# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-03-11T12:00:00.30 8.16
2025-03-11T12:00:01.30 8.16
2025-03-11T12:00:02.30 8.14
2025-03-11T12:00:03.30 8.14
2025-03-11T12:00:04.30 8.15
2025-03-11T12:00:05.30 8.14
2025-03-11T12:00:06.30 8.16
2025-03-11T12:00:07.30 8.15
2025-03-11T12:00:08.30 8.14
2025-03-11T12:00:09.30 8.17
2025-03-11T12:00:10.30 8.13
2025-03-11T12:00:11.30 8.13
2025-03-11T12:00:12.30 8.15
2025-03-11T12:00:13.30 8.15
2025-03-11T12:00:14.30 8.16
2025-03-11T12:00:15.30 8.16
2025-03-11T12:00:16.30 8.16
2025-03-11T12:00:17.30 8.12
2025-03-11T12:00:18.30 8.15
2025-03-11T12:00:19.30 8.14
2025-03-11T12:00:20.30 8.12
2025-03-11T12:00:21.30 8.15
2025-03-11T12:00:22.30 8.16
2025-03-11T12:00:23.30 8.14
2025-03-11T12:00:24.30 8.16
2025-03-11T12:00:25.30 8.16
2025-03-11T12:00:26.30 8.17
2025-03-11T12:00:27.30 8.16
2025-03-11T12:00:28.30 8.15
2025-03-11T12:00:29.30 8.12
2025-03-11T12:00:30.30 8.15
2025-03-11T12:00:31.30 8.16
2025-03-11T12:00:32.30 8.14
2025-03-11T12:00:33.30 8.14
2025-03-11T12:00:34.30 8.16
2025-03-11T12:00:35.30 8.16
2025-03-11T12:00:36.30 8.15
2025-03-11T12:00:37.30 8.14
2025-03-11T12:00:38.30 8.14
2025-03-11T12:00:39.30 8.15
2025-03-11T12:00:40.30 8.16
2025-03-11T12:00:41.30 8.16
2025-03-11T12:00:42.30 8.15
2025-03-11T12:00:43.30 8.12
2025-03-11T12:00:44.30 8.15
2025-03-11T12:00:45.30 8.16
2025-03-11T12:00:46.30 8.14
2025-03-11T12:00:47.30 8.16
2025-03-11T12:00:48.30 8.16
2025-03-11T12:00:49.30 8.15
2025-03-11T12:00:50.30 8.16
2025-03-11T12:00:51.30 8.16
2025-03-11T12:00:52.30 8.14
2025-03-11T12:00:53.30 8.15
2025-03-11T12:00:54.30 8.16
2025-03-11T12:00:55.30 8.15
2025-03-11T12:00:56.30 8.15
2025-03-11T12:00:57.30 8.16
2025-03-11T12:00:58.30 8.14
2025-03-11T12:00:59.30 8.17
2025-03-11T12:01:00.30 8.17
2025-03-11T12:01:01.30 8.14
2025-03-11T12:01:02.30 8.15
2025-03-11T12:01:03.30 8.16
2025-03-11T12:01:04.30 8.15
2025-03-11T12:01:05.30 8.15
2025-03-11T12:01:06.30 8.12
2025-03-11T12:01:07.30 8.16
2025-03-11T12:01:08.30 8.14
2025-03-11T12:01:09.30 8.15
2025-03-11T12:01:10.30 8.14
2025-03-11T12:01:11.30 8.13
2025-03-11T12:01:12.30 8.16
2025-03-11T12:01:13.30 8.15
2025-03-11T12:01:14.30 8.14
2025-03-11T12:01:15.30 8.15
2025-03-11T12:01:16.30 8.16
2025-03-11T12:01:17.30 8.16
2025-03-11T12:01:18.30 8.14
2025-03-11T12:01:19.30 8.14
2025-03-11T12:01:20.30 8.14
2025-03-11T12:01:21.30 8.16
2025-03-11T12:01:22.30 8.16
2025-03-11T12:01:23.30 8.16
2025-03-11T12:01:24.30 8.14
2025-03-11T12:01:25.30 8.16
2025-03-11T12:01:26.30 8.15
2025-03-11T12:01:27.30 8.14
2025-03-11T12:01:28.30 8.16
2025-03-11T12:01:29.30 8.14
2025-03-11T12:01:30.30 8.14
2025-03-11T12:01:31.30 8.15
2025-03-11T12:01:32.30 8.15
2025-03-11T12:01:33.30 8.16
2025-03-11T12:01:34.30 8.16
2025-03-11T12:01:35.30 8.14
2025-03-11T12:01:36.30 8.13
2025-03-11T12:01:37.30 8.12
2025-03-11T12:01:38.30 8.14
2025-03-11T12:01:39.30 8.16
2025-03-11T12:01:40.30 8.15
2025-03-11T12:01:41.30 8.17
2025-03-11T12:01:42.30 8.15
2025-03-11T12:01:43.30 8.16
2025-03-11T12:01:44.30 8.16
2025-03-11T12:01:45.30 8.14
2025-03-11T12:01:46.30 8.15
2025-03-11T12:01:47.30 8.15
2025-03-11T12:01:48.30 8.15
2025-03-11T12:01:49.30 8.14
2025-03-11T12:01:50.30 8.16
2025-03-11T12:01:51.30 8.17
2025-03-11T12:01:52.30 8.12
2025-03-11T12:01:53.30 8.16
2025-03-11T12:01:54.30 8.14
2025-03-11T12:01:55.30 8.14
2025-03-11T12:01:56.30 8.15
2025-03-11T12:01:57.30 8.13
2025-03-11T12:01:58.30 8.14
2025-03-11T12:01:59.30 8.15
2025-03-11T12:02:00.30 8.14
2025-03-11T12:02:01.30 8.15
2025-03-11T12:02:02.30 8.13
2025-03-11T12:02:03.30 8.16
2025-03-11T12:02:04.30 8.17
2025-03-11T12:02:05.30 8.16
2025-03-11T12:02:06.30 8.15
2025-03-11T12:02:07.30 8.14
2025-03-11T12:02:08.30 8.15
2025-03-11T12:02:09.30 8.15
2025-03-11T12:02:10.30 8.15
2025-03-11T12:02:11.30 8.16
2025-03-11T12:02:12.30 8.14
2025-03-11T12:02:13.30 8.16
2025-03-11T12:02:14.30 8.14
2025-03-11T12:02:15.30 8.15
2025-03-11T12:02:16.30 8.14
2025-03-11T12:02:17.30 8.14
2025-03-11T12:02:18.30 8.12
2025-03-11T12:02:19.30 8.16
2025-03-11T12:02:20.30 8.14
2025-03-11T12:02:21.30 8.15
2025-03-11T12:02:22.30 8.15
2025-03-11T12:02:23.30 8.15
2025-03-11T12:02:24.30 8.16
2025-03-11T12:02:25.30 8.14
2025-03-11T12:02:26.30 8.15
2025-03-11T12:02:27.30 8.15
2025-03-11T12:02:28.30 8.14
2025-03-11T12:02:29.30 8.15
2025-03-11T12:02:30.30 8.16
2025-03-11T12:02:31.30 8.16
2025-03-11T12:02:32.30 8.14
2025-03-11T12:02:33.30 8.15
2025-03-11T12:02:34.30 8.13
2025-03-11T12:02:35.30 8.14
2025-03-11T12:02:36.30 8.14
2025-03-11T12:02:37.30 8.14
2025-03-11T12:02:38.30 8.11
2025-03-11T12:02:39.30 8.15
2025-03-11T12:02:40.30 8.15
2025-03-11T12:02:41.30 8.14
2025-03-11T12:02:42.30 8.16
2025-03-11T12:02:43.30 8.16
2025-03-11T12:02:44.30 8.14
2025-03-11T12:02:45.30 8.14
2025-03-11T12:02:46.30 8.15
2025-03-11T12:02:47.30 8.17
2025-03-11T12:02:48.30 8.15
2025-03-11T12:02:49.30 8.13
2025-03-11T12:02:50.30 8.13
2025-03-11T12:02:51.30 8.14
2025-03-11T12:02:52.30 8.13
2025-03-11T12:02:53.30 8.15
2025-03-11T12:02:54.30 8.14
2025-03-11T12:02:55.30 8.14
2025-03-11T12:02:56.30 8.14
2025-03-11T12:02:57.30 8.16
2025-03-11T12:02:58.30 8.14
2025-03-11T12:02:59.30 8.14
2025-03-11T12:03:00.30 8.14
2025-03-11T12:03:01.30 8.13
2025-03-11T12:03:02.30 8.14
2025-03-11T12:03:03.31 8.14
2025-03-11T12:03:04.29 8.17
2025-03-11T12:03:05.30 8.14
2025-03-11T12:03:06.29 8.16
2025-03-11T12:03:07.29 8.14
2025-03-11T12:03:08.29 8.16
2025-03-11T12:03:09.29 8.14
2025-03-11T12:03:10.29 8.15
2025-03-11T12:03:11.29 8.13
2025-03-11T12:03:12.29 8.14
2025-03-11T12:03:13.29 8.14
2025-03-11T12:03:14.29 8.14
2025-03-11T12:03:15.29 8.16
2025-03-11T12:03:16.29 8.14
2025-03-11T12:03:17.29 8.13
2025-03-11T12:03:18.29 8.14
2025-03-11T12:03:19.29 8.14
2025-03-11T12:03:20.29 8.13
2025-03-11T12:03:21.29 8.15
2025-03-11T12:03:22.29 8.14
2025-03-11T12:03:23.29 8.13
2025-03-11T12:03:24.29 8.14
2025-03-11T12:03:25.29 8.15
2025-03-11T12:03:26.29 8.16
2025-03-11T12:03:27.29 8.13
2025-03-11T12:03:28.29 8.12
2025-03-11T12:03:29.29 8.14
2025-03-11T12:03:30.29 8.13
2025-03-11T12:03:31.29 8.14
2025-03-11T12:03:32.29 8.16
2025-03-11T12:03:33.29 8.14
2025-03-11T12:03:34.29 8.16
2025-03-11T12:03:35.30 8.14
2025-03-11T12:03:36.29 8.16
2025-03-11T12:03:37.29 8.16
2025-03-11T12:03:38.29 8.15
2025-03-11T12:03:39.29 8.16
2025-03-11T12:03:40.29 8.15
2025-03-11T12:03:41.29 8.14
2025-03-11T12:03:42.29 8.13
2025-03-11T12:03:43.29 8.12
2025-03-11T12:03:44.29 8.15
2025-03-11T12:03:45.29 8.16
2025-03-11T12:03:46.29 8.14
2025-03-11T12:03:47.29 8.15
2025-03-11T12:03:48.29 8.14
2025-03-11T12:03:49.29 8.14
2025-03-11T12:03:50.29 8.14
2025-03-11T12:03:51.29 8.14
2025-03-11T12:03:52.29 8.13
2025-03-11T12:03:53.29 8.14
2025-03-11T12:03:54.29 8.12
2025-03-11T12:03:55.29 8.16
2025-03-11T12:03:56.29 8.14
2025-03-11T12:03:57.29 8.14
2025-03-11T12:03:58.29 8.12
2025-03-11T12:03:59.29 8.16
2025-03-11T12:04:00.29 8.16
2025-03-11T12:04:01.29 8.13
2025-03-11T12:04:02.29 8.16
2025-03-11T12:04:03.29 8.14
2025-03-11T12:04:04.29 8.14
2025-03-11T12:04:05.29 8.14
2025-03-11T12:04:06.29 8.15
2025-03-11T12:04:07.29 8.14
2025-03-11T12:04:08.29 8.12
2025-03-11T12:04:09.29 8.15
2025-03-11T12:04:10.29 8.15
2025-03-11T12:04:11.29 8.14
2025-03-11T12:04:12.29 8.16
2025-03-11T12:04:13.29 8.12
2025-03-11T12:04:14.29 8.12
2025-03-11T12:04:15.29 8.16
2025-03-11T12:04:16.29 8.16
2025-03-11T12:04:17.29 8.15
2025-03-11T12:04:18.29 8.14
2025-03-11T12:04:19.29 8.14
2025-03-11T12:04:20.29 8.17
2025-03-11T12:04:21.29 8.17
2025-03-11T12:04:22.30 8.16
2025-03-11T12:04:23.29 8.15
2025-03-11T12:04:24.29 8.14
2025-03-11T12:04:25.29 8.17
2025-03-11T12:04:26.29 8.15
2025-03-11T12:04:27.29 8.13
2025-03-11T12:04:28.29 8.15
2025-03-11T12:04:29.29 8.16
2025-03-11T12:04:30.29 8.13
2025-03-11T12:04:31.29 8.14
2025-03-11T12:04:32.30 8.14
2025-03-11T12:04:33.29 8.12
2025-03-11T12:04:34.29 8.14
2025-03-11T12:04:35.30 8.15
2025-03-11T12:04:36.29 8.14
2025-03-11T12:04:37.30 8.13
2025-03-11T12:04:38.30 8.14
2025-03-11T12:04:39.30 8.14
2025-03-11T12:04:40.30 8.14
2025-03-11T12:04:41.30 8.16
2025-03-11T12:04:42.30 8.16
2025-03-11T12:04:43.30 8.14
2025-03-11T12:04:44.30 8.14
2025-03-11T12:04:45.30 8.12
2025-03-11T12:04:46.30 8.14
2025-03-11T12:04:47.30 8.14
2025-03-11T12:04:48.30 8.16
2025-03-11T12:04:49.30 8.14
2025-03-11T12:04:50.30 8.14
2025-03-11T12:04:51.30 8.16
2025-03-11T12:04:52.30 8.16
2025-03-11T12:04:53.30 8.16
2025-03-11T12:04:54.30 8.14
2025-03-11T12:04:55.30 8.14
2025-03-11T12:04:56.30 8.14
2025-03-11T12:04:57.30 8.17
2025-03-11T12:04:58.30 8.16
2025-03-11T12:04:59.30 8.13
2025-03-11T12:05:00.30 8.15
2025-03-11T12:05:01.30 8.15
2025-03-11T12:05:02.30 8.14
2025-03-11T12:05:03.30 8.14
2025-03-11T12:05:04.30 8.14
2025-03-11T12:05:05.31 8.14
2025-03-11T12:05:06.34 8.13
2025-03-11T12:05:07.30 8.14
2025-03-11T12:05:08.30 8.15
2025-03-11T12:05:09.30 8.14
2025-03-11T12:05:10.30 8.13
2025-03-11T12:05:11.30 8.13
2025-03-11T12:05:12.30 8.14
2025-03-11T12:05:13.30 8.16
2025-03-11T12:05:14.30 8.14
2025-03-11T12:05:15.30 8.15
2025-03-11T12:05:16.30 8.14
2025-03-11T12:05:17.30 8.12
2025-03-11T12:05:18.30 8.13
2025-03-11T12:05:19.30 8.14
2025-03-11T12:05:20.30 8.14
2025-03-11T12:05:21.30 8.16
2025-03-11T12:05:22.30 8.15
2025-03-11T12:05:23.30 8.14
2025-03-11T12:05:24.30 8.14
2025-03-11T12:05:25.30 8.14
2025-03-11T12:05:26.30 8.16
2025-03-11T12:05:27.30 8.12
2025-03-11T12:05:28.30 8.17
2025-03-11T12:05:29.30 8.16
2025-03-11T12:05:30.30 8.14
2025-03-11T12:05:31.30 8.16
2025-03-11T12:05:32.30 8.17
2025-03-11T12:05:33.30 8.14
2025-03-11T12:05:34.30 8.13
2025-03-11T12:05:35.30 8.12
2025-03-11T12:05:36.30 8.14
2025-03-11T12:05:37.30 8.16
2025-03-11T12:05:38.30 8.15
2025-03-11T12:05:39.30 8.14
2025-03-11T12:05:40.30 8.13
2025-03-11T12:05:41.30 8.13
2025-03-11T12:05:42.30 8.16
2025-03-11T12:05:43.30 8.16
2025-03-11T12:05:44.30 8.13
2025-03-11T12:05:45.30 8.12
2025-03-11T12:05:46.30 8.15
2025-03-11T12:05:47.30 8.14
2025-03-11T12:05:48.30 8.14
2025-03-11T12:05:49.30 8.12
2025-03-11T12:05:50.30 8.14
2025-03-11T12:05:51.30 8.17
2025-03-11T12:05:52.30 8.15
2025-03-11T12:05:53.30 8.14
2025-03-11T12:05:54.30 8.16
2025-03-11T12:05:55.30 8.14
2025-03-11T12:05:56.30 8.15
2025-03-11T12:05:57.30 8.14
2025-03-11T12:05:58.30 8.15
2025-03-11T12:05:59.30 8.16
2025-03-11T12:06:00.30 8.13
2025-03-11T12:06:01.30 8.12
2025-03-11T12:06:02.30 8.16
2025-03-11T12:06:03.30 8.15
2025-03-11T12:06:04.30 8.16
2025-03-11T12:06:05.30 8.14
2025-03-11T12:06:06.30 8.14
2025-03-11T12:06:07.30 8.14
2025-03-11T12:06:08.30 8.11
2025-03-11T12:06:09.30 8.15
2025-03-11T12:06:10.30 8.14
2025-03-11T12:06:11.30 8.13
2025-03-11T12:06:12.30 8.16
2025-03-11T12:06:13.30 8.15
2025-03-11T12:06:14.30 8.14
2025-03-11T12:06:15.30 8.15
2025-03-11T12:06:16.30 8.15
2025-03-11T12:06:17.30 8.14
2025-03-11T12:06:18.30 8.16
2025-03-11T12:06:19.30 8.14
2025-03-11T12:06:20.30 8.14
2025-03-11T12:06:21.30 8.15
2025-03-11T12:06:22.30 8.14
2025-03-11T12:06:23.30 8.14
2025-03-11T12:06:24.30 8.14
2025-03-11T12:06:25.30 8.16
2025-03-11T12:06:26.30 8.16
2025-03-11T12:06:27.30 8.12
2025-03-11T12:06:28.30 8.14
2025-03-11T12:06:29.30 8.14
2025-03-11T12:06:30.30 8.14
2025-03-11T12:06:31.30 8.14
2025-03-11T12:06:32.30 8.14
2025-03-11T12:06:33.30 8.14
2025-03-11T12:06:34.30 8.16
2025-03-11T12:06:35.30 8.15
2025-03-11T12:06:36.30 8.15
2025-03-11T12:06:37.30 8.14
2025-03-11T12:06:38.30 8.16
2025-03-11T12:06:39.30 8.15
2025-03-11T12:06:40.30 8.13
2025-03-11T12:06:41.30 8.16
2025-03-11T12:06:42.30 8.15
2025-03-11T12:06:43.30 8.15
2025-03-11T12:06:44.30 8.16
2025-03-11T12:06:45.30 8.13
2025-03-11T12:06:46.30 8.15
2025-03-11T12:06:47.30 8.12
2025-03-11T12:06:48.30 8.16
2025-03-11T12:06:49.30 8.14
2025-03-11T12:06:50.30 8.16
2025-03-11T12:06:51.30 8.16
2025-03-11T12:06:52.30 8.16
2025-03-11T12:06:53.30 8.16
2025-03-11T12:06:54.30 8.14
2025-03-11T12:06:55.30 8.15
2025-03-11T12:06:56.30 8.14
2025-03-11T12:06:57.30 8.13
2025-03-11T12:06:58.30 8.14
2025-03-11T12:06:59.30 8.13
2025-03-11T12:07:00.30 8.15
2025-03-11T12:07:01.30 8.13
2025-03-11T12:07:02.30 8.15
2025-03-11T12:07:03.30 8.16
2025-03-11T12:07:04.30 8.14
2025-03-11T12:07:05.30 8.14
2025-03-11T12:07:06.30 8.13
2025-03-11T12:07:07.30 8.15
2025-03-11T12:07:08.30 8.14
2025-03-11T12:07:09.30 8.16
2025-03-11T12:07:10.30 8.15
2025-03-11T12:07:11.30 8.16
2025-03-11T12:07:12.30 8.16
2025-03-11T12:07:13.30 8.15
2025-03-11T12:07:14.30 8.14
2025-03-11T12:07:15.30 8.17
2025-03-11T12:07:16.30 8.16
2025-03-11T12:07:17.30 8.15
2025-03-11T12:07:18.30 8.14
2025-03-11T12:07:19.30 8.16
2025-03-11T12:07:20.30 8.14
2025-03-11T12:07:21.30 8.14
2025-03-11T12:07:22.30 8.15
2025-03-11T12:07:23.30 8.13
2025-03-11T12:07:24.30 8.15
2025-03-11T12:07:25.30 8.14
2025-03-11T12:07:26.30 8.14
2025-03-11T12:07:27.30 8.14
2025-03-11T12:07:28.30 8.14
2025-03-11T12:07:29.30 8.12
2025-03-11T12:07:30.30 8.14
2025-03-11T12:07:31.30 8.15
2025-03-11T12:07:32.30 8.14
2025-03-11T12:07:33.30 8.14
2025-03-11T12:07:34.30 8.14
2025-03-11T12:07:35.30 8.14
2025-03-11T12:07:36.30 8.14
2025-03-11T12:07:37.30 8.14
2025-03-11T12:07:38.30 8.14
2025-03-11T12:07:39.30 8.15
2025-03-11T12:07:40.30 8.15
2025-03-11T12:07:41.30 8.13
2025-03-11T12:07:42.30 8.14
2025-03-11T12:07:43.30 8.16
2025-03-11T12:07:44.30 8.14
2025-03-11T12:07:45.30 8.14
2025-03-11T12:07:46.30 8.16
2025-03-11T12:07:47.30 8.15
2025-03-11T12:07:48.30 8.14
2025-03-11T12:07:49.30 8.14
2025-03-11T12:07:50.30 8.13
2025-03-11T12:07:51.30 8.14
2025-03-11T12:07:52.30 8.12
2025-03-11T12:07:53.30 8.16
2025-03-11T12:07:54.30 8.13
2025-03-11T12:07:55.30 8.15
2025-03-11T12:07:56.30 8.17
2025-03-11T12:07:57.30 8.13
2025-03-11T12:07:58.30 8.14
2025-03-11T12:07:59.30 8.14
2025-03-11T12:08:00.30 8.14
2025-03-11T12:08:01.30 8.15
2025-03-11T12:08:02.30 8.13
2025-03-11T12:08:03.30 8.14
2025-03-11T12:08:04.30 8.14
2025-03-11T12:08:05.30 8.16
2025-03-11T12:08:06.30 8.12
2025-03-11T12:08:07.30 8.16
2025-03-11T12:08:08.30 8.13
2025-03-11T12:08:09.30 8.14
2025-03-11T12:08:10.30 8.14
2025-03-11T12:08:11.30 8.16
2025-03-11T12:08:12.30 8.14
2025-03-11T12:08:13.30 8.14
2025-03-11T12:08:14.30 8.14
2025-03-11T12:08:15.30 8.15
2025-03-11T12:08:16.30 8.17
2025-03-11T12:08:17.30 8.15
2025-03-11T12:08:18.30 8.15
2025-03-11T12:08:19.30 8.14
2025-03-11T12:08:20.30 8.14
2025-03-11T12:08:21.30 8.16
2025-03-11T12:08:22.30 8.16
2025-03-11T12:08:23.30 8.14
2025-03-11T12:08:24.30 8.14
2025-03-11T12:08:25.30 8.14
2025-03-11T12:08:26.30 8.17
2025-03-11T12:08:27.30 8.16
2025-03-11T12:08:28.30 8.14
2025-03-11T12:08:29.30 8.16
2025-03-11T12:08:30.30 8.16
2025-03-11T12:08:31.30 8.16
2025-03-11T12:08:32.30 8.14
2025-03-11T12:08:33.30 8.14
2025-03-11T12:08:34.30 8.15
2025-03-11T12:08:35.30 8.12
2025-03-11T12:08:36.30 8.17
2025-03-11T12:08:37.30 8.14
2025-03-11T12:08:38.30 8.14
2025-03-11T12:08:39.30 8.14
2025-03-11T12:08:40.30 8.15
2025-03-11T12:08:41.30 8.15
2025-03-11T12:08:42.30 8.14
2025-03-11T12:08:43.30 8.14
2025-03-11T12:08:44.30 8.15
2025-03-11T12:08:45.30 8.15
2025-03-11T12:08:46.30 8.16
2025-03-11T12:08:47.30 8.15
2025-03-11T12:08:48.30 8.17
2025-03-11T12:08:49.30 8.16
2025-03-11T12:08:50.30 8.14
2025-03-11T12:08:51.30 8.16
2025-03-11T12:08:52.30 8.15
2025-03-11T12:08:53.30 8.15
2025-03-11T12:08:54.30 8.16
2025-03-11T12:08:55.30 8.16
2025-03-11T12:08:56.30 8.16
2025-03-11T12:08:57.30 8.13
2025-03-11T12:08:58.30 8.14
2025-03-11T12:08:59.30 8.12
2025-03-11T12:09:00.30 8.14
2025-03-11T12:09:01.30 8.15
2025-03-11T12:09:02.30 8.13
2025-03-11T12:09:03.30 8.17
2025-03-11T12:09:04.30 8.16
2025-03-11T12:09:05.30 8.14
2025-03-11T12:09:06.30 8.14
2025-03-11T12:09:07.30 8.12
2025-03-11T12:09:08.30 8.14
2025-03-11T12:09:09.30 8.16
2025-03-11T12:09:10.30 8.14
2025-03-11T12:09:11.30 8.16
2025-03-11T12:09:12.30 8.14
2025-03-11T12:09:13.30 8.14
2025-03-11T12:09:14.30 8.14
2025-03-11T12:09:15.30 8.15
2025-03-11T12:09:16.30 8.14
2025-03-11T12:09:17.30 8.15
2025-03-11T12:09:18.30 8.14
2025-03-11T12:09:19.30 8.14
2025-03-11T12:09:20.30 8.14
2025-03-11T12:09:21.30 8.14
2025-03-11T12:09:22.30 8.16
2025-03-11T12:09:23.30 8.15
2025-03-11T12:09:24.30 8.17
2025-03-11T12:09:25.30 8.16
2025-03-11T12:09:26.30 8.15
2025-03-11T12:09:27.30 8.14
2025-03-11T12:09:28.30 8.15
2025-03-11T12:09:29.30 8.14
2025-03-11T12:09:30.30 8.16
2025-03-11T12:09:31.30 8.15
2025-03-11T12:09:32.30 8.16
2025-03-11T12:09:33.30 8.14
2025-03-11T12:09:34.30 8.14
2025-03-11T12:09:35.30 8.15
2025-03-11T12:09:36.30 8.14
2025-03-11T12:09:37.30 8.14
2025-03-11T12:09:38.30 8.15
2025-03-11T12:09:39.30 8.14
2025-03-11T12:09:40.30 8.15
2025-03-11T12:09:41.30 8.14
2025-03-11T12:09:42.30 8.13
2025-03-11T12:09:43.30 8.16
2025-03-11T12:09:44.30 8.14
2025-03-11T12:09:45.30 8.14
2025-03-11T12:09:46.30 8.14
2025-03-11T12:09:47.30 8.13
2025-03-11T12:09:48.30 8.14
2025-03-11T12:09:49.30 8.15
2025-03-11T12:09:50.30 8.16
2025-03-11T12:09:51.31 8.14
2025-03-11T12:09:52.30 8.14
2025-03-11T12:09:53.30 8.17
2025-03-11T12:09:54.30 8.15
2025-03-11T12:09:55.30 8.13
2025-03-11T12:09:56.31 8.12
2025-03-11T12:09:57.31 8.14
2025-03-11T12:09:58.31 8.16
2025-03-11T12:09:59.31 8.16
2025-03-11T12:10:00.31 8.14
2025-03-11T12:10:01.31 8.16
2025-03-11T12:10:02.31 8.15
2025-03-11T12:10:03.31 8.13
2025-03-11T12:10:04.31 8.14
2025-03-11T12:10:05.31 8.14
2025-03-11T12:10:06.31 8.16
2025-03-11T12:10:07.31 8.15
2025-03-11T12:10:08.31 8.13
2025-03-11T12:10:09.31 8.15
2025-03-11T12:10:10.31 8.14
2025-03-11T12:10:11.31 8.12
2025-03-11T12:10:12.31 8.14
2025-03-11T12:10:13.31 8.16
2025-03-11T12:10:14.31 8.16
2025-03-11T12:10:15.31 8.14
2025-03-11T12:10:16.31 8.15
2025-03-11T12:10:17.31 8.13
2025-03-11T12:10:18.31 8.16
2025-03-11T12:10:19.31 8.14
2025-03-11T12:10:20.31 8.17
2025-03-11T12:10:21.31 8.15
2025-03-11T12:10:22.31 8.16
2025-03-11T12:10:23.31 8.14
2025-03-11T12:10:24.31 8.16
2025-03-11T12:10:25.31 8.14
2025-03-11T12:10:26.31 8.14
2025-03-11T12:10:27.31 8.14
2025-03-11T12:10:28.31 8.12
2025-03-11T12:10:29.31 8.13
2025-03-11T12:10:30.31 8.16
2025-03-11T12:10:31.31 8.13
2025-03-11T12:10:32.31 8.14
2025-03-11T12:10:33.31 8.15
2025-03-11T12:10:34.31 8.15
2025-03-11T12:10:35.31 8.14
2025-03-11T12:10:36.31 8.16
2025-03-11T12:10:37.31 8.16
2025-03-11T12:10:38.31 8.16
2025-03-11T12:10:39.31 8.14
2025-03-11T12:10:40.31 8.16
2025-03-11T12:10:41.31 8.16
2025-03-11T12:10:42.31 8.16
2025-03-11T12:10:43.31 8.16
2025-03-11T12:10:44.31 8.17
2025-03-11T12:10:45.31 8.15
2025-03-11T12:10:46.31 8.16
2025-03-11T12:10:47.31 8.16
2025-03-11T12:10:48.31 8.18
2025-03-11T12:10:49.31 8.13
2025-03-11T12:10:50.31 8.14
2025-03-11T12:10:51.31 8.15
2025-03-11T12:10:52.31 8.15
2025-03-11T12:10:53.31 8.14
2025-03-11T12:10:54.31 8.14
2025-03-11T12:10:55.31 8.16
2025-03-11T12:10:56.31 8.14
2025-03-11T12:10:57.31 8.16
2025-03-11T12:10:58.31 8.14
2025-03-11T12:10:59.31 8.14
2025-03-11T12:11:00.31 8.14
2025-03-11T12:11:01.31 8.13
2025-03-11T12:11:02.31 8.14
2025-03-11T12:11:03.31 8.14
2025-03-11T12:11:04.31 8.14
2025-03-11T12:11:05.31 8.16
2025-03-11T12:11:06.31 8.14
2025-03-11T12:11:07.31 8.16
2025-03-11T12:11:08.31 8.14
2025-03-11T12:11:09.31 8.14
2025-03-11T12:11:10.31 8.14
2025-03-11T12:11:11.31 8.13
2025-03-11T12:11:12.31 8.12
2025-03-11T12:11:13.31 8.16
2025-03-11T12:11:14.31 8.12
2025-03-11T12:11:15.31 8.15
2025-03-11T12:11:16.31 8.16
2025-03-11T12:11:17.31 8.16
2025-03-11T12:11:18.31 8.15
2025-03-11T12:11:19.31 8.13
2025-03-11T12:11:20.31 8.14
2025-03-11T12:11:21.31 8.15
2025-03-11T12:11:22.31 8.12
2025-03-11T12:11:23.31 8.16
2025-03-11T12:11:24.31 8.15
2025-03-11T12:11:25.31 8.12
2025-03-11T12:11:26.31 8.14
2025-03-11T12:11:27.31 8.16
2025-03-11T12:11:28.31 8.14
2025-03-11T12:11:29.31 8.12
2025-03-11T12:11:30.31 8.12
2025-03-11T12:11:31.31 8.14
2025-03-11T12:11:32.31 8.13
2025-03-11T12:11:33.31 8.14
2025-03-11T12:11:34.31 8.16
2025-03-11T12:11:35.31 8.15
2025-03-11T12:11:36.31 8.15
2025-03-11T12:11:37.31 8.12
2025-03-11T12:11:38.31 8.15
2025-03-11T12:11:39.31 8.14
2025-03-11T12:11:40.31 8.15
2025-03-11T12:11:41.31 8.15
2025-03-11T12:11:42.31 8.14
2025-03-11T12:11:43.31 8.14
2025-03-11T12:11:44.31 8.15
2025-03-11T12:11:45.31 8.17
2025-03-11T12:11:46.31 8.14
2025-03-11T12:11:47.31 8.15
2025-03-11T12:11:48.31 8.15
2025-03-11T12:11:49.31 8.12
2025-03-11T12:11:50.31 8.16
2025-03-11T12:11:51.31 8.15
2025-03-11T12:11:52.31 8.14
2025-03-11T12:11:53.31 8.16
2025-03-11T12:11:54.31 8.16
2025-03-11T12:11:55.31 8.16
2025-03-11T12:11:56.31 8.15
2025-03-11T12:11:57.31 8.12
2025-03-11T12:11:58.31 8.15
2025-03-11T12:11:59.31 8.14
2025-03-11T12:12:00.31 8.13
2025-03-11T12:12:01.31 8.13
2025-03-11T12:12:02.31 8.13
2025-03-11T12:12:03.31 8.13
2025-03-11T12:12:04.31 8.13
2025-03-11T12:12:05.31 8.15
2025-03-11T12:12:06.31 8.14
2025-03-11T12:12:07.31 8.16
2025-03-11T12:12:08.31 8.14
2025-03-11T12:12:09.31 8.17
2025-03-11T12:12:10.31 8.14
2025-03-11T12:12:11.31 8.16
2025-03-11T12:12:12.31 8.14
2025-03-11T12:12:13.31 8.13
2025-03-11T12:12:14.31 8.14
2025-03-11T12:12:15.31 8.14
2025-03-11T12:12:16.31 8.14
2025-03-11T12:12:17.31 8.15
2025-03-11T12:12:18.31 8.16
2025-03-11T12:12:19.31 8.14
2025-03-11T12:12:20.31 8.14
2025-03-11T12:12:21.31 8.16
2025-03-11T12:12:22.31 8.13
2025-03-11T12:12:23.31 8.16
2025-03-11T12:12:24.31 8.17
2025-03-11T12:12:25.31 8.14
2025-03-11T12:12:26.31 8.14
2025-03-11T12:12:27.31 8.17
2025-03-11T12:12:28.31 8.14
2025-03-11T12:12:29.31 8.16
2025-03-11T12:12:30.31 8.15
2025-03-11T12:12:31.31 8.16
2025-03-11T12:12:32.31 8.13
2025-03-11T12:12:33.31 8.14
2025-03-11T12:12:34.31 8.16
2025-03-11T12:12:35.31 8.14
2025-03-11T12:12:36.31 8.14
2025-03-11T12:12:37.31 8.14
2025-03-11T12:12:38.31 8.15
2025-03-11T12:12:39.31 8.16
2025-03-11T12:12:40.31 8.13
2025-03-11T12:12:41.31 8.15
2025-03-11T12:12:42.31 8.16
2025-03-11T12:12:43.31 8.16
2025-03-11T12:12:44.31 8.16
2025-03-11T12:12:45.31 8.14
2025-03-11T12:12:46.31 8.15
2025-03-11T12:12:47.31 8.14
2025-03-11T12:12:48.31 8.16
2025-03-11T12:12:49.31 8.16
2025-03-11T12:12:50.31 8.16
2025-03-11T12:12:51.31 8.16
2025-03-11T12:12:52.31 8.14
2025-03-11T12:12:53.31 8.14
2025-03-11T12:12:54.31 8.15
2025-03-11T12:12:55.31 8.14
2025-03-11T12:12:56.31 8.16
2025-03-11T12:12:57.31 8.16
2025-03-11T12:12:58.31 8.14
2025-03-11T12:12:59.31 8.16
2025-03-11T12:13:00.31 8.14
2025-03-11T12:13:01.31 8.16
2025-03-11T12:13:02.31 8.15
2025-03-11T12:13:03.31 8.15
2025-03-11T12:13:04.31 8.17
2025-03-11T12:13:05.31 8.15
2025-03-11T12:13:06.31 8.17
2025-03-11T12:13:07.31 8.15
2025-03-11T12:13:08.31 8.14
2025-03-11T12:13:09.31 8.17
2025-03-11T12:13:10.31 8.16
2025-03-11T12:13:11.31 8.14
2025-03-11T12:13:12.31 8.16
2025-03-11T12:13:13.31 8.13
2025-03-11T12:13:14.31 8.12
2025-03-11T12:13:15.31 8.15
2025-03-11T12:13:16.31 8.13
2025-03-11T12:13:17.31 8.14
2025-03-11T12:13:18.31 8.16
2025-03-11T12:13:19.31 8.14
2025-03-11T12:13:20.31 8.14
2025-03-11T12:13:21.31 8.16
2025-03-11T12:13:22.31 8.15
2025-03-11T12:13:23.31 8.16
2025-03-11T12:13:24.31 8.14
2025-03-11T12:13:25.31 8.14
2025-03-11T12:13:26.31 8.14
2025-03-11T12:13:27.31 8.15
2025-03-11T12:13:28.31 8.13
2025-03-11T12:13:29.31 8.16
2025-03-11T12:13:30.31 8.14
2025-03-11T12:13:31.31 8.14
2025-03-11T12:13:32.31 8.16
2025-03-11T12:13:33.31 8.15
2025-03-11T12:13:34.31 8.17
2025-03-11T12:13:35.31 8.16
2025-03-11T12:13:36.31 8.14
2025-03-11T12:13:37.31 8.14
2025-03-11T12:13:38.31 8.14
2025-03-11T12:13:39.31 8.17
2025-03-11T12:13:40.31 8.17
2025-03-11T12:13:41.31 8.15
2025-03-11T12:13:42.31 8.13
2025-03-11T12:13:43.31 8.16
2025-03-11T12:13:44.31 8.12
2025-03-11T12:13:45.31 8.15
2025-03-11T12:13:46.31 8.13
2025-03-11T12:13:47.31 8.15
2025-03-11T12:13:48.31 8.14
2025-03-11T12:13:49.31 8.15
2025-03-11T12:13:50.31 8.12
2025-03-11T12:13:51.31 8.16
2025-03-11T12:13:52.31 8.13
2025-03-11T12:13:53.31 8.15
2025-03-11T12:13:54.31 8.16
2025-03-11T12:13:55.31 8.15
2025-03-11T12:13:56.31 8.16
2025-03-11T12:13:57.31 8.14
2025-03-11T12:13:58.31 8.16
2025-03-11T12:13:59.31 8.15
2025-03-11T12:14:00.31 8.15
2025-03-11T12:14:01.31 8.14
2025-03-11T12:14:02.31 8.16
2025-03-11T12:14:03.31 8.15
2025-03-11T12:14:04.31 8.14
2025-03-11T12:14:05.31 8.16
2025-03-11T12:14:06.31 8.14
2025-03-11T12:14:07.31 8.14
2025-03-11T12:14:08.31 8.14
2025-03-11T12:14:09.31 8.14
2025-03-11T12:14:10.31 8.14
2025-03-11T12:14:11.31 8.14
2025-03-11T12:14:12.31 8.14
2025-03-11T12:14:13.31 8.16
2025-03-11T12:14:14.31 8.14
2025-03-11T12:14:15.31 8.15
2025-03-11T12:14:16.31 8.14
2025-03-11T12:14:17.31 8.15
2025-03-11T12:14:18.31 8.15
2025-03-11T12:14:19.31 8.14
2025-03-11T12:14:20.31 8.14
2025-03-11T12:14:21.31 8.16
2025-03-11T12:14:22.31 8.14
2025-03-11T12:14:23.31 8.15
2025-03-11T12:14:24.31 8.14
2025-03-11T12:14:25.31 8.15
2025-03-11T12:14:26.31 8.14
2025-03-11T12:14:27.31 8.12
2025-03-11T12:14:28.31 8.14
2025-03-11T12:14:29.31 8.16
2025-03-11T12:14:30.31 8.18
2025-03-11T12:14:31.31 8.16
2025-03-11T12:14:32.31 8.14
2025-03-11T12:14:33.31 8.16
2025-03-11T12:14:34.31 8.14
2025-03-11T12:14:35.31 8.16
2025-03-11T12:14:36.31 8.14
2025-03-11T12:14:37.31 8.12
2025-03-11T12:14:38.31 8.12
2025-03-11T12:14:39.31 8.15
2025-03-11T12:14:40.31 8.13
2025-03-11T12:14:41.31 8.14
2025-03-11T12:14:42.31 8.13
2025-03-11T12:14:43.31 8.13
2025-03-11T12:14:44.31 8.16
2025-03-11T12:14:45.31 8.12
2025-03-11T12:14:46.31 8.12
2025-03-11T12:14:47.31 8.14
2025-03-11T12:14:48.31 8.15
2025-03-11T12:14:49.31 8.15
2025-03-11T12:14:50.31 8.16
2025-03-11T12:14:51.31 8.14
2025-03-11T12:14:52.31 8.14
2025-03-11T12:14:53.31 8.15
2025-03-11T12:14:54.31 8.16
2025-03-11T12:14:55.31 8.14
2025-03-11T12:14:56.31 8.14
2025-03-11T12:14:57.31 8.16
2025-03-11T12:14:58.31 8.12
2025-03-11T12:14:59.31 8.14
2025-03-11T12:15:00.31 8.15
2025-03-11T12:15:01.31 8.16
2025-03-11T12:15:02.31 8.16
2025-03-11T12:15:03.31 8.17
2025-03-11T12:15:04.31 8.16
2025-03-11T12:15:05.31 8.17
2025-03-11T12:15:06.31 8.16
2025-03-11T12:15:07.31 8.14
2025-03-11T12:15:08.31 8.12
2025-03-11T12:15:09.31 8.14
2025-03-11T12:15:10.31 8.16
2025-03-11T12:15:11.31 8.13
2025-03-11T12:15:12.31 8.16
2025-03-11T12:15:13.32 8.16
2025-03-11T12:15:14.31 8.14
2025-03-11T12:15:15.32 8.13
2025-03-11T12:15:16.32 8.14
2025-03-11T12:15:17.32 8.16
2025-03-11T12:15:18.32 8.17
2025-03-11T12:15:19.32 8.14
2025-03-11T12:15:20.32 8.16
2025-03-11T12:15:21.32 8.16
2025-03-11T12:15:22.32 8.14
2025-03-11T12:15:23.32 8.14
2025-03-11T12:15:24.32 8.14
2025-03-11T12:15:25.32 8.15
2025-03-11T12:15:26.32 8.14
2025-03-11T12:15:27.32 8.16
2025-03-11T12:15:28.32 8.15
2025-03-11T12:15:29.32 8.14
2025-03-11T12:15:30.32 8.13
2025-03-11T12:15:31.32 8.14
2025-03-11T12:15:32.32 8.15
2025-03-11T12:15:33.32 8.14
2025-03-11T12:15:34.32 8.16
2025-03-11T12:15:35.32 8.14
2025-03-11T12:15:36.32 8.14
2025-03-11T12:15:37.32 8.14
2025-03-11T12:15:38.32 8.17
2025-03-11T12:15:39.32 8.13
2025-03-11T12:15:40.32 8.15
2025-03-11T12:15:41.32 8.16
2025-03-11T12:15:42.32 8.17
2025-03-11T12:15:43.32 8.15
2025-03-11T12:15:44.32 8.14
2025-03-11T12:15:45.32 8.14
2025-03-11T12:15:46.32 8.14
2025-03-11T12:15:47.32 8.15
2025-03-11T12:15:48.32 8.12
2025-03-11T12:15:49.32 8.15
2025-03-11T12:15:50.32 8.14
2025-03-11T12:15:51.32 8.14
2025-03-11T12:15:52.32 8.13
2025-03-11T12:15:53.32 8.13
2025-03-11T12:15:54.32 8.15
2025-03-11T12:15:55.32 8.12
2025-03-11T12:15:56.32 8.14
2025-03-11T12:15:57.32 8.16
2025-03-11T12:15:58.32 8.12
2025-03-11T12:15:59.32 8.16
2025-03-11T12:16:00.32 8.16
2025-03-11T12:16:01.32 8.14
2025-03-11T12:16:02.32 8.14
2025-03-11T12:16:03.32 8.16
2025-03-11T12:16:04.32 8.15
2025-03-11T12:16:05.32 8.17
2025-03-11T12:16:06.32 8.15
2025-03-11T12:16:07.32 8.14
2025-03-11T12:16:08.32 8.15
2025-03-11T12:16:09.32 8.17
2025-03-11T12:16:10.32 8.14
2025-03-11T12:16:11.32 8.14
2025-03-11T12:16:12.32 8.16
2025-03-11T12:16:13.32 8.10
2025-03-11T12:16:14.32 8.13
2025-03-11T12:16:15.32 8.12
2025-03-11T12:16:16.32 8.16
2025-03-11T12:16:17.32 8.13
2025-03-11T12:16:18.32 8.14
2025-03-11T12:16:19.32 8.13
2025-03-11T12:16:20.32 8.14
2025-03-11T12:16:21.32 8.14
2025-03-11T12:16:22.32 8.13
2025-03-11T12:16:23.32 8.12
2025-03-11T12:16:24.32 8.14
2025-03-11T12:16:25.32 8.15
2025-03-11T12:16:26.32 8.13
2025-03-11T12:16:27.32 8.14
2025-03-11T12:16:28.32 8.14
2025-03-11T12:16:29.32 8.14
2025-03-11T12:16:30.32 8.14
2025-03-11T12:16:31.32 8.14
2025-03-11T12:16:32.32 8.14
2025-03-11T12:16:33.32 8.15
2025-03-11T12:16:34.32 8.15
2025-03-11T12:16:35.32 8.14
2025-03-11T12:16:36.32 8.16
2025-03-11T12:16:37.32 8.14
2025-03-11T12:16:38.32 8.16
2025-03-11T12:16:39.32 8.15
2025-03-11T12:16:40.32 8.12
2025-03-11T12:16:41.32 8.14
2025-03-11T12:16:42.32 8.16
2025-03-11T12:16:43.32 8.16
2025-03-11T12:16:44.32 8.16
2025-03-11T12:16:45.32 8.15
2025-03-11T12:16:46.32 8.14
2025-03-11T12:16:47.32 8.13
2025-03-11T12:16:48.32 8.15
2025-03-11T12:16:49.32 8.14
2025-03-11T12:16:50.32 8.13
2025-03-11T12:16:51.32 8.14
2025-03-11T12:16:52.32 8.17
2025-03-11T12:16:53.32 8.14
2025-03-11T12:16:54.32 8.16
2025-03-11T12:16:55.32 8.17
2025-03-11T12:16:56.32 8.15
2025-03-11T12:16:57.32 8.15
2025-03-11T12:16:58.32 8.16
2025-03-11T12:16:59.32 8.14
2025-03-11T12:17:00.32 8.12
2025-03-11T12:17:01.32 8.14
2025-03-11T12:17:02.32 8.13
2025-03-11T12:17:03.32 8.14
2025-03-11T12:17:04.32 8.14
2025-03-11T12:17:05.32 8.13
2025-03-11T12:17:06.32 8.16
2025-03-11T12:17:07.32 8.14
2025-03-11T12:17:08.32 8.14
2025-03-11T12:17:09.32 8.14
2025-03-11T12:17:10.32 8.16
2025-03-11T12:17:11.32 8.16
2025-03-11T12:17:12.32 8.14
2025-03-11T12:17:13.32 8.14
2025-03-11T12:17:14.32 8.13
2025-03-11T12:17:15.32 8.16
2025-03-11T12:17:16.32 8.16
2025-03-11T12:17:17.32 8.14
2025-03-11T12:17:18.32 8.14
2025-03-11T12:17:19.32 8.15
2025-03-11T12:17:20.32 8.15
2025-03-11T12:17:21.32 8.13
2025-03-11T12:17:22.32 8.14
2025-03-11T12:17:23.32 8.15
2025-03-11T12:17:24.32 8.15
2025-03-11T12:17:25.32 8.15
2025-03-11T12:17:26.32 8.13
2025-03-11T12:17:27.32 8.15
2025-03-11T12:17:28.32 8.16
2025-03-11T12:17:29.32 8.15
2025-03-11T12:17:30.32 8.14
2025-03-11T12:17:31.32 8.14
2025-03-11T12:17:32.32 8.13
2025-03-11T12:17:33.32 8.13
2025-03-11T12:17:34.32 8.12
2025-03-11T12:17:35.32 8.12
2025-03-11T12:17:36.32 8.14
2025-03-11T12:17:37.32 8.12
2025-03-11T12:17:38.32 8.13
2025-03-11T12:17:39.32 8.16
2025-03-11T12:17:40.32 8.13
2025-03-11T12:17:41.32 8.11
2025-03-11T12:17:42.32 8.13
2025-03-11T12:17:43.32 8.13
2025-03-11T12:17:44.32 8.14
2025-03-11T12:17:45.32 8.14
2025-03-11T12:17:46.32 8.13
2025-03-11T12:17:47.32 8.14
2025-03-11T12:17:48.32 8.16
2025-03-11T12:17:49.32 8.14
2025-03-11T12:17:50.32 8.13
2025-03-11T12:17:51.32 8.14
2025-03-11T12:17:52.32 8.14
2025-03-11T12:17:53.32 8.16
2025-03-11T12:17:54.32 8.16
2025-03-11T12:17:55.32 8.14
2025-03-11T12:17:56.32 8.15
2025-03-11T12:17:57.32 8.14
2025-03-11T12:17:58.32 8.16
2025-03-11T12:17:59.32 8.14
2025-03-11T12:18:00.32 8.14
2025-03-11T12:18:01.32 8.15
2025-03-11T12:18:02.32 8.16
2025-03-11T12:18:03.32 8.15
2025-03-11T12:18:04.32 8.14
2025-03-11T12:18:05.32 8.14
2025-03-11T12:18:06.32 8.14
2025-03-11T12:18:07.32 8.16
2025-03-11T12:18:08.32 8.16
2025-03-11T12:18:09.32 8.15
2025-03-11T12:18:10.32 8.16
2025-03-11T12:18:11.32 8.16
2025-03-11T12:18:12.32 8.14
2025-03-11T12:18:13.32 8.14
2025-03-11T12:18:14.32 8.15
2025-03-11T12:18:15.32 8.13
2025-03-11T12:18:16.32 8.14
2025-03-11T12:18:17.32 8.14
2025-03-11T12:18:18.32 8.16
2025-03-11T12:18:19.32 8.14
2025-03-11T12:18:20.32 8.15
2025-03-11T12:18:21.32 8.14
2025-03-11T12:18:22.32 8.14
2025-03-11T12:18:23.32 8.15
2025-03-11T12:18:24.32 8.13
2025-03-11T12:18:25.32 8.15
2025-03-11T12:18:26.32 8.16
2025-03-11T12:18:27.32 8.12
2025-03-11T12:18:28.32 8.12
2025-03-11T12:18:29.32 8.14
2025-03-11T12:18:30.32 8.15
2025-03-11T12:18:31.32 8.16
2025-03-11T12:18:32.32 8.14
2025-03-11T12:18:33.32 8.14
2025-03-11T12:18:34.32 8.14
2025-03-11T12:18:35.32 8.14
2025-03-11T12:18:36.32 8.12
2025-03-11T12:18:37.32 8.14
2025-03-11T12:18:38.32 8.16
2025-03-11T12:18:39.32 8.15
2025-03-11T12:18:40.32 8.14
2025-03-11T12:18:41.32 8.16
2025-03-11T12:18:42.32 8.16
2025-03-11T12:18:43.32 8.15
2025-03-11T12:18:44.32 8.13
2025-03-11T12:18:45.32 8.16
2025-03-11T12:18:46.32 8.15
2025-03-11T12:18:47.32 8.14
2025-03-11T12:18:48.32 8.14
2025-03-11T12:18:49.32 8.14
2025-03-11T12:18:50.32 8.12
2025-03-11T12:18:51.32 8.12
2025-03-11T12:18:52.32 8.15
2025-03-11T12:18:53.32 8.16
2025-03-11T12:18:54.32 8.15
2025-03-11T12:18:55.32 8.14
2025-03-11T12:18:56.32 8.14
2025-03-11T12:18:57.32 8.14
2025-03-11T12:18:58.32 8.12
2025-03-11T12:18:59.32 8.14
2025-03-11T12:19:00.32 8.15
2025-03-11T12:19:01.32 8.15
2025-03-11T12:19:02.32 8.16
2025-03-11T12:19:03.32 8.14
2025-03-11T12:19:04.32 8.16
2025-03-11T12:19:05.32 8.15
2025-03-11T12:19:06.32 8.14
2025-03-11T12:19:07.32 8.14
2025-03-11T12:19:08.32 8.14
2025-03-11T12:19:09.32 8.15
2025-03-11T12:19:10.32 8.14
2025-03-11T12:19:11.32 8.14
2025-03-11T12:19:12.32 8.15
2025-03-11T12:19:13.32 8.14
2025-03-11T12:19:14.32 8.15
2025-03-11T12:19:15.32 8.13
2025-03-11T12:19:16.32 8.16
2025-03-11T12:19:17.32 8.16
2025-03-11T12:19:18.32 8.16
2025-03-11T12:19:19.32 8.14
2025-03-11T12:19:20.32 8.17
2025-03-11T12:19:21.32 8.12
2025-03-11T12:19:22.32 8.14
2025-03-11T12:19:23.32 8.14
2025-03-11T12:19:24.32 8.12
2025-03-11T12:19:25.32 8.16
2025-03-11T12:19:26.32 8.14
2025-03-11T12:19:27.32 8.14
2025-03-11T12:19:28.32 8.12
2025-03-11T12:19:29.32 8.16
2025-03-11T12:19:30.32 8.15
2025-03-11T12:19:31.32 8.15
2025-03-11T12:19:32.32 8.14
2025-03-11T12:19:33.32 8.15
2025-03-11T12:19:34.32 8.14
2025-03-11T12:19:35.32 8.15
2025-03-11T12:19:36.32 8.15
2025-03-11T12:19:37.32 8.14
2025-03-11T12:19:38.32 8.14
2025-03-11T12:19:39.32 8.12
2025-03-11T12:19:40.32 8.14
2025-03-11T12:19:41.32 8.14
2025-03-11T12:19:42.32 8.14
2025-03-11T12:19:43.32 8.13
2025-03-11T12:19:44.32 8.16
2025-03-11T12:19:45.32 8.16
2025-03-11T12:19:46.32 8.15
2025-03-11T12:19:47.32 8.14
2025-03-11T12:19:48.32 8.14
2025-03-11T12:19:49.32 8.12
2025-03-11T12:19:50.32 8.15
2025-03-11T12:19:51.32 8.16
2025-03-11T12:19:52.32 8.14
2025-03-11T12:19:53.32 8.15
2025-03-11T12:19:54.32 8.14
2025-03-11T12:19:55.32 8.16
2025-03-11T12:19:56.32 8.14
2025-03-11T12:19:57.32 8.15
2025-03-11T12:19:58.32 8.14
2025-03-11T12:19:59.32 8.16
2025-03-11T12:20:00.32 8.17
2025-03-11T12:20:01.32 8.14
2025-03-11T12:20:02.32 8.16
2025-03-11T12:20:03.32 8.14
2025-03-11T12:20:04.32 8.12
2025-03-11T12:20:05.32 8.14
2025-03-11T12:20:06.32 8.15
2025-03-11T12:20:07.32 8.13
2025-03-11T12:20:08.32 8.14
2025-03-11T12:20:09.32 8.14
2025-03-11T12:20:10.32 8.14
2025-03-11T12:20:11.32 8.15
2025-03-11T12:20:12.32 8.14
2025-03-11T12:20:13.32 8.12
2025-03-11T12:20:14.32 8.16
2025-03-11T12:20:15.32 8.14
2025-03-11T12:20:16.32 8.15
2025-03-11T12:20:17.32 8.16
2025-03-11T12:20:18.32 8.14
2025-03-11T12:20:19.32 8.18
2025-03-11T12:20:20.32 8.17
2025-03-11T12:20:21.32 8.14
2025-03-11T12:20:22.32 8.16
2025-03-11T12:20:23.32 8.14
2025-03-11T12:20:24.32 8.15
2025-03-11T12:20:25.32 8.16
2025-03-11T12:20:26.32 8.14
2025-03-11T12:20:27.32 8.16
2025-03-11T12:20:28.32 8.16
2025-03-11T12:20:29.33 8.14
2025-03-11T12:20:30.32 8.16
2025-03-11T12:20:31.32 8.17
2025-03-11T12:20:32.32 8.14
2025-03-11T12:20:33.33 8.16
2025-03-11T12:20:34.33 8.16
2025-03-11T12:20:35.33 8.16
2025-03-11T12:20:36.33 8.16
2025-03-11T12:20:37.33 8.15
2025-03-11T12:20:38.33 8.16
2025-03-11T12:20:39.33 8.14
2025-03-11T12:20:40.33 8.16
2025-03-11T12:20:41.33 8.16
2025-03-11T12:20:42.33 8.16
2025-03-11T12:20:43.33 8.15
2025-03-11T12:20:44.33 8.15
2025-03-11T12:20:45.33 8.15
2025-03-11T12:20:46.33 8.15
2025-03-11T12:20:47.33 8.16
2025-03-11T12:20:48.33 8.16
2025-03-11T12:20:49.33 8.14
2025-03-11T12:20:50.33 8.14
2025-03-11T12:20:51.33 8.16
2025-03-11T12:20:52.33 8.14
2025-03-11T12:20:53.33 8.12
2025-03-11T12:20:54.33 8.14
2025-03-11T12:20:55.33 8.16
2025-03-11T12:20:56.33 8.14
2025-03-11T12:20:57.33 8.16
2025-03-11T12:20:58.33 8.14
2025-03-11T12:20:59.33 8.14
2025-03-11T12:21:00.33 8.14
2025-03-11T12:21:01.33 8.14
2025-03-11T12:21:02.33 8.15
2025-03-11T12:21:03.33 8.16
2025-03-11T12:21:04.33 8.13
2025-03-11T12:21:05.33 8.13
2025-03-11T12:21:06.33 8.14
2025-03-11T12:21:07.33 8.15
2025-03-11T12:21:08.33 8.14
2025-03-11T12:21:09.33 8.16
2025-03-11T12:21:10.33 8.14
2025-03-11T12:21:11.33 8.13
2025-03-11T12:21:12.33 8.13
2025-03-11T12:21:13.33 8.16
2025-03-11T12:21:14.33 8.15
2025-03-11T12:21:15.33 8.14
2025-03-11T12:21:16.33 8.16
2025-03-11T12:21:17.33 8.15
2025-03-11T12:21:18.33 8.14
2025-03-11T12:21:19.33 8.15
2025-03-11T12:21:20.33 8.14
2025-03-11T12:21:21.33 8.14
2025-03-11T12:21:22.33 8.15
2025-03-11T12:21:23.33 8.15
2025-03-11T12:21:24.33 8.15
2025-03-11T12:21:25.33 8.15
2025-03-11T12:21:26.33 8.14
2025-03-11T12:21:27.33 8.16
2025-03-11T12:21:28.33 8.16
2025-03-11T12:21:29.33 8.15
2025-03-11T12:21:30.33 8.16
2025-03-11T12:21:31.33 8.17
2025-03-11T12:21:32.33 8.15
2025-03-11T12:21:33.33 8.14
2025-03-11T12:21:34.33 8.14
2025-03-11T12:21:35.33 8.13
2025-03-11T12:21:36.33 8.12
2025-03-11T12:21:37.33 8.16
2025-03-11T12:21:38.33 8.14
2025-03-11T12:21:39.33 8.13
2025-03-11T12:21:40.33 8.14
2025-03-11T12:21:41.33 8.15
2025-03-11T12:21:42.33 8.15
2025-03-11T12:21:43.33 8.14
2025-03-11T12:21:44.33 8.14
2025-03-11T12:21:45.33 8.13
2025-03-11T12:21:46.33 8.15
2025-03-11T12:21:47.33 8.15
2025-03-11T12:21:48.33 8.11
2025-03-11T12:21:49.33 8.15
2025-03-11T12:21:50.33 8.15
2025-03-11T12:21:51.33 8.16
2025-03-11T12:21:52.33 8.16
2025-03-11T12:21:53.33 8.14
2025-03-11T12:21:54.33 8.14
2025-03-11T12:21:55.33 8.14
2025-03-11T12:21:56.33 8.14
2025-03-11T12:21:57.33 8.15
2025-03-11T12:21:58.33 8.15
2025-03-11T12:21:59.33 8.15
2025-03-11T12:22:00.33 8.12
2025-03-11T12:22:01.33 8.13
2025-03-11T12:22:02.33 8.15
2025-03-11T12:22:03.33 8.12
2025-03-11T12:22:04.33 8.12
2025-03-11T12:22:05.33 8.16
2025-03-11T12:22:06.33 8.16
2025-03-11T12:22:07.33 8.14
2025-03-11T12:22:08.33 8.14
2025-03-11T12:22:09.33 8.13
2025-03-11T12:22:10.33 8.10
2025-03-11T12:22:11.33 8.14
2025-03-11T12:22:12.33 8.14
2025-03-11T12:22:13.33 8.16
2025-03-11T12:22:14.33 8.14
2025-03-11T12:22:15.33 8.14
2025-03-11T12:22:16.33 8.13
2025-03-11T12:22:17.33 8.13
2025-03-11T12:22:18.33 8.14
2025-03-11T12:22:19.33 8.14
2025-03-11T12:22:20.33 8.16
2025-03-11T12:22:21.33 8.14
2025-03-11T12:22:22.33 8.14
2025-03-11T12:22:23.34 8.15
2025-03-11T12:22:24.32 8.16
2025-03-11T12:22:25.32 8.16
2025-03-11T12:22:26.32 8.14
2025-03-11T12:22:27.32 8.13
2025-03-11T12:22:28.32 8.12
2025-03-11T12:22:29.32 8.14
2025-03-11T12:22:30.32 8.14
2025-03-11T12:22:31.32 8.16
2025-03-11T12:22:32.32 8.14
2025-03-11T12:22:33.32 8.16
2025-03-11T12:22:34.32 8.14
2025-03-11T12:22:35.32 8.15
2025-03-11T12:22:36.32 8.17
2025-03-11T12:22:37.32 8.14
2025-03-11T12:22:38.32 8.15
2025-03-11T12:22:39.32 8.16
2025-03-11T12:22:40.32 8.16
2025-03-11T12:22:41.32 8.15
2025-03-11T12:22:42.32 8.14
2025-03-11T12:22:43.32 8.16
2025-03-11T12:22:44.32 8.16
2025-03-11T12:22:45.32 8.16
2025-03-11T12:22:46.32 8.14
2025-03-11T12:22:47.32 8.14
2025-03-11T12:22:48.32 8.14
2025-03-11T12:22:49.32 8.14
2025-03-11T12:22:50.32 8.16
2025-03-11T12:22:51.32 8.15
2025-03-11T12:22:52.32 8.12
2025-03-11T12:22:53.32 8.14
2025-03-11T12:22:54.32 8.14
2025-03-11T12:22:55.32 8.16
2025-03-11T12:22:56.32 8.14
2025-03-11T12:22:57.32 8.15
2025-03-11T12:22:58.32 8.15
2025-03-11T12:22:59.32 8.14
2025-03-11T12:23:00.32 8.14
2025-03-11T12:23:01.32 8.15
2025-03-11T12:23:02.32 8.15
2025-03-11T12:23:03.32 8.14
2025-03-11T12:23:04.32 8.16
2025-03-11T12:23:05.32 8.14
2025-03-11T12:23:06.32 8.15
2025-03-11T12:23:07.32 8.15
2025-03-11T12:23:08.32 8.13
2025-03-11T12:23:09.32 8.14
2025-03-11T12:23:10.32 8.15
2025-03-11T12:23:11.32 8.14
2025-03-11T12:23:12.32 8.12
2025-03-11T12:23:13.32 8.17
2025-03-11T12:23:14.32 8.15
2025-03-11T12:23:15.32 8.16
2025-03-11T12:23:16.32 8.14
2025-03-11T12:23:17.32 8.12
2025-03-11T12:23:18.32 8.16
2025-03-11T12:23:19.32 8.16
2025-03-11T12:23:20.32 8.14
2025-03-11T12:23:21.32 8.13
2025-03-11T12:23:22.32 8.14
2025-03-11T12:23:23.32 8.17
2025-03-11T12:23:24.32 8.13
2025-03-11T12:23:25.32 8.14
2025-03-11T12:23:26.32 8.15
2025-03-11T12:23:27.32 8.16
2025-03-11T12:23:28.32 8.15
2025-03-11T12:23:29.32 8.14
2025-03-11T12:23:30.32 8.14
2025-03-11T12:23:31.32 8.14
2025-03-11T12:23:32.32 8.17
2025-03-11T12:23:33.32 8.14
2025-03-11T12:23:34.32 8.12
2025-03-11T12:23:35.32 8.14
2025-03-11T12:23:36.32 8.12
2025-03-11T12:23:37.32 8.14
2025-03-11T12:23:38.32 8.16
2025-03-11T12:23:39.32 8.14
2025-03-11T12:23:40.32 8.16
2025-03-11T12:23:41.32 8.14
2025-03-11T12:23:42.32 8.14
2025-03-11T12:23:43.32 8.12
2025-03-11T12:23:44.32 8.14
2025-03-11T12:23:45.32 8.16
2025-03-11T12:23:46.32 8.14
2025-03-11T12:23:47.32 8.16
2025-03-11T12:23:48.32 8.15
2025-03-11T12:23:49.32 8.14
2025-03-11T12:23:50.32 8.13
2025-03-11T12:23:51.32 8.10
2025-03-11T12:23:52.32 8.15
2025-03-11T12:23:53.32 8.14
2025-03-11T12:23:54.32 8.17
2025-03-11T12:23:55.32 8.14
2025-03-11T12:23:56.32 8.15
2025-03-11T12:23:57.32 8.13
2025-03-11T12:23:58.32 8.13
2025-03-11T12:23:59.32 8.13
2025-03-11T12:24:00.32 8.13
2025-03-11T12:24:01.32 8.14
2025-03-11T12:24:02.32 8.17
2025-03-11T12:24:03.32 8.15
2025-03-11T12:24:04.32 8.13
2025-03-11T12:24:05.32 8.16
2025-03-11T12:24:06.32 8.15
2025-03-11T12:24:07.32 8.16
2025-03-11T12:24:08.32 8.14
2025-03-11T12:24:09.32 8.14
2025-03-11T12:24:10.32 8.14
2025-03-11T12:24:11.32 8.14
2025-03-11T12:24:12.32 8.14
2025-03-11T12:24:13.32 8.16
2025-03-11T12:24:14.32 8.16
2025-03-11T12:24:15.32 8.16
2025-03-11T12:24:16.32 8.14
2025-03-11T12:24:17.32 8.16
2025-03-11T12:24:18.32 8.12
2025-03-11T12:24:19.32 8.14
2025-03-11T12:24:20.32 8.14
2025-03-11T12:24:21.32 8.14
2025-03-11T12:24:22.32 8.15
2025-03-11T12:24:23.32 8.14
2025-03-11T12:24:24.32 8.16
2025-03-11T12:24:25.32 8.15
2025-03-11T12:24:26.32 8.14
2025-03-11T12:24:27.32 8.14
2025-03-11T12:24:28.32 8.14
2025-03-11T12:24:29.32 8.16
2025-03-11T12:24:30.32 8.16
2025-03-11T12:24:31.32 8.13
2025-03-11T12:24:32.32 8.14
2025-03-11T12:24:33.32 8.15
2025-03-11T12:24:34.32 8.13
2025-03-11T12:24:35.32 8.12
2025-03-11T12:24:36.32 8.14
2025-03-11T12:24:37.32 8.14
2025-03-11T12:24:38.32 8.12
2025-03-11T12:24:39.32 8.14
2025-03-11T12:24:40.32 8.13
2025-03-11T12:24:41.32 8.14
2025-03-11T12:24:42.32 8.16
2025-03-11T12:24:43.32 8.13
2025-03-11T12:24:44.32 8.14
2025-03-11T12:24:45.32 8.14
2025-03-11T12:24:46.32 8.16
2025-03-11T12:24:47.32 8.13
2025-03-11T12:24:48.32 8.15
2025-03-11T12:24:49.32 8.14
2025-03-11T12:24:50.32 8.13
2025-03-11T12:24:51.32 8.12
2025-03-11T12:24:52.32 8.16
2025-03-11T12:24:53.32 8.14
2025-03-11T12:24:54.32 8.15
2025-03-11T12:24:55.32 8.14
2025-03-11T12:24:56.32 8.16
2025-03-11T12:24:57.32 8.14
2025-03-11T12:24:58.32 8.15
2025-03-11T12:24:59.32 8.14
2025-03-11T12:25:00.32 8.15
2025-03-11T12:25:01.32 8.15
2025-03-11T12:25:02.32 8.14
2025-03-11T12:25:03.32 8.16
2025-03-11T12:25:04.32 8.13
2025-03-11T12:25:05.32 8.15
2025-03-11T12:25:06.32 8.11
2025-03-11T12:25:07.32 8.14
2025-03-11T12:25:08.32 8.13
2025-03-11T12:25:09.32 8.16
2025-03-11T12:25:10.32 8.13
2025-03-11T12:25:11.32 8.13
2025-03-11T12:25:12.32 8.14
2025-03-11T12:25:13.32 8.17
2025-03-11T12:25:14.32 8.13
2025-03-11T12:25:15.32 8.13
2025-03-11T12:25:16.32 8.16
2025-03-11T12:25:17.32 8.16
2025-03-11T12:25:18.32 8.12
2025-03-11T12:25:19.32 8.14
2025-03-11T12:25:20.32 8.16
2025-03-11T12:25:21.32 8.16
2025-03-11T12:25:22.32 8.14
2025-03-11T12:25:23.32 8.16
2025-03-11T12:25:24.32 8.15
2025-03-11T12:25:25.32 8.13
2025-03-11T12:25:26.32 8.15
2025-03-11T12:25:27.32 8.14
2025-03-11T12:25:28.32 8.16
2025-03-11T12:25:29.32 8.16
2025-03-11T12:25:30.32 8.15
2025-03-11T12:25:31.32 8.13
2025-03-11T12:25:32.32 8.14
2025-03-11T12:25:33.32 8.14
2025-03-11T12:25:34.32 8.16
2025-03-11T12:25:35.32 8.12
2025-03-11T12:25:36.32 8.16
2025-03-11T12:25:37.32 8.10
2025-03-11T12:25:38.32 8.15
2025-03-11T12:25:39.32 8.14
2025-03-11T12:25:40.32 8.15
2025-03-11T12:25:41.32 8.13
2025-03-11T12:25:42.32 8.15
2025-03-11T12:25:43.32 8.16
2025-03-11T12:25:44.32 8.14
2025-03-11T12:25:45.32 8.14
2025-03-11T12:25:46.32 8.15
2025-03-11T12:25:47.32 8.16
2025-03-11T12:25:48.32 8.14
2025-03-11T12:25:49.33 8.14
2025-03-11T12:25:50.33 8.14
2025-03-11T12:25:51.33 8.16
2025-03-11T12:25:52.33 8.14
2025-03-11T12:25:53.33 8.14
2025-03-11T12:25:54.33 8.13
2025-03-11T12:25:55.33 8.14
2025-03-11T12:25:56.33 8.14
2025-03-11T12:25:57.33 8.12
2025-03-11T12:25:58.33 8.16
2025-03-11T12:25:59.33 8.14
2025-03-11T12:26:00.33 8.15
2025-03-11T12:26:01.33 8.13
2025-03-11T12:26:02.33 8.14
2025-03-11T12:26:03.33 8.14
2025-03-11T12:26:04.33 8.13
2025-03-11T12:26:05.33 8.16
2025-03-11T12:26:06.33 8.13
2025-03-11T12:26:07.33 8.16
2025-03-11T12:26:08.33 8.14
2025-03-11T12:26:09.33 8.16
2025-03-11T12:26:10.33 8.16
2025-03-11T12:26:11.33 8.15
2025-03-11T12:26:12.33 8.13
2025-03-11T12:26:13.33 8.16
2025-03-11T12:26:14.33 8.13
2025-03-11T12:26:15.34 8.14
2025-03-11T12:26:16.32 8.14
2025-03-11T12:26:17.32 8.13
2025-03-11T12:26:18.32 8.14
2025-03-11T12:26:19.32 8.14
2025-03-11T12:26:20.32 8.13
2025-03-11T12:26:21.32 8.15
2025-03-11T12:26:22.32 8.15
2025-03-11T12:26:23.32 8.16
2025-03-11T12:26:24.32 8.14
2025-03-11T12:26:25.32 8.15
2025-03-11T12:26:26.32 8.16
2025-03-11T12:26:27.32 8.13
2025-03-11T12:26:28.32 8.14
2025-03-11T12:26:29.32 8.12
2025-03-11T12:26:30.32 8.13
2025-03-11T12:26:31.32 8.14
2025-03-11T12:26:32.32 8.16
2025-03-11T12:26:33.32 8.15
2025-03-11T12:26:34.32 8.14
2025-03-11T12:26:35.32 8.14
2025-03-11T12:26:36.32 8.14
2025-03-11T12:26:37.32 8.15
2025-03-11T12:26:38.32 8.13
2025-03-11T12:26:39.32 8.16
2025-03-11T12:26:40.32 8.12
2025-03-11T12:26:41.32 8.15
2025-03-11T12:26:42.32 8.16
2025-03-11T12:26:43.32 8.16
2025-03-11T12:26:44.32 8.16
2025-03-11T12:26:45.32 8.14
2025-03-11T12:26:46.32 8.17
2025-03-11T12:26:47.32 8.16
2025-03-11T12:26:48.32 8.15
2025-03-11T12:26:49.32 8.13
2025-03-11T12:26:50.32 8.14
2025-03-11T12:26:51.32 8.13
2025-03-11T12:26:52.32 8.15
2025-03-11T12:26:53.32 8.14
2025-03-11T12:26:54.32 8.15
2025-03-11T12:26:55.32 8.12
2025-03-11T12:26:56.32 8.16
2025-03-11T12:26:57.32 8.14
2025-03-11T12:26:58.32 8.17
2025-03-11T12:26:59.32 8.12
2025-03-11T12:27:00.32 8.16
2025-03-11T12:27:01.32 8.13
2025-03-11T12:27:02.32 8.16
2025-03-11T12:27:03.32 8.15
2025-03-11T12:27:04.32 8.17
2025-03-11T12:27:05.32 8.14
2025-03-11T12:27:06.32 8.16
2025-03-11T12:27:07.32 8.15
2025-03-11T12:27:08.32 8.13
2025-03-11T12:27:09.32 8.16
2025-03-11T12:27:10.32 8.14
2025-03-11T12:27:11.32 8.14
2025-03-11T12:27:12.32 8.14
2025-03-11T12:27:13.32 8.14
2025-03-11T12:27:14.32 8.17
2025-03-11T12:27:15.32 8.13
2025-03-11T12:27:16.32 8.15
2025-03-11T12:27:17.32 8.14
2025-03-11T12:27:18.32 8.16
2025-03-11T12:27:19.32 8.14
2025-03-11T12:27:20.32 8.13
2025-03-11T12:27:21.32 8.16
2025-03-11T12:27:22.32 8.16
2025-03-11T12:27:23.32 8.15
2025-03-11T12:27:24.32 8.13
2025-03-11T12:27:25.32 8.14
2025-03-11T12:27:26.32 8.14
2025-03-11T12:27:27.32 8.16
2025-03-11T12:27:28.32 8.14
2025-03-11T12:27:29.32 8.11
2025-03-11T12:27:30.32 8.15
2025-03-11T12:27:31.32 8.14
2025-03-11T12:27:32.32 8.14
2025-03-11T12:27:33.32 8.16
2025-03-11T12:27:34.32 8.14
2025-03-11T12:27:35.32 8.16
2025-03-11T12:27:36.32 8.17
2025-03-11T12:27:37.32 8.17
2025-03-11T12:27:38.32 8.15
2025-03-11T12:27:39.32 8.15
2025-03-11T12:27:40.32 8.15
2025-03-11T12:27:41.32 8.16
2025-03-11T12:27:42.32 8.15
2025-03-11T12:27:43.32 8.14
2025-03-11T12:27:44.32 8.13
2025-03-11T12:27:45.32 8.14
2025-03-11T12:27:46.32 8.14
2025-03-11T12:27:47.32 8.14
2025-03-11T12:27:48.32 8.14
2025-03-11T12:27:49.32 8.15
2025-03-11T12:27:50.32 8.14
2025-03-11T12:27:51.32 8.14
2025-03-11T12:27:52.32 8.14
2025-03-11T12:27:53.32 8.16
2025-03-11T12:27:54.32 8.16
2025-03-11T12:27:55.32 8.14
2025-03-11T12:27:56.32 8.13
2025-03-11T12:27:57.32 8.14
2025-03-11T12:27:58.32 8.14
2025-03-11T12:27:59.32 8.15
2025-03-11T12:28:00.32 8.14
2025-03-11T12:28:01.32 8.16
2025-03-11T12:28:02.32 8.15
2025-03-11T12:28:03.32 8.15
2025-03-11T12:28:04.32 8.12
2025-03-11T12:28:05.32 8.14
2025-03-11T12:28:06.32 8.16
2025-03-11T12:28:07.32 8.14
2025-03-11T12:28:08.32 8.14
2025-03-11T12:28:09.32 8.13
2025-03-11T12:28:10.32 8.13
2025-03-11T12:28:11.32 8.14
2025-03-11T12:28:12.32 8.13
2025-03-11T12:28:13.32 8.16
2025-03-11T12:28:14.32 8.13
2025-03-11T12:28:15.32 8.14
2025-03-11T12:28:16.32 8.15
2025-03-11T12:28:17.32 8.14
2025-03-11T12:28:18.32 8.14
2025-03-11T12:28:19.32 8.14
2025-03-11T12:28:20.32 8.14
2025-03-11T12:28:21.32 8.16
2025-03-11T12:28:22.32 8.16
2025-03-11T12:28:23.32 8.13
2025-03-11T12:28:24.32 8.15
2025-03-11T12:28:25.32 8.14
2025-03-11T12:28:26.32 8.16
2025-03-11T12:28:27.32 8.15
2025-03-11T12:28:28.32 8.16
2025-03-11T12:28:29.32 8.17
2025-03-11T12:28:30.32 8.14
2025-03-11T12:28:31.32 8.13
2025-03-11T12:28:32.32 8.16
2025-03-11T12:28:33.32 8.15
2025-03-11T12:28:34.32 8.14
2025-03-11T12:28:35.32 8.16
2025-03-11T12:28:36.32 8.12
2025-03-11T12:28:37.32 8.12
2025-03-11T12:28:38.32 8.16
2025-03-11T12:28:39.32 8.15
2025-03-11T12:28:40.32 8.16
2025-03-11T12:28:41.32 8.16
2025-03-11T12:28:42.32 8.16
2025-03-11T12:28:43.32 8.16
2025-03-11T12:28:44.32 8.15
2025-03-11T12:28:45.32 8.14
2025-03-11T12:28:46.32 8.16
2025-03-11T12:28:47.32 8.16
2025-03-11T12:28:48.32 8.14
2025-03-11T12:28:49.32 8.16
2025-03-11T12:28:50.32 8.14
2025-03-11T12:28:51.32 8.15
2025-03-11T12:28:52.32 8.14
2025-03-11T12:28:53.32 8.17
2025-03-11T12:28:54.32 8.14
2025-03-11T12:28:55.32 8.14
2025-03-11T12:28:56.32 8.14
2025-03-11T12:28:57.32 8.14
2025-03-11T12:28:58.32 8.15
2025-03-11T12:28:59.32 8.14
2025-03-11T12:29:00.32 8.16
2025-03-11T12:29:01.32 8.14
2025-03-11T12:29:02.32 8.15
2025-03-11T12:29:03.32 8.14
2025-03-11T12:29:04.32 8.14
2025-03-11T12:29:05.32 8.15
2025-03-11T12:29:06.32 8.16
2025-03-11T12:29:07.32 8.14
2025-03-11T12:29:08.32 8.14
2025-03-11T12:29:09.32 8.16
2025-03-11T12:29:10.32 8.14
2025-03-11T12:29:11.32 8.14
2025-03-11T12:29:12.32 8.16
2025-03-11T12:29:13.32 8.14
2025-03-11T12:29:14.32 8.13
2025-03-11T12:29:15.32 8.12
2025-03-11T12:29:16.32 8.14
2025-03-11T12:29:17.32 8.14
2025-03-11T12:29:18.32 8.16
2025-03-11T12:29:19.32 8.16
2025-03-11T12:29:20.32 8.16
2025-03-11T12:29:21.32 8.17
2025-03-11T12:29:22.32 8.16
2025-03-11T12:29:23.32 8.15
2025-03-11T12:29:24.32 8.15
2025-03-11T12:29:25.32 8.12
2025-03-11T12:29:26.32 8.13
2025-03-11T12:29:27.32 8.16
2025-03-11T12:29:28.32 8.14
2025-03-11T12:29:29.32 8.14
2025-03-11T12:29:30.32 8.17
2025-03-11T12:29:31.32 8.16
2025-03-11T12:29:32.32 8.14
2025-03-11T12:29:33.32 8.17
2025-03-11T12:29:34.32 8.15
2025-03-11T12:29:35.32 8.16
2025-03-11T12:29:36.32 8.16
2025-03-11T12:29:37.32 8.14
2025-03-11T12:29:38.32 8.14
2025-03-11T12:29:39.32 8.16
2025-03-11T12:29:40.32 8.16
2025-03-11T12:29:41.32 8.17
2025-03-11T12:29:42.32 8.14
2025-03-11T12:29:43.32 8.15
2025-03-11T12:29:44.32 8.17
2025-03-11T12:29:45.32 8.15
2025-03-11T12:29:46.32 8.16
2025-03-11T12:29:47.32 8.13
2025-03-11T12:29:48.32 8.14
2025-03-11T12:29:49.32 8.16
2025-03-11T12:29:50.32 8.16
2025-03-11T12:29:51.32 8.14
2025-03-11T12:29:52.32 8.16
2025-03-11T12:29:53.32 8.15
2025-03-11T12:29:54.32 8.15
2025-03-11T12:29:55.32 8.14
2025-03-11T12:29:56.32 8.14
2025-03-11T12:29:57.32 8.14
2025-03-11T12:29:58.32 8.14
2025-03-11T12:29:59.32 8.15
2025-03-11T12:30:00.32 8.17
2025-03-11T12:30:01.32 8.16
2025-03-11T12:30:02.32 8.15
2025-03-11T12:30:03.32 8.15
2025-03-11T12:30:04.32 8.16
2025-03-11T12:30:05.32 8.16
2025-03-11T12:30:06.32 8.14
2025-03-11T12:30:07.34 8.15
2025-03-11T12:30:08.31 8.15
2025-03-11T12:30:09.31 8.15
2025-03-11T12:30:10.31 8.14
2025-03-11T12:30:11.31 8.14
2025-03-11T12:30:12.31 8.14
2025-03-11T12:30:13.31 8.12
2025-03-11T12:30:14.31 8.16
2025-03-11T12:30:15.31 8.16
2025-03-11T12:30:16.31 8.13
2025-03-11T12:30:17.31 8.16
2025-03-11T12:30:18.31 8.16
2025-03-11T12:30:19.31 8.16
2025-03-11T12:30:20.31 8.16
2025-03-11T12:30:21.31 8.15
2025-03-11T12:30:22.31 8.16
2025-03-11T12:30:23.31 8.15
2025-03-11T12:30:24.31 8.17
2025-03-11T12:30:25.31 8.15
2025-03-11T12:30:26.31 8.16
2025-03-11T12:30:27.31 8.16
2025-03-11T12:30:28.31 8.17
2025-03-11T12:30:29.31 8.14
2025-03-11T12:30:30.31 8.14
2025-03-11T12:30:31.31 8.14
2025-03-11T12:30:32.31 8.16
2025-03-11T12:30:33.31 8.16
2025-03-11T12:30:34.31 8.15
2025-03-11T12:30:35.31 8.15
2025-03-11T12:30:36.31 8.14
2025-03-11T12:30:37.31 8.16
2025-03-11T12:30:38.31 8.15
2025-03-11T12:30:39.31 8.15
2025-03-11T12:30:40.31 8.15
2025-03-11T12:30:41.31 8.14
2025-03-11T12:30:42.31 8.15
2025-03-11T12:30:43.31 8.16
2025-03-11T12:30:44.31 8.13
2025-03-11T12:30:45.31 8.16
2025-03-11T12:30:46.31 8.15
2025-03-11T12:30:47.31 8.16
2025-03-11T12:30:48.31 8.14
2025-03-11T12:30:49.31 8.14
2025-03-11T12:30:50.31 8.15
2025-03-11T12:30:51.31 8.14
2025-03-11T12:30:52.31 8.14
2025-03-11T12:30:53.31 8.16
2025-03-11T12:30:54.31 8.15
2025-03-11T12:30:55.32 8.17
2025-03-11T12:30:56.31 8.16
2025-03-11T12:30:57.31 8.14
2025-03-11T12:30:58.31 8.15
2025-03-11T12:30:59.31 8.15
2025-03-11T12:31:00.31 8.17
2025-03-11T12:31:01.31 8.14
2025-03-11T12:31:02.31 8.16
2025-03-11T12:31:03.31 8.17
2025-03-11T12:31:04.31 8.15
2025-03-11T12:31:05.31 8.15
2025-03-11T12:31:06.32 8.17
2025-03-11T12:31:07.31 8.12
2025-03-11T12:31:08.31 8.14
2025-03-11T12:31:09.32 8.16
2025-03-11T12:31:10.32 8.14
2025-03-11T12:31:11.32 8.14
2025-03-11T12:31:12.32 8.14
2025-03-11T12:31:13.32 8.16
2025-03-11T12:31:14.32 8.14
2025-03-11T12:31:15.32 8.16
2025-03-11T12:31:16.32 8.14
2025-03-11T12:31:17.32 8.16
2025-03-11T12:31:18.32 8.16
2025-03-11T12:31:19.32 8.13
2025-03-11T12:31:20.32 8.15
2025-03-11T12:31:21.32 8.13
2025-03-11T12:31:22.32 8.15
2025-03-11T12:31:23.32 8.14
2025-03-11T12:31:24.32 8.16
2025-03-11T12:31:25.32 8.14
2025-03-11T12:31:26.32 8.15
2025-03-11T12:31:27.32 8.16
2025-03-11T12:31:28.32 8.14
2025-03-11T12:31:29.32 8.16
2025-03-11T12:31:30.32 8.16
2025-03-11T12:31:31.32 8.14
2025-03-11T12:31:32.32 8.16
2025-03-11T12:31:33.32 8.16
2025-03-11T12:31:34.32 8.16
2025-03-11T12:31:35.32 8.16
2025-03-11T12:31:36.32 8.16
2025-03-11T12:31:37.32 8.14
2025-03-11T12:31:38.32 8.15
2025-03-11T12:31:39.32 8.14
2025-03-11T12:31:40.32 8.16
2025-03-11T12:31:41.32 8.13
2025-03-11T12:31:42.32 8.15
2025-03-11T12:31:43.32 8.16
2025-03-11T12:31:44.32 8.16
2025-03-11T12:31:45.32 8.13
2025-03-11T12:31:46.32 8.17
2025-03-11T12:31:47.32 8.16
2025-03-11T12:31:48.32 8.16
2025-03-11T12:31:49.32 8.16
2025-03-11T12:31:50.32 8.14
2025-03-11T12:31:51.32 8.16
2025-03-11T12:31:52.32 8.14
2025-03-11T12:31:53.32 8.15
2025-03-11T12:31:54.32 8.15
2025-03-11T12:31:55.32 8.15
2025-03-11T12:31:56.32 8.14
2025-03-11T12:31:57.32 8.16
2025-03-11T12:31:58.32 8.16
2025-03-11T12:31:59.32 8.18
2025-03-11T12:32:00.32 8.15
2025-03-11T12:32:01.32 8.16
2025-03-11T12:32:02.32 8.16
2025-03-11T12:32:03.32 8.14
2025-03-11T12:32:04.32 8.16
2025-03-11T12:32:05.32 8.18
2025-03-11T12:32:06.32 8.16
2025-03-11T12:32:07.32 8.16
2025-03-11T12:32:08.32 8.14
2025-03-11T12:32:09.32 8.16
2025-03-11T12:32:10.32 8.14
2025-03-11T12:32:11.32 8.12
2025-03-11T12:32:12.32 8.15
2025-03-11T12:32:13.32 8.16
2025-03-11T12:32:14.32 8.16
2025-03-11T12:32:15.32 8.14
2025-03-11T12:32:16.32 8.14
2025-03-11T12:32:17.32 8.14
2025-03-11T12:32:18.32 8.14
2025-03-11T12:32:19.32 8.14
2025-03-11T12:32:20.32 8.17
2025-03-11T12:32:21.32 8.13
2025-03-11T12:32:22.32 8.16
2025-03-11T12:32:23.32 8.14
2025-03-11T12:32:24.32 8.15
2025-03-11T12:32:25.32 8.16
2025-03-11T12:32:26.32 8.14
2025-03-11T12:32:27.32 8.17
2025-03-11T12:32:28.32 8.14
2025-03-11T12:32:29.32 8.14
2025-03-11T12:32:30.32 8.14
2025-03-11T12:32:31.32 8.15
2025-03-11T12:32:32.32 8.16
2025-03-11T12:32:33.32 8.14
2025-03-11T12:32:34.32 8.15
2025-03-11T12:32:35.32 8.14
2025-03-11T12:32:36.32 8.15
2025-03-11T12:32:37.32 8.15
2025-03-11T12:32:38.32 8.18
2025-03-11T12:32:39.32 8.13
2025-03-11T12:32:40.32 8.15
2025-03-11T12:32:41.32 8.15
2025-03-11T12:32:42.32 8.16
2025-03-11T12:32:43.32 8.14
2025-03-11T12:32:44.32 8.14
2025-03-11T12:32:45.32 8.16
2025-03-11T12:32:46.32 8.14
2025-03-11T12:32:47.32 8.16
2025-03-11T12:32:48.32 8.14
2025-03-11T12:32:49.32 8.16
2025-03-11T12:32:50.32 8.16
2025-03-11T12:32:51.32 8.16
2025-03-11T12:32:52.32 8.14
2025-03-11T12:32:53.32 8.17
2025-03-11T12:32:54.32 8.14
2025-03-11T12:32:55.32 8.14
2025-03-11T12:32:56.32 8.16
2025-03-11T12:32:57.32 8.16
2025-03-11T12:32:58.32 8.14
2025-03-11T12:32:59.32 8.14
2025-03-11T12:33:00.32 8.14
2025-03-11T12:33:01.32 8.14
2025-03-11T12:33:02.32 8.15
2025-03-11T12:33:03.32 8.16
2025-03-11T12:33:04.32 8.14
2025-03-11T12:33:05.32 8.16
2025-03-11T12:33:06.32 8.14
2025-03-11T12:33:07.32 8.15
2025-03-11T12:33:08.32 8.16
2025-03-11T12:33:09.32 8.14
2025-03-11T12:33:10.32 8.14
2025-03-11T12:33:11.32 8.17
2025-03-11T12:33:12.32 8.14
2025-03-11T12:33:13.32 8.15
2025-03-11T12:33:14.32 8.14
2025-03-11T12:33:15.32 8.12
2025-03-11T12:33:16.32 8.16
2025-03-11T12:33:17.32 8.14
2025-03-11T12:33:18.32 8.13
2025-03-11T12:33:19.32 8.14
2025-03-11T12:33:20.32 8.14
2025-03-11T12:33:21.32 8.14
2025-03-11T12:33:22.32 8.17
2025-03-11T12:33:23.32 8.17
2025-03-11T12:33:24.32 8.14
2025-03-11T12:33:25.32 8.15
2025-03-11T12:33:26.32 8.16
2025-03-11T12:33:27.32 8.16
2025-03-11T12:33:28.32 8.14
2025-03-11T12:33:29.32 8.14
2025-03-11T12:33:30.32 8.16
2025-03-11T12:33:31.32 8.13
2025-03-11T12:33:32.32 8.14
2025-03-11T12:33:33.32 8.15
2025-03-11T12:33:34.32 8.16
2025-03-11T12:33:35.32 8.16
2025-03-11T12:33:36.32 8.14
2025-03-11T12:33:37.32 8.14
2025-03-11T12:33:38.32 8.15
2025-03-11T12:33:39.32 8.14
2025-03-11T12:33:40.32 8.15
2025-03-11T12:33:41.32 8.14
2025-03-11T12:33:42.32 8.14
2025-03-11T12:33:43.32 8.13
2025-03-11T12:33:44.32 8.14
2025-03-11T12:33:45.32 8.13
2025-03-11T12:33:46.32 8.16
2025-03-11T12:33:47.32 8.14
2025-03-11T12:33:48.32 8.14
2025-03-11T12:33:49.32 8.16
2025-03-11T12:33:50.32 8.13
2025-03-11T12:33:51.32 8.15
2025-03-11T12:33:52.32 8.14
2025-03-11T12:33:53.32 8.14
2025-03-11T12:33:54.32 8.16
2025-03-11T12:33:55.32 8.16
2025-03-11T12:33:56.32 8.15
2025-03-11T12:33:57.32 8.14
2025-03-11T12:33:58.32 8.17
2025-03-11T12:33:59.32 8.12
2025-03-11T12:34:00.32 8.13
2025-03-11T12:34:01.32 8.16
2025-03-11T12:34:02.32 8.16
2025-03-11T12:34:03.32 8.17
2025-03-11T12:34:04.32 8.16
2025-03-11T12:34:05.32 8.17
2025-03-11T12:34:06.32 8.14
2025-03-11T12:34:07.32 8.16
2025-03-11T12:34:08.32 8.14
2025-03-11T12:34:09.32 8.12
2025-03-11T12:34:10.32 8.14
2025-03-11T12:34:11.32 8.15
2025-03-11T12:34:12.32 8.15
2025-03-11T12:34:13.32 8.15
2025-03-11T12:34:14.32 8.14
2025-03-11T12:34:15.32 8.16
2025-03-11T12:34:16.32 8.14
2025-03-11T12:34:17.32 8.15
2025-03-11T12:34:18.32 8.17
2025-03-11T12:34:19.32 8.13
2025-03-11T12:34:20.32 8.16
2025-03-11T12:34:21.32 8.14
2025-03-11T12:34:22.32 8.15
2025-03-11T12:34:23.32 8.14
2025-03-11T12:34:24.32 8.14
2025-03-11T12:34:25.32 8.17
2025-03-11T12:34:26.32 8.16
2025-03-11T12:34:27.32 8.16
2025-03-11T12:34:28.32 8.16
2025-03-11T12:34:29.32 8.13
2025-03-11T12:34:30.32 8.14
2025-03-11T12:34:31.32 8.16
2025-03-11T12:34:32.32 8.13
2025-03-11T12:34:33.32 8.13
2025-03-11T12:34:34.32 8.13
2025-03-11T12:34:35.32 8.14
2025-03-11T12:34:36.32 8.15
2025-03-11T12:34:37.32 8.16
2025-03-11T12:34:38.32 8.15
2025-03-11T12:34:39.32 8.16
2025-03-11T12:34:40.32 8.13
2025-03-11T12:34:41.32 8.15
2025-03-11T12:34:42.32 8.16
2025-03-11T12:34:43.32 8.16
2025-03-11T12:34:44.32 8.13
2025-03-11T12:34:45.32 8.15
2025-03-11T12:34:46.32 8.14
2025-03-11T12:34:47.32 8.13
2025-03-11T12:34:48.32 8.13
2025-03-11T12:34:49.32 8.14
2025-03-11T12:34:50.32 8.16
2025-03-11T12:34:51.32 8.15
2025-03-11T12:34:52.32 8.15
2025-03-11T12:34:53.32 8.14
2025-03-11T12:34:54.32 8.14
2025-03-11T12:34:55.32 8.16
2025-03-11T12:34:56.32 8.16
2025-03-11T12:34:57.32 8.14
2025-03-11T12:34:58.32 8.15
2025-03-11T12:34:59.32 8.13
2025-03-11T12:35:00.32 8.17
2025-03-11T12:35:01.32 8.16
2025-03-11T12:35:02.32 8.16
2025-03-11T12:35:03.32 8.16
2025-03-11T12:35:04.32 8.16
2025-03-11T12:35:05.32 8.17
2025-03-11T12:35:06.32 8.17
2025-03-11T12:35:07.32 8.14
2025-03-11T12:35:08.32 8.12
2025-03-11T12:35:09.32 8.16
2025-03-11T12:35:10.32 8.14
2025-03-11T12:35:11.32 8.14
2025-03-11T12:35:12.32 8.14
2025-03-11T12:35:13.32 8.16
2025-03-11T12:35:14.32 8.12
2025-03-11T12:35:15.32 8.17
2025-03-11T12:35:16.32 8.15
2025-03-11T12:35:17.32 8.13
2025-03-11T12:35:18.32 8.16
2025-03-11T12:35:19.32 8.15
2025-03-11T12:35:20.32 8.16
2025-03-11T12:35:21.32 8.16
2025-03-11T12:35:22.32 8.12
2025-03-11T12:35:23.32 8.16
2025-03-11T12:35:24.32 8.14
2025-03-11T12:35:25.32 8.14
2025-03-11T12:35:26.32 8.15
2025-03-11T12:35:27.32 8.13
2025-03-11T12:35:28.32 8.15
2025-03-11T12:35:29.32 8.17
2025-03-11T12:35:30.32 8.14
2025-03-11T12:35:31.32 8.16
2025-03-11T12:35:32.32 8.16
2025-03-11T12:35:33.32 8.13
2025-03-11T12:35:34.32 8.15
2025-03-11T12:35:35.32 8.15
2025-03-11T12:35:36.32 8.17
2025-03-11T12:35:37.32 8.15
2025-03-11T12:35:38.32 8.18
2025-03-11T12:35:39.32 8.16
2025-03-11T12:35:40.32 8.15
2025-03-11T12:35:41.32 8.14
2025-03-11T12:35:42.32 8.14
2025-03-11T12:35:43.32 8.16
2025-03-11T12:35:44.32 8.14
2025-03-11T12:35:45.32 8.15
2025-03-11T12:35:46.32 8.16
2025-03-11T12:35:47.32 8.14
2025-03-11T12:35:48.32 8.15
2025-03-11T12:35:49.32 8.15
2025-03-11T12:35:50.32 8.16
2025-03-11T12:35:51.32 8.14
2025-03-11T12:35:52.32 8.13
2025-03-11T12:35:53.32 8.14
2025-03-11T12:35:54.32 8.15
2025-03-11T12:35:55.32 8.14
2025-03-11T12:35:56.32 8.14
2025-03-11T12:35:57.32 8.15
2025-03-11T12:35:58.32 8.15
2025-03-11T12:35:59.32 8.16
2025-03-11T12:36:00.32 8.14
2025-03-11T12:36:01.32 8.16
2025-03-11T12:36:02.32 8.14
2025-03-11T12:36:03.32 8.16
2025-03-11T12:36:04.32 8.16
2025-03-11T12:36:05.32 8.13
2025-03-11T12:36:06.32 8.16
2025-03-11T12:36:07.32 8.14
2025-03-11T12:36:08.32 8.14
2025-03-11T12:36:09.32 8.14
2025-03-11T12:36:10.32 8.14
2025-03-11T12:36:11.32 8.11
2025-03-11T12:36:12.32 8.15
2025-03-11T12:36:13.32 8.15
2025-03-11T12:36:14.32 8.14
2025-03-11T12:36:15.32 8.13
2025-03-11T12:36:16.32 8.17
2025-03-11T12:36:17.32 8.14
2025-03-11T12:36:18.32 8.12
2025-03-11T12:36:19.32 8.13
2025-03-11T12:36:20.32 8.16
2025-03-11T12:36:21.32 8.13
2025-03-11T12:36:22.32 8.15
2025-03-11T12:36:23.32 8.14
2025-03-11T12:36:24.32 8.14
2025-03-11T12:36:25.32 8.14
2025-03-11T12:36:26.32 8.15
2025-03-11T12:36:27.32 8.16
2025-03-11T12:36:28.33 8.16
2025-03-11T12:36:29.33 8.16
2025-03-11T12:36:30.33 8.15
2025-03-11T12:36:31.33 8.14
2025-03-11T12:36:32.33 8.15
2025-03-11T12:36:33.33 8.15
2025-03-11T12:36:34.33 8.12
2025-03-11T12:36:35.33 8.12
2025-03-11T12:36:36.33 8.13
2025-03-11T12:36:37.33 8.14
2025-03-11T12:36:38.33 8.13
2025-03-11T12:36:39.33 8.14
2025-03-11T12:36:40.33 8.13
2025-03-11T12:36:41.33 8.14
2025-03-11T12:36:42.33 8.13
2025-03-11T12:36:43.33 8.14
2025-03-11T12:36:44.33 8.16
2025-03-11T12:36:45.33 8.16
2025-03-11T12:36:46.33 8.14
2025-03-11T12:36:47.33 8.15
2025-03-11T12:36:48.33 8.16
2025-03-11T12:36:49.33 8.16
2025-03-11T12:36:50.33 8.16
2025-03-11T12:36:51.33 8.16
2025-03-11T12:36:52.33 8.14
2025-03-11T12:36:53.33 8.16
2025-03-11T12:36:54.33 8.15
2025-03-11T12:36:55.33 8.14
2025-03-11T12:36:56.33 8.14
2025-03-11T12:36:57.33 8.15
2025-03-11T12:36:58.33 8.14
2025-03-11T12:36:59.33 8.16
2025-03-11T12:37:00.33 8.16
2025-03-11T12:37:01.33 8.16
2025-03-11T12:37:02.33 8.15
2025-03-11T12:37:03.33 8.14
2025-03-11T12:37:04.33 8.15
2025-03-11T12:37:05.33 8.16
2025-03-11T12:37:06.33 8.15
2025-03-11T12:37:07.33 8.16
2025-03-11T12:37:08.33 8.17
2025-03-11T12:37:09.33 8.14
2025-03-11T12:37:10.33 8.14
2025-03-11T12:37:11.33 8.15
2025-03-11T12:37:12.33 8.14
2025-03-11T12:37:13.33 8.16
2025-03-11T12:37:14.33 8.15
2025-03-11T12:37:15.33 8.14
2025-03-11T12:37:16.33 8.14
2025-03-11T12:37:17.33 8.16
2025-03-11T12:37:18.33 8.15
2025-03-11T12:37:19.33 8.16
2025-03-11T12:37:20.33 8.14
2025-03-11T12:37:21.33 8.13
2025-03-11T12:37:22.33 8.14
2025-03-11T12:37:23.33 8.16
2025-03-11T12:37:24.33 8.16
2025-03-11T12:37:25.33 8.16
2025-03-11T12:37:26.33 8.16
2025-03-11T12:37:27.33 8.15
2025-03-11T12:37:28.33 8.14
2025-03-11T12:37:29.33 8.13
2025-03-11T12:37:30.33 8.13
2025-03-11T12:37:31.33 8.14
2025-03-11T12:37:32.33 8.15
2025-03-11T12:37:33.33 8.14
2025-03-11T12:37:34.33 8.14
2025-03-11T12:37:35.33 8.14
2025-03-11T12:37:36.33 8.13
2025-03-11T12:37:37.33 8.14
2025-03-11T12:37:38.33 8.13
2025-03-11T12:37:39.33 8.13
2025-03-11T12:37:40.33 8.12
2025-03-11T12:37:41.33 8.12
2025-03-11T12:37:42.33 8.14
2025-03-11T12:37:43.33 8.14
2025-03-11T12:37:44.33 8.14
2025-03-11T12:37:45.33 8.15
2025-03-11T12:37:46.33 8.14
2025-03-11T12:37:47.33 8.14
2025-03-11T12:37:48.33 8.16
2025-03-11T12:37:49.33 8.14
2025-03-11T12:37:50.33 8.14
2025-03-11T12:37:51.33 8.14
2025-03-11T12:37:52.33 8.16
2025-03-11T12:37:53.33 8.14
2025-03-11T12:37:54.33 8.13
2025-03-11T12:37:55.33 8.16
2025-03-11T12:37:56.33 8.11
2025-03-11T12:37:57.33 8.16
2025-03-11T12:37:58.33 8.16
2025-03-11T12:37:59.33 8.15
2025-03-11T12:38:00.33 8.16
2025-03-11T12:38:01.33 8.13
2025-03-11T12:38:02.33 8.14
2025-03-11T12:38:03.33 8.15
2025-03-11T12:38:04.33 8.14
2025-03-11T12:38:05.33 8.15
2025-03-11T12:38:06.33 8.17
2025-03-11T12:38:07.33 8.14
2025-03-11T12:38:08.33 8.13
2025-03-11T12:38:09.33 8.15
2025-03-11T12:38:10.33 8.17
2025-03-11T12:38:11.33 8.14
2025-03-11T12:38:12.33 8.15
2025-03-11T12:38:13.33 8.16
2025-03-11T12:38:14.33 8.14
2025-03-11T12:38:15.33 8.14
2025-03-11T12:38:16.33 8.15
2025-03-11T12:38:17.33 8.13
2025-03-11T12:38:18.33 8.16
2025-03-11T12:38:19.33 8.14
2025-03-11T12:38:20.33 8.16
2025-03-11T12:38:21.33 8.16
2025-03-11T12:38:22.33 8.12
2025-03-11T12:38:23.33 8.14
2025-03-11T12:38:24.33 8.14
2025-03-11T12:38:25.33 8.16
2025-03-11T12:38:26.33 8.16
2025-03-11T12:38:27.33 8.14
2025-03-11T12:38:28.33 8.16
2025-03-11T12:38:29.33 8.14
2025-03-11T12:38:30.33 8.16
2025-03-11T12:38:31.33 8.14
2025-03-11T12:38:32.33 8.14
2025-03-11T12:38:33.33 8.16
2025-03-11T12:38:34.33 8.15
2025-03-11T12:38:35.33 8.13
2025-03-11T12:38:36.33 8.15
2025-03-11T12:38:37.33 8.16
2025-03-11T12:38:38.33 8.15
2025-03-11T12:38:39.33 8.14
2025-03-11T12:38:40.33 8.15
2025-03-11T12:38:41.33 8.16
2025-03-11T12:38:42.33 8.14
2025-03-11T12:38:43.33 8.16
2025-03-11T12:38:44.33 8.14
2025-03-11T12:38:45.33 8.15
2025-03-11T12:38:46.33 8.12
2025-03-11T12:38:47.33 8.15
2025-03-11T12:38:48.33 8.14
2025-03-11T12:38:49.33 8.16
2025-03-11T12:38:50.33 8.15
2025-03-11T12:38:51.33 8.14
2025-03-11T12:38:52.33 8.16
2025-03-11T12:38:53.33 8.14
2025-03-11T12:38:54.33 8.14
2025-03-11T12:38:55.33 8.15
2025-03-11T12:38:56.33 8.14
2025-03-11T12:38:57.33 8.14
2025-03-11T12:38:58.33 8.14
2025-03-11T12:38:59.33 8.14
2025-03-11T12:39:00.33 8.14
2025-03-11T12:39:01.33 8.15
2025-03-11T12:39:02.33 8.14
2025-03-11T12:39:03.33 8.12
2025-03-11T12:39:04.33 8.12
2025-03-11T12:39:05.33 8.14
2025-03-11T12:39:06.33 8.14
2025-03-11T12:39:07.33 8.13
2025-03-11T12:39:08.33 8.15
2025-03-11T12:39:09.33 8.16
2025-03-11T12:39:10.33 8.15
2025-03-11T12:39:11.33 8.13
2025-03-11T12:39:12.33 8.15
2025-03-11T12:39:13.33 8.16
2025-03-11T12:39:14.33 8.13
2025-03-11T12:39:15.33 8.16
2025-03-11T12:39:16.33 8.13
2025-03-11T12:39:17.33 8.14
2025-03-11T12:39:18.33 8.14
2025-03-11T12:39:19.33 8.14
2025-03-11T12:39:20.33 8.16
2025-03-11T12:39:21.33 8.15
2025-03-11T12:39:22.33 8.14
2025-03-11T12:39:23.33 8.14
2025-03-11T12:39:24.33 8.15
2025-03-11T12:39:25.33 8.15
2025-03-11T12:39:26.33 8.16
2025-03-11T12:39:27.33 8.12
2025-03-11T12:39:28.33 8.17
2025-03-11T12:39:29.33 8.15
2025-03-11T12:39:30.33 8.15
2025-03-11T12:39:31.33 8.15
2025-03-11T12:39:32.33 8.13
2025-03-11T12:39:33.33 8.12
2025-03-11T12:39:34.33 8.14
2025-03-11T12:39:35.33 8.12
2025-03-11T12:39:36.33 8.13
2025-03-11T12:39:37.33 8.14
2025-03-11T12:39:38.33 8.14
2025-03-11T12:39:39.33 8.13
2025-03-11T12:39:40.34 8.15
2025-03-11T12:39:41.32 8.14
2025-03-11T12:39:42.32 8.14
2025-03-11T12:39:43.32 8.14
2025-03-11T12:39:44.32 8.16
2025-03-11T12:39:45.32 8.17
2025-03-11T12:39:46.32 8.15
2025-03-11T12:39:47.32 8.14
2025-03-11T12:39:48.32 8.15
2025-03-11T12:39:49.32 8.14
2025-03-11T12:39:50.32 8.15
2025-03-11T12:39:51.32 8.13
2025-03-11T12:39:52.32 8.14
2025-03-11T12:39:53.32 8.16
2025-03-11T12:39:54.32 8.16
2025-03-11T12:39:55.32 8.14
2025-03-11T12:39:56.32 8.16
2025-03-11T12:39:57.32 8.15
2025-03-11T12:39:58.32 8.17
2025-03-11T12:39:59.32 8.14
2025-03-11T12:40:00.32 8.17
2025-03-11T12:40:01.32 8.14
2025-03-11T12:40:02.32 8.14
2025-03-11T12:40:03.32 8.13
2025-03-11T12:40:04.32 8.15
2025-03-11T12:40:05.32 8.16
2025-03-11T12:40:06.32 8.14
2025-03-11T12:40:07.32 8.17
2025-03-11T12:40:08.32 8.14
2025-03-11T12:40:09.32 8.14
2025-03-11T12:40:10.32 8.18
2025-03-11T12:40:11.32 8.14
2025-03-11T12:40:12.32 8.16
2025-03-11T12:40:13.32 8.16
2025-03-11T12:40:14.32 8.14
2025-03-11T12:40:15.32 8.17
2025-03-11T12:40:16.32 8.14
2025-03-11T12:40:17.32 8.14
2025-03-11T12:40:18.32 8.16
2025-03-11T12:40:19.32 8.17
2025-03-11T12:40:20.32 8.15
2025-03-11T12:40:21.32 8.17
2025-03-11T12:40:22.32 8.15
2025-03-11T12:40:23.32 8.14
2025-03-11T12:40:24.32 8.15
2025-03-11T12:40:25.32 8.16
2025-03-11T12:40:26.32 8.16
2025-03-11T12:40:27.32 8.14
2025-03-11T12:40:28.32 8.14
2025-03-11T12:40:29.32 8.13
2025-03-11T12:40:30.32 8.14
2025-03-11T12:40:31.32 8.13
2025-03-11T12:40:32.32 8.14
2025-03-11T12:40:33.32 8.14
2025-03-11T12:40:34.32 8.15
2025-03-11T12:40:35.32 8.15
2025-03-11T12:40:36.32 8.14
2025-03-11T12:40:37.32 8.17
2025-03-11T12:40:38.32 8.14
2025-03-11T12:40:39.32 8.14
2025-03-11T12:40:40.32 8.15
2025-03-11T12:40:41.32 8.16
2025-03-11T12:40:42.32 8.14
2025-03-11T12:40:43.32 8.16
2025-03-11T12:40:44.32 8.16
2025-03-11T12:40:45.32 8.16
2025-03-11T12:40:46.32 8.15
2025-03-11T12:40:47.32 8.16
2025-03-11T12:40:48.32 8.16
2025-03-11T12:40:49.32 8.15
2025-03-11T12:40:50.32 8.14
2025-03-11T12:40:51.32 8.16
2025-03-11T12:40:52.32 8.13
2025-03-11T12:40:53.32 8.15
2025-03-11T12:40:54.32 8.15
2025-03-11T12:40:55.32 8.16
2025-03-11T12:40:56.32 8.15
2025-03-11T12:40:57.32 8.17
2025-03-11T12:40:58.32 8.16
2025-03-11T12:40:59.32 8.12
2025-03-11T12:41:00.32 8.16
2025-03-11T12:41:01.32 8.15
2025-03-11T12:41:02.32 8.15
2025-03-11T12:41:03.32 8.15
2025-03-11T12:41:04.32 8.14
2025-03-11T12:41:05.32 8.15
2025-03-11T12:41:06.32 8.14
2025-03-11T12:41:07.32 8.16
2025-03-11T12:41:08.32 8.14
2025-03-11T12:41:09.32 8.14
2025-03-11T12:41:10.32 8.17
2025-03-11T12:41:11.32 8.14
2025-03-11T12:41:12.32 8.12
2025-03-11T12:41:13.32 8.12
2025-03-11T12:41:14.32 8.16
2025-03-11T12:41:15.32 8.16
2025-03-11T12:41:16.32 8.14
2025-03-11T12:41:17.32 8.15
2025-03-11T12:41:18.32 8.14
2025-03-11T12:41:19.32 8.12
2025-03-11T12:41:20.32 8.17
2025-03-11T12:41:21.32 8.14
2025-03-11T12:41:22.32 8.14
2025-03-11T12:41:23.32 8.14
2025-03-11T12:41:24.32 8.17
2025-03-11T12:41:25.32 8.13
2025-03-11T12:41:26.32 8.14
2025-03-11T12:41:27.32 8.13
2025-03-11T12:41:28.32 8.14
2025-03-11T12:41:29.32 8.15
2025-03-11T12:41:30.32 8.16
2025-03-11T12:41:31.32 8.14
2025-03-11T12:41:32.32 8.15
2025-03-11T12:41:33.32 8.15
2025-03-11T12:41:34.32 8.15
2025-03-11T12:41:35.32 8.14
2025-03-11T12:41:36.32 8.16
2025-03-11T12:41:37.32 8.17
2025-03-11T12:41:38.32 8.16
2025-03-11T12:41:39.32 8.11
2025-03-11T12:41:40.32 8.14
2025-03-11T12:41:41.32 8.14
2025-03-11T12:41:42.32 8.14
2025-03-11T12:41:43.35 8.15
2025-03-11T12:41:44.31 8.14
2025-03-11T12:41:45.31 8.14
2025-03-11T12:41:46.32 8.16
2025-03-11T12:41:47.32 8.15
2025-03-11T12:41:48.32 8.15
2025-03-11T12:41:49.32 8.16
2025-03-11T12:41:50.32 8.14
2025-03-11T12:41:51.32 8.16
2025-03-11T12:41:52.32 8.15
2025-03-11T12:41:53.32 8.15
2025-03-11T12:41:54.32 8.14
2025-03-11T12:41:55.32 8.15
2025-03-11T12:41:56.32 8.16
2025-03-11T12:41:57.32 8.17
2025-03-11T12:41:58.32 8.16
2025-03-11T12:41:59.32 8.16
2025-03-11T12:42:00.32 8.14
2025-03-11T12:42:01.32 8.12
2025-03-11T12:42:02.32 8.14
2025-03-11T12:42:03.32 8.14
2025-03-11T12:42:04.32 8.17
2025-03-11T12:42:05.32 8.16
2025-03-11T12:42:06.32 8.15
2025-03-11T12:42:07.32 8.14
2025-03-11T12:42:08.32 8.15
2025-03-11T12:42:09.32 8.16
2025-03-11T12:42:10.32 8.13
2025-03-11T12:42:11.32 8.14
2025-03-11T12:42:12.32 8.14
2025-03-11T12:42:13.32 8.16
2025-03-11T12:42:14.32 8.16
2025-03-11T12:42:15.32 8.16
2025-03-11T12:42:16.32 8.16
2025-03-11T12:42:17.32 8.14
2025-03-11T12:42:18.32 8.16
2025-03-11T12:42:19.32 8.16
2025-03-11T12:42:20.32 8.14
2025-03-11T12:42:21.32 8.16
2025-03-11T12:42:22.32 8.14
2025-03-11T12:42:23.32 8.16
2025-03-11T12:42:24.32 8.17
2025-03-11T12:42:25.32 8.14
2025-03-11T12:42:26.32 8.17
2025-03-11T12:42:27.32 8.15
2025-03-11T12:42:28.32 8.14
2025-03-11T12:42:29.32 8.16
2025-03-11T12:42:30.32 8.17
2025-03-11T12:42:31.32 8.17
2025-03-11T12:42:32.32 8.14
2025-03-11T12:42:33.32 8.14
2025-03-11T12:42:34.32 8.13
2025-03-11T12:42:35.32 8.14
2025-03-11T12:42:36.32 8.15
2025-03-11T12:42:37.32 8.16
2025-03-11T12:42:38.32 8.13
2025-03-11T12:42:39.32 8.15
2025-03-11T12:42:40.32 8.15
2025-03-11T12:42:41.32 8.14
2025-03-11T12:42:42.32 8.13
2025-03-11T12:42:43.32 8.12
2025-03-11T12:42:44.32 8.14
2025-03-11T12:42:45.32 8.15
2025-03-11T12:42:46.32 8.16
2025-03-11T12:42:47.32 8.13
2025-03-11T12:42:48.32 8.18
2025-03-11T12:42:49.32 8.12
2025-03-11T12:42:50.32 8.14
2025-03-11T12:42:51.32 8.12
2025-03-11T12:42:52.32 8.17
2025-03-11T12:42:53.32 8.14
2025-03-11T12:42:54.32 8.15
2025-03-11T12:42:55.32 8.15
2025-03-11T12:42:56.32 8.16
2025-03-11T12:42:57.32 8.13
2025-03-11T12:42:58.32 8.13
2025-03-11T12:42:59.32 8.14
2025-03-11T12:43:00.32 8.17
2025-03-11T12:43:01.32 8.11
2025-03-11T12:43:02.32 8.14
2025-03-11T12:43:03.32 8.16
2025-03-11T12:43:04.32 8.16
2025-03-11T12:43:05.32 8.15
2025-03-11T12:43:06.32 8.15
2025-03-11T12:43:07.32 8.14
2025-03-11T12:43:08.32 8.14
2025-03-11T12:43:09.32 8.14
2025-03-11T12:43:10.32 8.16
2025-03-11T12:43:11.32 8.14
2025-03-11T12:43:12.32 8.14
2025-03-11T12:43:13.32 8.15
2025-03-11T12:43:14.32 8.14
2025-03-11T12:43:15.32 8.16
2025-03-11T12:43:16.32 8.15
2025-03-11T12:43:17.32 8.17
2025-03-11T12:43:18.32 8.13
2025-03-11T12:43:19.32 8.14
2025-03-11T12:43:20.32 8.14
2025-03-11T12:43:21.32 8.11
2025-03-11T12:43:22.32 8.15
2025-03-11T12:43:23.32 8.14
2025-03-11T12:43:24.32 8.15
2025-03-11T12:43:25.32 8.16
2025-03-11T12:43:26.32 8.14
2025-03-11T12:43:27.32 8.13
2025-03-11T12:43:28.32 8.15
2025-03-11T12:43:29.32 8.14
2025-03-11T12:43:30.32 8.14
2025-03-11T12:43:31.32 8.14
2025-03-11T12:43:32.32 8.12
2025-03-11T12:43:33.32 8.14
2025-03-11T12:43:34.32 8.14
2025-03-11T12:43:35.32 8.16
2025-03-11T12:43:36.32 8.16
2025-03-11T12:43:37.32 8.15
2025-03-11T12:43:38.32 8.16
2025-03-11T12:43:39.32 8.14
2025-03-11T12:43:40.32 8.14
2025-03-11T12:43:41.32 8.15
2025-03-11T12:43:42.32 8.16
2025-03-11T12:43:43.32 8.14
2025-03-11T12:43:44.32 8.14
2025-03-11T12:43:45.32 8.15
2025-03-11T12:43:46.32 8.11
2025-03-11T12:43:47.32 8.17
2025-03-11T12:43:48.32 8.14
2025-03-11T12:43:49.32 8.14
2025-03-11T12:43:50.32 8.15
2025-03-11T12:43:51.32 8.14
2025-03-11T12:43:52.32 8.14
2025-03-11T12:43:53.32 8.14
2025-03-11T12:43:54.32 8.13
2025-03-11T12:43:55.32 8.12
2025-03-11T12:43:56.32 8.15
2025-03-11T12:43:57.32 8.15
2025-03-11T12:43:58.32 8.13
2025-03-11T12:43:59.32 8.14
2025-03-11T12:44:00.32 8.17
2025-03-11T12:44:01.32 8.17
2025-03-11T12:44:02.32 8.12
2025-03-11T12:44:03.32 8.17
2025-03-11T12:44:04.32 8.14
2025-03-11T12:44:05.32 8.15
2025-03-11T12:44:06.32 8.14
2025-03-11T12:44:07.32 8.13
2025-03-11T12:44:08.32 8.15
2025-03-11T12:44:09.32 8.16
2025-03-11T12:44:10.32 8.14
2025-03-11T12:44:11.32 8.16
2025-03-11T12:44:12.32 8.16
2025-03-11T12:44:13.32 8.11
2025-03-11T12:44:14.32 8.14
2025-03-11T12:44:15.32 8.14
2025-03-11T12:44:16.32 8.15
2025-03-11T12:44:17.32 8.17
2025-03-11T12:44:18.32 8.13
2025-03-11T12:44:19.32 8.16
2025-03-11T12:44:20.32 8.14
2025-03-11T12:44:21.32 8.13
2025-03-11T12:44:22.32 8.16
2025-03-11T12:44:23.32 8.15
2025-03-11T12:44:24.32 8.15
2025-03-11T12:44:25.32 8.15
2025-03-11T12:44:26.32 8.15
2025-03-11T12:44:27.32 8.12
2025-03-11T12:44:28.32 8.16
2025-03-11T12:44:29.32 8.15
2025-03-11T12:44:30.32 8.16
2025-03-11T12:44:31.32 8.14
2025-03-11T12:44:32.32 8.14
2025-03-11T12:44:33.32 8.13
2025-03-11T12:44:34.32 8.13
2025-03-11T12:44:35.32 8.14
2025-03-11T12:44:36.32 8.15
2025-03-11T12:44:37.32 8.16
2025-03-11T12:44:38.32 8.16
2025-03-11T12:44:39.32 8.14
2025-03-11T12:44:40.32 8.14
2025-03-11T12:44:41.32 8.14
2025-03-11T12:44:42.32 8.13
2025-03-11T12:44:43.32 8.14
2025-03-11T12:44:44.32 8.14
2025-03-11T12:44:45.32 8.18
2025-03-11T12:44:46.32 8.12
2025-03-11T12:44:47.32 8.15
2025-03-11T12:44:48.32 8.14
2025-03-11T12:44:49.32 8.15
2025-03-11T12:44:50.32 8.12
2025-03-11T12:44:51.32 8.14
2025-03-11T12:44:52.32 8.15
2025-03-11T12:44:53.32 8.16
2025-03-11T12:44:54.32 8.16
2025-03-11T12:44:55.32 8.14
2025-03-11T12:44:56.32 8.14
2025-03-11T12:44:57.32 8.15
2025-03-11T12:44:58.32 8.15
2025-03-11T12:44:59.32 8.16
2025-03-11T12:45:00.32 8.15
2025-03-11T12:45:01.32 8.16
2025-03-11T12:45:02.32 8.14
2025-03-11T12:45:03.32 8.14
2025-03-11T12:45:04.32 8.15
2025-03-11T12:45:05.32 8.13
2025-03-11T12:45:06.32 8.14
2025-03-11T12:45:07.32 8.16
2025-03-11T12:45:08.32 8.16
2025-03-11T12:45:09.32 8.16
2025-03-11T12:45:10.32 8.12
2025-03-11T12:45:11.32 8.16
2025-03-11T12:45:12.32 8.16
2025-03-11T12:45:13.32 8.14
2025-03-11T12:45:14.32 8.14
2025-03-11T12:45:15.32 8.16
2025-03-11T12:45:16.32 8.15
2025-03-11T12:45:17.32 8.16
2025-03-11T12:45:18.32 8.16
2025-03-11T12:45:19.32 8.14
2025-03-11T12:45:20.32 8.16
2025-03-11T12:45:21.32 8.16
2025-03-11T12:45:22.32 8.16
2025-03-11T12:45:23.32 8.16
2025-03-11T12:45:24.32 8.16
2025-03-11T12:45:25.32 8.14
2025-03-11T12:45:26.32 8.15
2025-03-11T12:45:27.32 8.14
2025-03-11T12:45:28.32 8.16
2025-03-11T12:45:29.32 8.15
2025-03-11T12:45:30.32 8.16
2025-03-11T12:45:31.32 8.15
2025-03-11T12:45:32.32 8.14
2025-03-11T12:45:33.32 8.16
2025-03-11T12:45:34.32 8.16
2025-03-11T12:45:35.33 8.16
2025-03-11T12:45:36.31 8.12
2025-03-11T12:45:37.31 8.13
2025-03-11T12:45:38.31 8.14
2025-03-11T12:45:39.31 8.16
2025-03-11T12:45:40.31 8.17
2025-03-11T12:45:41.31 8.16
2025-03-11T12:45:42.31 8.13
2025-03-11T12:45:43.31 8.16
2025-03-11T12:45:44.31 8.16
2025-03-11T12:45:45.31 8.16
2025-03-11T12:45:46.31 8.14
2025-03-11T12:45:47.31 8.16
2025-03-11T12:45:48.31 8.15
2025-03-11T12:45:49.31 8.13
2025-03-11T12:45:50.31 8.14
2025-03-11T12:45:51.31 8.16
2025-03-11T12:45:52.31 8.15
2025-03-11T12:45:53.31 8.13
2025-03-11T12:45:54.31 8.14
2025-03-11T12:45:55.31 8.16
2025-03-11T12:45:56.31 8.16
2025-03-11T12:45:57.31 8.13
2025-03-11T12:45:58.31 8.16
2025-03-11T12:45:59.31 8.14
2025-03-11T12:46:00.31 8.16
2025-03-11T12:46:01.31 8.13
2025-03-11T12:46:02.31 8.15
2025-03-11T12:46:03.31 8.14
2025-03-11T12:46:04.31 8.15
2025-03-11T12:46:05.31 8.14
2025-03-11T12:46:06.31 8.16
2025-03-11T12:46:07.31 8.16
2025-03-11T12:46:08.31 8.14
2025-03-11T12:46:09.31 8.12
2025-03-11T12:46:10.31 8.15
2025-03-11T12:46:11.31 8.15
2025-03-11T12:46:12.31 8.17
2025-03-11T12:46:13.31 8.15
2025-03-11T12:46:14.31 8.14
2025-03-11T12:46:15.31 8.15
2025-03-11T12:46:16.31 8.16
2025-03-11T12:46:17.31 8.14
2025-03-11T12:46:18.31 8.14
2025-03-11T12:46:19.31 8.17
2025-03-11T12:46:20.31 8.15
2025-03-11T12:46:21.31 8.11
2025-03-11T12:46:22.31 8.14
2025-03-11T12:46:23.31 8.13
2025-03-11T12:46:24.31 8.14
2025-03-11T12:46:25.31 8.16
2025-03-11T12:46:26.31 8.16
2025-03-11T12:46:27.31 8.15
2025-03-11T12:46:28.31 8.16
2025-03-11T12:46:29.31 8.14
2025-03-11T12:46:30.31 8.17
2025-03-11T12:46:31.31 8.14
2025-03-11T12:46:32.31 8.15
2025-03-11T12:46:33.31 8.13
2025-03-11T12:46:34.31 8.16
2025-03-11T12:46:35.31 8.17
2025-03-11T12:46:36.31 8.14
2025-03-11T12:46:37.31 8.16
2025-03-11T12:46:38.31 8.14
2025-03-11T12:46:39.31 8.14
2025-03-11T12:46:40.31 8.17
2025-03-11T12:46:41.31 8.16
2025-03-11T12:46:42.31 8.13
2025-03-11T12:46:43.31 8.12
2025-03-11T12:46:44.31 8.12
2025-03-11T12:46:45.31 8.14
2025-03-11T12:46:46.31 8.15
2025-03-11T12:46:47.31 8.14
2025-03-11T12:46:48.31 8.15
2025-03-11T12:46:49.31 8.14
2025-03-11T12:46:50.31 8.14
2025-03-11T12:46:51.31 8.16
2025-03-11T12:46:52.31 8.15
2025-03-11T12:46:53.31 8.14
2025-03-11T12:46:54.31 8.14
2025-03-11T12:46:55.31 8.16
2025-03-11T12:46:56.31 8.14
2025-03-11T12:46:57.31 8.14
2025-03-11T12:46:58.31 8.14
2025-03-11T12:46:59.31 8.16
2025-03-11T12:47:00.31 8.14
2025-03-11T12:47:01.31 8.13
2025-03-11T12:47:02.31 8.16
2025-03-11T12:47:03.31 8.15
2025-03-11T12:47:04.31 8.13
2025-03-11T12:47:05.32 8.17
2025-03-11T12:47:06.32 8.14
2025-03-11T12:47:07.32 8.14
2025-03-11T12:47:08.32 8.15
2025-03-11T12:47:09.32 8.12
2025-03-11T12:47:10.32 8.13
2025-03-11T12:47:11.32 8.13
2025-03-11T12:47:12.32 8.16
2025-03-11T12:47:13.32 8.13
2025-03-11T12:47:14.32 8.14
2025-03-11T12:47:15.32 8.15
2025-03-11T12:47:16.32 8.12
2025-03-11T12:47:17.32 8.15
2025-03-11T12:47:18.32 8.16
2025-03-11T12:47:19.32 8.14
2025-03-11T12:47:20.32 8.13
2025-03-11T12:47:21.32 8.15
2025-03-11T12:47:22.32 8.15
2025-03-11T12:47:23.32 8.15
2025-03-11T12:47:24.32 8.15
2025-03-11T12:47:25.32 8.17
2025-03-11T12:47:26.32 8.16
2025-03-11T12:47:27.32 8.14
2025-03-11T12:47:28.32 8.13
2025-03-11T12:47:29.32 8.15
2025-03-11T12:47:30.32 8.14
2025-03-11T12:47:31.32 8.16
2025-03-11T12:47:32.32 8.15
2025-03-11T12:47:33.32 8.14
2025-03-11T12:47:34.32 8.14
2025-03-11T12:47:35.32 8.15
2025-03-11T12:47:36.32 8.14
2025-03-11T12:47:37.32 8.15
2025-03-11T12:47:38.32 8.14
2025-03-11T12:47:39.32 8.14
2025-03-11T12:47:40.32 8.14
2025-03-11T12:47:41.32 8.16
2025-03-11T12:47:42.32 8.14
2025-03-11T12:47:43.32 8.15
2025-03-11T12:47:44.32 8.14
2025-03-11T12:47:45.33 8.14
2025-03-11T12:47:46.31 8.14
2025-03-11T12:47:47.31 8.15
2025-03-11T12:47:48.31 8.15
2025-03-11T12:47:49.31 8.14
2025-03-11T12:47:50.31 8.16
2025-03-11T12:47:51.31 8.12
2025-03-11T12:47:52.31 8.16
2025-03-11T12:47:53.31 8.14
2025-03-11T12:47:54.31 8.14
2025-03-11T12:47:55.31 8.14
2025-03-11T12:47:56.31 8.12
2025-03-11T12:47:57.31 8.14
2025-03-11T12:47:58.31 8.14
2025-03-11T12:47:59.31 8.16
2025-03-11T12:48:00.31 8.14
2025-03-11T12:48:01.31 8.15
2025-03-11T12:48:02.31 8.13
2025-03-11T12:48:03.31 8.14
2025-03-11T12:48:04.31 8.14
2025-03-11T12:48:05.31 8.14
2025-03-11T12:48:06.31 8.15
2025-03-11T12:48:07.31 8.15
2025-03-11T12:48:08.31 8.14
2025-03-11T12:48:09.31 8.16
2025-03-11T12:48:10.31 8.13
2025-03-11T12:48:11.31 8.13
2025-03-11T12:48:12.31 8.14
2025-03-11T12:48:13.31 8.16
2025-03-11T12:48:14.31 8.15
2025-03-11T12:48:15.31 8.17
2025-03-11T12:48:16.31 8.15
2025-03-11T12:48:17.31 8.15
2025-03-11T12:48:18.31 8.14
2025-03-11T12:48:19.31 8.13
2025-03-11T12:48:20.31 8.15
2025-03-11T12:48:21.31 8.14
2025-03-11T12:48:22.31 8.16
2025-03-11T12:48:23.31 8.12
2025-03-11T12:48:24.31 8.17
2025-03-11T12:48:25.31 8.14
2025-03-11T12:48:26.31 8.14
2025-03-11T12:48:27.31 8.13
2025-03-11T12:48:28.31 8.15
2025-03-11T12:48:29.31 8.14
2025-03-11T12:48:30.31 8.13
2025-03-11T12:48:31.31 8.14
2025-03-11T12:48:32.31 8.14
2025-03-11T12:48:33.31 8.15
2025-03-11T12:48:34.31 8.13
2025-03-11T12:48:35.31 8.14
2025-03-11T12:48:36.31 8.16
2025-03-11T12:48:37.31 8.15
2025-03-11T12:48:38.31 8.14
2025-03-11T12:48:39.31 8.16
2025-03-11T12:48:40.31 8.14
2025-03-11T12:48:41.31 8.14
2025-03-11T12:48:42.31 8.16
2025-03-11T12:48:43.31 8.15
2025-03-11T12:48:44.31 8.16
2025-03-11T12:48:45.31 8.14
2025-03-11T12:48:46.31 8.15
2025-03-11T12:48:47.31 8.13
2025-03-11T12:48:48.31 8.13
2025-03-11T12:48:49.31 8.17
2025-03-11T12:48:50.31 8.13
2025-03-11T12:48:51.31 8.14
2025-03-11T12:48:52.31 8.14
2025-03-11T12:48:53.31 8.15
2025-03-11T12:48:54.31 8.15
2025-03-11T12:48:55.31 8.14
2025-03-11T12:48:56.31 8.16
2025-03-11T12:48:57.31 8.14
2025-03-11T12:48:58.31 8.15
2025-03-11T12:48:59.31 8.14
2025-03-11T12:49:00.31 8.15
2025-03-11T12:49:01.31 8.14
2025-03-11T12:49:02.31 8.15
2025-03-11T12:49:03.31 8.15
2025-03-11T12:49:04.31 8.14
2025-03-11T12:49:05.31 8.16
2025-03-11T12:49:06.31 8.14
2025-03-11T12:49:07.31 8.16
2025-03-11T12:49:08.31 8.14
2025-03-11T12:49:09.31 8.16
2025-03-11T12:49:10.31 8.12
2025-03-11T12:49:11.31 8.16
2025-03-11T12:49:12.31 8.14
2025-03-11T12:49:13.31 8.15
2025-03-11T12:49:14.31 8.15
2025-03-11T12:49:15.31 8.17
2025-03-11T12:49:16.31 8.15
2025-03-11T12:49:17.31 8.14
2025-03-11T12:49:18.31 8.13
2025-03-11T12:49:19.31 8.15
2025-03-11T12:49:20.31 8.12
2025-03-11T12:49:21.31 8.12
2025-03-11T12:49:22.31 8.14
2025-03-11T12:49:23.31 8.13
2025-03-11T12:49:24.31 8.14
2025-03-11T12:49:25.31 8.12
2025-03-11T12:49:26.31 8.15
2025-03-11T12:49:27.34 8.14
2025-03-11T12:49:28.30 8.16
2025-03-11T12:49:29.30 8.16
2025-03-11T12:49:30.30 8.14
2025-03-11T12:49:31.30 8.14
2025-03-11T12:49:32.30 8.15
2025-03-11T12:49:33.30 8.16
2025-03-11T12:49:34.30 8.13
2025-03-11T12:49:35.30 8.17
2025-03-11T12:49:36.30 8.14
2025-03-11T12:49:37.30 8.15
2025-03-11T12:49:38.30 8.14
2025-03-11T12:49:39.30 8.16
2025-03-11T12:49:40.30 8.14
2025-03-11T12:49:41.30 8.15
2025-03-11T12:49:42.30 8.14
2025-03-11T12:49:43.30 8.14
2025-03-11T12:49:44.30 8.14
2025-03-11T12:49:45.30 8.14
2025-03-11T12:49:46.30 8.16
2025-03-11T12:49:47.30 8.14
2025-03-11T12:49:48.30 8.16
2025-03-11T12:49:49.30 8.14
2025-03-11T12:49:50.30 8.14
2025-03-11T12:49:51.30 8.14
2025-03-11T12:49:52.30 8.16
2025-03-11T12:49:53.30 8.15
2025-03-11T12:49:54.30 8.16
2025-03-11T12:49:55.30 8.14
2025-03-11T12:49:56.30 8.14
2025-03-11T12:49:57.30 8.15
2025-03-11T12:49:58.30 8.13
2025-03-11T12:49:59.30 8.16
2025-03-11T12:50:00.30 8.16
2025-03-11T12:50:01.30 8.15
2025-03-11T12:50:02.30 8.16
2025-03-11T12:50:03.30 8.13
2025-03-11T12:50:04.30 8.14
2025-03-11T12:50:05.30 8.12
2025-03-11T12:50:06.30 8.15
2025-03-11T12:50:07.30 8.14
2025-03-11T12:50:08.30 8.16
2025-03-11T12:50:09.30 8.13
2025-03-11T12:50:10.30 8.15
2025-03-11T12:50:11.30 8.14
2025-03-11T12:50:12.30 8.15
2025-03-11T12:50:13.30 8.15
2025-03-11T12:50:14.30 8.15
2025-03-11T12:50:15.30 8.12
2025-03-11T12:50:16.30 8.14
2025-03-11T12:50:17.30 8.15
2025-03-11T12:50:18.30 8.12
2025-03-11T12:50:19.30 8.14
2025-03-11T12:50:20.30 8.14
2025-03-11T12:50:21.30 8.16
2025-03-11T12:50:22.30 8.15
2025-03-11T12:50:23.30 8.14
2025-03-11T12:50:24.30 8.14
2025-03-11T12:50:25.30 8.14
2025-03-11T12:50:26.30 8.14
2025-03-11T12:50:27.30 8.16
2025-03-11T12:50:28.30 8.16
2025-03-11T12:50:29.30 8.13
2025-03-11T12:50:30.30 8.15
2025-03-11T12:50:31.30 8.12
2025-03-11T12:50:32.30 8.13
2025-03-11T12:50:33.30 8.13
2025-03-11T12:50:34.30 8.15
2025-03-11T12:50:35.30 8.15
2025-03-11T12:50:36.30 8.15
2025-03-11T12:50:37.30 8.13
2025-03-11T12:50:38.30 8.13
2025-03-11T12:50:39.30 8.12
2025-03-11T12:50:40.30 8.14
2025-03-11T12:50:41.30 8.16
2025-03-11T12:50:42.30 8.14
2025-03-11T12:50:43.30 8.15
2025-03-11T12:50:44.30 8.16
2025-03-11T12:50:45.30 8.16
2025-03-11T12:50:46.30 8.15
2025-03-11T12:50:47.30 8.16
2025-03-11T12:50:48.30 8.13
2025-03-11T12:50:49.30 8.16
2025-03-11T12:50:50.30 8.14
2025-03-11T12:50:51.30 8.15
2025-03-11T12:50:52.30 8.16
2025-03-11T12:50:53.30 8.14
2025-03-11T12:50:54.30 8.13
2025-03-11T12:50:55.30 8.16
2025-03-11T12:50:56.30 8.14
2025-03-11T12:50:57.30 8.15
2025-03-11T12:50:58.30 8.14
2025-03-11T12:50:59.30 8.14
2025-03-11T12:51:00.30 8.12
2025-03-11T12:51:01.30 8.14
2025-03-11T12:51:02.30 8.14
2025-03-11T12:51:03.30 8.14
2025-03-11T12:51:04.30 8.14
2025-03-11T12:51:05.30 8.12
2025-03-11T12:51:06.30 8.13
2025-03-11T12:51:07.30 8.15
2025-03-11T12:51:08.30 8.14
2025-03-11T12:51:09.30 8.14
2025-03-11T12:51:10.30 8.13
2025-03-11T12:51:11.30 8.14
2025-03-11T12:51:12.30 8.16
2025-03-11T12:51:13.30 8.15
2025-03-11T12:51:14.30 8.14
2025-03-11T12:51:15.30 8.17
2025-03-11T12:51:16.30 8.12
2025-03-11T12:51:17.30 8.16
2025-03-11T12:51:18.30 8.17
2025-03-11T12:51:19.30 8.13
2025-03-11T12:51:20.30 8.14
2025-03-11T12:51:21.30 8.15
2025-03-11T12:51:22.30 8.14
2025-03-11T12:51:23.30 8.14
2025-03-11T12:51:24.30 8.12
2025-03-11T12:51:25.30 8.14
2025-03-11T12:51:26.30 8.12
2025-03-11T12:51:27.30 8.12
2025-03-11T12:51:28.30 8.14
2025-03-11T12:51:29.30 8.14
2025-03-11T12:51:30.30 8.14
2025-03-11T12:51:31.30 8.16
2025-03-11T12:51:32.30 8.14
2025-03-11T12:51:33.30 8.16
2025-03-11T12:51:34.30 8.14
2025-03-11T12:51:35.30 8.16
2025-03-11T12:51:36.30 8.13
2025-03-11T12:51:37.30 8.14
2025-03-11T12:51:38.30 8.16
2025-03-11T12:51:39.30 8.16
2025-03-11T12:51:40.30 8.13
2025-03-11T12:51:41.30 8.16
2025-03-11T12:51:42.30 8.17
2025-03-11T12:51:43.30 8.16
2025-03-11T12:51:44.30 8.14
2025-03-11T12:51:45.30 8.15
2025-03-11T12:51:46.30 8.16
2025-03-11T12:51:47.30 8.13
2025-03-11T12:51:48.30 8.15
2025-03-11T12:51:49.30 8.15
2025-03-11T12:51:50.30 8.14
2025-03-11T12:51:51.30 8.16
2025-03-11T12:51:52.30 8.14
2025-03-11T12:51:53.30 8.15
2025-03-11T12:51:54.30 8.14
2025-03-11T12:51:55.30 8.14
2025-03-11T12:51:56.30 8.12
2025-03-11T12:51:57.30 8.13
2025-03-11T12:51:58.30 8.12
2025-03-11T12:51:59.30 8.12
2025-03-11T12:52:00.30 8.15
2025-03-11T12:52:01.30 8.13
2025-03-11T12:52:02.30 8.16
2025-03-11T12:52:03.30 8.13
2025-03-11T12:52:04.30 8.14
2025-03-11T12:52:05.30 8.16
2025-03-11T12:52:06.30 8.14
2025-03-11T12:52:07.30 8.12
2025-03-11T12:52:08.30 8.17
2025-03-11T12:52:09.30 8.16
2025-03-11T12:52:10.30 8.14
2025-03-11T12:52:11.30 8.16
2025-03-11T12:52:12.30 8.15
2025-03-11T12:52:13.30 8.15
2025-03-11T12:52:14.30 8.15
2025-03-11T12:52:15.30 8.15
2025-03-11T12:52:16.30 8.16
2025-03-11T12:52:17.30 8.11
2025-03-11T12:52:18.30 8.15
2025-03-11T12:52:19.30 8.16
2025-03-11T12:52:20.30 8.16
2025-03-11T12:52:21.31 8.14
2025-03-11T12:52:22.31 8.16
2025-03-11T12:52:23.30 8.13
2025-03-11T12:52:24.31 8.16
2025-03-11T12:52:25.31 8.14
2025-03-11T12:52:26.31 8.14
2025-03-11T12:52:27.31 8.15
2025-03-11T12:52:28.31 8.14
2025-03-11T12:52:29.31 8.14
2025-03-11T12:52:30.31 8.16
2025-03-11T12:52:31.31 8.14
2025-03-11T12:52:32.31 8.16
2025-03-11T12:52:33.31 8.14
2025-03-11T12:52:34.31 8.15
2025-03-11T12:52:35.31 8.14
2025-03-11T12:52:36.31 8.14
2025-03-11T12:52:37.31 8.14
2025-03-11T12:52:38.31 8.15
2025-03-11T12:52:39.31 8.14
2025-03-11T12:52:40.31 8.12
2025-03-11T12:52:41.31 8.14
2025-03-11T12:52:42.31 8.17
2025-03-11T12:52:43.31 8.16
2025-03-11T12:52:44.31 8.17
2025-03-11T12:52:45.31 8.17
2025-03-11T12:52:46.31 8.14
2025-03-11T12:52:47.31 8.16
2025-03-11T12:52:48.31 8.14
2025-03-11T12:52:49.31 8.14
2025-03-11T12:52:50.31 8.14
2025-03-11T12:52:51.31 8.16
2025-03-11T12:52:52.31 8.14
2025-03-11T12:52:53.31 8.14
2025-03-11T12:52:54.31 8.16
2025-03-11T12:52:55.31 8.13
2025-03-11T12:52:56.31 8.15
2025-03-11T12:52:57.31 8.13
2025-03-11T12:52:58.31 8.14
2025-03-11T12:52:59.31 8.12
2025-03-11T12:53:00.31 8.15
2025-03-11T12:53:01.31 8.13
2025-03-11T12:53:02.31 8.16
2025-03-11T12:53:03.31 8.16
2025-03-11T12:53:04.31 8.15
2025-03-11T12:53:05.31 8.15
2025-03-11T12:53:06.31 8.14
2025-03-11T12:53:07.31 8.14
2025-03-11T12:53:08.31 8.14
2025-03-11T12:53:09.31 8.12
2025-03-11T12:53:10.31 8.16
2025-03-11T12:53:11.31 8.14
2025-03-11T12:53:12.31 8.13
2025-03-11T12:53:13.31 8.13
2025-03-11T12:53:14.31 8.14
2025-03-11T12:53:15.31 8.16
2025-03-11T12:53:16.31 8.17
2025-03-11T12:53:17.31 8.15
2025-03-11T12:53:18.31 8.14
2025-03-11T12:53:19.32 8.16
2025-03-11T12:53:20.30 8.15
2025-03-11T12:53:21.30 8.14
2025-03-11T12:53:22.30 8.16
2025-03-11T12:53:23.30 8.13
2025-03-11T12:53:24.30 8.14
2025-03-11T12:53:25.30 8.19
2025-03-11T12:53:26.30 8.14
2025-03-11T12:53:27.30 8.15
2025-03-11T12:53:28.30 8.15
2025-03-11T12:53:29.30 8.14
2025-03-11T12:53:30.30 8.14
2025-03-11T12:53:31.30 8.14
2025-03-11T12:53:32.30 8.14
2025-03-11T12:53:33.30 8.16
2025-03-11T12:53:34.30 8.12
2025-03-11T12:53:35.30 8.14
2025-03-11T12:53:36.30 8.16
2025-03-11T12:53:37.30 8.16
2025-03-11T12:53:38.30 8.15
2025-03-11T12:53:39.30 8.17
2025-03-11T12:53:40.30 8.15
2025-03-11T12:53:41.30 8.14
2025-03-11T12:53:42.30 8.16
2025-03-11T12:53:43.30 8.12
2025-03-11T12:53:44.30 8.16
2025-03-11T12:53:45.30 8.16
2025-03-11T12:53:46.30 8.16
2025-03-11T12:53:47.30 8.14
2025-03-11T12:53:48.30 8.16
2025-03-11T12:53:49.30 8.13
2025-03-11T12:53:50.30 8.16
2025-03-11T12:53:51.30 8.13
2025-03-11T12:53:52.30 8.12
2025-03-11T12:53:53.30 8.13
2025-03-11T12:53:54.30 8.15
2025-03-11T12:53:55.30 8.14
2025-03-11T12:53:56.30 8.14
2025-03-11T12:53:57.30 8.12
2025-03-11T12:53:58.30 8.14
2025-03-11T12:53:59.30 8.15
2025-03-11T12:54:00.30 8.16
2025-03-11T12:54:01.30 8.16
2025-03-11T12:54:02.30 8.16
2025-03-11T12:54:03.30 8.12
2025-03-11T12:54:04.30 8.13
2025-03-11T12:54:05.30 8.16
2025-03-11T12:54:06.30 8.14
2025-03-11T12:54:07.30 8.12
2025-03-11T12:54:08.30 8.16
2025-03-11T12:54:09.30 8.14
2025-03-11T12:54:10.30 8.13
2025-03-11T12:54:11.30 8.13
2025-03-11T12:54:12.30 8.14
2025-03-11T12:54:13.30 8.13
2025-03-11T12:54:14.30 8.16
2025-03-11T12:54:15.30 8.16
2025-03-11T12:54:16.30 8.12
2025-03-11T12:54:17.30 8.16
2025-03-11T12:54:18.30 8.15
2025-03-11T12:54:19.30 8.12
2025-03-11T12:54:20.30 8.15
2025-03-11T12:54:21.30 8.15
2025-03-11T12:54:22.30 8.14
2025-03-11T12:54:23.30 8.14
2025-03-11T12:54:24.30 8.14
2025-03-11T12:54:25.30 8.14
2025-03-11T12:54:26.30 8.13
2025-03-11T12:54:27.30 8.13
2025-03-11T12:54:28.30 8.12
2025-03-11T12:54:29.30 8.16
2025-03-11T12:54:30.30 8.15
2025-03-11T12:54:31.30 8.17
2025-03-11T12:54:32.30 8.15
2025-03-11T12:54:33.30 8.14
2025-03-11T12:54:34.30 8.16
2025-03-11T12:54:35.30 8.16
2025-03-11T12:54:36.30 8.13
2025-03-11T12:54:37.30 8.16
2025-03-11T12:54:38.30 8.12
2025-03-11T12:54:39.30 8.15
2025-03-11T12:54:40.30 8.16
2025-03-11T12:54:41.30 8.14
2025-03-11T12:54:42.30 8.14
2025-03-11T12:54:43.30 8.14
2025-03-11T12:54:44.30 8.16
2025-03-11T12:54:45.30 8.16
2025-03-11T12:54:46.30 8.16
2025-03-11T12:54:47.30 8.14
2025-03-11T12:54:48.30 8.14
2025-03-11T12:54:49.30 8.14
2025-03-11T12:54:50.30 8.14
2025-03-11T12:54:51.30 8.12
2025-03-11T12:54:52.30 8.12
2025-03-11T12:54:53.30 8.16
2025-03-11T12:54:54.30 8.14
2025-03-11T12:54:55.30 8.13
2025-03-11T12:54:56.30 8.15
2025-03-11T12:54:57.30 8.17
2025-03-11T12:54:58.30 8.15
2025-03-11T12:54:59.30 8.16
2025-03-11T12:55:00.30 8.13
2025-03-11T12:55:01.30 8.17
2025-03-11T12:55:02.30 8.17
2025-03-11T12:55:03.30 8.15
2025-03-11T12:55:04.30 8.17
2025-03-11T12:55:05.30 8.15
2025-03-11T12:55:06.30 8.13
2025-03-11T12:55:07.30 8.15
2025-03-11T12:55:08.30 8.16
2025-03-11T12:55:09.30 8.13
2025-03-11T12:55:10.30 8.14
2025-03-11T12:55:11.30 8.14
2025-03-11T12:55:12.30 8.14
2025-03-11T12:55:13.30 8.14
2025-03-11T12:55:14.30 8.14
2025-03-11T12:55:15.30 8.14
2025-03-11T12:55:16.30 8.14
2025-03-11T12:55:17.30 8.15
2025-03-11T12:55:18.30 8.14
2025-03-11T12:55:19.30 8.14
2025-03-11T12:55:20.30 8.14
2025-03-11T12:55:21.30 8.14
2025-03-11T12:55:22.30 8.14
2025-03-11T12:55:23.30 8.14
2025-03-11T12:55:24.30 8.16
2025-03-11T12:55:25.30 8.15
2025-03-11T12:55:26.30 8.12
2025-03-11T12:55:27.30 8.16
2025-03-11T12:55:28.30 8.16
2025-03-11T12:55:29.30 8.14
2025-03-11T12:55:30.30 8.15
2025-03-11T12:55:31.30 8.14
2025-03-11T12:55:32.30 8.14
2025-03-11T12:55:33.30 8.17
2025-03-11T12:55:34.30 8.16
2025-03-11T12:55:35.30 8.15
2025-03-11T12:55:36.30 8.14
2025-03-11T12:55:37.30 8.14
2025-03-11T12:55:38.30 8.14
2025-03-11T12:55:39.30 8.15
2025-03-11T12:55:40.30 8.14
2025-03-11T12:55:41.30 8.14
2025-03-11T12:55:42.30 8.14
2025-03-11T12:55:43.30 8.12
2025-03-11T12:55:44.30 8.16
2025-03-11T12:55:45.30 8.13
2025-03-11T12:55:46.30 8.16
2025-03-11T12:55:47.30 8.15
2025-03-11T12:55:48.30 8.15
2025-03-11T12:55:49.30 8.16
2025-03-11T12:55:50.31 8.16
2025-03-11T12:55:51.29 8.14
2025-03-11T12:55:52.29 8.17
2025-03-11T12:55:53.29 8.17
2025-03-11T12:55:54.29 8.16
2025-03-11T12:55:55.29 8.16
2025-03-11T12:55:56.29 8.15
2025-03-11T12:55:57.29 8.15
2025-03-11T12:55:58.29 8.15
2025-03-11T12:55:59.29 8.15
2025-03-11T12:56:00.29 8.15
2025-03-11T12:56:01.29 8.17
2025-03-11T12:56:02.29 8.13
2025-03-11T12:56:03.29 8.12
2025-03-11T12:56:04.29 8.14
2025-03-11T12:56:05.29 8.15
2025-03-11T12:56:06.29 8.15
2025-03-11T12:56:07.29 8.16
2025-03-11T12:56:08.29 8.15
2025-03-11T12:56:09.29 8.16
2025-03-11T12:56:10.29 8.14
2025-03-11T12:56:11.29 8.14
2025-03-11T12:56:12.29 8.16
2025-03-11T12:56:13.29 8.15
2025-03-11T12:56:14.29 8.14
2025-03-11T12:56:15.29 8.16
2025-03-11T12:56:16.29 8.13
2025-03-11T12:56:17.29 8.14
2025-03-11T12:56:18.29 8.14
2025-03-11T12:56:19.29 8.14
2025-03-11T12:56:20.29 8.17
2025-03-11T12:56:21.29 8.16
2025-03-11T12:56:22.29 8.14
2025-03-11T12:56:23.29 8.14
2025-03-11T12:56:24.29 8.15
2025-03-11T12:56:25.29 8.15
2025-03-11T12:56:26.29 8.14
2025-03-11T12:56:27.29 8.13
2025-03-11T12:56:28.29 8.14
2025-03-11T12:56:29.29 8.16
2025-03-11T12:56:30.29 8.13
2025-03-11T12:56:31.29 8.14
2025-03-11T12:56:32.29 8.14
2025-03-11T12:56:33.29 8.16
2025-03-11T12:56:34.29 8.12
2025-03-11T12:56:35.29 8.13
2025-03-11T12:56:36.29 8.12
2025-03-11T12:56:37.29 8.13
2025-03-11T12:56:38.29 8.13
2025-03-11T12:56:39.29 8.16
2025-03-11T12:56:40.29 8.14
2025-03-11T12:56:41.29 8.16
2025-03-11T12:56:42.29 8.16
2025-03-11T12:56:43.29 8.14
2025-03-11T12:56:44.29 8.15
2025-03-11T12:56:45.29 8.15
2025-03-11T12:56:46.29 8.15
2025-03-11T12:56:47.29 8.15
2025-03-11T12:56:48.29 8.16
2025-03-11T12:56:49.29 8.14
2025-03-11T12:56:50.29 8.14
2025-03-11T12:56:51.29 8.15
2025-03-11T12:56:52.29 8.14
2025-03-11T12:56:53.29 8.14
2025-03-11T12:56:54.29 8.16
2025-03-11T12:56:55.29 8.13
2025-03-11T12:56:56.29 8.15
2025-03-11T12:56:57.29 8.14
2025-03-11T12:56:58.29 8.14
2025-03-11T12:56:59.29 8.14
2025-03-11T12:57:00.29 8.14
2025-03-11T12:57:01.29 8.16
2025-03-11T12:57:02.29 8.13
2025-03-11T12:57:03.29 8.15
2025-03-11T12:57:04.29 8.13
2025-03-11T12:57:05.29 8.14
2025-03-11T12:57:06.29 8.15
2025-03-11T12:57:07.29 8.16
2025-03-11T12:57:08.29 8.14
2025-03-11T12:57:09.29 8.14
2025-03-11T12:57:10.29 8.16
2025-03-11T12:57:11.30 8.14
2025-03-11T12:57:12.28 8.14
2025-03-11T12:57:13.28 8.16
2025-03-11T12:57:14.28 8.14
2025-03-11T12:57:15.29 8.15
2025-03-11T12:57:16.29 8.15
2025-03-11T12:57:17.29 8.15
2025-03-11T12:57:18.29 8.16
2025-03-11T12:57:19.29 8.12
2025-03-11T12:57:20.29 8.14
2025-03-11T12:57:21.29 8.15
2025-03-11T12:57:22.29 8.15
2025-03-11T12:57:23.29 8.16
2025-03-11T12:57:24.29 8.14
2025-03-11T12:57:25.29 8.16
2025-03-11T12:57:26.29 8.12
2025-03-11T12:57:27.29 8.14
2025-03-11T12:57:28.29 8.14
2025-03-11T12:57:29.29 8.17
2025-03-11T12:57:30.29 8.16
2025-03-11T12:57:31.29 8.14
2025-03-11T12:57:32.29 8.16
2025-03-11T12:57:33.29 8.15
2025-03-11T12:57:34.29 8.15
2025-03-11T12:57:35.29 8.14
2025-03-11T12:57:36.29 8.14
2025-03-11T12:57:37.29 8.14
2025-03-11T12:57:38.29 8.14
2025-03-11T12:57:39.29 8.14
2025-03-11T12:57:40.29 8.16
2025-03-11T12:57:41.29 8.16
2025-03-11T12:57:42.29 8.14
2025-03-11T12:57:43.29 8.14
2025-03-11T12:57:44.29 8.15
2025-03-11T12:57:45.29 8.12
2025-03-11T12:57:46.29 8.14
2025-03-11T12:57:47.29 8.13
2025-03-11T12:57:48.29 8.15
2025-03-11T12:57:49.29 8.14
2025-03-11T12:57:50.29 8.14
2025-03-11T12:57:51.29 8.14
2025-03-11T12:57:52.29 8.13
2025-03-11T12:57:53.29 8.15
2025-03-11T12:57:54.29 8.16
2025-03-11T12:57:55.29 8.14
2025-03-11T12:57:56.29 8.14
2025-03-11T12:57:57.29 8.17
2025-03-11T12:57:58.29 8.16
2025-03-11T12:57:59.29 8.14
2025-03-11T12:58:00.29 8.13
2025-03-11T12:58:01.29 8.15
2025-03-11T12:58:02.29 8.15
2025-03-11T12:58:03.29 8.14
2025-03-11T12:58:04.29 8.16
2025-03-11T12:58:05.29 8.15
2025-03-11T12:58:06.29 8.17
2025-03-11T12:58:07.29 8.15
2025-03-11T12:58:08.29 8.12
2025-03-11T12:58:09.29 8.15
2025-03-11T12:58:10.29 8.15
2025-03-11T12:58:11.29 8.16
2025-03-11T12:58:12.29 8.16
2025-03-11T12:58:13.29 8.16
2025-03-11T12:58:14.29 8.15
2025-03-11T12:58:15.29 8.16
2025-03-11T12:58:16.29 8.17
2025-03-11T12:58:17.29 8.16
2025-03-11T12:58:18.29 8.14
2025-03-11T12:58:19.29 8.17
2025-03-11T12:58:20.29 8.14
2025-03-11T12:58:21.29 8.14
2025-03-11T12:58:22.29 8.15
2025-03-11T12:58:23.29 8.16
2025-03-11T12:58:24.29 8.14
2025-03-11T12:58:25.29 8.15
2025-03-11T12:58:26.29 8.16
2025-03-11T12:58:27.29 8.13
2025-03-11T12:58:28.29 8.14
2025-03-11T12:58:29.29 8.14
2025-03-11T12:58:30.29 8.16
2025-03-11T12:58:31.29 8.15
2025-03-11T12:58:32.29 8.14
2025-03-11T12:58:33.29 8.13
2025-03-11T12:58:34.29 8.14
2025-03-11T12:58:35.29 8.15
2025-03-11T12:58:36.29 8.12
2025-03-11T12:58:37.29 8.14
2025-03-11T12:58:38.29 8.15
2025-03-11T12:58:39.29 8.14
2025-03-11T12:58:40.29 8.14
2025-03-11T12:58:41.29 8.15
2025-03-11T12:58:42.29 8.17
2025-03-11T12:58:43.29 8.13
2025-03-11T12:58:44.29 8.14
2025-03-11T12:58:45.29 8.15
2025-03-11T12:58:46.29 8.16
2025-03-11T12:58:47.29 8.15
2025-03-11T12:58:48.29 8.15
2025-03-11T12:58:49.29 8.16
2025-03-11T12:58:50.29 8.14
2025-03-11T12:58:51.29 8.14
2025-03-11T12:58:52.29 8.14
2025-03-11T12:58:53.29 8.14
2025-03-11T12:58:54.29 8.14
2025-03-11T12:58:55.29 8.14
2025-03-11T12:58:56.29 8.14
2025-03-11T12:58:57.29 8.15
2025-03-11T12:58:58.29 8.17
2025-03-11T12:58:59.29 8.14
2025-03-11T12:59:00.29 8.15
2025-03-11T12:59:01.29 8.16
2025-03-11T12:59:02.29 8.14
2025-03-11T12:59:03.29 8.14
2025-03-11T12:59:04.29 8.15
2025-03-11T12:59:05.29 8.12
2025-03-11T12:59:06.29 8.16
2025-03-11T12:59:07.29 8.15
2025-03-11T12:59:08.29 8.16
2025-03-11T12:59:09.29 8.17
2025-03-11T12:59:10.29 8.14
2025-03-11T12:59:11.29 8.15
2025-03-11T12:59:12.29 8.15
2025-03-11T12:59:13.29 8.16
2025-03-11T12:59:14.29 8.15
2025-03-11T12:59:15.29 8.15
2025-03-11T12:59:16.29 8.14
2025-03-11T12:59:17.29 8.14
2025-03-11T12:59:18.29 8.14
2025-03-11T12:59:19.29 8.16
2025-03-11T12:59:20.29 8.16
2025-03-11T12:59:21.29 8.14
2025-03-11T12:59:22.29 8.16
2025-03-11T12:59:23.29 8.13
2025-03-11T12:59:24.29 8.17
2025-03-11T12:59:25.29 8.16
2025-03-11T12:59:26.29 8.14
2025-03-11T12:59:27.29 8.16
2025-03-11T12:59:28.29 8.14
2025-03-11T12:59:29.29 8.17
2025-03-11T12:59:30.29 8.16
2025-03-11T12:59:31.29 8.14
2025-03-11T12:59:32.29 8.14
2025-03-11T12:59:33.29 8.14
2025-03-11T12:59:34.29 8.12
2025-03-11T12:59:35.29 8.14
2025-03-11T12:59:36.29 8.14
2025-03-11T12:59:37.29 8.16
2025-03-11T12:59:38.29 8.13
2025-03-11T12:59:39.29 8.14
2025-03-11T12:59:40.29 8.14
2025-03-11T12:59:41.29 8.14
2025-03-11T12:59:42.29 8.14
2025-03-11T12:59:43.29 8.15
2025-03-11T12:59:44.29 8.15
2025-03-11T12:59:45.29 8.16
2025-03-11T12:59:46.29 8.16
2025-03-11T12:59:47.29 8.14
2025-03-11T12:59:48.29 8.15
2025-03-11T12:59:49.29 8.14
2025-03-11T12:59:50.29 8.16
2025-03-11T12:59:51.29 8.16
2025-03-11T12:59:52.29 8.13
2025-03-11T12:59:53.29 8.12
2025-03-11T12:59:54.29 8.14
2025-03-11T12:59:55.29 8.13
2025-03-11T12:59:56.29 8.14
2025-03-11T12:59:57.29 8.14
2025-03-11T12:59:58.29 8.15
2025-03-11T12:59:59.29 8.16
