.12
2025-03-12T17:21:55.06 13.12
2025-03-12T17:21:56.06 13.08
2025-03-12T17:21:57.06 13.07
2025-03-12T17:21:58.06 13.10
2025-03-12T17:21:59.06 13.09
2025-03-12T17:22:00.06 13.10
2025-03-12T17:22:01.06 13.11
2025-03-12T17:22:02.06 13.11
2025-03-12T17:22:03.06 13.09
2025-03-12T17:22:04.06 13.10
2025-03-12T17:22:05.06 13.12
2025-03-12T17:22:06.06 13.08
2025-03-12T17:22:07.06 13.11
2025-03-12T17:22:08.06 13.10
2025-03-12T17:22:09.06 13.12
2025-03-12T17:22:10.06 13.10
2025-03-12T17:22:11.06 13.08
2025-03-12T17:22:12.06 13.12
2025-03-12T17:22:13.06 13.10
2025-03-12T17:22:14.06 13.10
2025-03-12T17:22:15.06 13.10
2025-03-12T17:22:16.06 13.10
2025-03-12T17:22:17.06 13.09
2025-03-12T17:22:18.06 13.08
2025-03-12T17:22:19.06 13.10
2025-03-12T17:22:20.06 13.11
2025-03-12T17:22:21.06 13.08
2025-03-12T17:22:22.06 13.11
2025-03-12T17:22:23.06 13.12
2025-03-12T17:22:24.06 13.10
2025-03-12T17:22:25.06 13.13
2025-03-12T17:22:26.06 13.10
2025-03-12T17:22:27.06 13.11
2025-03-12T17:22:28.06 13.11
2025-03-12T17:22:29.06 13.10
2025-03-12T17:22:30.06 13.10
2025-03-12T17:22:31.06 13.12
2025-03-12T17:22:32.06 13.11
2025-03-12T17:22:33.06 13.11
2025-03-12T17:22:34.06 13.09
2025-03-12T17:22:35.06 13.10
2025-03-12T17:22:36.06 13.11
2025-03-12T17:22:37.06 13.07
2025-03-12T17:22:38.06 13.12
2025-03-12T17:22:39.06 13.11
2025-03-12T17:22:40.06 13.10
2025-03-12T17:22:41.06 13.09
2025-03-12T17:22:42.06 13.10
2025-03-12T17:22:43.06 13.08
2025-03-12T17:22:44.06 13.10
2025-03-12T17:22:45.06 13.14
2025-03-12T17:22:46.06 13.10
2025-03-12T17:22:47.06 13.09
2025-03-12T17:22:48.06 13.12
2025-03-12T17:22:49.06 13.10
2025-03-12T17:22:50.06 13.08
2025-03-12T17:22:51.06 13.10
2025-03-12T17:22:52.06 13.09
2025-03-12T17:22:53.06 13.10
2025-03-12T17:22:54.06 13.11
2025-03-12T17:22:55.06 13.09
2025-03-12T17:22:56.06 13.10
2025-03-12T17:22:57.06 13.11
2025-03-12T17:22:58.06 13.09
2025-03-12T17:22:59.06 13.11
2025-03-12T17:23:00.06 13.10
2025-03-12T17:23:01.06 13.12
2025-03-12T17:23:02.06 13.12
2025-03-12T17:23:03.06 13.12
2025-03-12T17:23:04.06 13.12
2025-03-12T17:23:05.06 13.10
2025-03-12T17:23:06.06 13.10
2025-03-12T17:23:07.06 13.13
2025-03-12T17:23:08.06 13.13
2025-03-12T17:23:09.06 13.11
2025-03-12T17:23:10.06 13.10
2025-03-12T17:23:11.06 13.12
2025-03-12T17:23:12.06 13.10
2025-03-12T17:23:13.06 13.11
2025-03-12T17:23:14.06 13.10
2025-03-12T17:23:15.06 13.13
2025-03-12T17:23:16.06 13.11
2025-03-12T17:23:17.06 13.10
2025-03-12T17:23:18.06 13.08
2025-03-12T17:23:19.06 13.09
2025-03-12T17:23:20.06 13.09
2025-03-12T17:23:21.06 13.07
2025-03-12T17:23:22.06 13.11
2025-03-12T17:23:23.06 13.09
2025-03-12T17:23:24.06 13.09
2025-03-12T17:23:25.06 13.09
2025-03-12T17:23:26.06 13.09
2025-03-12T17:23:27.06 13.11
2025-03-12T17:23:28.06 13.10
2025-03-12T17:23:29.06 13.08
2025-03-12T17:23:30.06 13.09
2025-03-12T17:23:31.06 13.11
2025-03-12T17:23:32.06 13.07
2025-03-12T17:23:33.06 13.10
2025-03-12T17:23:34.06 13.10
2025-03-12T17:23:35.06 13.12
2025-03-12T17:23:36.06 13.10
2025-03-12T17:23:37.06 13.10
2025-03-12T17:23:38.06 13.12
2025-03-12T17:23:39.06 13.12
2025-03-12T17:23:40.07 13.10
2025-03-12T17:23:41.05 13.09
2025-03-12T17:23:42.05 13.10
2025-03-12T17:23:43.05 13.10
2025-03-12T17:23:44.05 13.11
2025-03-12T17:23:45.05 13.11
2025-03-12T17:23:46.05 13.11
2025-03-12T17:23:47.05 13.10
2025-03-12T17:23:48.05 13.08
2025-03-12T17:23:49.05 13.10
2025-03-12T17:23:50.05 13.10
2025-03-12T17:23:51.05 13.12
2025-03-12T17:23:52.05 13.11
2025-03-12T17:23:53.05 13.09
2025-03-12T17:23:54.05 13.11
2025-03-12T17:23:55.05 13.09
2025-03-12T17:23:56.05 13.10
2025-03-12T17:23:57.06 13.10
2025-03-12T17:23:58.04 13.10
2025-03-12T17:23:59.04 13.10
2025-03-12T17:24:00.04 13.10
2025-03-12T17:24:01.04 13.10
2025-03-12T17:24:02.04 13.10
2025-03-12T17:24:03.04 13.12
2025-03-12T17:24:04.04 13.11
2025-03-12T17:24:05.04 13.12
2025-03-12T17:24:06.04 13.11
2025-03-12T17:24:07.04 13.10
2025-03-12T17:24:08.04 13.11
2025-03-12T17:24:09.04 13.09
2025-03-12T17:24:10.04 13.12
2025-03-12T17:24:11.04 13.10
2025-03-12T17:24:12.04 13.09
2025-03-12T17:24:13.04 13.10
2025-03-12T17:24:14.04 13.07
2025-03-12T17:24:15.04 13.09
2025-03-12T17:24:16.04 13.11
2025-03-12T17:24:17.04 13.08
2025-03-12T17:24:18.04 13.10
2025-03-12T17:24:19.04 13.12
2025-03-12T17:24:20.04 13.10
2025-03-12T17:24:21.04 13.10
2025-03-12T17:24:22.04 13.11
2025-03-12T17:24:23.04 13.10
2025-03-12T17:24:24.04 13.11
2025-03-12T17:24:25.04 13.12
2025-03-12T17:24:26.04 13.10
2025-03-12T17:24:27.04 13.11
2025-03-12T17:24:28.04 13.09
2025-03-12T17:24:29.04 13.12
2025-03-12T17:24:30.04 13.09
2025-03-12T17:24:31.04 13.11
2025-03-12T17:24:32.04 13.11
2025-03-12T17:24:33.04 13.12
2025-03-12T17:24:34.04 13.11
2025-03-12T17:24:35.04 13.10
2025-03-12T17:24:36.04 13.09
2025-03-12T17:24:37.04 13.11
2025-03-12T17:24:38.04 13.10
2025-03-12T17:24:39.04 13.12
2025-03-12T17:24:40.04 13.14
2025-03-12T17:24:41.04 13.08
2025-03-12T17:24:42.04 13.10
2025-03-12T17:24:43.04 13.13
2025-03-12T17:24:44.04 13.12
2025-03-12T17:24:45.04 13.12
2025-03-12T17:24:46.04 13.07
2025-03-12T17:24:47.04 13.09
2025-03-12T17:24:48.04 13.10
2025-03-12T17:24:49.04 13.11
2025-03-12T17:24:50.04 13.10
2025-03-12T17:24:51.04 13.11
2025-03-12T17:24:52.04 13.12
2025-03-12T17:24:53.04 13.12
2025-03-12T17:24:54.04 13.08
2025-03-12T17:24:55.04 13.08
2025-03-12T17:24:56.04 13.10
2025-03-12T17:24:57.04 13.10
2025-03-12T17:24:58.04 13.10
2025-03-12T17:24:59.04 13.12
2025-03-12T17:25:00.04 13.10
2025-03-12T17:25:01.04 13.09
2025-03-12T17:25:02.04 13.10
2025-03-12T17:25:03.04 13.12
2025-03-12T17:25:04.04 13.08
2025-03-12T17:25:05.04 13.10
2025-03-12T17:25:06.04 13.12
2025-03-12T17:25:07.04 13.10
2025-03-12T17:25:08.04 13.09
2025-03-12T17:25:09.04 13.10
2025-03-12T17:25:10.04 13.10
2025-03-12T17:25:11.04 13.09
2025-03-12T17:25:12.04 13.11
2025-03-12T17:25:13.04 13.12
2025-03-12T17:25:14.04 13.10
2025-03-12T17:25:15.04 13.12
2025-03-12T17:25:16.04 13.12
2025-03-12T17:25:17.04 13.11
2025-03-12T17:25:18.04 13.08
2025-03-12T17:25:19.04 13.10
2025-03-12T17:25:20.04 13.11
2025-03-12T17:25:21.04 13.10
2025-03-12T17:25:22.04 13.08
2025-03-12T17:25:23.04 13.11
2025-03-12T17:25:24.04 13.12
2025-03-12T17:25:25.04 13.10
2025-03-12T17:25:26.04 13.10
2025-03-12T17:25:27.04 13.10
2025-03-12T17:25:28.04 13.10
2025-03-12T17:25:29.04 13.10
2025-03-12T17:25:30.04 13.10
2025-03-12T17:25:31.04 13.08
2025-03-12T17:25:32.04 13.11
2025-03-12T17:25:33.04 13.10
2025-03-12T17:25:34.04 13.10
2025-03-12T17:25:35.04 13.11
2025-03-12T17:25:36.04 13.10
2025-03-12T17:25:37.04 13.14
2025-03-12T17:25:38.04 13.12
2025-03-12T17:25:39.04 13.12
2025-03-12T17:25:40.04 13.08
2025-03-12T17:25:41.04 13.10
2025-03-12T17:25:42.04 13.11
2025-03-12T17:25:43.04 13.11
2025-03-12T17:25:44.04 13.11
2025-03-12T17:25:45.04 13.10
2025-03-12T17:25:46.04 13.08
2025-03-12T17:25:47.04 13.11
2025-03-12T17:25:48.04 13.12
2025-03-12T17:25:49.04 13.13
2025-03-12T17:25:50.04 13.11
2025-03-12T17:25:51.04 13.08
2025-03-12T17:25:52.04 13.11
2025-03-12T17:25:53.04 13.10
2025-03-12T17:25:54.04 13.10
2025-03-12T17:25:55.04 13.07
2025-03-12T17:25:56.04 13.12
2025-03-12T17:25:57.04 13.10
2025-03-12T17:25:58.04 13.12
2025-03-12T17:25:59.04 13.10
2025-03-12T17:26:00.04 13.11
2025-03-12T17:26:01.04 13.10
2025-03-12T17:26:02.04 13.12
2025-03-12T17:26:03.04 13.10
2025-03-12T17:26:04.04 13.09
2025-03-12T17:26:05.04 13.12
2025-03-12T17:26:06.04 13.10
2025-03-12T17:26:07.04 13.11
2025-03-12T17:26:08.04 13.11
2025-03-12T17:26:09.04 13.10
2025-03-12T17:26:10.04 13.12
2025-03-12T17:26:11.04 13.08
2025-03-12T17:26:12.04 13.10
2025-03-12T17:26:13.04 13.11
2025-03-12T17:26:14.04 13.11
2025-03-12T17:26:15.04 13.10
2025-03-12T17:26:16.04 13.08
2025-03-12T17:26:17.04 13.10
2025-03-12T17:26:18.04 13.10
2025-03-12T17:26:19.04 13.09
2025-03-12T17:26:20.04 13.09
2025-03-12T17:26:21.04 13.09
2025-03-12T17:26:22.04 13.08
2025-03-12T17:26:23.04 13.10
2025-03-12T17:26:24.04 13.10
2025-03-12T17:26:25.04 13.10
2025-03-12T17:26:26.04 13.10
2025-03-12T17:26:27.04 13.11
2025-03-12T17:26:28.04 13.12
2025-03-12T17:26:29.04 13.10
2025-03-12T17:26:30.04 13.11
2025-03-12T17:26:31.04 13.12
2025-03-12T17:26:32.04 13.11
2025-03-12T17:26:33.04 13.12
2025-03-12T17:26:34.04 13.10
2025-03-12T17:26:35.04 13.12
2025-03-12T17:26:36.04 13.10
2025-03-12T17:26:37.04 13.12
2025-03-12T17:26:38.04 13.10
2025-03-12T17:26:39.04 13.08
2025-03-12T17:26:40.04 13.11
2025-03-12T17:26:41.04 13.09
2025-03-12T17:26:42.04 13.12
2025-03-12T17:26:43.04 13.11
2025-03-12T17:26:44.04 13.12
2025-03-12T17:26:45.04 13.08
2025-03-12T17:26:46.04 13.12
2025-03-12T17:26:47.04 13.09
2025-03-12T17:26:48.04 13.12
2025-03-12T17:26:49.04 13.10
2025-03-12T17:26:50.04 13.10
2025-03-12T17:26:51.04 13.10
2025-03-12T17:26:52.04 13.12
2025-03-12T17:26:53.04 13.13
2025-03-12T17:26:54.04 13.11
2025-03-12T17:26:55.04 13.08
2025-03-12T17:26:56.04 13.09
2025-03-12T17:26:57.04 13.10
2025-03-12T17:26:58.04 13.10
2025-03-12T17:26:59.04 13.10
2025-03-12T17:27:00.04 13.11
2025-03-12T17:27:01.04 13.10
2025-03-12T17:27:02.04 13.10
2025-03-12T17:27:03.04 13.09
2025-03-12T17:27:04.04 13.12
2025-03-12T17:27:05.04 13.11
2025-03-12T17:27:06.04 13.08
2025-03-12T17:27:07.04 13.10
2025-03-12T17:27:08.04 13.11
2025-03-12T17:27:09.04 13.10
2025-03-12T17:27:10.04 13.10
2025-03-12T17:27:11.04 13.11
2025-03-12T17:27:12.04 13.10
2025-03-12T17:27:13.04 13.08
2025-03-12T17:27:14.04 13.10
2025-03-12T17:27:15.04 13.11
2025-03-12T17:27:16.04 13.10
2025-03-12T17:27:17.04 13.07
2025-03-12T17:27:18.04 13.09
2025-03-12T17:27:19.04 13.09
2025-03-12T17:27:20.04 13.11
2025-03-12T17:27:21.04 13.10
2025-03-12T17:27:22.04 13.11
2025-03-12T17:27:23.04 13.10
2025-03-12T17:27:24.04 13.11
2025-03-12T17:27:25.04 13.12
2025-03-12T17:27:26.04 13.10
2025-03-12T17:27:27.04 13.12
2025-03-12T17:27:28.04 13.10
2025-03-12T17:27:29.04 13.12
2025-03-12T17:27:30.04 13.10
2025-03-12T17:27:31.04 13.10
2025-03-12T17:27:32.04 13.08
2025-03-12T17:27:33.04 13.10
2025-03-12T17:27:34.04 13.10
2025-03-12T17:27:35.04 13.10
2025-03-12T17:27:36.04 13.09
2025-03-12T17:27:37.04 13.10
2025-03-12T17:27:38.04 13.10
2025-03-12T17:27:39.04 13.09
2025-03-12T17:27:40.04 13.10
2025-03-12T17:27:41.04 13.10
2025-03-12T17:27:42.04 13.10
2025-03-12T17:27:43.04 13.08
2025-03-12T17:27:44.04 13.08
2025-03-12T17:27:45.04 13.10
2025-03-12T17:27:46.04 13.09
2025-03-12T17:27:47.04 13.10
2025-03-12T17:27:48.04 13.08
2025-03-12T17:27:49.06 13.10
2025-03-12T17:27:50.03 13.11
2025-03-12T17:27:51.03 13.10
2025-03-12T17:27:52.03 13.09
2025-03-12T17:27:53.03 13.09
2025-03-12T17:27:54.03 13.10
2025-03-12T17:27:55.03 13.07
2025-03-12T17:27:56.03 13.09
2025-03-12T17:27:57.03 13.09
2025-03-12T17:27:58.03 13.10
2025-03-12T17:27:59.03 13.12
2025-03-12T17:28:00.04 13.12
2025-03-12T17:28:01.03 13.12
2025-03-12T17:28:02.03 13.10
2025-03-12T17:28:03.03 13.08
2025-03-12T17:28:04.04 13.11
2025-03-12T17:28:05.03 13.10
2025-03-12T17:28:06.03 13.11
2025-03-12T17:28:07.03 13.10
2025-03-12T17:28:08.03 13.10
2025-03-12T17:28:09.03 13.10
2025-03-12T17:28:10.03 13.09
2025-03-12T17:28:11.03 13.12
2025-03-12T17:28:12.03 13.09
2025-03-12T17:28:13.04 13.12
2025-03-12T17:28:14.03 13.08
2025-03-12T17:28:15.04 13.11
2025-03-12T17:28:16.03 13.11
2025-03-12T17:28:17.03 13.10
2025-03-12T17:28:18.03 13.10
2025-03-12T17:28:19.03 13.10
2025-03-12T17:28:20.03 13.12
2025-03-12T17:28:21.04 13.10
2025-03-12T17:28:22.04 13.11
2025-03-12T17:28:23.04 13.10
2025-03-12T17:28:24.04 13.13
2025-03-12T17:28:25.04 13.11
2025-03-12T17:28:26.04 13.09
2025-03-12T17:28:27.04 13.09
2025-03-12T17:28:28.04 13.12
2025-03-12T17:28:29.04 13.09
2025-03-12T17:28:30.04 13.12
2025-03-12T17:28:31.04 13.11
2025-03-12T17:28:32.04 13.11
2025-03-12T17:28:33.04 13.10
2025-03-12T17:28:34.04 13.11
2025-03-12T17:28:35.04 13.12
2025-03-12T17:28:36.04 13.09
2025-03-12T17:28:37.04 13.10
2025-03-12T17:28:38.04 13.08
2025-03-12T17:28:39.04 13.12
2025-03-12T17:28:40.04 13.10
2025-03-12T17:28:41.04 13.09
2025-03-12T17:28:42.04 13.10
2025-03-12T17:28:43.04 13.10
2025-03-12T17:28:44.04 13.12
2025-03-12T17:28:45.04 13.10
2025-03-12T17:28:46.04 13.10
2025-03-12T17:28:47.04 13.10
2025-03-12T17:28:48.04 13.10
2025-03-12T17:28:49.04 13.10
2025-03-12T17:28:50.04 13.12
2025-03-12T17:28:51.04 13.10
2025-03-12T17:28:52.04 13.12
2025-03-12T17:28:53.04 13.10
2025-03-12T17:28:54.04 13.10
2025-03-12T17:28:55.04 13.08
2025-03-12T17:28:56.04 13.11
2025-03-12T17:28:57.04 13.10
2025-03-12T17:28:58.04 13.12
2025-03-12T17:28:59.04 13.12
2025-03-12T17:29:00.04 13.10
2025-03-12T17:29:01.04 13.10
2025-03-12T17:29:02.04 13.10
2025-03-12T17:29:03.04 13.10
2025-03-12T17:29:04.04 13.10
2025-03-12T17:29:05.04 13.13
2025-03-12T17:29:06.04 13.11
2025-03-12T17:29:07.04 13.10
2025-03-12T17:29:08.04 13.11
2025-03-12T17:29:09.04 13.10
2025-03-12T17:29:10.04 13.10
2025-03-12T17:29:11.04 13.11
2025-03-12T17:29:12.04 13.10
2025-03-12T17:29:13.04 13.09
2025-03-12T17:29:14.04 13.11
2025-03-12T17:29:15.04 13.13
2025-03-12T17:29:16.04 13.12
2025-03-12T17:29:17.04 13.10
2025-03-12T17:29:18.04 13.11
2025-03-12T17:29:19.04 13.10
2025-03-12T17:29:20.04 13.12
2025-03-12T17:29:21.04 13.10
2025-03-12T17:29:22.04 13.10
2025-03-12T17:29:23.04 13.08
2025-03-12T17:29:24.04 13.11
2025-03-12T17:29:25.04 13.08
2025-03-12T17:29:26.04 13.10
2025-03-12T17:29:27.04 13.10
2025-03-12T17:29:28.04 13.10
2025-03-12T17:29:29.04 13.10
2025-03-12T17:29:30.04 13.09
2025-03-12T17:29:31.04 13.11
2025-03-12T17:29:32.04 13.12
2025-03-12T17:29:33.04 13.09
2025-03-12T17:29:34.04 13.09
2025-03-12T17:29:35.04 13.11
2025-03-12T17:29:36.04 13.11
2025-03-12T17:29:37.04 13.11
2025-03-12T17:29:38.04 13.10
2025-03-12T17:29:39.04 13.11
2025-03-12T17:29:40.04 13.10
2025-03-12T17:29:41.04 13.09
2025-03-12T17:29:42.04 13.10
2025-03-12T17:29:43.04 13.11
2025-03-12T17:29:44.04 13.10
2025-03-12T17:29:45.04 13.10
2025-03-12T17:29:46.04 13.11
2025-03-12T17:29:47.04 13.10
2025-03-12T17:29:48.04 13.10
2025-03-12T17:29:49.04 13.11
2025-03-12T17:29:50.04 13.10
2025-03-12T17:29:51.04 13.09
2025-03-12T17:29:52.04 13.09
2025-03-12T17:29:53.04 13.10
2025-03-12T17:29:54.04 13.12
2025-03-12T17:29:55.04 13.11
2025-03-12T17:29:56.04 13.09
2025-03-12T17:29:57.04 13.11
2025-03-12T17:29:58.04 13.09
2025-03-12T17:29:59.04 13.12
2025-03-12T17:30:00.04 13.09
2025-03-12T17:30:01.04 13.12
2025-03-12T17:30:02.04 13.10
2025-03-12T17:30:03.04 13.09
2025-03-12T17:30:04.04 13.10
2025-03-12T17:30:05.04 13.09
2025-03-12T17:30:06.04 13.09
2025-03-12T17:30:07.04 13.10
2025-03-12T17:30:08.04 13.10
2025-03-12T17:30:09.04 13.13
2025-03-12T17:30:10.04 13.12
2025-03-12T17:30:11.04 13.10
2025-03-12T17:30:12.04 13.11
2025-03-12T17:30:13.04 13.10
2025-03-12T17:30:14.04 13.10
2025-03-12T17:30:15.04 13.10
2025-03-12T17:30:16.04 13.06
2025-03-12T17:30:17.04 13.12
2025-03-12T17:30:18.04 13.10
2025-03-12T17:30:19.04 13.09
2025-03-12T17:30:20.04 13.11
2025-03-12T17:30:21.04 13.12
2025-03-12T17:30:22.04 13.12
2025-03-12T17:30:23.04 13.10
2025-03-12T17:30:24.04 13.10
2025-03-12T17:30:25.04 13.10
2025-03-12T17:30:26.04 13.10
2025-03-12T17:30:27.04 13.12
2025-03-12T17:30:28.04 13.11
2025-03-12T17:30:29.04 13.09
2025-03-12T17:30:30.04 13.12
2025-03-12T17:30:31.04 13.10
2025-03-12T17:30:32.04 13.09
2025-03-12T17:30:33.04 13.12
2025-03-12T17:30:34.04 13.10
2025-03-12T17:30:35.04 13.10
2025-03-12T17:30:36.04 13.12
2025-03-12T17:30:37.04 13.09
2025-03-12T17:30:38.04 13.10
2025-03-12T17:30:39.04 13.11
2025-03-12T17:30:40.04 13.12
2025-03-12T17:30:41.04 13.10
2025-03-12T17:30:42.04 13.10
2025-03-12T17:30:43.04 13.10
2025-03-12T17:30:44.04 13.11
2025-03-12T17:30:45.04 13.10
2025-03-12T17:30:46.04 13.12
2025-03-12T17:30:47.04 13.10
2025-03-12T17:30:48.04 13.12
2025-03-12T17:30:49.04 13.13
2025-03-12T17:30:50.04 13.10
2025-03-12T17:30:51.04 13.10
2025-03-12T17:30:52.04 13.10
2025-03-12T17:30:53.04 13.11
2025-03-12T17:30:54.04 13.11
2025-03-12T17:30:55.04 13.11
2025-03-12T17:30:56.04 13.12
2025-03-12T17:30:57.04 13.09
2025-03-12T17:30:58.04 13.09
2025-03-12T17:30:59.04 13.10
2025-03-12T17:31:00.04 13.10
2025-03-12T17:31:01.04 13.08
2025-03-12T17:31:02.04 13.10
2025-03-12T17:31:03.04 13.10
2025-03-12T17:31:04.04 13.11
2025-03-12T17:31:05.04 13.09
2025-03-12T17:31:06.04 13.09
2025-03-12T17:31:07.04 13.10
2025-03-12T17:31:08.04 13.12
2025-03-12T17:31:09.04 13.12
2025-03-12T17:31:10.04 13.08
2025-03-12T17:31:11.04 13.09
2025-03-12T17:31:12.04 13.09
2025-03-12T17:31:13.04 13.11
2025-03-12T17:31:14.04 13.12
2025-03-12T17:31:15.04 13.10
2025-03-12T17:31:16.04 13.11
2025-03-12T17:31:17.04 13.08
2025-03-12T17:31:18.04 13.10
2025-03-12T17:31:19.04 13.09
2025-03-12T17:31:20.04 13.12
2025-03-12T17:31:21.04 13.09
2025-03-12T17:31:22.04 13.12
2025-03-12T17:31:23.04 13.10
2025-03-12T17:31:24.04 13.09
2025-03-12T17:31:25.04 13.12
2025-03-12T17:31:26.04 13.10
2025-03-12T17:31:27.04 13.08
2025-03-12T17:31:28.04 13.12
2025-03-12T17:31:29.04 13.12
2025-03-12T17:31:30.04 13.12
2025-03-12T17:31:31.04 13.12
2025-03-12T17:31:32.04 13.10
2025-03-12T17:31:33.04 13.10
2025-03-12T17:31:34.04 13.09
2025-03-12T17:31:35.04 13.12
2025-03-12T17:31:36.04 13.12
2025-03-12T17:31:37.04 13.10
2025-03-12T17:31:38.04 13.11
2025-03-12T17:31:39.04 13.12
2025-03-12T17:31:40.04 13.12
2025-03-12T17:31:41.04 13.12
2025-03-12T17:31:42.04 13.10
2025-03-12T17:31:43.04 13.10
2025-03-12T17:31:44.04 13.09
2025-03-12T17:31:45.04 13.10
2025-03-12T17:31:46.04 13.11
2025-03-12T17:31:47.04 13.13
2025-03-12T17:31:48.04 13.10
2025-03-12T17:31:49.04 13.09
2025-03-12T17:31:50.05 13.09
2025-03-12T17:31:51.03 13.09
2025-03-12T17:31:52.03 13.10
2025-03-12T17:31:53.03 13.09
2025-03-12T17:31:54.03 13.10
2025-03-12T17:31:55.03 13.10
2025-03-12T17:31:56.03 13.10
2025-03-12T17:31:57.03 13.11
2025-03-12T17:31:58.03 13.11
2025-03-12T17:31:59.03 13.10
2025-03-12T17:32:00.03 13.10
2025-03-12T17:32:01.03 13.12
2025-03-12T17:32:02.03 13.09
2025-03-12T17:32:03.03 13.11
2025-03-12T17:32:04.03 13.08
2025-03-12T17:32:05.03 13.09
2025-03-12T17:32:06.03 13.11
2025-03-12T17:32:07.03 13.12
2025-03-12T17:32:08.03 13.10
2025-03-12T17:32:09.03 13.11
2025-03-12T17:32:10.03 13.12
2025-03-12T17:32:11.03 13.10
2025-03-12T17:32:12.03 13.10
2025-03-12T17:32:13.04 13.10
2025-03-12T17:32:14.02 13.10
2025-03-12T17:32:15.02 13.10
2025-03-12T17:32:16.02 13.12
2025-03-12T17:32:17.02 13.10
2025-03-12T17:32:18.02 13.08
2025-03-12T17:32:19.02 13.12
2025-03-12T17:32:20.02 13.11
2025-03-12T17:32:21.02 13.10
2025-03-12T17:32:22.02 13.12
2025-03-12T17:32:23.02 13.12
2025-03-12T17:32:24.02 13.11
2025-03-12T17:32:25.02 13.10
2025-03-12T17:32:26.02 13.08
2025-03-12T17:32:27.02 13.08
2025-03-12T17:32:28.02 13.10
2025-03-12T17:32:29.02 13.10
2025-03-12T17:32:30.02 13.10
2025-03-12T17:32:31.02 13.07
2025-03-12T17:32:32.02 13.11
2025-03-12T17:32:33.02 13.10
2025-03-12T17:32:34.02 13.08
2025-03-12T17:32:35.02 13.11
2025-03-12T17:32:36.02 13.10
2025-03-12T17:32:37.07 13.11
2025-03-12T17:32:38.01 13.09
2025-03-12T17:32:39.01 13.10
2025-03-12T17:32:40.01 13.12
2025-03-12T17:32:41.01 13.10
2025-03-12T17:32:42.01 13.10
2025-03-12T17:32:43.01 13.09
2025-03-12T17:32:44.01 13.08
2025-03-12T17:32:45.01 13.12
2025-03-12T17:32:46.01 13.08
2025-03-12T17:32:47.01 13.10
2025-03-12T17:32:48.01 13.10
2025-03-12T17:32:49.01 13.12
2025-03-12T17:32:50.01 13.10
2025-03-12T17:32:51.01 13.10
2025-03-12T17:32:52.01 13.10
2025-03-12T17:32:53.01 13.10
2025-03-12T17:32:54.01 13.08
2025-03-12T17:32:55.01 13.08
2025-03-12T17:32:56.01 13.12
2025-03-12T17:32:57.01 13.12
2025-03-12T17:32:58.01 13.09
2025-03-12T17:32:59.01 13.12
2025-03-12T17:33:00.01 13.10
2025-03-12T17:33:01.01 13.11
2025-03-12T17:33:02.01 13.10
2025-03-12T17:33:03.01 13.09
2025-03-12T17:33:04.01 13.10
2025-03-12T17:33:05.01 13.11
2025-03-12T17:33:06.01 13.10
2025-03-12T17:33:07.01 13.08
2025-03-12T17:33:08.01 13.12
2025-03-12T17:33:09.01 13.10
2025-03-12T17:33:10.01 13.11
2025-03-12T17:33:11.01 13.14
2025-03-12T17:33:12.01 13.11
2025-03-12T17:33:13.01 13.09
2025-03-12T17:33:14.01 13.09
2025-03-12T17:33:15.01 13.09
2025-03-12T17:33:16.01 13.10
2025-03-12T17:33:17.01 13.10
2025-03-12T17:33:18.01 13.10
2025-03-12T17:33:19.01 13.10
2025-03-12T17:33:20.01 13.12
2025-03-12T17:33:21.01 13.10
2025-03-12T17:33:22.01 13.10
2025-03-12T17:33:23.01 13.10
2025-03-12T17:33:24.01 13.11
2025-03-12T17:33:25.01 13.10
2025-03-12T17:33:26.01 13.11
2025-03-12T17:33:27.01 13.10
2025-03-12T17:33:28.01 13.12
2025-03-12T17:33:29.01 13.10
2025-03-12T17:33:30.01 13.12
2025-03-12T17:33:31.01 13.11
2025-03-12T17:33:32.01 13.11
2025-03-12T17:33:33.01 13.10
2025-03-12T17:33:34.01 13.09
2025-03-12T17:33:35.01 13.09
2025-03-12T17:33:36.01 13.10
2025-03-12T17:33:37.01 13.10
2025-03-12T17:33:38.01 13.10
2025-03-12T17:33:39.01 13.11
2025-03-12T17:33:40.01 13.10
2025-03-12T17:33:41.01 13.08
2025-03-12T17:33:42.01 13.07
2025-03-12T17:33:43.01 13.10
2025-03-12T17:33:44.01 13.10
2025-03-12T17:33:45.01 13.10
2025-03-12T17:33:46.01 13.08
2025-03-12T17:33:47.01 13.14
2025-03-12T17:33:48.01 13.11
2025-03-12T17:33:49.01 13.11
2025-03-12T17:33:50.01 13.08
2025-03-12T17:33:51.01 13.11
2025-03-12T17:33:52.01 13.10
2025-03-12T17:33:53.01 13.10
2025-03-12T17:33:54.01 13.10
2025-03-12T17:33:55.01 13.12
2025-03-12T17:33:56.01 13.10
2025-03-12T17:33:57.01 13.10
2025-03-12T17:33:58.01 13.11
2025-03-12T17:33:59.01 13.11
2025-03-12T17:34:00.01 13.08
2025-03-12T17:34:01.01 13.10
2025-03-12T17:34:02.01 13.10
2025-03-12T17:34:03.01 13.08
2025-03-12T17:34:04.01 13.11
2025-03-12T17:34:05.01 13.08
2025-03-12T17:34:06.01 13.10
2025-03-12T17:34:07.01 13.10
2025-03-12T17:34:08.01 13.08
2025-03-12T17:34:09.01 13.09
2025-03-12T17:34:10.01 13.09
2025-03-12T17:34:11.01 13.10
2025-03-12T17:34:12.01 13.10
2025-03-12T17:34:13.01 13.08
2025-03-12T17:34:14.01 13.09
2025-03-12T17:34:15.01 13.10
2025-03-12T17:34:16.01 13.12
2025-03-12T17:34:17.01 13.14
2025-03-12T17:34:18.01 13.11
2025-03-12T17:34:19.01 13.12
2025-03-12T17:34:20.01 13.11
2025-03-12T17:34:21.01 13.11
2025-03-12T17:34:22.01 13.11
2025-03-12T17:34:23.01 13.08
2025-03-12T17:34:24.01 13.11
2025-03-12T17:34:25.01 13.10
2025-03-12T17:34:26.01 13.09
2025-03-12T17:34:27.01 13.10
2025-03-12T17:34:28.01 13.10
2025-03-12T17:34:29.01 13.10
2025-03-12T17:34:30.01 13.09
2025-03-12T17:34:31.01 13.12
2025-03-12T17:34:32.01 13.10
2025-03-12T17:34:33.01 13.10
2025-03-12T17:34:34.01 13.10
2025-03-12T17:34:35.01 13.11
2025-03-12T17:34:36.01 13.10
2025-03-12T17:34:37.01 13.10
2025-03-12T17:34:38.01 13.10
2025-03-12T17:34:39.01 13.09
2025-03-12T17:34:40.01 13.11
2025-03-12T17:34:41.01 13.08
2025-03-12T17:34:42.01 13.13
2025-03-12T17:34:43.01 13.10
2025-03-12T17:34:44.01 13.07
2025-03-12T17:34:45.01 13.12
2025-03-12T17:34:46.01 13.07
2025-03-12T17:34:47.01 13.10
2025-03-12T17:34:48.01 13.09
2025-03-12T17:34:49.01 13.10
2025-03-12T17:34:50.02 13.11
2025-03-12T17:34:51.01 13.10
2025-03-12T17:34:52.01 13.11
2025-03-12T17:34:53.01 13.11
2025-03-12T17:34:54.01 13.10
2025-03-12T17:34:55.01 13.10
2025-03-12T17:34:56.01 13.09
2025-03-12T17:34:57.01 13.07
2025-03-12T17:34:58.01 13.10
2025-03-12T17:34:59.01 13.08
2025-03-12T17:35:00.01 13.13
2025-03-12T17:35:01.01 13.09
2025-03-12T17:35:02.01 13.12
2025-03-12T17:35:03.01 13.11
2025-03-12T17:35:04.01 13.10
2025-03-12T17:35:05.01 13.10
2025-03-12T17:35:06.01 13.12
2025-03-12T17:35:07.01 13.10
2025-03-12T17:35:08.01 13.08
2025-03-12T17:35:09.01 13.10
2025-03-12T17:35:10.01 13.11
2025-03-12T17:35:11.01 13.12
2025-03-12T17:35:12.01 13.13
2025-03-12T17:35:13.03 13.10
2025-03-12T17:35:14.00 13.13
2025-03-12T17:35:15.00 13.11
2025-03-12T17:35:16.00 13.10
2025-03-12T17:35:17.00 13.11
2025-03-12T17:35:18.00 13.10
2025-03-12T17:35:19.00 13.11
2025-03-12T17:35:20.00 13.10
2025-03-12T17:35:21.00 13.10
2025-03-12T17:35:22.00 13.10
2025-03-12T17:35:23.00 13.11
2025-03-12T17:35:24.00 13.10
2025-03-12T17:35:25.00 13.12
2025-03-12T17:35:26.00 13.06
2025-03-12T17:35:27.00 13.11
2025-03-12T17:35:28.00 13.11
2025-03-12T17:35:29.00 13.09
2025-03-12T17:35:30.00 13.10
2025-03-12T17:35:31.00 13.11
2025-03-12T17:35:32.01 13.10
2025-03-12T17:35:33.22 13.07
2025-03-12T17:35:34.00 13.10
2025-03-12T17:35:35.00 13.12
2025-03-12T17:35:36.02 13.08
2025-03-12T17:35:36.99 13.08
2025-03-12T17:35:37.99 13.10
2025-03-12T17:35:38.99 13.12
2025-03-12T17:35:39.99 13.09
2025-03-12T17:35:40.99 13.12
2025-03-12T17:35:41.99 13.10
2025-03-12T17:35:42.99 13.08
2025-03-12T17:35:43.99 13.12
2025-03-12T17:35:44.99 13.10
2025-03-12T17:35:45.99 13.12
2025-03-12T17:35:46.99 13.11
2025-03-12T17:35:47.99 13.10
2025-03-12T17:35:48.99 13.10
2025-03-12T17:35:49.99 13.09
2025-03-12T17:35:50.99 13.11
2025-03-12T17:35:51.99 13.10
2025-03-12T17:35:52.99 13.08
2025-03-12T17:35:53.99 13.10
2025-03-12T17:35:54.99 13.06
2025-03-12T17:35:55.99 13.08
2025-03-12T17:35:56.99 13.10
2025-03-12T17:35:57.99 13.09
2025-03-12T17:35:58.99 13.11
2025-03-12T17:35:59.99 13.10
2025-03-12T17:36:00.99 13.11
2025-03-12T17:36:01.99 13.11
2025-03-12T17:36:02.99 13.08
2025-03-12T17:36:03.99 13.11
2025-03-12T17:36:04.99 13.12
2025-03-12T17:36:05.99 13.11
2025-03-12T17:36:06.99 13.10
2025-03-12T17:36:07.99 13.11
2025-03-12T17:36:08.99 13.11
2025-03-12T17:36:09.99 13.13
2025-03-12T17:36:10.99 13.13
2025-03-12T17:36:11.99 13.12
2025-03-12T17:36:12.99 13.09
2025-03-12T17:36:13.99 13.12
2025-03-12T17:36:14.99 13.11
2025-03-12T17:36:15.99 13.10
2025-03-12T17:36:16.99 13.09
2025-03-12T17:36:17.99 13.09
2025-03-12T17:36:18.99 13.14
2025-03-12T17:36:19.99 13.12
2025-03-12T17:36:20.99 13.10
2025-03-12T17:36:21.99 13.09
2025-03-12T17:36:22.99 13.09
2025-03-12T17:36:23.99 13.10
2025-03-12T17:36:24.99 13.07
2025-03-12T17:36:25.99 13.10
2025-03-12T17:36:26.99 13.12
2025-03-12T17:36:27.99 13.11
2025-03-12T17:36:28.99 13.10
2025-03-12T17:36:29.99 13.09
2025-03-12T17:36:30.99 13.11
2025-03-12T17:36:31.99 13.08
2025-03-12T17:36:32.99 13.11
2025-03-12T17:36:33.99 13.11
2025-03-12T17:36:34.99 13.12
2025-03-12T17:36:35.99 13.09
2025-03-12T17:36:36.99 13.12
2025-03-12T17:36:37.99 13.11
2025-03-12T17:36:38.99 13.10
2025-03-12T17:36:40.00 13.11
2025-03-12T17:36:41.00 13.11
2025-03-12T17:36:41.99 13.08
2025-03-12T17:36:42.99 13.10
2025-03-12T17:36:43.99 13.10
2025-03-12T17:36:44.99 13.09
2025-03-12T17:36:45.99 13.09
2025-03-12T17:36:46.99 13.13
2025-03-12T17:36:47.99 13.10
2025-03-12T17:36:48.99 13.07
2025-03-12T17:36:49.99 13.08
2025-03-12T17:36:50.99 13.12
2025-03-12T17:36:51.99 13.10
2025-03-12T17:36:53.00 13.10
2025-03-12T17:36:53.99 13.12
2025-03-12T17:36:55.00 13.11
2025-03-12T17:36:56.00 13.10
2025-03-12T17:36:57.00 13.12
2025-03-12T17:36:58.00 13.08
2025-03-12T17:36:59.00 13.09
2025-03-12T17:37:00.00 13.10
2025-03-12T17:37:01.00 13.09
2025-03-12T17:37:02.00 13.08
2025-03-12T17:37:03.00 13.12
2025-03-12T17:37:04.00 13.08
2025-03-12T17:37:05.00 13.10
2025-03-12T17:37:06.00 13.10
2025-03-12T17:37:07.00 13.10
2025-03-12T17:37:08.00 13.10
2025-03-12T17:37:09.00 13.12
2025-03-12T17:37:10.00 13.10
2025-03-12T17:37:11.00 13.09
2025-03-12T17:37:12.00 13.11
2025-03-12T17:37:13.00 13.08
2025-03-12T17:37:14.00 13.10
2025-03-12T17:37:15.00 13.10
2025-03-12T17:37:16.00 13.10
2025-03-12T17:37:17.00 13.09
2025-03-12T17:37:18.00 13.09
2025-03-12T17:37:19.00 13.09
2025-03-12T17:37:20.00 13.10
2025-03-12T17:37:21.00 13.10
2025-03-12T17:37:22.00 13.08
2025-03-12T17:37:23.00 13.12
2025-03-12T17:37:24.00 13.08
2025-03-12T17:37:25.00 13.11
2025-03-12T17:37:26.00 13.10
2025-03-12T17:37:27.00 13.11
2025-03-12T17:37:28.00 13.12
2025-03-12T17:37:29.00 13.08
2025-03-12T17:37:30.00 13.10
2025-03-12T17:37:31.00 13.09
2025-03-12T17:37:32.00 13.10
2025-03-12T17:37:33.00 13.09
2025-03-12T17:37:34.00 13.07
2025-03-12T17:37:35.00 13.12
2025-03-12T17:37:36.00 13.11
2025-03-12T17:37:37.00 13.09
2025-03-12T17:37:38.00 13.09
2025-03-12T17:37:39.00 13.14
2025-03-12T17:37:40.00 13.11
2025-03-12T17:37:41.00 13.08
2025-03-12T17:37:42.00 13.09
2025-03-12T17:37:43.00 13.12
2025-03-12T17:37:44.00 13.11
2025-03-12T17:37:45.00 13.10
2025-03-12T17:37:46.00 13.10
2025-03-12T17:37:47.00 13.11
2025-03-12T17:37:48.01 13.08
2025-03-12T17:37:48.99 13.11
2025-03-12T17:37:49.99 13.11
2025-03-12T17:37:50.99 13.10
2025-03-12T17:37:51.99 13.10
2025-03-12T17:37:52.99 13.11
2025-03-12T17:37:53.99 13.11
2025-03-12T17:37:54.99 13.10
2025-03-12T17:37:55.99 13.14
2025-03-12T17:37:56.99 13.11
2025-03-12T17:37:57.99 13.10
2025-03-12T17:37:58.99 13.08
2025-03-12T17:37:59.99 13.11
2025-03-12T17:38:00.99 13.07
2025-03-12T17:38:01.99 13.08
2025-03-12T17:38:02.99 13.10
2025-03-12T17:38:03.99 13.10
2025-03-12T17:38:04.99 13.12
2025-03-12T17:38:05.99 13.11
2025-03-12T17:38:06.99 13.09
2025-03-12T17:38:07.99 13.12
2025-03-12T17:38:08.99 13.11
2025-03-12T17:38:09.99 13.12
2025-03-12T17:38:11.00 13.10
2025-03-12T17:38:11.98 13.10
2025-03-12T17:38:12.98 13.10
2025-03-12T17:38:13.98 13.09
2025-03-12T17:38:14.98 13.10
2025-03-12T17:38:15.98 13.09
2025-03-12T17:38:16.98 13.08
2025-03-12T17:38:17.98 13.09
2025-03-12T17:38:18.98 13.10
2025-03-12T17:38:19.98 13.10
2025-03-12T17:38:20.98 13.10
2025-03-12T17:38:21.98 13.08
2025-03-12T17:38:22.98 13.10
2025-03-12T17:38:23.98 13.08
2025-03-12T17:38:24.98 13.12
2025-03-12T17:38:25.98 13.12
2025-03-12T17:38:26.98 13.10
2025-03-12T17:38:27.98 13.07
2025-03-12T17:38:28.98 13.10
2025-03-12T17:38:29.98 13.12
2025-03-12T17:38:30.98 13.11
2025-03-12T17:38:31.98 13.10
2025-03-12T17:38:32.98 13.08
2025-03-12T17:38:33.98 13.10
2025-03-12T17:38:34.98 13.09
2025-03-12T17:38:35.98 13.09
2025-03-12T17:38:36.98 13.10
2025-03-12T17:38:37.98 13.09
2025-03-12T17:38:38.98 13.10
2025-03-12T17:38:39.98 13.11
2025-03-12T17:38:40.98 13.10
2025-03-12T17:38:41.98 13.11
2025-03-12T17:38:42.98 13.11
2025-03-12T17:38:43.98 13.13
2025-03-12T17:38:44.98 13.10
2025-03-12T17:38:45.98 13.10
2025-03-12T17:38:46.98 13.10
2025-03-12T17:38:47.98 13.10
2025-03-12T17:38:48.98 13.09
2025-03-12T17:38:49.98 13.10
2025-03-12T17:38:50.98 13.09
2025-03-12T17:38:51.98 13.09
2025-03-12T17:38:52.98 13.08
2025-03-12T17:38:53.98 13.08
2025-03-12T17:38:54.99 13.10
2025-03-12T17:38:55.97 13.09
2025-03-12T17:38:56.97 13.10
2025-03-12T17:38:57.97 13.09
2025-03-12T17:38:58.97 13.07
2025-03-12T17:38:59.97 13.11
2025-03-12T17:39:00.97 13.09
2025-03-12T17:39:01.97 13.11
2025-03-12T17:39:02.97 13.11
2025-03-12T17:39:03.97 13.08
2025-03-12T17:39:04.97 13.12
2025-03-12T17:39:05.97 13.10
2025-03-12T17:39:06.97 13.09
2025-03-12T17:39:07.97 13.08
2025-03-12T17:39:08.97 13.11
2025-03-12T17:39:09.97 13.09
2025-03-12T17:39:10.97 13.11
2025-03-12T17:39:11.97 13.10
2025-03-12T17:39:12.97 13.11
2025-03-12T17:39:13.97 13.10
2025-03-12T17:39:14.97 13.11
2025-03-12T17:39:15.97 13.11
2025-03-12T17:39:16.97 13.09
2025-03-12T17:39:17.97 13.11
2025-03-12T17:39:18.97 13.10
2025-03-12T17:39:19.97 13.10
2025-03-12T17:39:20.97 13.08
2025-03-12T17:39:21.97 13.08
2025-03-12T17:39:22.97 13.11
2025-03-12T17:39:23.97 13.11
2025-03-12T17:39:24.99 13.09
2025-03-12T17:39:25.96 13.09
2025-03-12T17:39:26.96 13.10
2025-03-12T17:39:27.96 13.11
2025-03-12T17:39:28.96 13.12
2025-03-12T17:39:29.96 13.12
2025-03-12T17:39:30.96 13.12
2025-03-12T17:39:31.96 13.10
2025-03-12T17:39:32.96 13.12
2025-03-12T17:39:33.96 13.11
2025-03-12T17:39:34.96 13.10
2025-03-12T17:39:35.96 13.11
2025-03-12T17:39:36.96 13.09
2025-03-12T17:39:37.96 13.12
2025-03-12T17:39:38.96 13.12
2025-03-12T17:39:39.96 13.10
2025-03-12T17:39:40.96 13.10
2025-03-12T17:39:41.96 13.10
2025-03-12T17:39:42.96 13.08
2025-03-12T17:39:43.96 13.10
2025-03-12T17:39:44.96 13.09
2025-03-12T17:39:45.96 13.12
2025-03-12T17:39:46.96 13.10
2025-03-12T17:39:47.96 13.10
2025-03-12T17:39:48.96 13.11
2025-03-12T17:39:49.96 13.12
2025-03-12T17:39:50.96 13.11
2025-03-12T17:39:51.96 13.10
2025-03-12T17:39:52.96 13.11
2025-03-12T17:39:53.96 13.10
2025-03-12T17:39:54.96 13.10
2025-03-12T17:39:55.96 13.12
2025-03-12T17:39:56.96 13.11
2025-03-12T17:39:57.96 13.11
2025-03-12T17:39:58.96 13.10
2025-03-12T17:39:59.96 13.12
2025-03-12T17:40:00.96 13.09
2025-03-12T17:40:01.96 13.11
2025-03-12T17:40:02.96 13.11
2025-03-12T17:40:03.96 13.09
2025-03-12T17:40:04.96 13.11
2025-03-12T17:40:05.96 13.12
2025-03-12T17:40:06.96 13.10
2025-03-12T17:40:07.96 13.12
2025-03-12T17:40:08.96 13.10
2025-03-12T17:40:09.96 13.12
2025-03-12T17:40:10.96 13.10
2025-03-12T17:40:11.96 13.12
2025-03-12T17:40:12.96 13.11
2025-03-12T17:40:13.96 13.11
2025-03-12T17:40:14.96 13.10
2025-03-12T17:40:15.96 13.10
2025-03-12T17:40:16.96 13.10
2025-03-12T17:40:17.96 13.10
2025-03-12T17:40:18.96 13.09
2025-03-12T17:40:19.96 13.08
2025-03-12T17:40:20.96 13.10
2025-03-12T17:40:21.96 13.09
2025-03-12T17:40:22.96 13.12
2025-03-12T17:40:23.96 13.12
2025-03-12T17:40:24.96 13.12
2025-03-12T17:40:25.96 13.11
2025-03-12T17:40:26.96 13.12
2025-03-12T17:40:27.96 13.08
2025-03-12T17:40:28.96 13.10
2025-03-12T17:40:29.96 13.10
2025-03-12T17:40:30.96 13.08
2025-03-12T17:40:31.96 13.08
2025-03-12T17:40:32.96 13.07
2025-03-12T17:40:33.96 13.10
2025-03-12T17:40:34.96 13.10
2025-03-12T17:40:35.96 13.08
2025-03-12T17:40:36.96 13.10
2025-03-12T17:40:37.96 13.10
2025-03-12T17:40:38.96 13.09
2025-03-12T17:40:39.96 13.11
2025-03-12T17:40:40.96 13.11
2025-03-12T17:40:41.96 13.10
2025-03-12T17:40:42.96 13.10
2025-03-12T17:40:43.96 13.09
2025-03-12T17:40:44.96 13.08
2025-03-12T17:40:45.96 13.10
2025-03-12T17:40:46.96 13.10
2025-03-12T17:40:47.96 13.12
2025-03-12T17:40:48.96 13.08
2025-03-12T17:40:49.96 13.12
2025-03-12T17:40:50.96 13.10
2025-03-12T17:40:51.96 13.11
2025-03-12T17:40:52.96 13.10
2025-03-12T17:40:53.96 13.10
2025-03-12T17:40:54.96 13.10
2025-03-12T17:40:55.96 13.10
2025-03-12T17:40:56.96 13.11
2025-03-12T17:40:57.96 13.08
2025-03-12T17:40:58.96 13.10
2025-03-12T17:40:59.96 13.12
2025-03-12T17:41:00.96 13.12
2025-03-12T17:41:01.96 13.08
2025-03-12T17:41:02.96 13.10
2025-03-12T17:41:03.96 13.13
2025-03-12T17:41:04.96 13.08
2025-03-12T17:41:05.96 13.10
2025-03-12T17:41:06.96 13.10
2025-03-12T17:41:07.96 13.10
2025-03-12T17:41:08.96 13.11
2025-03-12T17:41:09.96 13.11
2025-03-12T17:41:10.96 13.11
2025-03-12T17:41:11.96 13.08
2025-03-12T17:41:12.96 13.10
2025-03-12T17:41:13.96 13.10
2025-03-12T17:41:14.96 13.05
2025-03-12T17:41:15.96 13.11
2025-03-12T17:41:16.96 13.08
2025-03-12T17:41:17.96 13.11
2025-03-12T17:41:18.96 13.07
2025-03-12T17:41:19.96 13.11
2025-03-12T17:41:20.96 13.10
2025-03-12T17:41:21.96 13.10
2025-03-12T17:41:22.96 13.11
2025-03-12T17:41:23.96 13.12
2025-03-12T17:41:24.96 13.09
2025-03-12T17:41:25.96 13.10
2025-03-12T17:41:26.96 13.08
2025-03-12T17:41:27.96 13.08
2025-03-12T17:41:28.96 13.08
2025-03-12T17:41:29.96 13.10
2025-03-12T17:41:30.96 13.10
2025-03-12T17:41:31.96 13.09
2025-03-12T17:41:32.96 13.10
2025-03-12T17:41:33.96 13.10
2025-03-12T17:41:34.96 13.09
2025-03-12T17:41:35.96 13.08
2025-03-12T17:41:36.96 13.08
2025-03-12T17:41:37.96 13.08
2025-03-12T17:41:38.96 13.08
2025-03-12T17:41:39.96 13.11
2025-03-12T17:41:40.96 13.10
2025-03-12T17:41:41.96 13.09
2025-03-12T17:41:42.96 13.09
2025-03-12T17:41:43.96 13.12
2025-03-12T17:41:44.96 13.10
2025-03-12T17:41:45.96 13.10
2025-03-12T17:41:46.96 13.08
2025-03-12T17:41:47.96 13.12
2025-03-12T17:41:48.96 13.11
2025-03-12T17:41:49.96 13.10
2025-03-12T17:41:50.96 13.11
2025-03-12T17:41:51.96 13.12
2025-03-12T17:41:52.96 13.08
2025-03-12T17:41:53.96 13.11
2025-03-12T17:41:54.96 13.10
2025-03-12T17:41:55.96 13.07
2025-03-12T17:41:56.96 13.09
2025-03-12T17:41:57.96 13.09
2025-03-12T17:41:58.96 13.11
2025-03-12T17:41:59.96 13.11
2025-03-12T17:42:00.96 13.08
2025-03-12T17:42:01.96 13.09
2025-03-12T17:42:02.96 13.10
2025-03-12T17:42:03.96 13.12
2025-03-12T17:42:04.96 13.10
2025-03-12T17:42:05.96 13.10
2025-03-12T17:42:06.96 13.09
2025-03-12T17:42:07.96 13.10
2025-03-12T17:42:08.96 13.10
2025-03-12T17:42:09.96 13.11
2025-03-12T17:42:10.96 13.12
2025-03-12T17:42:11.96 13.12
2025-03-12T17:42:12.96 13.05
2025-03-12T17:42:13.96 13.09
2025-03-12T17:42:14.96 13.10
2025-03-12T17:42:15.96 13.10
2025-03-12T17:42:16.96 13.07
2025-03-12T17:42:17.96 13.12
2025-03-12T17:42:18.96 13.10
2025-03-12T17:42:19.96 13.09
2025-03-12T17:42:20.96 13.12
2025-03-12T17:42:21.96 13.10
2025-03-12T17:42:22.96 13.10
2025-03-12T17:42:23.96 13.12
2025-03-12T17:42:24.96 13.12
2025-03-12T17:42:25.96 13.08
2025-03-12T17:42:26.96 13.08
2025-03-12T17:42:27.96 13.09
2025-03-12T17:42:28.96 13.12
2025-03-12T17:42:29.96 13.10
2025-03-12T17:42:30.96 13.10
2025-03-12T17:42:31.96 13.10
2025-03-12T17:42:32.96 13.10
2025-03-12T17:42:33.96 13.11
2025-03-12T17:42:34.96 13.12
2025-03-12T17:42:35.96 13.10
2025-03-12T17:42:36.96 13.10
2025-03-12T17:42:37.96 13.10
2025-03-12T17:42:38.96 13.10
2025-03-12T17:42:39.96 13.12
2025-03-12T17:42:40.96 13.10
2025-03-12T17:42:41.96 13.10
2025-03-12T17:42:42.96 13.08
2025-03-12T17:42:43.96 13.09
2025-03-12T17:42:44.96 13.10
2025-03-12T17:42:45.96 13.10
2025-03-12T17:42:46.96 13.12
2025-03-12T17:42:47.96 13.10
2025-03-12T17:42:48.96 13.13
2025-03-12T17:42:49.96 13.09
2025-03-12T17:42:50.96 13.11
2025-03-12T17:42:51.96 13.13
2025-03-12T17:42:52.96 13.11
2025-03-12T17:42:53.96 13.11
2025-03-12T17:42:54.96 13.06
2025-03-12T17:42:55.96 13.10
2025-03-12T17:42:56.96 13.10
2025-03-12T17:42:57.96 13.10
2025-03-12T17:42:58.96 13.12
2025-03-12T17:42:59.96 13.10
2025-03-12T17:43:00.96 13.10
2025-03-12T17:43:01.96 13.11
2025-03-12T17:43:02.96 13.12
2025-03-12T17:43:03.96 13.11
2025-03-12T17:43:04.96 13.11
2025-03-12T17:43:05.96 13.10
2025-03-12T17:43:06.96 13.12
2025-03-12T17:43:07.96 13.10
2025-03-12T17:43:08.96 13.10
2025-03-12T17:43:09.96 13.10
2025-03-12T17:43:10.96 13.11
2025-03-12T17:43:11.96 13.10
2025-03-12T17:43:12.96 13.11
2025-03-12T17:43:13.96 13.10
2025-03-12T17:43:14.96 13.14
2025-03-12T17:43:15.96 13.12
2025-03-12T17:43:16.96 13.08
2025-03-12T17:43:17.96 13.10
2025-03-12T17:43:18.96 13.12
2025-03-12T17:43:19.96 13.11
2025-03-12T17:43:20.96 13.08
2025-03-12T17:43:21.96 13.10
2025-03-12T17:43:22.96 13.10
2025-03-12T17:43:23.96 13.11
2025-03-12T17:43:24.96 13.12
2025-03-12T17:43:25.96 13.11
2025-03-12T17:43:26.96 13.10
2025-03-12T17:43:27.96 13.10
2025-03-12T17:43:28.96 13.11
2025-03-12T17:43:29.96 13.12
2025-03-12T17:43:30.96 13.11
2025-03-12T17:43:31.96 13.11
2025-03-12T17:43:32.96 13.12
2025-03-12T17:43:33.96 13.12
2025-03-12T17:43:34.96 13.11
2025-03-12T17:43:35.96 13.12
2025-03-12T17:43:36.96 13.11
2025-03-12T17:43:37.96 13.11
2025-03-12T17:43:38.96 13.09
2025-03-12T17:43:39.96 13.07
2025-03-12T17:43:40.96 13.11
2025-03-12T17:43:41.96 13.10
2025-03-12T17:43:42.96 13.11
2025-03-12T17:43:43.96 13.09
2025-03-12T17:43:44.96 13.10
2025-03-12T17:43:45.97 13.08
2025-03-12T17:43:46.96 13.09
2025-03-12T17:43:47.96 13.12
2025-03-12T17:43:48.96 13.10
2025-03-12T17:43:49.96 13.08
2025-03-12T17:43:50.96 13.11
2025-03-12T17:43:51.96 13.13
2025-03-12T17:43:52.96 13.12
2025-03-12T17:43:53.96 13.10
2025-03-12T17:43:54.96 13.10
2025-03-12T17:43:55.96 13.12
2025-03-12T17:43:56.96 13.12
2025-03-12T17:43:57.96 13.10
2025-03-12T17:43:58.96 13.10
2025-03-12T17:43:59.96 13.11
2025-03-12T17:44:00.96 13.11
2025-03-12T17:44:01.96 13.14
2025-03-12T17:44:02.96 13.10
2025-03-12T17:44:03.96 13.10
2025-03-12T17:44:04.96 13.12
2025-03-12T17:44:05.96 13.10
2025-03-12T17:44:06.96 13.10
2025-03-12T17:44:07.96 13.10
2025-03-12T17:44:08.96 13.10
2025-03-12T17:44:09.96 13.10
2025-03-12T17:44:10.96 13.09
2025-03-12T17:44:11.96 13.10
2025-03-12T17:44:12.96 13.12
2025-03-12T17:44:13.96 13.10
2025-03-12T17:44:14.96 13.10
2025-03-12T17:44:15.96 13.12
2025-03-12T17:44:16.96 13.12
2025-03-12T17:44:17.96 13.11
2025-03-12T17:44:18.96 13.05
2025-03-12T17:44:19.96 13.11
2025-03-12T17:44:20.96 13.12
2025-03-12T17:44:21.96 13.10
2025-03-12T17:44:22.96 13.10
2025-03-12T17:44:23.96 13.11
2025-03-12T17:44:24.96 13.12
2025-03-12T17:44:25.96 13.10
2025-03-12T17:44:26.96 13.11
2025-03-12T17:44:27.96 13.08
2025-03-12T17:44:28.96 13.11
2025-03-12T17:44:29.97 13.10
2025-03-12T17:44:30.96 13.14
2025-03-12T17:44:31.96 13.09
2025-03-12T17:44:32.96 13.10
2025-03-12T17:44:33.96 13.10
2025-03-12T17:44:34.96 13.10
2025-03-12T17:44:35.96 13.10
2025-03-12T17:44:36.96 13.10
2025-03-12T17:44:37.96 13.10
2025-03-12T17:44:38.96 13.10
2025-03-12T17:44:39.96 13.12
2025-03-12T17:44:40.96 13.11
2025-03-12T17:44:41.96 13.12
2025-03-12T17:44:42.96 13.12
2025-03-12T17:44:43.96 13.10
2025-03-12T17:44:44.96 13.11
2025-03-12T17:44:45.96 13.09
2025-03-12T17:44:46.96 13.10
2025-03-12T17:44:47.96 13.08
2025-03-12T17:44:48.96 13.10
2025-03-12T17:44:49.96 13.11
2025-03-12T17:44:50.96 13.10
2025-03-12T17:44:51.96 13.11
2025-03-12T17:44:52.96 13.11
2025-03-12T17:44:53.96 13.10
2025-03-12T17:44:54.96 13.12
2025-03-12T17:44:55.96 13.10
2025-03-12T17:44:56.96 13.10
2025-03-12T17:44:57.96 13.11
2025-03-12T17:44:58.96 13.14
2025-03-12T17:44:59.96 13.10
2025-03-12T17:45:00.96 13.12
2025-03-12T17:45:01.96 13.11
2025-03-12T17:45:02.96 13.11
2025-03-12T17:45:03.96 13.08
2025-03-12T17:45:04.96 13.11
2025-03-12T17:45:05.96 13.11
2025-03-12T17:45:06.96 13.10
2025-03-12T17:45:07.96 13.12
2025-03-12T17:45:08.96 13.11
2025-03-12T17:45:09.96 13.11
2025-03-12T17:45:10.96 13.10
2025-03-12T17:45:11.96 13.11
2025-03-12T17:45:12.96 13.12
2025-03-12T17:45:13.97 13.10
2025-03-12T17:45:14.96 13.08
2025-03-12T17:45:15.96 13.09
2025-03-12T17:45:16.96 13.11
2025-03-12T17:45:17.96 13.10
2025-03-12T17:45:18.96 13.10
2025-03-12T17:45:19.96 13.08
2025-03-12T17:45:20.96 13.12
2025-03-12T17:45:21.96 13.12
2025-03-12T17:45:22.96 13.12
2025-03-12T17:45:23.96 13.09
2025-03-12T17:45:24.96 13.12
2025-03-12T17:45:25.96 13.10
2025-03-12T17:45:26.96 13.12
2025-03-12T17:45:27.97 13.11
2025-03-12T17:45:28.97 13.10
2025-03-12T17:45:29.97 13.09
2025-03-12T17:45:30.97 13.11
2025-03-12T17:45:31.97 13.12
2025-03-12T17:45:32.97 13.11
2025-03-12T17:45:33.97 13.10
2025-03-12T17:45:34.97 13.10
2025-03-12T17:45:35.97 13.11
2025-03-12T17:45:36.97 13.12
2025-03-12T17:45:37.97 13.12
2025-03-12T17:45:38.97 13.12
2025-03-12T17:45:39.97 13.10
2025-03-12T17:45:40.97 13.10
2025-03-12T17:45:41.97 13.13
2025-03-12T17:45:42.97 13.11
2025-03-12T17:45:43.97 13.07
2025-03-12T17:45:44.97 13.09
2025-03-12T17:45:45.97 13.11
2025-03-12T17:45:46.97 13.12
2025-03-12T17:45:47.97 13.10
2025-03-12T17:45:48.97 13.10
2025-03-12T17:45:49.97 13.10
2025-03-12T17:45:50.97 13.11
2025-03-12T17:45:51.97 13.11
2025-03-12T17:45:52.97 13.09
2025-03-12T17:45:53.97 13.08
2025-03-12T17:45:54.97 13.11
2025-03-12T17:45:55.97 13.12
2025-03-12T17:45:56.97 13.09
2025-03-12T17:45:57.97 13.11
2025-03-12T17:45:58.97 13.09
2025-03-12T17:45:59.97 13.10
2025-03-12T17:46:00.97 13.12
2025-03-12T17:46:01.97 13.10
2025-03-12T17:46:02.97 13.10
2025-03-12T17:46:03.97 13.10
2025-03-12T17:46:04.97 13.11
2025-03-12T17:46:05.97 13.12
2025-03-12T17:46:06.97 13.10
2025-03-12T17:46:07.97 13.12
2025-03-12T17:46:08.97 13.12
2025-03-12T17:46:09.97 13.10
2025-03-12T17:46:10.97 13.10
2025-03-12T17:46:11.97 13.09
2025-03-12T17:46:12.97 13.10
2025-03-12T17:46:13.97 13.10
2025-03-12T17:46:14.97 13.11
2025-03-12T17:46:15.97 13.12
2025-03-12T17:46:16.97 13.13
2025-03-12T17:46:17.97 13.10
2025-03-12T17:46:18.97 13.11
2025-03-12T17:46:19.97 13.10
2025-03-12T17:46:20.97 13.11
2025-03-12T17:46:21.97 13.10
2025-03-12T17:46:22.97 13.13
2025-03-12T17:46:23.97 13.13
2025-03-12T17:46:24.97 13.10
2025-03-12T17:46:25.97 13.08
2025-03-12T17:46:26.97 13.08
2025-03-12T17:46:27.97 13.10
2025-03-12T17:46:28.97 13.13
2025-03-12T17:46:29.97 13.08
2025-03-12T17:46:30.97 13.12
2025-03-12T17:46:31.97 13.12
2025-03-12T17:46:32.97 13.11
2025-03-12T17:46:33.97 13.11
2025-03-12T17:46:34.97 13.12
2025-03-12T17:46:35.97 13.12
2025-03-12T17:46:36.97 13.09
2025-03-12T17:46:37.97 13.10
2025-03-12T17:46:38.97 13.07
2025-03-12T17:46:39.97 13.08
2025-03-12T17:46:40.97 13.10
2025-03-12T17:46:41.97 13.09
2025-03-12T17:46:42.97 13.10
2025-03-12T17:46:43.97 13.11
2025-03-12T17:46:45.01 13.09
2025-03-12T17:46:45.96 13.11
2025-03-12T17:46:46.96 13.12
2025-03-12T17:46:47.96 13.10
2025-03-12T17:46:48.96 13.10
2025-03-12T17:46:49.96 13.10
2025-03-12T17:46:50.96 13.12
2025-03-12T17:46:51.96 13.10
2025-03-12T17:46:52.96 13.11
2025-03-12T17:46:53.96 13.10
2025-03-12T17:46:54.96 13.12
2025-03-12T17:46:55.96 13.10
2025-03-12T17:46:56.96 13.12
2025-03-12T17:46:57.96 13.12
2025-03-12T17:46:58.96 13.12
2025-03-12T17:46:59.96 13.10
2025-03-12T17:47:00.96 13.12
2025-03-12T17:47:01.96 13.10
2025-03-12T17:47:02.96 13.10
2025-03-12T17:47:03.96 13.10
2025-03-12T17:47:04.96 13.10
2025-03-12T17:47:05.96 13.11
2025-03-12T17:47:06.96 13.08
2025-03-12T17:47:07.96 13.11
2025-03-12T17:47:08.96 13.10
2025-03-12T17:47:09.96 13.12
2025-03-12T17:47:10.96 13.08
2025-03-12T17:47:11.96 13.11
2025-03-12T17:47:12.96 13.10
2025-03-12T17:47:13.96 13.11
2025-03-12T17:47:14.96 13.09
2025-03-12T17:47:15.96 13.12
2025-03-12T17:47:16.96 13.10
2025-03-12T17:47:17.96 13.05
2025-03-12T17:47:18.96 13.12
2025-03-12T17:47:19.96 13.11
2025-03-12T17:47:20.96 13.14
2025-03-12T17:47:21.96 13.09
2025-03-12T17:47:22.96 13.10
2025-03-12T17:47:23.96 13.12
2025-03-12T17:47:24.96 13.10
2025-03-12T17:47:25.96 13.10
2025-03-12T17:47:26.96 13.11
2025-03-12T17:47:27.96 13.12
2025-03-12T17:47:28.96 13.11
2025-03-12T17:47:29.96 13.12
2025-03-12T17:47:30.96 13.10
2025-03-12T17:47:31.96 13.10
2025-03-12T17:47:32.96 13.10
2025-03-12T17:47:33.96 13.09
2025-03-12T17:47:34.96 13.10
2025-03-12T17:47:35.96 13.12
2025-03-12T17:47:36.96 13.11
2025-03-12T17:47:37.96 13.10
2025-03-12T17:47:38.96 13.07
2025-03-12T17:47:39.96 13.11
2025-03-12T17:47:40.96 13.10
2025-03-12T17:47:41.96 13.12
2025-03-12T17:47:42.96 13.10
2025-03-12T17:47:43.96 13.11
2025-03-12T17:47:44.96 13.12
2025-03-12T17:47:45.96 13.12
2025-03-12T17:47:46.96 13.13
2025-03-12T17:47:47.96 13.12
2025-03-12T17:47:48.96 13.09
2025-03-12T17:47:49.96 13.12
2025-03-12T17:47:50.96 13.10
2025-03-12T17:47:51.96 13.11
2025-03-12T17:47:52.96 13.12
2025-03-12T17:47:53.96 13.12
2025-03-12T17:47:54.96 13.10
2025-03-12T17:47:55.96 13.11
2025-03-12T17:47:56.96 13.10
2025-03-12T17:47:57.96 13.10
2025-03-12T17:47:58.96 13.09
2025-03-12T17:47:59.96 13.11
2025-03-12T17:48:00.96 13.10
2025-03-12T17:48:01.96 13.09
2025-03-12T17:48:02.96 13.12
2025-03-12T17:48:03.96 13.11
2025-03-12T17:48:04.96 13.10
2025-03-12T17:48:05.96 13.10
2025-03-12T17:48:06.96 13.12
2025-03-12T17:48:07.96 13.10
2025-03-12T17:48:08.96 13.10
2025-03-12T17:48:09.96 13.11
2025-03-12T17:48:10.96 13.11
2025-03-12T17:48:11.96 13.10
2025-03-12T17:48:12.96 13.12
2025-03-12T17:48:13.96 13.11
2025-03-12T17:48:14.96 13.10
2025-03-12T17:48:15.96 13.09
2025-03-12T17:48:16.96 13.11
2025-03-12T17:48:17.96 13.12
2025-03-12T17:48:18.96 13.11
2025-03-12T17:48:19.96 13.11
2025-03-12T17:48:20.96 13.11
2025-03-12T17:48:21.96 13.09
2025-03-12T17:48:22.96 13.10
2025-03-12T17:48:23.96 13.12
2025-03-12T17:48:24.96 13.10
2025-03-12T17:48:25.96 13.09
2025-03-12T17:48:26.96 13.10
2025-03-12T17:48:27.96 13.10
2025-03-12T17:48:28.96 13.08
2025-03-12T17:48:29.96 13.10
2025-03-12T17:48:30.96 13.07
2025-03-12T17:48:31.96 13.11
2025-03-12T17:48:32.96 13.10
2025-03-12T17:48:33.96 13.10
2025-03-12T17:48:34.96 13.08
2025-03-12T17:48:35.96 13.12
2025-03-12T17:48:36.96 13.10
2025-03-12T17:48:37.96 13.10
2025-03-12T17:48:38.96 13.10
2025-03-12T17:48:39.96 13.11
2025-03-12T17:48:40.96 13.10
2025-03-12T17:48:41.96 13.12
2025-03-12T17:48:42.96 13.11
2025-03-12T17:48:43.96 13.10
2025-03-12T17:48:44.96 13.08
2025-03-12T17:48:45.96 13.11
2025-03-12T17:48:46.96 13.12
2025-03-12T17:48:47.96 13.10
2025-03-12T17:48:48.96 13.10
2025-03-12T17:48:49.96 13.10
2025-03-12T17:48:50.96 13.08
2025-03-12T17:48:51.96 13.09
2025-03-12T17:48:52.96 13.08
2025-03-12T17:48:53.96 13.13
2025-03-12T17:48:54.96 13.08
2025-03-12T17:48:55.96 13.10
2025-03-12T17:48:56.96 13.10
2025-03-12T17:48:57.96 13.09
2025-03-12T17:48:58.96 13.10
2025-03-12T17:48:59.96 13.11
2025-03-12T17:49:00.96 13.10
2025-03-12T17:49:01.96 13.12
2025-03-12T17:49:02.96 13.10
2025-03-12T17:49:03.96 13.12
2025-03-12T17:49:04.96 13.10
2025-03-12T17:49:05.96 13.10
2025-03-12T17:49:06.96 13.12
2025-03-12T17:49:07.96 13.12
2025-03-12T17:49:08.96 13.12
2025-03-12T17:49:09.96 13.11
2025-03-12T17:49:10.96 13.12
2025-03-12T17:49:11.96 13.09
2025-03-12T17:49:12.96 13.08
2025-03-12T17:49:13.96 13.10
2025-03-12T17:49:14.96 13.11
2025-03-12T17:49:15.96 13.11
2025-03-12T17:49:16.96 13.12
2025-03-12T17:49:17.96 13.12
2025-03-12T17:49:18.96 13.10
2025-03-12T17:49:19.96 13.11
2025-03-12T17:49:20.96 13.09
2025-03-12T17:49:21.96 13.10
2025-03-12T17:49:22.96 13.12
2025-03-12T17:49:23.96 13.10
2025-03-12T17:49:24.96 13.11
2025-03-12T17:49:25.96 13.10
2025-03-12T17:49:26.96 13.09
2025-03-12T17:49:27.96 13.10
2025-03-12T17:49:28.96 13.12
2025-03-12T17:49:29.96 13.10
2025-03-12T17:49:30.96 13.12
2025-03-12T17:49:31.96 13.10
2025-03-12T17:49:32.96 13.10
2025-03-12T17:49:33.96 13.11
2025-03-12T17:49:34.96 13.08
2025-03-12T17:49:35.96 13.12
2025-03-12T17:49:36.96 13.08
2025-03-12T17:49:37.96 13.10
2025-03-12T17:49:38.96 13.08
2025-03-12T17:49:39.96 13.08
2025-03-12T17:49:40.96 13.12
2025-03-12T17:49:41.96 13.11
2025-03-12T17:49:42.96 13.09
2025-03-12T17:49:43.96 13.11
2025-03-12T17:49:44.96 13.08
2025-03-12T17:49:45.96 13.11
2025-03-12T17:49:46.96 13.12
2025-03-12T17:49:47.96 13.09
2025-03-12T17:49:48.96 13.09
2025-03-12T17:49:49.96 13.09
2025-03-12T17:49:50.96 13.10
2025-03-12T17:49:51.96 13.10
2025-03-12T17:49:52.96 13.14
2025-03-12T17:49:53.96 13.10
2025-03-12T17:49:54.96 13.12
2025-03-12T17:49:55.96 13.10
2025-03-12T17:49:56.96 13.12
2025-03-12T17:49:57.96 13.10
2025-03-12T17:49:58.96 13.11
2025-03-12T17:49:59.96 13.10
2025-03-12T17:50:00.96 13.10
2025-03-12T17:50:01.96 13.12
2025-03-12T17:50:02.96 13.10
2025-03-12T17:50:03.96 13.10
2025-03-12T17:50:04.96 13.11
2025-03-12T17:50:05.96 13.13
2025-03-12T17:50:06.96 13.14
2025-03-12T17:50:07.96 13.09
2025-03-12T17:50:08.96 13.11
2025-03-12T17:50:09.96 13.11
2025-03-12T17:50:10.97 13.10
2025-03-12T17:50:11.96 13.09
2025-03-12T17:50:12.96 13.10
2025-03-12T17:50:13.96 13.10
2025-03-12T17:50:14.96 13.10
2025-03-12T17:50:15.96 13.10
2025-03-12T17:50:16.96 13.11
2025-03-12T17:50:17.96 13.12
2025-03-12T17:50:18.96 13.09
2025-03-12T17:50:19.96 13.11
2025-03-12T17:50:20.96 13.10
2025-03-12T17:50:21.96 13.10
2025-03-12T17:50:22.96 13.07
2025-03-12T17:50:23.96 13.10
2025-03-12T17:50:24.96 13.09
2025-03-12T17:50:25.96 13.10
2025-03-12T17:50:26.96 13.11
2025-03-12T17:50:27.96 13.10
2025-03-12T17:50:28.96 13.11
2025-03-12T17:50:29.96 13.10
2025-03-12T17:50:30.96 13.10
2025-03-12T17:50:31.96 13.13
2025-03-12T17:50:32.96 13.10
2025-03-12T17:50:33.96 13.09
2025-03-12T17:50:34.96 13.09
2025-03-12T17:50:35.96 13.13
2025-03-12T17:50:36.96 13.11
2025-03-12T17:50:37.96 13.10
2025-03-12T17:50:38.96 13.10
2025-03-12T17:50:39.96 13.10
2025-03-12T17:50:40.96 13.10
2025-03-12T17:50:41.96 13.08
2025-03-12T17:50:42.96 13.11
2025-03-12T17:50:43.96 13.12
2025-03-12T17:50:44.96 13.12
2025-03-12T17:50:45.96 13.11
2025-03-12T17:50:46.96 13.11
2025-03-12T17:50:47.96 13.11
2025-03-12T17:50:48.96 13.10
2025-03-12T17:50:49.96 13.10
2025-03-12T17:50:50.96 13.10
2025-03-12T17:50:51.96 13.11
2025-03-12T17:50:52.96 13.11
2025-03-12T17:50:53.96 13.10
2025-03-12T17:50:54.96 13.10
2025-03-12T17:50:55.96 13.10
2025-03-12T17:50:56.97 13.08
2025-03-12T17:50:57.96 13.10
2025-03-12T17:50:58.96 13.09
2025-03-12T17:50:59.96 13.08
2025-03-12T17:51:00.97 13.12
2025-03-12T17:51:01.95 13.11
2025-03-12T17:51:02.95 13.11
2025-03-12T17:51:03.95 13.12
2025-03-12T17:51:04.95 13.12
2025-03-12T17:51:05.95 13.11
2025-03-12T17:51:06.95 13.12
2025-03-12T17:51:07.95 13.10
2025-03-12T17:51:08.95 13.10
2025-03-12T17:51:09.95 13.08
2025-03-12T17:51:10.95 13.12
2025-03-12T17:51:11.95 13.10
2025-03-12T17:51:12.95 13.10
2025-03-12T17:51:13.95 13.10
2025-03-12T17:51:14.95 13.10
2025-03-12T17:51:15.95 13.11
2025-03-12T17:51:16.95 13.10
2025-03-12T17:51:17.95 13.09
2025-03-12T17:51:18.95 13.10
2025-03-12T17:51:19.96 13.09
2025-03-12T17:51:20.95 13.09
2025-03-12T17:51:21.95 13.09
2025-03-12T17:51:22.95 13.12
2025-03-12T17:51:23.95 13.10
2025-03-12T17:51:24.95 13.10
2025-03-12T17:51:25.95 13.10
2025-03-12T17:51:26.95 13.10
2025-03-12T17:51:27.95 13.12
2025-03-12T17:51:28.95 13.08
2025-03-12T17:51:29.95 13.11
2025-03-12T17:51:30.95 13.12
2025-03-12T17:51:31.95 13.10
2025-03-12T17:51:32.95 13.11
2025-03-12T17:51:33.95 13.10
2025-03-12T17:51:34.95 13.11
2025-03-12T17:51:35.95 13.09
2025-03-12T17:51:36.95 13.11
2025-03-12T17:51:37.95 13.13
2025-03-12T17:51:38.95 13.12
2025-03-12T17:51:39.95 13.12
2025-03-12T17:51:40.95 13.12
2025-03-12T17:51:41.95 13.12
2025-03-12T17:51:42.95 13.09
2025-03-12T17:51:43.95 13.10
2025-03-12T17:51:44.95 13.10
2025-03-12T17:51:45.95 13.10
2025-03-12T17:51:46.95 13.10
2025-03-12T17:51:47.95 13.10
2025-03-12T17:51:48.95 13.10
2025-03-12T17:51:49.95 13.11
2025-03-12T17:51:50.95 13.11
2025-03-12T17:51:51.95 13.10
2025-03-12T17:51:52.95 13.09
2025-03-12T17:51:53.95 13.09
2025-03-12T17:51:54.95 13.09
2025-03-12T17:51:55.95 13.10
2025-03-12T17:51:56.95 13.10
2025-03-12T17:51:57.95 13.10
2025-03-12T17:51:58.95 13.11
2025-03-12T17:51:59.95 13.12
2025-03-12T17:52:00.95 13.10
2025-03-12T17:52:01.95 13.12
2025-03-12T17:52:02.95 13.07
2025-03-12T17:52:03.95 13.12
2025-03-12T17:52:04.95 13.12
2025-03-12T17:52:05.97 13.10
2025-03-12T17:52:06.94 13.10
2025-03-12T17:52:07.94 13.11
2025-03-12T17:52:08.94 13.10
2025-03-12T17:52:09.94 13.12
2025-03-12T17:52:10.94 13.12
2025-03-12T17:52:11.94 13.08
2025-03-12T17:52:12.94 13.09
2025-03-12T17:52:13.94 13.09
2025-03-12T17:52:14.94 13.13
2025-03-12T17:52:15.94 13.11
2025-03-12T17:52:16.94 13.10
2025-03-12T17:52:17.94 13.10
2025-03-12T17:52:18.94 13.10
2025-03-12T17:52:19.94 13.10
2025-03-12T17:52:20.94 13.10
2025-03-12T17:52:21.94 13.10
2025-03-12T17:52:22.94 13.10
2025-03-12T17:52:23.94 13.08
2025-03-12T17:52:24.94 13.11
2025-03-12T17:52:25.94 13.09
2025-03-12T17:52:26.94 13.10
2025-03-12T17:52:27.94 13.11
2025-03-12T17:52:28.94 13.10
2025-03-12T17:52:29.94 13.11
2025-03-12T17:52:30.94 13.10
2025-03-12T17:52:31.94 13.10
2025-03-12T17:52:32.94 13.11
2025-03-12T17:52:33.94 13.11
2025-03-12T17:52:34.94 13.09
2025-03-12T17:52:35.94 13.08
2025-03-12T17:52:36.94 13.08
2025-03-12T17:52:37.94 13.10
2025-03-12T17:52:38.94 13.08
2025-03-12T17:52:39.94 13.10
2025-03-12T17:52:40.94 13.10
2025-03-12T17:52:41.94 13.10
2025-03-12T17:52:42.94 13.10
2025-03-12T17:52:43.94 13.11
2025-03-12T17:52:44.94 13.09
2025-03-12T17:52:45.94 13.10
2025-03-12T17:52:46.94 13.10
2025-03-12T17:52:47.94 13.12
2025-03-12T17:52:48.94 13.10
2025-03-12T17:52:49.94 13.10
2025-03-12T17:52:50.94 13.12
2025-03-12T17:52:51.94 13.09
2025-03-12T17:52:52.94 13.09
2025-03-12T17:52:53.94 13.10
2025-03-12T17:52:54.94 13.11
2025-03-12T17:52:55.94 13.10
2025-03-12T17:52:56.94 13.11
2025-03-12T17:52:57.94 13.10
2025-03-12T17:52:58.94 13.12
2025-03-12T17:52:59.94 13.10
2025-03-12T17:53:00.94 13.12
2025-03-12T17:53:01.94 13.12
2025-03-12T17:53:02.94 13.08
2025-03-12T17:53:03.94 13.10
2025-03-12T17:53:04.94 13.11
2025-03-12T17:53:05.94 13.10
2025-03-12T17:53:06.94 13.11
2025-03-12T17:53:07.94 13.10
2025-03-12T17:53:08.94 13.10
2025-03-12T17:53:09.94 13.12
2025-03-12T17:53:10.94 13.12
2025-03-12T17:53:11.94 13.12
2025-03-12T17:53:12.94 13.11
2025-03-12T17:53:13.94 13.10
2025-03-12T17:53:14.94 13.07
2025-03-12T17:53:15.94 13.11
2025-03-12T17:53:16.94 13.09
2025-03-12T17:53:17.94 13.10
2025-03-12T17:53:18.94 13.09
2025-03-12T17:53:19.94 13.09
2025-03-12T17:53:20.94 13.12
2025-03-12T17:53:21.94 13.10
2025-03-12T17:53:22.94 13.10
2025-03-12T17:53:23.94 13.10
2025-03-12T17:53:24.94 13.11
2025-03-12T17:53:25.94 13.10
2025-03-12T17:53:26.94 13.12
2025-03-12T17:53:27.94 13.10
2025-03-12T17:53:28.94 13.09
2025-03-12T17:53:29.94 13.10
2025-03-12T17:53:30.94 13.10
2025-03-12T17:53:31.94 13.12
2025-03-12T17:53:32.94 13.10
2025-03-12T17:53:33.94 13.11
2025-03-12T17:53:34.94 13.08
2025-03-12T17:53:35.94 13.10
2025-03-12T17:53:36.94 13.08
2025-03-12T17:53:37.94 13.11
2025-03-12T17:53:38.94 13.10
2025-03-12T17:53:39.94 13.07
2025-03-12T17:53:40.94 13.11
2025-03-12T17:53:41.95 13.11
2025-03-12T17:53:42.94 13.10
2025-03-12T17:53:43.94 13.10
2025-03-12T17:53:44.94 13.11
2025-03-12T17:53:45.94 13.10
2025-03-12T17:53:46.94 13.10
2025-03-12T17:53:47.94 13.12
2025-03-12T17:53:48.94 13.12
2025-03-12T17:53:49.94 13.10
2025-03-12T17:53:50.94 13.09
2025-03-12T17:53:51.94 13.08
2025-03-12T17:53:52.94 13.11
2025-03-12T17:53:53.94 13.11
2025-03-12T17:53:54.94 13.11
2025-03-12T17:53:55.94 13.12
2025-03-12T17:53:56.94 13.11
2025-03-12T17:53:57.94 13.10
2025-03-12T17:53:58.94 13.12
2025-03-12T17:53:59.94 13.10
2025-03-12T17:54:00.94 13.12
2025-03-12T17:54:01.94 13.09
2025-03-12T17:54:02.94 13.09
2025-03-12T17:54:03.95 13.12
2025-03-12T17:54:04.95 13.10
2025-03-12T17:54:05.95 13.10
2025-03-12T17:54:06.95 13.10
2025-03-12T17:54:07.95 13.10
2025-03-12T17:54:08.95 13.07
2025-03-12T17:54:09.95 13.10
2025-03-12T17:54:10.95 13.10
2025-03-12T17:54:11.95 13.10
2025-03-12T17:54:12.95 13.12
2025-03-12T17:54:13.95 13.10
2025-03-12T17:54:14.95 13.13
2025-03-12T17:54:15.95 13.10
2025-03-12T17:54:16.95 13.10
2025-03-12T17:54:17.95 13.10
2025-03-12T17:54:18.95 13.11
2025-03-12T17:54:19.95 13.08
2025-03-12T17:54:20.95 13.08
2025-03-12T17:54:21.95 13.10
2025-03-12T17:54:22.95 13.09
2025-03-12T17:54:23.95 13.12
2025-03-12T17:54:24.95 13.09
2025-03-12T17:54:25.95 13.12
2025-03-12T17:54:26.95 13.10
2025-03-12T17:54:27.95 13.10
2025-03-12T17:54:28.95 13.09
2025-03-12T17:54:29.95 13.10
2025-03-12T17:54:30.95 13.10
2025-03-12T17:54:31.95 13.10
2025-03-12T17:54:32.95 13.10
2025-03-12T17:54:33.95 13.12
2025-03-12T17:54:34.95 13.10
2025-03-12T17:54:35.95 13.11
2025-03-12T17:54:36.95 13.13
2025-03-12T17:54:37.95 13.10
2025-03-12T17:54:38.95 13.11
2025-03-12T17:54:39.95 13.11
2025-03-12T17:54:40.95 13.11
2025-03-12T17:54:41.95 13.10
2025-03-12T17:54:42.95 13.10
2025-03-12T17:54:43.95 13.12
2025-03-12T17:54:44.95 13.09
2025-03-12T17:54:45.95 13.11
2025-03-12T17:54:46.95 13.10
2025-03-12T17:54:47.95 13.13
2025-03-12T17:54:48.95 13.12
2025-03-12T17:54:49.95 13.09
2025-03-12T17:54:50.95 13.11
2025-03-12T17:54:51.95 13.10
2025-03-12T17:54:52.96 13.12
2025-03-12T17:54:53.94 13.11
2025-03-12T17:54:54.94 13.10
2025-03-12T17:54:55.94 13.10
2025-03-12T17:54:56.94 13.12
2025-03-12T17:54:57.94 13.09
2025-03-12T17:54:58.94 13.10
2025-03-12T17:54:59.94 13.11
2025-03-12T17:55:00.94 13.10
2025-03-12T17:55:01.94 13.10
2025-03-12T17:55:02.94 13.12
2025-03-12T17:55:03.94 13.10
2025-03-12T17:55:04.94 13.10
2025-03-12T17:55:05.94 13.08
2025-03-12T17:55:06.94 13.12
2025-03-12T17:55:07.94 13.08
2025-03-12T17:55:08.94 13.09
2025-03-12T17:55:09.94 13.10
2025-03-12T17:55:10.94 13.10
2025-03-12T17:55:11.94 13.10
2025-03-12T17:55:12.94 13.09
2025-03-12T17:55:13.94 13.12
2025-03-12T17:55:14.94 13.11
2025-03-12T17:55:15.94 13.11
2025-03-12T17:55:16.94 13.12
2025-03-12T17:55:17.94 13.09
2025-03-12T17:55:18.94 13.11
2025-03-12T17:55:19.94 13.11
2025-03-12T17:55:20.94 13.10
2025-03-12T17:55:21.94 13.09
2025-03-12T17:55:22.94 13.12
2025-03-12T17:55:23.94 13.13
2025-03-12T17:55:24.94 13.10
2025-03-12T17:55:25.94 13.10
2025-03-12T17:55:26.94 13.12
2025-03-12T17:55:27.94 13.12
2025-03-12T17:55:28.94 13.11
2025-03-12T17:55:29.94 13.10
2025-03-12T17:55:30.94 13.10
2025-03-12T17:55:31.94 13.11
2025-03-12T17:55:32.94 13.11
2025-03-12T17:55:33.94 13.10
2025-03-12T17:55:34.94 13.10
2025-03-12T17:55:35.94 13.09
2025-03-12T17:55:36.94 13.10
2025-03-12T17:55:37.94 13.10
2025-03-12T17:55:38.94 13.10
2025-03-12T17:55:39.94 13.11
2025-03-12T17:55:40.94 13.12
2025-03-12T17:55:41.94 13.10
2025-03-12T17:55:42.94 13.11
2025-03-12T17:55:43.94 13.10
2025-03-12T17:55:44.94 13.10
2025-03-12T17:55:45.94 13.10
2025-03-12T17:55:46.94 13.10
2025-03-12T17:55:47.94 13.11
2025-03-12T17:55:48.94 13.10
2025-03-12T17:55:49.94 13.10
2025-03-12T17:55:50.94 13.10
2025-03-12T17:55:51.94 13.10
2025-03-12T17:55:52.94 13.12
2025-03-12T17:55:53.94 13.12
2025-03-12T17:55:54.94 13.10
2025-03-12T17:55:55.94 13.10
2025-03-12T17:55:56.94 13.13
2025-03-12T17:55:57.94 13.10
2025-03-12T17:55:58.94 13.10
2025-03-12T17:55:59.94 13.10
2025-03-12T17:56:00.94 13.08
2025-03-12T17:56:01.94 13.09
2025-03-12T17:56:02.94 13.10
2025-03-12T17:56:03.94 13.09
2025-03-12T17:56:04.94 13.10
2025-03-12T17:56:05.94 13.10
2025-03-12T17:56:06.94 13.09
2025-03-12T17:56:07.94 13.12
2025-03-12T17:56:08.94 13.10
2025-03-12T17:56:09.94 13.10
2025-03-12T17:56:10.94 13.09
2025-03-12T17:56:11.94 13.07
2025-03-12T17:56:12.94 13.09
2025-03-12T17:56:13.94 13.10
2025-03-12T17:56:14.94 13.07
2025-03-12T17:56:15.94 13.08
2025-03-12T17:56:16.94 13.10
2025-03-12T17:56:17.94 13.08
2025-03-12T17:56:18.94 13.10
2025-03-12T17:56:19.94 13.10
2025-03-12T17:56:20.94 13.12
2025-03-12T17:56:21.94 13.10
2025-03-12T17:56:22.94 13.11
2025-03-12T17:56:23.94 13.10
2025-03-12T17:56:24.94 13.12
2025-03-12T17:56:25.94 13.12
2025-03-12T17:56:26.94 13.11
2025-03-12T17:56:27.94 13.09
2025-03-12T17:56:28.94 13.10
2025-03-12T17:56:29.94 13.10
2025-03-12T17:56:30.94 13.08
2025-03-12T17:56:31.94 13.09
2025-03-12T17:56:32.94 13.10
2025-03-12T17:56:33.94 13.09
2025-03-12T17:56:34.94 13.12
2025-03-12T17:56:35.94 13.10
2025-03-12T17:56:36.94 13.10
2025-03-12T17:56:37.94 13.09
2025-03-12T17:56:38.94 13.11
2025-03-12T17:56:39.94 13.10
2025-03-12T17:56:40.94 13.10
2025-03-12T17:56:41.94 13.11
2025-03-12T17:56:42.94 13.10
2025-03-12T17:56:43.94 13.12
2025-03-12T17:56:44.94 13.09
2025-03-12T17:56:45.94 13.10
2025-03-12T17:56:46.94 13.10
2025-03-12T17:56:47.94 13.10
2025-03-12T17:56:48.94 13.11
2025-03-12T17:56:49.94 13.09
2025-03-12T17:56:50.95 13.10
2025-03-12T17:56:51.95 13.10
2025-03-12T17:56:52.95 13.11
2025-03-12T17:56:53.95 13.10
2025-03-12T17:56:54.95 13.09
2025-03-12T17:56:55.95 13.09
2025-03-12T17:56:56.95 13.10
2025-03-12T17:56:57.95 13.10
2025-03-12T17:56:58.95 13.08
2025-03-12T17:56:59.95 13.11
2025-03-12T17:57:00.95 13.12
2025-03-12T17:57:01.95 13.11
2025-03-12T17:57:02.95 13.10
2025-03-12T17:57:03.95 13.08
2025-03-12T17:57:04.95 13.10
2025-03-12T17:57:05.95 13.13
2025-03-12T17:57:06.95 13.10
2025-03-12T17:57:07.95 13.10
2025-03-12T17:57:08.95 13.12
2025-03-12T17:57:09.95 13.11
2025-03-12T17:57:10.95 13.12
2025-03-12T17:57:11.95 13.12
2025-03-12T17:57:12.95 13.10
2025-03-12T17:57:13.95 13.10
2025-03-12T17:57:14.95 13.11
2025-03-12T17:57:15.95 13.10
2025-03-12T17:57:16.95 13.09
2025-03-12T17:57:17.95 13.10
2025-03-12T17:57:18.95 13.11
2025-03-12T17:57:19.95 13.14
2025-03-12T17:57:20.95 13.10
2025-03-12T17:57:21.95 13.12
2025-03-12T17:57:22.95 13.12
2025-03-12T17:57:23.95 13.13
2025-03-12T17:57:24.95 13.12
2025-03-12T17:57:25.95 13.10
2025-03-12T17:57:26.95 13.11
2025-03-12T17:57:27.95 13.13
2025-03-12T17:57:28.95 13.12
2025-03-12T17:57:29.95 13.12
2025-03-12T17:57:30.95 13.10
2025-03-12T17:57:31.95 13.10
2025-03-12T17:57:32.95 13.11
2025-03-12T17:57:33.95 13.11
2025-03-12T17:57:34.95 13.10
2025-03-12T17:57:35.95 13.10
2025-03-12T17:57:36.95 13.10
2025-03-12T17:57:37.95 13.11
2025-03-12T17:57:38.95 13.11
2025-03-12T17:57:39.95 13.11
2025-03-12T17:57:40.95 13.10
2025-03-12T17:57:41.95 13.10
2025-03-12T17:57:42.95 13.12
2025-03-12T17:57:43.95 13.10
2025-03-12T17:57:44.95 13.12
2025-03-12T17:57:45.95 13.12
2025-03-12T17:57:46.95 13.10
2025-03-12T17:57:47.95 13.08
2025-03-12T17:57:48.95 13.10
2025-03-12T17:57:49.95 13.10
2025-03-12T17:57:50.95 13.09
2025-03-12T17:57:51.95 13.12
2025-03-12T17:57:52.95 13.09
2025-03-12T17:57:53.95 13.10
2025-03-12T17:57:54.95 13.10
2025-03-12T17:57:55.95 13.10
2025-03-12T17:57:56.95 13.10
2025-03-12T17:57:57.95 13.10
2025-03-12T17:57:58.95 13.09
2025-03-12T17:57:59.95 13.10
2025-03-12T17:58:00.95 13.12
2025-03-12T17:58:01.95 13.13
2025-03-12T17:58:02.95 13.09
2025-03-12T17:58:03.95 13.11
2025-03-12T17:58:04.95 13.11
2025-03-12T17:58:05.95 13.09
2025-03-12T17:58:06.95 13.12
2025-03-12T17:58:07.95 13.08
2025-03-12T17:58:08.95 13.12
2025-03-12T17:58:09.95 13.10
2025-03-12T17:58:10.95 13.09
2025-03-12T17:58:11.95 13.09
2025-03-12T17:58:12.95 13.10
2025-03-12T17:58:13.95 13.08
2025-03-12T17:58:14.95 13.10
2025-03-12T17:58:15.95 13.11
2025-03-12T17:58:16.95 13.10
2025-03-12T17:58:17.95 13.11
2025-03-12T17:58:18.95 13.12
2025-03-12T17:58:19.95 13.10
2025-03-12T17:58:20.95 13.11
2025-03-12T17:58:21.95 13.09
2025-03-12T17:58:22.95 13.12
2025-03-12T17:58:23.95 13.10
2025-03-12T17:58:24.95 13.11
2025-03-12T17:58:25.95 13.12
2025-03-12T17:58:26.95 13.11
2025-03-12T17:58:27.95 13.11
2025-03-12T17:58:28.95 13.09
2025-03-12T17:58:29.95 13.12
2025-03-12T17:58:30.95 13.13
2025-03-12T17:58:31.95 13.12
2025-03-12T17:58:32.95 13.07
2025-03-12T17:58:33.95 13.11
2025-03-12T17:58:34.95 13.09
2025-03-12T17:58:35.95 13.09
2025-03-12T17:58:36.95 13.12
2025-03-12T17:58:37.95 13.10
2025-03-12T17:58:38.95 13.10
2025-03-12T17:58:39.95 13.12
2025-03-12T17:58:40.95 13.09
2025-03-12T17:58:41.95 13.11
2025-03-12T17:58:42.95 13.11
2025-03-12T17:58:43.95 13.10
2025-03-12T17:58:44.96 13.11
2025-03-12T17:58:45.94 13.10
2025-03-12T17:58:46.94 13.11
2025-03-12T17:58:47.94 13.10
2025-03-12T17:58:48.94 13.12
2025-03-12T17:58:49.94 13.11
2025-03-12T17:58:50.94 13.12
2025-03-12T17:58:51.94 13.11
2025-03-12T17:58:52.94 13.11
2025-03-12T17:58:53.94 13.13
2025-03-12T17:58:54.94 13.09
2025-03-12T17:58:55.94 13.11
2025-03-12T17:58:56.94 13.12
2025-03-12T17:58:57.95 13.11
2025-03-12T17:58:58.94 13.11
2025-03-12T17:58:59.94 13.12
2025-03-12T17:59:00.94 13.10
2025-03-12T17:59:01.94 13.12
2025-03-12T17:59:02.94 13.10
2025-03-12T17:59:03.94 13.13
2025-03-12T17:59:04.94 13.10
2025-03-12T17:59:05.94 13.11
2025-03-12T17:59:06.94 13.11
2025-03-12T17:59:07.94 13.09
2025-03-12T17:59:08.94 13.10
2025-03-12T17:59:09.94 13.09
2025-03-12T17:59:10.94 13.11
2025-03-12T17:59:11.94 13.10
2025-03-12T17:59:12.94 13.12
2025-03-12T17:59:13.94 13.11
2025-03-12T17:59:14.94 13.10
2025-03-12T17:59:15.94 13.09
2025-03-12T17:59:16.94 13.11
2025-03-12T17:59:17.94 13.11
2025-03-12T17:59:18.94 13.13
2025-03-12T17:59:19.94 13.12
2025-03-12T17:59:20.94 13.12
2025-03-12T17:59:21.94 13.11
2025-03-12T17:59:22.94 13.10
2025-03-12T17:59:23.94 13.10
2025-03-12T17:59:24.94 13.10
2025-03-12T17:59:25.94 13.10
2025-03-12T17:59:26.94 13.10
2025-03-12T17:59:27.94 13.10
2025-03-12T17:59:28.94 13.10
2025-03-12T17:59:29.94 13.12
2025-03-12T17:59:30.94 13.12
2025-03-12T17:59:31.94 13.11
2025-03-12T17:59:32.94 13.09
2025-03-12T17:59:33.94 13.09
2025-03-12T17:59:34.94 13.12
2025-03-12T17:59:35.94 13.10
2025-03-12T17:59:36.94 13.10
2025-03-12T17:59:37.94 13.11
2025-03-12T17:59:38.94 13.12
2025-03-12T17:59:39.94 13.10
2025-03-12T17:59:40.94 13.12
2025-03-12T17:59:41.94 13.11
2025-03-12T17:59:42.94 13.12
2025-03-12T17:59:43.94 13.12
2025-03-12T17:59:44.94 13.11
2025-03-12T17:59:45.94 13.10
2025-03-12T17:59:46.94 13.10
2025-03-12T17:59:47.94 13.10
2025-03-12T17:59:48.94 13.10
2025-03-12T17:59:49.94 13.11
2025-03-12T17:59:50.94 13.12
2025-03-12T17:59:51.94 13.12
2025-03-12T17:59:52.94 13.11
2025-03-12T17:59:53.94 13.10
2025-03-12T17:59:54.94 13.10
2025-03-12T17:59:55.94 13.11
2025-03-12T17:59:56.94 13.11
2025-03-12T17:59:57.94 13.12
2025-03-12T17:59:58.94 13.07
2025-03-12T17:59:59.94 13.08
