# PBO Tiltmeter Data, format version 1.1
# http://pboweb.unavco.org/strain_data
#
# B204 marble204bwa2007
# Latitude     : +46.1360 degrees (WGS-84)
# Longitude    : -122.1690 degrees (WGS-84)
# Elevation    : 784 meters (WGS-84)
# Sensor Depth : 3.05 meters
# SEED Codes   : PB B204 TT LKD
#
# Timestamp (UTC)   Temperature (C)
2025-04-29T13:00:00.57 8.34
2025-04-29T13:00:01.57 8.33
2025-04-29T13:00:02.57 8.35
2025-04-29T13:00:03.57 8.35
2025-04-29T13:00:04.57 8.37
2025-04-29T13:00:05.57 8.37
2025-04-29T13:00:06.57 8.33
2025-04-29T13:00:07.57 8.36
2025-04-29T13:00:08.57 8.37
2025-04-29T13:00:09.57 8.34
2025-04-29T13:00:10.57 8.33
2025-04-29T13:00:11.57 8.34
2025-04-29T13:00:12.57 8.34
2025-04-29T13:00:13.57 8.37
2025-04-29T13:00:14.57 8.34
2025-04-29T13:00:15.57 8.34
2025-04-29T13:00:16.57 8.36
2025-04-29T13:00:17.57 8.35
2025-04-29T13:00:18.57 8.35
2025-04-29T13:00:19.57 8.36
2025-04-29T13:00:20.57 8.33
2025-04-29T13:00:21.57 8.34
2025-04-29T13:00:22.57 8.35
2025-04-29T13:00:23.57 8.34
2025-04-29T13:00:24.57 8.35
2025-04-29T13:00:25.57 8.35
2025-04-29T13:00:26.57 8.34
2025-04-29T13:00:27.57 8.36
2025-04-29T13:00:28.57 8.33
2025-04-29T13:00:29.57 8.34
2025-04-29T13:00:30.57 8.36
2025-04-29T13:00:31.57 8.33
2025-04-29T13:00:32.57 8.33
2025-04-29T13:00:33.57 8.33
2025-04-29T13:00:34.57 8.35
2025-04-29T13:00:35.57 8.36
2025-04-29T13:00:36.57 8.35
2025-04-29T13:00:37.57 8.35
2025-04-29T13:00:38.57 8.35
2025-04-29T13:00:39.57 8.35
2025-04-29T13:00:40.57 8.34
2025-04-29T13:00:41.57 8.36
2025-04-29T13:00:42.57 8.35
2025-04-29T13:00:43.57 8.37
2025-04-29T13:00:44.57 8.36
2025-04-29T13:00:45.57 8.35
2025-04-29T13:00:46.57 8.35
2025-04-29T13:00:47.57 8.35
2025-04-29T13:00:48.57 8.35
2025-04-29T13:00:49.57 8.36
2025-04-29T13:00:50.57 8.35
2025-04-29T13:00:51.57 8.35
2025-04-29T13:00:52.57 8.35
2025-04-29T13:00:53.57 8.37
2025-04-29T13:00:54.57 8.35
2025-04-29T13:00:55.57 8.35
2025-04-29T13:00:56.57 8.36
2025-04-29T13:00:57.57 8.35
2025-04-29T13:00:58.57 8.35
2025-04-29T13:00:59.57 8.36
2025-04-29T13:01:00.57 8.34
2025-04-29T13:01:01.58 8.36
2025-04-29T13:01:02.56 8.37
2025-04-29T13:01:03.56 8.37
2025-04-29T13:01:04.56 8.36
2025-04-29T13:01:05.56 8.34
2025-04-29T13:01:06.56 8.33
2025-04-29T13:01:07.56 8.35
2025-04-29T13:01:08.56 8.36
2025-04-29T13:01:09.56 8.33
2025-04-29T13:01:10.56 8.34
2025-04-29T13:01:11.56 8.35
2025-04-29T13:01:12.56 8.37
2025-04-29T13:01:13.56 8.34
2025-04-29T13:01:14.56 8.34
2025-04-29T13:01:15.56 8.34
2025-04-29T13:01:16.56 8.37
2025-04-29T13:01:17.56 8.32
2025-04-29T13:01:18.56 8.37
2025-04-29T13:01:19.56 8.37
2025-04-29T13:01:20.56 8.35
2025-04-29T13:01:21.56 8.33
2025-04-29T13:01:22.56 8.33
2025-04-29T13:01:23.56 8.35
2025-04-29T13:01:24.56 8.34
2025-04-29T13:01:25.56 8.33
2025-04-29T13:01:26.56 8.35
2025-04-29T13:01:27.56 8.35
2025-04-29T13:01:28.56 8.33
2025-04-29T13:01:29.56 8.36
2025-04-29T13:01:30.56 8.33
2025-04-29T13:01:31.56 8.39
2025-04-29T13:01:32.56 8.33
2025-04-29T13:01:33.56 8.38
2025-04-29T13:01:34.56 8.35
2025-04-29T13:01:35.56 8.33
2025-04-29T13:01:36.56 8.36
2025-04-29T13:01:37.56 8.35
2025-04-29T13:01:38.56 8.35
2025-04-29T13:01:39.56 8.34
2025-04-29T13:01:40.56 8.35
2025-04-29T13:01:41.56 8.35
2025-04-29T13:01:42.56 8.34
2025-04-29T13:01:43.56 8.36
2025-04-29T13:01:44.56 8.37
2025-04-29T13:01:45.56 8.34
2025-04-29T13:01:46.56 8.37
2025-04-29T13:01:47.56 8.36
2025-04-29T13:01:48.56 8.33
2025-04-29T13:01:49.56 8.35
2025-04-29T13:01:50.56 8.35
2025-04-29T13:01:51.56 8.32
2025-04-29T13:01:52.56 8.37
2025-04-29T13:01:53.56 8.35
2025-04-29T13:01:54.56 8.35
2025-04-29T13:01:55.56 8.33
2025-04-29T13:01:56.56 8.36
2025-04-29T13:01:57.56 8.34
2025-04-29T13:01:58.56 8.33
2025-04-29T13:01:59.56 8.38
2025-04-29T13:02:00.56 8.35
2025-04-29T13:02:01.56 8.37
2025-04-29T13:02:02.56 8.36
2025-04-29T13:02:03.56 8.35
2025-04-29T13:02:04.56 8.35
2025-04-29T13:02:05.56 8.35
2025-04-29T13:02:06.56 8.36
2025-04-29T13:02:07.56 8.36
2025-04-29T13:02:08.56 8.37
2025-04-29T13:02:09.56 8.37
2025-04-29T13:02:10.56 8.35
2025-04-29T13:02:11.56 8.34
2025-04-29T13:02:12.56 8.35
2025-04-29T13:02:13.56 8.36
2025-04-29T13:02:14.56 8.37
2025-04-29T13:02:15.56 8.38
2025-04-29T13:02:16.56 8.35
2025-04-29T13:02:17.56 8.36
2025-04-29T13:02:18.56 8.35
2025-04-29T13:02:19.56 8.36
2025-04-29T13:02:20.56 8.35
2025-04-29T13:02:21.56 8.35
2025-04-29T13:02:22.56 8.36
2025-04-29T13:02:23.56 8.35
2025-04-29T13:02:24.56 8.36
2025-04-29T13:02:25.56 8.35
2025-04-29T13:02:26.56 8.34
2025-04-29T13:02:27.56 8.36
2025-04-29T13:02:28.56 8.38
2025-04-29T13:02:29.56 8.34
2025-04-29T13:02:30.56 8.33
2025-04-29T13:02:31.56 8.35
2025-04-29T13:02:32.56 8.35
2025-04-29T13:02:33.56 8.34
2025-04-29T13:02:34.56 8.35
2025-04-29T13:02:35.56 8.32
2025-04-29T13:02:36.56 8.35
2025-04-29T13:02:37.56 8.36
2025-04-29T13:02:38.56 8.37
2025-04-29T13:02:39.56 8.35
2025-04-29T13:02:40.56 8.37
2025-04-29T13:02:41.56 8.37
2025-04-29T13:02:42.56 8.37
2025-04-29T13:02:43.56 8.33
2025-04-29T13:02:44.56 8.35
2025-04-29T13:02:45.56 8.34
2025-04-29T13:02:46.56 8.35
2025-04-29T13:02:47.56 8.33
2025-04-29T13:02:48.56 8.37
2025-04-29T13:02:49.56 8.35
2025-04-29T13:02:50.56 8.35
2025-04-29T13:02:51.56 8.35
2025-04-29T13:02:52.56 8.37
2025-04-29T13:02:53.56 8.35
2025-04-29T13:02:54.56 8.35
2025-04-29T13:02:55.56 8.33
2025-04-29T13:02:56.56 8.35
2025-04-29T13:02:57.56 8.36
2025-04-29T13:02:58.56 8.39
2025-04-29T13:02:59.56 8.35
2025-04-29T13:03:00.56 8.35
2025-04-29T13:03:01.56 8.34
2025-04-29T13:03:02.56 8.36
2025-04-29T13:03:03.56 8.36
2025-04-29T13:03:04.56 8.37
2025-04-29T13:03:05.56 8.35
2025-04-29T13:03:06.56 8.35
2025-04-29T13:03:07.56 8.37
2025-04-29T13:03:08.56 8.37
2025-04-29T13:03:09.56 8.35
2025-04-29T13:03:10.56 8.35
2025-04-29T13:03:11.56 8.33
2025-04-29T13:03:12.56 8.39
2025-04-29T13:03:13.56 8.35
2025-04-29T13:03:14.56 8.35
2025-04-29T13:03:15.56 8.35
2025-04-29T13:03:16.56 8.35
2025-04-29T13:03:17.56 8.34
2025-04-29T13:03:18.56 8.36
2025-04-29T13:03:19.56 8.36
2025-04-29T13:03:20.56 8.36
2025-04-29T13:03:21.56 8.35
2025-04-29T13:03:22.56 8.35
2025-04-29T13:03:23.56 8.35
2025-04-29T13:03:24.56 8.36
2025-04-29T13:03:25.56 8.37
2025-04-29T13:03:26.56 8.35
2025-04-29T13:03:27.56 8.35
2025-04-29T13:03:28.56 8.35
2025-04-29T13:03:29.56 8.32
2025-04-29T13:03:30.56 8.36
2025-04-29T13:03:31.56 8.35
2025-04-29T13:03:32.56 8.36
2025-04-29T13:03:33.56 8.35
2025-04-29T13:03:34.56 8.33
2025-04-29T13:03:35.56 8.35
2025-04-29T13:03:36.56 8.32
2025-04-29T13:03:37.56 8.33
2025-04-29T13:03:38.56 8.35
2025-04-29T13:03:39.56 8.35
2025-04-29T13:03:40.56 8.36
2025-04-29T13:03:41.56 8.33
2025-04-29T13:03:42.56 8.37
2025-04-29T13:03:43.56 8.36
2025-04-29T13:03:44.56 8.33
2025-04-29T13:03:45.56 8.36
2025-04-29T13:03:46.56 8.37
2025-04-29T13:03:47.56 8.37
2025-04-29T13:03:48.56 8.38
2025-04-29T13:03:49.56 8.34
2025-04-29T13:03:50.56 8.33
2025-04-29T13:03:51.56 8.37
2025-04-29T13:03:52.56 8.35
2025-04-29T13:03:53.56 8.37
2025-04-29T13:03:54.56 8.34
2025-04-29T13:03:55.56 8.35
2025-04-29T13:03:56.56 8.33
2025-04-29T13:03:57.56 8.35
2025-04-29T13:03:58.56 8.35
2025-04-29T13:03:59.56 8.35
2025-04-29T13:04:00.56 8.34
2025-04-29T13:04:01.56 8.35
2025-04-29T13:04:02.56 8.35
2025-04-29T13:04:03.56 8.35
2025-04-29T13:04:04.56 8.35
2025-04-29T13:04:05.56 8.35
2025-04-29T13:04:06.56 8.36
2025-04-29T13:04:07.56 8.34
2025-04-29T13:04:08.56 8.36
2025-04-29T13:04:09.56 8.35
2025-04-29T13:04:10.56 8.36
2025-04-29T13:04:11.56 8.37
2025-04-29T13:04:12.56 8.33
2025-04-29T13:04:13.56 8.36
2025-04-29T13:04:14.56 8.36
2025-04-29T13:04:15.56 8.33
2025-04-29T13:04:16.56 8.36
2025-04-29T13:04:17.56 8.35
2025-04-29T13:04:18.56 8.37
2025-04-29T13:04:19.56 8.34
2025-04-29T13:04:20.56 8.37
2025-04-29T13:04:21.56 8.37
2025-04-29T13:04:22.56 8.37
2025-04-29T13:04:23.56 8.35
2025-04-29T13:04:24.56 8.36
2025-04-29T13:04:25.56 8.37
2025-04-29T13:04:26.56 8.35
2025-04-29T13:04:27.56 8.38
2025-04-29T13:04:28.56 8.35
2025-04-29T13:04:29.56 8.34
2025-04-29T13:04:30.56 8.35
2025-04-29T13:04:31.56 8.36
2025-04-29T13:04:32.56 8.36
2025-04-29T13:04:33.56 8.35
2025-04-29T13:04:34.56 8.36
2025-04-29T13:04:35.57 8.33
2025-04-29T13:04:36.57 8.34
2025-04-29T13:04:37.57 8.35
2025-04-29T13:04:38.57 8.35
2025-04-29T13:04:39.57 8.36
2025-04-29T13:04:40.57 8.34
2025-04-29T13:04:41.57 8.37
2025-04-29T13:04:42.57 8.34
2025-04-29T13:04:43.57 8.37
2025-04-29T13:04:44.57 8.35
2025-04-29T13:04:45.57 8.35
2025-04-29T13:04:46.57 8.36
2025-04-29T13:04:47.57 8.35
2025-04-29T13:04:48.57 8.34
2025-04-29T13:04:49.57 8.35
2025-04-29T13:04:50.57 8.37
2025-04-29T13:04:51.57 8.35
2025-04-29T13:04:52.57 8.34
2025-04-29T13:04:53.58 8.35
2025-04-29T13:04:54.56 8.33
2025-04-29T13:04:55.56 8.34
2025-04-29T13:04:56.56 8.35
2025-04-29T13:04:57.56 8.37
2025-04-29T13:04:58.56 8.35
2025-04-29T13:04:59.56 8.35
2025-04-29T13:05:00.56 8.35
2025-04-29T13:05:01.56 8.34
2025-04-29T13:05:02.56 8.38
2025-04-29T13:05:03.56 8.34
2025-04-29T13:05:04.56 8.36
2025-04-29T13:05:05.56 8.35
2025-04-29T13:05:06.56 8.35
2025-04-29T13:05:07.56 8.37
2025-04-29T13:05:08.56 8.36
2025-04-29T13:05:09.56 8.35
2025-04-29T13:05:10.56 8.35
2025-04-29T13:05:11.56 8.36
2025-04-29T13:05:12.56 8.37
2025-04-29T13:05:13.56 8.33
2025-04-29T13:05:14.56 8.36
2025-04-29T13:05:15.56 8.33
2025-04-29T13:05:16.56 8.35
2025-04-29T13:05:17.56 8.37
2025-04-29T13:05:18.56 8.35
2025-04-29T13:05:19.56 8.36
2025-04-29T13:05:20.56 8.34
2025-04-29T13:05:21.56 8.35
2025-04-29T13:05:22.56 8.35
2025-04-29T13:05:23.56 8.33
2025-04-29T13:05:24.56 8.35
2025-04-29T13:05:25.56 8.33
2025-04-29T13:05:26.56 8.34
2025-04-29T13:05:27.56 8.36
2025-04-29T13:05:28.56 8.35
2025-04-29T13:05:29.56 8.37
2025-04-29T13:05:30.56 8.36
2025-04-29T13:05:31.56 8.35
2025-04-29T13:05:32.56 8.37
2025-04-29T13:05:33.56 8.35
2025-04-29T13:05:34.56 8.33
2025-04-29T13:05:35.56 8.34
2025-04-29T13:05:36.56 8.37
2025-04-29T13:05:37.56 8.37
2025-04-29T13:05:38.56 8.33
2025-04-29T13:05:39.56 8.35
2025-04-29T13:05:40.56 8.38
2025-04-29T13:05:41.56 8.35
2025-04-29T13:05:42.56 8.35
2025-04-29T13:05:43.56 8.36
2025-04-29T13:05:44.56 8.37
2025-04-29T13:05:45.56 8.36
2025-04-29T13:05:46.56 8.37
2025-04-29T13:05:47.56 8.33
2025-04-29T13:05:48.56 8.34
2025-04-29T13:05:49.56 8.35
2025-04-29T13:05:50.56 8.35
2025-04-29T13:05:51.56 8.36
2025-04-29T13:05:52.56 8.35
2025-04-29T13:05:53.56 8.33
2025-04-29T13:05:54.56 8.35
2025-04-29T13:05:55.56 8.35
2025-04-29T13:05:56.56 8.35
2025-04-29T13:05:57.56 8.34
2025-04-29T13:05:58.56 8.35
2025-04-29T13:05:59.56 8.36
2025-04-29T13:06:00.56 8.35
2025-04-29T13:06:01.56 8.33
2025-04-29T13:06:02.56 8.34
2025-04-29T13:06:03.56 8.34
2025-04-29T13:06:04.56 8.35
2025-04-29T13:06:05.56 8.37
2025-04-29T13:06:06.56 8.35
2025-04-29T13:06:07.56 8.33
2025-04-29T13:06:08.56 8.37
2025-04-29T13:06:09.56 8.34
2025-04-29T13:06:10.56 8.33
2025-04-29T13:06:11.56 8.35
2025-04-29T13:06:12.56 8.36
2025-04-29T13:06:13.56 8.34
2025-04-29T13:06:14.56 8.33
2025-04-29T13:06:15.56 8.35
2025-04-29T13:06:16.56 8.32
2025-04-29T13:06:17.56 8.36
2025-04-29T13:06:18.56 8.35
2025-04-29T13:06:19.56 8.37
2025-04-29T13:06:20.56 8.33
2025-04-29T13:06:21.56 8.35
2025-04-29T13:06:22.56 8.36
2025-04-29T13:06:23.56 8.37
2025-04-29T13:06:24.56 8.34
2025-04-29T13:06:25.56 8.35
2025-04-29T13:06:26.56 8.33
2025-04-29T13:06:27.56 8.34
2025-04-29T13:06:28.56 8.36
2025-04-29T13:06:29.56 8.33
2025-04-29T13:06:30.56 8.35
2025-04-29T13:06:31.56 8.35
2025-04-29T13:06:32.56 8.33
2025-04-29T13:06:33.56 8.37
2025-04-29T13:06:34.56 8.33
2025-04-29T13:06:35.56 8.35
2025-04-29T13:06:36.56 8.35
2025-04-29T13:06:37.56 8.35
2025-04-29T13:06:38.56 8.33
2025-04-29T13:06:39.56 8.37
2025-04-29T13:06:40.56 8.35
2025-04-29T13:06:41.56 8.36
2025-04-29T13:06:42.56 8.36
2025-04-29T13:06:43.56 8.37
2025-04-29T13:06:44.56 8.36
2025-04-29T13:06:45.56 8.35
2025-04-29T13:06:46.56 8.33
2025-04-29T13:06:47.56 8.34
2025-04-29T13:06:48.56 8.35
2025-04-29T13:06:49.56 8.37
2025-04-29T13:06:50.56 8.35
2025-04-29T13:06:51.56 8.37
2025-04-29T13:06:52.56 8.34
2025-04-29T13:06:53.56 8.37
2025-04-29T13:06:54.56 8.35
2025-04-29T13:06:55.56 8.35
2025-04-29T13:06:56.56 8.32
2025-04-29T13:06:57.56 8.36
2025-04-29T13:06:58.56 8.36
2025-04-29T13:06:59.56 8.38
2025-04-29T13:07:00.56 8.35
2025-04-29T13:07:01.56 8.35
2025-04-29T13:07:02.56 8.36
2025-04-29T13:07:03.56 8.33
2025-04-29T13:07:04.56 8.35
2025-04-29T13:07:05.56 8.33
2025-04-29T13:07:06.56 8.36
2025-04-29T13:07:07.56 8.33
2025-04-29T13:07:08.56 8.37
2025-04-29T13:07:09.56 8.35
2025-04-29T13:07:10.56 8.36
2025-04-29T13:07:11.56 8.35
2025-04-29T13:07:12.56 8.36
2025-04-29T13:07:13.56 8.35
2025-04-29T13:07:14.56 8.36
2025-04-29T13:07:15.56 8.36
2025-04-29T13:07:16.56 8.36
2025-04-29T13:07:17.56 8.39
2025-04-29T13:07:18.56 8.35
2025-04-29T13:07:19.56 8.35
2025-04-29T13:07:20.56 8.34
2025-04-29T13:07:21.56 8.35
2025-04-29T13:07:22.56 8.34
2025-04-29T13:07:23.56 8.35
2025-04-29T13:07:24.56 8.33
2025-04-29T13:07:25.56 8.37
2025-04-29T13:07:26.56 8.34
2025-04-29T13:07:27.56 8.35
2025-04-29T13:07:28.56 8.36
2025-04-29T13:07:29.56 8.35
2025-04-29T13:07:30.56 8.35
2025-04-29T13:07:31.56 8.35
2025-04-29T13:07:32.56 8.35
2025-04-29T13:07:33.56 8.35
2025-04-29T13:07:34.56 8.36
2025-04-29T13:07:35.56 8.35
2025-04-29T13:07:36.56 8.34
2025-04-29T13:07:37.56 8.34
2025-04-29T13:07:38.56 8.35
2025-04-29T13:07:39.56 8.32
2025-04-29T13:07:40.56 8.35
2025-04-29T13:07:41.56 8.37
2025-04-29T13:07:42.56 8.36
2025-04-29T13:07:43.56 8.37
2025-04-29T13:07:44.56 8.35
2025-04-29T13:07:45.56 8.35
2025-04-29T13:07:46.56 8.37
2025-04-29T13:07:47.56 8.33
2025-04-29T13:07:48.56 8.33
2025-04-29T13:07:49.56 8.35
2025-04-29T13:07:50.56 8.35
2025-04-29T13:07:51.56 8.37
2025-04-29T13:07:52.56 8.35
2025-04-29T13:07:53.56 8.35
2025-04-29T13:07:54.56 8.38
2025-04-29T13:07:55.56 8.35
2025-04-29T13:07:56.56 8.35
2025-04-29T13:07:57.56 8.34
2025-04-29T13:07:58.56 8.36
2025-04-29T13:07:59.56 8.35
2025-04-29T13:08:00.56 8.34
2025-04-29T13:08:01.56 8.36
2025-04-29T13:08:02.56 8.35
2025-04-29T13:08:03.56 8.34
2025-04-29T13:08:04.56 8.34
2025-04-29T13:08:05.56 8.35
2025-04-29T13:08:06.56 8.34
2025-04-29T13:08:07.56 8.35
2025-04-29T13:08:08.56 8.36
2025-04-29T13:08:09.56 8.37
2025-04-29T13:08:10.56 8.35
2025-04-29T13:08:11.56 8.37
2025-04-29T13:08:12.56 8.37
2025-04-29T13:08:13.56 8.37
2025-04-29T13:08:14.56 8.33
2025-04-29T13:08:15.56 8.35
2025-04-29T13:08:16.56 8.32
2025-04-29T13:08:17.56 8.35
2025-04-29T13:08:18.56 8.35
2025-04-29T13:08:19.56 8.34
2025-04-29T13:08:20.56 8.37
2025-04-29T13:08:21.56 8.36
2025-04-29T13:08:22.56 8.34
2025-04-29T13:08:23.56 8.35
2025-04-29T13:08:24.56 8.34
2025-04-29T13:08:25.56 8.34
2025-04-29T13:08:26.56 8.35
2025-04-29T13:08:27.56 8.33
2025-04-29T13:08:28.56 8.36
2025-04-29T13:08:29.56 8.34
2025-04-29T13:08:30.56 8.33
2025-04-29T13:08:31.56 8.35
2025-04-29T13:08:32.56 8.35
2025-04-29T13:08:33.56 8.34
2025-04-29T13:08:34.56 8.35
2025-04-29T13:08:35.56 8.35
2025-04-29T13:08:36.56 8.37
2025-04-29T13:08:37.56 8.35
2025-04-29T13:08:38.56 8.35
2025-04-29T13:08:39.56 8.37
2025-04-29T13:08:40.56 8.37
2025-04-29T13:08:41.56 8.35
2025-04-29T13:08:42.56 8.35
2025-04-29T13:08:43.56 8.37
2025-04-29T13:08:44.56 8.36
2025-04-29T13:08:45.56 8.35
2025-04-29T13:08:46.56 8.35
2025-04-29T13:08:47.56 8.33
2025-04-29T13:08:48.56 8.35
2025-04-29T13:08:49.56 8.36
2025-04-29T13:08:50.56 8.38
2025-04-29T13:08:51.56 8.35
2025-04-29T13:08:52.56 8.36
2025-04-29T13:08:53.56 8.35
2025-04-29T13:08:54.56 8.35
2025-04-29T13:08:55.56 8.35
2025-04-29T13:08:56.56 8.35
2025-04-29T13:08:57.56 8.35
2025-04-29T13:08:58.56 8.35
2025-04-29T13:08:59.56 8.37
2025-04-29T13:09:00.56 8.35
2025-04-29T13:09:01.56 8.35
2025-04-29T13:09:02.56 8.35
2025-04-29T13:09:03.56 8.34
2025-04-29T13:09:04.56 8.36
2025-04-29T13:09:05.56 8.36
2025-04-29T13:09:06.56 8.36
2025-04-29T13:09:07.56 8.36
2025-04-29T13:09:08.56 8.37
2025-04-29T13:09:09.56 8.34
2025-04-29T13:09:10.56 8.38
2025-04-29T13:09:11.56 8.35
2025-04-29T13:09:12.56 8.35
2025-04-29T13:09:13.56 8.36
2025-04-29T13:09:14.56 8.36
2025-04-29T13:09:15.56 8.35
2025-04-29T13:09:16.56 8.36
2025-04-29T13:09:17.56 8.34
2025-04-29T13:09:18.56 8.34
2025-04-29T13:09:19.56 8.35
2025-04-29T13:09:20.56 8.35
2025-04-29T13:09:21.56 8.37
2025-04-29T13:09:22.56 8.33
2025-04-29T13:09:23.56 8.35
2025-04-29T13:09:24.56 8.34
2025-04-29T13:09:25.56 8.39
2025-04-29T13:09:26.56 8.33
2025-04-29T13:09:27.56 8.35
2025-04-29T13:09:28.56 8.35
2025-04-29T13:09:29.56 8.35
2025-04-29T13:09:30.57 8.35
2025-04-29T13:09:31.56 8.35
2025-04-29T13:09:32.56 8.36
2025-04-29T13:09:33.56 8.33
2025-04-29T13:09:34.56 8.37
2025-04-29T13:09:35.56 8.35
2025-04-29T13:09:36.56 8.34
2025-04-29T13:09:37.56 8.36
2025-04-29T13:09:38.56 8.37
2025-04-29T13:09:39.56 8.35
2025-04-29T13:09:40.56 8.36
2025-04-29T13:09:41.56 8.37
2025-04-29T13:09:42.56 8.37
2025-04-29T13:09:43.56 8.35
2025-04-29T13:09:44.56 8.36
2025-04-29T13:09:45.56 8.37
2025-04-29T13:09:46.56 8.35
2025-04-29T13:09:47.56 8.35
2025-04-29T13:09:48.56 8.37
2025-04-29T13:09:49.56 8.37
2025-04-29T13:09:50.56 8.37
2025-04-29T13:09:51.57 8.33
2025-04-29T13:09:52.56 8.33
2025-04-29T13:09:53.57 8.33
2025-04-29T13:09:54.57 8.36
2025-04-29T13:09:55.57 8.35
2025-04-29T13:09:56.57 8.33
2025-04-29T13:09:57.57 8.35
2025-04-29T13:09:58.57 8.36
2025-04-29T13:09:59.57 8.35
2025-04-29T13:10:00.57 8.34
2025-04-29T13:10:01.57 8.33
2025-04-29T13:10:02.57 8.34
2025-04-29T13:10:03.57 8.35
2025-04-29T13:10:04.57 8.37
2025-04-29T13:10:05.57 8.34
2025-04-29T13:10:06.57 8.35
2025-04-29T13:10:07.57 8.33
2025-04-29T13:10:08.57 8.34
2025-04-29T13:10:09.57 8.33
2025-04-29T13:10:10.57 8.36
2025-04-29T13:10:11.57 8.35
2025-04-29T13:10:12.57 8.35
2025-04-29T13:10:13.57 8.35
2025-04-29T13:10:14.57 8.32
2025-04-29T13:10:15.57 8.35
2025-04-29T13:10:16.57 8.35
2025-04-29T13:10:17.57 8.35
2025-04-29T13:10:18.57 8.35
2025-04-29T13:10:19.57 8.35
2025-04-29T13:10:20.57 8.35
2025-04-29T13:10:21.57 8.35
2025-04-29T13:10:22.57 8.35
2025-04-29T13:10:23.57 8.33
2025-04-29T13:10:24.57 8.35
2025-04-29T13:10:25.57 8.34
2025-04-29T13:10:26.57 8.36
2025-04-29T13:10:27.57 8.34
2025-04-29T13:10:28.57 8.35
2025-04-29T13:10:29.57 8.33
2025-04-29T13:10:30.57 8.35
2025-04-29T13:10:31.57 8.35
2025-04-29T13:10:32.57 8.35
2025-04-29T13:10:33.57 8.35
2025-04-29T13:10:34.57 8.36
2025-04-29T13:10:35.57 8.33
2025-04-29T13:10:36.57 8.32
2025-04-29T13:10:37.57 8.35
2025-04-29T13:10:38.57 8.34
2025-04-29T13:10:39.57 8.35
2025-04-29T13:10:40.57 8.33
2025-04-29T13:10:41.57 8.35
2025-04-29T13:10:42.57 8.36
2025-04-29T13:10:43.57 8.35
2025-04-29T13:10:44.57 8.37
2025-04-29T13:10:45.57 8.32
2025-04-29T13:10:46.57 8.33
2025-04-29T13:10:47.57 8.35
2025-04-29T13:10:48.57 8.35
2025-04-29T13:10:49.57 8.34
2025-04-29T13:10:50.57 8.35
2025-04-29T13:10:51.57 8.35
2025-04-29T13:10:52.57 8.34
2025-04-29T13:10:53.57 8.36
2025-04-29T13:10:54.57 8.34
2025-04-29T13:10:55.57 8.35
2025-04-29T13:10:56.57 8.37
2025-04-29T13:10:57.57 8.36
2025-04-29T13:10:58.57 8.35
2025-04-29T13:10:59.57 8.35
2025-04-29T13:11:00.57 8.34
2025-04-29T13:11:01.57 8.35
2025-04-29T13:11:02.57 8.33
2025-04-29T13:11:03.57 8.35
2025-04-29T13:11:04.57 8.37
2025-04-29T13:11:05.57 8.36
2025-04-29T13:11:06.57 8.34
2025-04-29T13:11:07.57 8.35
2025-04-29T13:11:08.57 8.35
2025-04-29T13:11:09.57 8.35
2025-04-29T13:11:10.57 8.37
2025-04-29T13:11:11.57 8.35
2025-04-29T13:11:12.57 8.33
2025-04-29T13:11:13.57 8.35
2025-04-29T13:11:14.57 8.35
2025-04-29T13:11:15.57 8.37
2025-04-29T13:11:16.57 8.35
2025-04-29T13:11:17.57 8.36
2025-04-29T13:11:18.57 8.35
2025-04-29T13:11:19.57 8.36
2025-04-29T13:11:20.57 8.34
2025-04-29T13:11:21.57 8.34
2025-04-29T13:11:22.57 8.37
2025-04-29T13:11:23.57 8.36
2025-04-29T13:11:24.57 8.35
2025-04-29T13:11:25.57 8.35
2025-04-29T13:11:26.57 8.36
2025-04-29T13:11:27.57 8.37
2025-04-29T13:11:28.57 8.34
2025-04-29T13:11:29.57 8.37
2025-04-29T13:11:30.57 8.35
2025-04-29T13:11:31.57 8.35
2025-04-29T13:11:32.57 8.35
2025-04-29T13:11:33.57 8.33
2025-04-29T13:11:34.57 8.35
2025-04-29T13:11:35.57 8.34
2025-04-29T13:11:36.57 8.34
2025-04-29T13:11:37.57 8.33
2025-04-29T13:11:38.57 8.35
2025-04-29T13:11:39.57 8.35
2025-04-29T13:11:40.57 8.34
2025-04-29T13:11:41.57 8.35
2025-04-29T13:11:42.57 8.35
2025-04-29T13:11:43.57 8.33
2025-04-29T13:11:44.57 8.35
2025-04-29T13:11:45.57 8.35
2025-04-29T13:11:46.57 8.36
2025-04-29T13:11:47.57 8.35
2025-04-29T13:11:48.57 8.35
2025-04-29T13:11:49.57 8.35
2025-04-29T13:11:50.57 8.36
2025-04-29T13:11:51.57 8.35
2025-04-29T13:11:52.57 8.35
2025-04-29T13:11:53.57 8.35
2025-04-29T13:11:54.57 8.35
2025-04-29T13:11:55.57 8.35
2025-04-29T13:11:56.57 8.35
2025-04-29T13:11:57.57 8.37
2025-04-29T13:11:58.57 8.33
2025-04-29T13:11:59.57 8.37
2025-04-29T13:12:00.57 8.36
2025-04-29T13:12:01.57 8.35
2025-04-29T13:12:02.57 8.33
2025-04-29T13:12:03.57 8.35
2025-04-29T13:12:04.57 8.35
2025-04-29T13:12:05.57 8.34
2025-04-29T13:12:06.57 8.38
2025-04-29T13:12:07.57 8.33
2025-04-29T13:12:08.57 8.35
2025-04-29T13:12:09.57 8.35
2025-04-29T13:12:10.57 8.37
2025-04-29T13:12:11.57 8.35
2025-04-29T13:12:12.57 8.35
2025-04-29T13:12:13.57 8.36
2025-04-29T13:12:14.57 8.36
2025-04-29T13:12:15.57 8.35
2025-04-29T13:12:16.57 8.35
2025-04-29T13:12:17.57 8.37
2025-04-29T13:12:18.57 8.33
2025-04-29T13:12:19.57 8.33
2025-04-29T13:12:20.57 8.32
2025-04-29T13:12:21.57 8.34
2025-04-29T13:12:22.57 8.34
2025-04-29T13:12:23.57 8.35
2025-04-29T13:12:24.57 8.35
2025-04-29T13:12:25.57 8.35
2025-04-29T13:12:26.57 8.36
2025-04-29T13:12:27.57 8.37
2025-04-29T13:12:28.57 8.33
2025-04-29T13:12:29.57 8.32
2025-04-29T13:12:30.57 8.35
2025-04-29T13:12:31.57 8.34
2025-04-29T13:12:32.57 8.33
2025-04-29T13:12:33.57 8.36
2025-04-29T13:12:34.57 8.35
2025-04-29T13:12:35.57 8.34
2025-04-29T13:12:36.57 8.37
2025-04-29T13:12:37.58 8.32
2025-04-29T13:12:38.56 8.35
2025-04-29T13:12:39.56 8.33
2025-04-29T13:12:40.56 8.33
2025-04-29T13:12:41.56 8.38
2025-04-29T13:12:42.56 8.37
2025-04-29T13:12:43.56 8.38
2025-04-29T13:12:44.56 8.35
2025-04-29T13:12:45.56 8.35
2025-04-29T13:12:46.56 8.34
2025-04-29T13:12:47.56 8.35
2025-04-29T13:12:48.56 8.35
2025-04-29T13:12:49.56 8.34
2025-04-29T13:12:50.56 8.35
2025-04-29T13:12:51.56 8.34
2025-04-29T13:12:52.56 8.35
2025-04-29T13:12:53.56 8.35
2025-04-29T13:12:54.56 8.35
2025-04-29T13:12:55.56 8.34
2025-04-29T13:12:56.56 8.35
2025-04-29T13:12:57.56 8.36
2025-04-29T13:12:58.56 8.36
2025-04-29T13:12:59.56 8.35
2025-04-29T13:13:00.56 8.35
2025-04-29T13:13:01.56 8.35
2025-04-29T13:13:02.56 8.35
2025-04-29T13:13:03.56 8.36
2025-04-29T13:13:04.56 8.34
2025-04-29T13:13:05.56 8.33
2025-04-29T13:13:06.56 8.34
2025-04-29T13:13:07.56 8.33
2025-04-29T13:13:08.56 8.33
2025-04-29T13:13:09.56 8.35
2025-04-29T13:13:10.56 8.34
2025-04-29T13:13:11.56 8.34
2025-04-29T13:13:12.56 8.36
2025-04-29T13:13:13.56 8.36
2025-04-29T13:13:14.56 8.36
2025-04-29T13:13:15.56 8.36
2025-04-29T13:13:16.56 8.35
2025-04-29T13:13:17.56 8.35
2025-04-29T13:13:18.56 8.37
2025-04-29T13:13:19.56 8.34
2025-04-29T13:13:20.56 8.35
2025-04-29T13:13:21.56 8.36
2025-04-29T13:13:22.56 8.35
2025-04-29T13:13:23.56 8.36
2025-04-29T13:13:24.56 8.35
2025-04-29T13:13:25.56 8.35
2025-04-29T13:13:26.56 8.34
2025-04-29T13:13:27.56 8.35
2025-04-29T13:13:28.56 8.34
2025-04-29T13:13:29.56 8.35
2025-04-29T13:13:30.56 8.38
2025-04-29T13:13:31.56 8.35
2025-04-29T13:13:32.56 8.35
2025-04-29T13:13:33.56 8.33
2025-04-29T13:13:34.56 8.35
2025-04-29T13:13:35.56 8.35
2025-04-29T13:13:36.56 8.33
2025-04-29T13:13:37.56 8.35
2025-04-29T13:13:38.56 8.34
2025-04-29T13:13:39.56 8.34
2025-04-29T13:13:40.56 8.35
2025-04-29T13:13:41.56 8.33
2025-04-29T13:13:42.56 8.33
2025-04-29T13:13:43.56 8.36
2025-04-29T13:13:44.56 8.36
2025-04-29T13:13:45.56 8.35
2025-04-29T13:13:46.56 8.34
2025-04-29T13:13:47.56 8.34
2025-04-29T13:13:48.56 8.35
2025-04-29T13:13:49.56 8.34
2025-04-29T13:13:50.56 8.34
2025-04-29T13:13:51.56 8.33
2025-04-29T13:13:52.56 8.33
2025-04-29T13:13:53.56 8.35
2025-04-29T13:13:54.56 8.36
2025-04-29T13:13:55.56 8.35
2025-04-29T13:13:56.56 8.36
2025-04-29T13:13:57.56 8.33
2025-04-29T13:13:58.56 8.37
2025-04-29T13:13:59.56 8.32
2025-04-29T13:14:00.56 8.36
2025-04-29T13:14:01.56 8.33
2025-04-29T13:14:02.56 8.36
2025-04-29T13:14:03.56 8.35
2025-04-29T13:14:04.56 8.35
2025-04-29T13:14:05.56 8.36
2025-04-29T13:14:06.56 8.33
2025-04-29T13:14:07.56 8.33
2025-04-29T13:14:08.56 8.37
2025-04-29T13:14:09.56 8.35
2025-04-29T13:14:10.56 8.35
2025-04-29T13:14:11.56 8.35
2025-04-29T13:14:12.56 8.33
2025-04-29T13:14:13.56 8.35
2025-04-29T13:14:14.56 8.34
2025-04-29T13:14:15.56 8.35
2025-04-29T13:14:16.56 8.37
2025-04-29T13:14:17.56 8.35
2025-04-29T13:14:18.56 8.34
2025-04-29T13:14:19.56 8.35
2025-04-29T13:14:20.56 8.35
2025-04-29T13:14:21.56 8.36
2025-04-29T13:14:22.56 8.36
2025-04-29T13:14:23.56 8.36
2025-04-29T13:14:24.56 8.34
2025-04-29T13:14:25.56 8.37
2025-04-29T13:14:26.56 8.35
2025-04-29T13:14:27.56 8.37
2025-04-29T13:14:28.56 8.35
2025-04-29T13:14:29.56 8.35
2025-04-29T13:14:30.56 8.35
2025-04-29T13:14:31.56 8.35
2025-04-29T13:14:32.56 8.34
2025-04-29T13:14:33.56 8.35
2025-04-29T13:14:34.56 8.37
2025-04-29T13:14:35.56 8.33
2025-04-29T13:14:36.56 8.33
2025-04-29T13:14:37.56 8.33
2025-04-29T13:14:38.56 8.32
2025-04-29T13:14:39.56 8.37
2025-04-29T13:14:40.56 8.34
2025-04-29T13:14:41.56 8.32
2025-04-29T13:14:42.56 8.34
2025-04-29T13:14:43.56 8.32
2025-04-29T13:14:44.56 8.35
2025-04-29T13:14:45.56 8.35
2025-04-29T13:14:46.56 8.35
2025-04-29T13:14:47.56 8.35
2025-04-29T13:14:48.56 8.35
2025-04-29T13:14:49.56 8.32
2025-04-29T13:14:50.56 8.35
2025-04-29T13:14:51.56 8.33
2025-04-29T13:14:52.56 8.37
2025-04-29T13:14:53.56 8.33
2025-04-29T13:14:54.56 8.37
2025-04-29T13:14:55.56 8.35
2025-04-29T13:14:56.56 8.36
2025-04-29T13:14:57.56 8.35
2025-04-29T13:14:58.56 8.34
2025-04-29T13:14:59.56 8.34
2025-04-29T13:15:00.56 8.38
2025-04-29T13:15:01.56 8.37
2025-04-29T13:15:02.56 8.35
2025-04-29T13:15:03.56 8.36
2025-04-29T13:15:04.56 8.34
2025-04-29T13:15:05.56 8.35
2025-04-29T13:15:06.56 8.33
2025-04-29T13:15:07.56 8.35
2025-04-29T13:15:08.56 8.35
2025-04-29T13:15:09.56 8.36
2025-04-29T13:15:10.56 8.36
2025-04-29T13:15:11.57 8.39
2025-04-29T13:15:12.57 8.35
2025-04-29T13:15:13.57 8.37
2025-04-29T13:15:14.57 8.33
2025-04-29T13:15:15.57 8.34
2025-04-29T13:15:16.57 8.34
2025-04-29T13:15:17.57 8.36
2025-04-29T13:15:18.57 8.37
2025-04-29T13:15:19.57 8.37
2025-04-29T13:15:20.57 8.35
2025-04-29T13:15:21.57 8.35
2025-04-29T13:15:22.57 8.38
2025-04-29T13:15:23.57 8.35
2025-04-29T13:15:24.57 8.36
2025-04-29T13:15:25.57 8.33
2025-04-29T13:15:26.57 8.37
2025-04-29T13:15:27.57 8.39
2025-04-29T13:15:28.57 8.35
2025-04-29T13:15:29.57 8.34
2025-04-29T13:15:30.57 8.37
2025-04-29T13:15:31.57 8.36
2025-04-29T13:15:32.57 8.35
2025-04-29T13:15:33.57 8.35
2025-04-29T13:15:34.57 8.35
2025-04-29T13:15:35.57 8.35
2025-04-29T13:15:36.57 8.35
2025-04-29T13:15:37.57 8.36
2025-04-29T13:15:38.57 8.35
2025-04-29T13:15:39.57 8.33
2025-04-29T13:15:40.57 8.35
2025-04-29T13:15:41.57 8.35
2025-04-29T13:15:42.57 8.33
2025-04-29T13:15:43.57 8.33
2025-04-29T13:15:44.57 8.36
2025-04-29T13:15:45.57 8.32
2025-04-29T13:15:46.57 8.37
2025-04-29T13:15:47.57 8.33
2025-04-29T13:15:48.57 8.35
2025-04-29T13:15:49.57 8.38
2025-04-29T13:15:50.57 8.34
2025-04-29T13:15:51.57 8.35
2025-04-29T13:15:52.57 8.34
2025-04-29T13:15:53.57 8.37
2025-04-29T13:15:54.57 8.35
2025-04-29T13:15:55.57 8.34
2025-04-29T13:15:56.57 8.33
2025-04-29T13:15:57.57 8.34
2025-04-29T13:15:58.57 8.33
2025-04-29T13:15:59.57 8.33
2025-04-29T13:16:00.57 8.35
2025-04-29T13:16:01.57 8.35
2025-04-29T13:16:02.57 8.35
2025-04-29T13:16:03.57 8.35
2025-04-29T13:16:04.57 8.35
2025-04-29T13:16:05.57 8.35
2025-04-29T13:16:06.57 8.35
2025-04-29T13:16:07.57 8.37
2025-04-29T13:16:08.57 8.35
2025-04-29T13:16:09.57 8.35
2025-04-29T13:16:10.57 8.36
2025-04-29T13:16:11.57 8.34
2025-04-29T13:16:12.57 8.35
2025-04-29T13:16:13.57 8.35
2025-04-29T13:16:14.57 8.35
2025-04-29T13:16:15.57 8.35
2025-04-29T13:16:16.57 8.36
2025-04-29T13:16:17.57 8.34
2025-04-29T13:16:18.57 8.36
2025-04-29T13:16:19.57 8.35
2025-04-29T13:16:20.57 8.35
2025-04-29T13:16:21.57 8.33
2025-04-29T13:16:22.57 8.36
2025-04-29T13:16:23.57 8.35
2025-04-29T13:16:24.57 8.35
2025-04-29T13:16:25.57 8.35
2025-04-29T13:16:26.57 8.35
2025-04-29T13:16:27.57 8.35
2025-04-29T13:16:28.57 8.37
2025-04-29T13:16:29.58 8.33
2025-04-29T13:16:30.56 8.35
2025-04-29T13:16:31.56 8.37
2025-04-29T13:16:32.56 8.34
2025-04-29T13:16:33.56 8.36
2025-04-29T13:16:34.56 8.35
2025-04-29T13:16:35.56 8.36
2025-04-29T13:16:36.56 8.35
2025-04-29T13:16:37.56 8.35
2025-04-29T13:16:38.56 8.35
2025-04-29T13:16:39.56 8.37
2025-04-29T13:16:40.56 8.34
2025-04-29T13:16:41.56 8.37
2025-04-29T13:16:42.56 8.35
2025-04-29T13:16:43.56 8.35
2025-04-29T13:16:44.56 8.36
2025-04-29T13:16:45.56 8.35
2025-04-29T13:16:46.56 8.34
2025-04-29T13:16:47.56 8.36
2025-04-29T13:16:48.56 8.36
2025-04-29T13:16:49.56 8.35
2025-04-29T13:16:50.56 8.35
2025-04-29T13:16:51.56 8.36
2025-04-29T13:16:52.56 8.37
2025-04-29T13:16:53.56 8.37
2025-04-29T13:16:54.56 8.37
2025-04-29T13:16:55.56 8.35
2025-04-29T13:16:56.56 8.36
2025-04-29T13:16:57.56 8.34
2025-04-29T13:16:58.56 8.33
2025-04-29T13:16:59.56 8.34
2025-04-29T13:17:00.56 8.35
2025-04-29T13:17:01.56 8.35
2025-04-29T13:17:02.56 8.34
2025-04-29T13:17:03.56 8.37
2025-04-29T13:17:04.56 8.37
2025-04-29T13:17:05.56 8.32
2025-04-29T13:17:06.56 8.34
2025-04-29T13:17:07.56 8.36
2025-04-29T13:17:08.56 8.34
2025-04-29T13:17:09.56 8.37
2025-04-29T13:17:10.56 8.33
2025-04-29T13:17:11.56 8.34
2025-04-29T13:17:12.56 8.35
2025-04-29T13:17:13.56 8.35
2025-04-29T13:17:14.56 8.32
2025-04-29T13:17:15.56 8.36
2025-04-29T13:17:16.56 8.35
2025-04-29T13:17:17.56 8.34
2025-04-29T13:17:18.56 8.33
2025-04-29T13:17:19.56 8.35
2025-04-29T13:17:20.56 8.34
2025-04-29T13:17:21.56 8.37
2025-04-29T13:17:22.56 8.33
2025-04-29T13:17:23.56 8.36
2025-04-29T13:17:24.56 8.36
2025-04-29T13:17:25.56 8.38
2025-04-29T13:17:26.56 8.37
2025-04-29T13:17:27.56 8.34
2025-04-29T13:17:28.56 8.34
2025-04-29T13:17:29.56 8.33
2025-04-29T13:17:30.56 8.35
2025-04-29T13:17:31.56 8.36
2025-04-29T13:17:32.56 8.35
2025-04-29T13:17:33.56 8.33
2025-04-29T13:17:34.56 8.35
2025-04-29T13:17:35.56 8.35
2025-04-29T13:17:36.56 8.36
2025-04-29T13:17:37.56 8.35
2025-04-29T13:17:38.56 8.33
2025-04-29T13:17:39.56 8.34
2025-04-29T13:17:40.56 8.37
2025-04-29T13:17:41.56 8.35
2025-04-29T13:17:42.56 8.37
2025-04-29T13:17:43.56 8.37
2025-04-29T13:17:44.56 8.33
2025-04-29T13:17:45.56 8.37
2025-04-29T13:17:46.56 8.35
2025-04-29T13:17:47.56 8.36
2025-04-29T13:17:48.56 8.34
2025-04-29T13:17:49.56 8.35
2025-04-29T13:17:50.56 8.35
2025-04-29T13:17:51.56 8.34
2025-04-29T13:17:52.56 8.35
2025-04-29T13:17:53.56 8.33
2025-04-29T13:17:54.56 8.36
2025-04-29T13:17:55.56 8.34
2025-04-29T13:17:56.56 8.33
2025-04-29T13:17:57.56 8.36
2025-04-29T13:17:58.56 8.35
2025-04-29T13:17:59.56 8.32
2025-04-29T13:18:00.56 8.35
2025-04-29T13:18:01.56 8.35
2025-04-29T13:18:02.56 8.34
2025-04-29T13:18:03.56 8.36
2025-04-29T13:18:04.56 8.37
2025-04-29T13:18:05.56 8.34
2025-04-29T13:18:06.56 8.33
2025-04-29T13:18:07.56 8.34
2025-04-29T13:18:08.56 8.34
2025-04-29T13:18:09.56 8.34
2025-04-29T13:18:10.56 8.32
2025-04-29T13:18:11.56 8.33
2025-04-29T13:18:12.56 8.34
2025-04-29T13:18:13.56 8.35
2025-04-29T13:18:14.56 8.34
2025-04-29T13:18:15.56 8.33
2025-04-29T13:18:16.56 8.37
2025-04-29T13:18:17.56 8.34
2025-04-29T13:18:18.56 8.35
2025-04-29T13:18:19.56 8.34
2025-04-29T13:18:20.56 8.34
2025-04-29T13:18:21.56 8.35
2025-04-29T13:18:22.56 8.37
2025-04-29T13:18:23.56 8.35
2025-04-29T13:18:24.56 8.34
2025-04-29T13:18:25.56 8.37
2025-04-29T13:18:26.56 8.37
2025-04-29T13:18:27.56 8.36
2025-04-29T13:18:28.56 8.36
2025-04-29T13:18:29.56 8.35
2025-04-29T13:18:30.56 8.36
2025-04-29T13:18:31.56 8.34
2025-04-29T13:18:32.56 8.35
2025-04-29T13:18:33.56 8.35
2025-04-29T13:18:34.56 8.34
2025-04-29T13:18:35.56 8.35
2025-04-29T13:18:36.56 8.35
2025-04-29T13:18:37.56 8.35
2025-04-29T13:18:38.56 8.35
2025-04-29T13:18:39.56 8.36
2025-04-29T13:18:40.56 8.37
2025-04-29T13:18:41.56 8.35
2025-04-29T13:18:42.56 8.35
2025-04-29T13:18:43.56 8.33
2025-04-29T13:18:44.56 8.36
2025-04-29T13:18:45.56 8.35
2025-04-29T13:18:46.56 8.33
2025-04-29T13:18:47.56 8.36
2025-04-29T13:18:48.56 8.36
2025-04-29T13:18:49.56 8.35
2025-04-29T13:18:50.56 8.36
2025-04-29T13:18:51.56 8.36
2025-04-29T13:18:52.56 8.37
2025-04-29T13:18:53.56 8.37
2025-04-29T13:18:54.56 8.34
2025-04-29T13:18:55.56 8.36
2025-04-29T13:18:56.56 8.35
2025-04-29T13:18:57.56 8.34
2025-04-29T13:18:58.56 8.36
2025-04-29T13:18:59.56 8.35
2025-04-29T13:19:00.56 8.35
2025-04-29T13:19:01.56 8.35
2025-04-29T13:19:02.56 8.37
2025-04-29T13:19:03.56 8.36
2025-04-29T13:19:04.56 8.36
2025-04-29T13:19:05.56 8.33
2025-04-29T13:19:06.56 8.36
2025-04-29T13:19:07.56 8.35
2025-04-29T13:19:08.56 8.37
2025-04-29T13:19:09.58 8.35
2025-04-29T13:19:10.55 8.36
2025-04-29T13:19:11.55 8.38
2025-04-29T13:19:12.55 8.35
2025-04-29T13:19:13.55 8.35
2025-04-29T13:19:14.55 8.36
2025-04-29T13:19:15.55 8.35
2025-04-29T13:19:16.55 8.33
2025-04-29T13:19:17.55 8.35
2025-04-29T13:19:18.55 8.35
2025-04-29T13:19:19.55 8.35
2025-04-29T13:19:20.55 8.33
2025-04-29T13:19:21.55 8.34
2025-04-29T13:19:22.55 8.36
2025-04-29T13:19:23.55 8.35
2025-04-29T13:19:24.55 8.37
2025-04-29T13:19:25.55 8.36
2025-04-29T13:19:26.55 8.36
2025-04-29T13:19:27.55 8.37
2025-04-29T13:19:28.55 8.35
2025-04-29T13:19:29.55 8.35
2025-04-29T13:19:30.55 8.39
2025-04-29T13:19:31.55 8.37
2025-04-29T13:19:32.55 8.37
2025-04-29T13:19:33.55 8.37
2025-04-29T13:19:34.55 8.36
2025-04-29T13:19:35.55 8.35
2025-04-29T13:19:36.55 8.35
2025-04-29T13:19:37.55 8.36
2025-04-29T13:19:38.55 8.34
2025-04-29T13:19:39.55 8.36
2025-04-29T13:19:40.55 8.35
2025-04-29T13:19:41.55 8.33
2025-04-29T13:19:42.55 8.37
2025-04-29T13:19:43.55 8.35
2025-04-29T13:19:44.55 8.35
2025-04-29T13:19:45.55 8.35
2025-04-29T13:19:46.55 8.35
2025-04-29T13:19:47.55 8.36
2025-04-29T13:19:48.55 8.34
2025-04-29T13:19:49.55 8.37
2025-04-29T13:19:50.55 8.33
2025-04-29T13:19:51.55 8.35
2025-04-29T13:19:52.55 8.34
2025-04-29T13:19:53.55 8.37
2025-04-29T13:19:54.55 8.35
2025-04-29T13:19:55.55 8.35
2025-04-29T13:19:56.55 8.35
2025-04-29T13:19:57.55 8.35
2025-04-29T13:19:58.55 8.36
2025-04-29T13:19:59.55 8.34
2025-04-29T13:20:00.55 8.37
2025-04-29T13:20:01.55 8.36
2025-04-29T13:20:02.55 8.36
2025-04-29T13:20:03.55 8.35
2025-04-29T13:20:04.55 8.35
2025-04-29T13:20:05.55 8.35
2025-04-29T13:20:06.55 8.37
2025-04-29T13:20:07.55 8.34
2025-04-29T13:20:08.55 8.35
2025-04-29T13:20:09.55 8.35
2025-04-29T13:20:10.55 8.35
2025-04-29T13:20:11.55 8.36
2025-04-29T13:20:12.55 8.35
2025-04-29T13:20:13.55 8.33
2025-04-29T13:20:14.55 8.35
2025-04-29T13:20:15.55 8.34
2025-04-29T13:20:16.55 8.34
2025-04-29T13:20:17.55 8.37
2025-04-29T13:20:18.55 8.35
2025-04-29T13:20:19.55 8.33
2025-04-29T13:20:20.55 8.35
2025-04-29T13:20:21.55 8.37
2025-04-29T13:20:22.55 8.33
2025-04-29T13:20:23.55 8.38
2025-04-29T13:20:24.55 8.33
2025-04-29T13:20:25.55 8.36
2025-04-29T13:20:26.55 8.33
2025-04-29T13:20:27.55 8.36
2025-04-29T13:20:28.55 8.35
2025-04-29T13:20:29.55 8.37
2025-04-29T13:20:30.56 8.36
2025-04-29T13:20:31.56 8.37
2025-04-29T13:20:32.56 8.36
2025-04-29T13:20:33.56 8.35
2025-04-29T13:20:34.56 8.34
2025-04-29T13:20:35.56 8.38
2025-04-29T13:20:36.56 8.37
2025-04-29T13:20:37.56 8.35
2025-04-29T13:20:38.56 8.35
2025-04-29T13:20:39.56 8.37
2025-04-29T13:20:40.56 8.34
2025-04-29T13:20:41.56 8.37
2025-04-29T13:20:42.56 8.36
2025-04-29T13:20:43.56 8.37
2025-04-29T13:20:44.56 8.37
2025-04-29T13:20:45.56 8.33
2025-04-29T13:20:46.56 8.36
2025-04-29T13:20:47.56 8.35
2025-04-29T13:20:48.56 8.35
2025-04-29T13:20:49.56 8.35
2025-04-29T13:20:50.56 8.36
2025-04-29T13:20:51.56 8.36
2025-04-29T13:20:52.56 8.35
2025-04-29T13:20:53.56 8.35
2025-04-29T13:20:54.56 8.34
2025-04-29T13:20:55.56 8.33
2025-04-29T13:20:56.56 8.35
2025-04-29T13:20:57.56 8.37
2025-04-29T13:20:58.56 8.35
2025-04-29T13:20:59.56 8.37
2025-04-29T13:21:00.56 8.37
2025-04-29T13:21:01.56 8.32
2025-04-29T13:21:02.56 8.37
2025-04-29T13:21:03.56 8.36
2025-04-29T13:21:04.56 8.37
2025-04-29T13:21:05.56 8.35
2025-04-29T13:21:06.56 8.34
2025-04-29T13:21:07.56 8.36
2025-04-29T13:21:08.56 8.36
2025-04-29T13:21:09.56 8.37
2025-04-29T13:21:10.56 8.37
2025-04-29T13:21:11.56 8.35
2025-04-29T13:21:12.56 8.35
2025-04-29T13:21:13.56 8.35
2025-04-29T13:21:14.56 8.36
2025-04-29T13:21:15.56 8.37
2025-04-29T13:21:16.56 8.35
2025-04-29T13:21:17.56 8.37
2025-04-29T13:21:18.56 8.38
2025-04-29T13:21:19.56 8.33
2025-04-29T13:21:20.56 8.32
2025-04-29T13:21:21.56 8.36
2025-04-29T13:21:22.56 8.35
2025-04-29T13:21:23.56 8.37
2025-04-29T13:21:24.56 8.34
2025-04-29T13:21:25.56 8.37
2025-04-29T13:21:26.56 8.36
2025-04-29T13:21:27.56 8.35
2025-04-29T13:21:28.56 8.35
2025-04-29T13:21:29.56 8.37
2025-04-29T13:21:30.56 8.37
2025-04-29T13:21:31.56 8.35
2025-04-29T13:21:32.56 8.35
2025-04-29T13:21:33.56 8.35
2025-04-29T13:21:34.56 8.35
2025-04-29T13:21:35.56 8.33
2025-04-29T13:21:36.56 8.35
2025-04-29T13:21:37.56 8.37
2025-04-29T13:21:38.56 8.33
2025-04-29T13:21:39.56 8.36
2025-04-29T13:21:40.56 8.34
2025-04-29T13:21:41.56 8.37
2025-04-29T13:21:42.56 8.35
2025-04-29T13:21:43.56 8.35
2025-04-29T13:21:44.56 8.35
2025-04-29T13:21:45.56 8.33
2025-04-29T13:21:46.56 8.35
2025-04-29T13:21:47.56 8.33
2025-04-29T13:21:48.56 8.37
2025-04-29T13:21:49.56 8.37
2025-04-29T13:21:50.56 8.35
2025-04-29T13:21:51.56 8.37
2025-04-29T13:21:52.56 8.33
2025-04-29T13:21:53.56 8.35
2025-04-29T13:21:54.56 8.36
2025-04-29T13:21:55.56 8.36
2025-04-29T13:21:56.56 8.34
2025-04-29T13:21:57.56 8.39
2025-04-29T13:21:58.56 8.37
2025-04-29T13:21:59.56 8.36
2025-04-29T13:22:00.56 8.33
2025-04-29T13:22:01.56 8.36
2025-04-29T13:22:02.56 8.34
2025-04-29T13:22:03.56 8.35
2025-04-29T13:22:04.56 8.36
2025-04-29T13:22:05.56 8.36
2025-04-29T13:22:06.56 8.33
2025-04-29T13:22:07.56 8.33
2025-04-29T13:22:08.56 8.32
2025-04-29T13:22:09.56 8.37
2025-04-29T13:22:10.56 8.34
2025-04-29T13:22:11.56 8.36
2025-04-29T13:22:12.56 8.34
2025-04-29T13:22:13.56 8.36
2025-04-29T13:22:14.56 8.35
2025-04-29T13:22:15.56 8.36
2025-04-29T13:22:16.56 8.35
2025-04-29T13:22:17.56 8.38
2025-04-29T13:22:18.56 8.35
2025-04-29T13:22:19.56 8.35
2025-04-29T13:22:20.56 8.35
2025-04-29T13:22:21.56 8.35
2025-04-29T13:22:22.56 8.36
2025-04-29T13:22:23.56 8.36
2025-04-29T13:22:24.56 8.36
2025-04-29T13:22:25.56 8.36
2025-04-29T13:22:26.56 8.34
2025-04-29T13:22:27.56 8.36
2025-04-29T13:22:28.56 8.35
2025-04-29T13:22:29.56 8.34
2025-04-29T13:22:30.56 8.36
2025-04-29T13:22:31.56 8.35
2025-04-29T13:22:32.56 8.35
2025-04-29T13:22:33.56 8.34
2025-04-29T13:22:34.56 8.37
2025-04-29T13:22:35.56 8.35
2025-04-29T13:22:36.56 8.37
2025-04-29T13:22:37.56 8.35
2025-04-29T13:22:38.56 8.35
2025-04-29T13:22:39.56 8.35
2025-04-29T13:22:40.56 8.33
2025-04-29T13:22:41.56 8.35
2025-04-29T13:22:42.56 8.34
2025-04-29T13:22:43.56 8.35
2025-04-29T13:22:44.56 8.35
2025-04-29T13:22:45.56 8.37
2025-04-29T13:22:46.56 8.35
2025-04-29T13:22:47.56 8.33
2025-04-29T13:22:48.56 8.33
2025-04-29T13:22:49.56 8.37
2025-04-29T13:22:50.56 8.33
2025-04-29T13:22:51.56 8.35
2025-04-29T13:22:52.56 8.34
2025-04-29T13:22:53.56 8.35
2025-04-29T13:22:54.56 8.34
2025-04-29T13:22:55.56 8.36
2025-04-29T13:22:56.56 8.35
2025-04-29T13:22:57.56 8.35
2025-04-29T13:22:58.56 8.35
2025-04-29T13:22:59.56 8.35
2025-04-29T13:23:00.56 8.35
2025-04-29T13:23:01.56 8.37
2025-04-29T13:23:02.56 8.35
2025-04-29T13:23:03.56 8.35
2025-04-29T13:23:04.56 8.35
2025-04-29T13:23:05.56 8.33
2025-04-29T13:23:06.56 8.34
2025-04-29T13:23:07.56 8.33
2025-04-29T13:23:08.56 8.35
2025-04-29T13:23:09.56 8.36
2025-04-29T13:23:10.56 8.34
2025-04-29T13:23:11.56 8.35
2025-04-29T13:23:12.56 8.35
2025-04-29T13:23:13.56 8.33
2025-04-29T13:23:14.56 8.35
2025-04-29T13:23:15.56 8.37
2025-04-29T13:23:16.56 8.33
2025-04-29T13:23:17.56 8.35
2025-04-29T13:23:18.56 8.35
2025-04-29T13:23:19.56 8.34
2025-04-29T13:23:20.56 8.34
2025-04-29T13:23:21.56 8.35
2025-04-29T13:23:22.56 8.35
2025-04-29T13:23:23.56 8.33
2025-04-29T13:23:24.56 8.35
2025-04-29T13:23:25.56 8.34
2025-04-29T13:23:26.56 8.35
2025-04-29T13:23:27.56 8.35
2025-04-29T13:23:28.56 8.35
2025-04-29T13:23:29.56 8.37
2025-04-29T13:23:30.56 8.35
2025-04-29T13:23:31.56 8.36
2025-04-29T13:23:32.56 8.36
2025-04-29T13:23:33.56 8.37
2025-04-29T13:23:34.56 8.36
2025-04-29T13:23:35.56 8.36
2025-04-29T13:23:36.56 8.35
2025-04-29T13:23:37.56 8.35
2025-04-29T13:23:38.56 8.35
2025-04-29T13:23:39.56 8.35
2025-04-29T13:23:40.56 8.37
2025-04-29T13:23:41.56 8.38
2025-04-29T13:23:42.56 8.35
2025-04-29T13:23:43.56 8.35
2025-04-29T13:23:44.56 8.36
2025-04-29T13:23:45.56 8.35
2025-04-29T13:23:46.56 8.37
2025-04-29T13:23:47.56 8.34
2025-04-29T13:23:48.56 8.36
2025-04-29T13:23:49.56 8.35
2025-04-29T13:23:50.56 8.33
2025-04-29T13:23:51.56 8.33
2025-04-29T13:23:52.56 8.34
2025-04-29T13:23:53.56 8.37
2025-04-29T13:23:54.56 8.36
2025-04-29T13:23:55.56 8.33
2025-04-29T13:23:56.56 8.36
2025-04-29T13:23:57.56 8.36
2025-04-29T13:23:58.56 8.32
2025-04-29T13:23:59.56 8.34
2025-04-29T13:24:00.56 8.36
2025-04-29T13:24:01.56 8.34
2025-04-29T13:24:02.56 8.32
2025-04-29T13:24:03.56 8.32
2025-04-29T13:24:04.56 8.35
2025-04-29T13:24:05.56 8.35
2025-04-29T13:24:06.56 8.35
2025-04-29T13:24:07.56 8.37
2025-04-29T13:24:08.56 8.35
2025-04-29T13:24:09.56 8.37
2025-04-29T13:24:10.56 8.34
2025-04-29T13:24:11.56 8.35
2025-04-29T13:24:12.56 8.36
2025-04-29T13:24:13.58 8.33
2025-04-29T13:24:14.55 8.35
2025-04-29T13:24:15.55 8.35
2025-04-29T13:24:16.55 8.36
2025-04-29T13:24:17.55 8.35
2025-04-29T13:24:18.55 8.35
2025-04-29T13:24:19.55 8.34
2025-04-29T13:24:20.55 8.35
2025-04-29T13:24:21.55 8.37
2025-04-29T13:24:22.55 8.35
2025-04-29T13:24:23.55 8.33
2025-04-29T13:24:24.55 8.35
2025-04-29T13:24:25.55 8.34
2025-04-29T13:24:26.55 8.33
2025-04-29T13:24:27.55 8.35
2025-04-29T13:24:28.55 8.37
2025-04-29T13:24:29.55 8.35
2025-04-29T13:24:30.55 8.35
2025-04-29T13:24:31.55 8.35
2025-04-29T13:24:32.55 8.35
2025-04-29T13:24:33.55 8.34
2025-04-29T13:24:34.55 8.33
2025-04-29T13:24:35.55 8.34
2025-04-29T13:24:36.55 8.33
2025-04-29T13:24:37.55 8.35
2025-04-29T13:24:38.55 8.34
2025-04-29T13:24:39.55 8.35
2025-04-29T13:24:40.55 8.33
2025-04-29T13:24:41.55 8.35
2025-04-29T13:24:42.55 8.36
2025-04-29T13:24:43.55 8.36
2025-04-29T13:24:44.55 8.35
2025-04-29T13:24:45.55 8.36
2025-04-29T13:24:46.55 8.37
2025-04-29T13:24:47.55 8.36
2025-04-29T13:24:48.55 8.37
2025-04-29T13:24:49.55 8.34
2025-04-29T13:24:50.55 8.35
2025-04-29T13:24:51.55 8.34
2025-04-29T13:24:52.55 8.35
2025-04-29T13:24:53.55 8.37
2025-04-29T13:24:54.55 8.36
2025-04-29T13:24:55.55 8.37
2025-04-29T13:24:56.55 8.39
2025-04-29T13:24:57.55 8.35
2025-04-29T13:24:58.55 8.35
2025-04-29T13:24:59.55 8.35
2025-04-29T13:25:00.56 8.35
2025-04-29T13:25:01.55 8.33
2025-04-29T13:25:02.55 8.37
2025-04-29T13:25:03.55 8.37
2025-04-29T13:25:04.55 8.33
2025-04-29T13:25:05.55 8.35
2025-04-29T13:25:06.55 8.34
2025-04-29T13:25:07.55 8.37
2025-04-29T13:25:08.55 8.35
2025-04-29T13:25:09.55 8.37
2025-04-29T13:25:10.55 8.33
2025-04-29T13:25:11.55 8.34
2025-04-29T13:25:12.55 8.35
2025-04-29T13:25:13.55 8.34
2025-04-29T13:25:14.55 8.37
2025-04-29T13:25:15.55 8.36
2025-04-29T13:25:16.55 8.37
2025-04-29T13:25:17.55 8.37
2025-04-29T13:25:18.55 8.37
2025-04-29T13:25:19.55 8.36
2025-04-29T13:25:20.55 8.37
2025-04-29T13:25:21.55 8.32
2025-04-29T13:25:22.55 8.37
2025-04-29T13:25:23.55 8.34
2025-04-29T13:25:24.55 8.35
2025-04-29T13:25:25.55 8.34
2025-04-29T13:25:26.55 8.35
2025-04-29T13:25:27.55 8.35
2025-04-29T13:25:28.55 8.33
2025-04-29T13:25:29.55 8.33
2025-04-29T13:25:30.55 8.35
2025-04-29T13:25:31.55 8.33
2025-04-29T13:25:32.55 8.32
2025-04-29T13:25:33.55 8.35
2025-04-29T13:25:34.55 8.35
2025-04-29T13:25:35.55 8.33
2025-04-29T13:25:36.55 8.35
2025-04-29T13:25:37.55 8.35
2025-04-29T13:25:38.55 8.35
2025-04-29T13:25:39.55 8.34
2025-04-29T13:25:40.55 8.35
2025-04-29T13:25:41.55 8.33
2025-04-29T13:25:42.55 8.36
2025-04-29T13:25:43.55 8.33
2025-04-29T13:25:44.55 8.34
2025-04-29T13:25:45.55 8.35
2025-04-29T13:25:46.55 8.35
2025-04-29T13:25:47.56 8.34
2025-04-29T13:25:48.56 8.35
2025-04-29T13:25:49.56 8.35
2025-04-29T13:25:50.56 8.34
2025-04-29T13:25:51.56 8.35
2025-04-29T13:25:52.56 8.36
2025-04-29T13:25:53.56 8.35
2025-04-29T13:25:54.56 8.35
2025-04-29T13:25:55.56 8.36
2025-04-29T13:25:56.56 8.35
2025-04-29T13:25:57.56 8.32
2025-04-29T13:25:58.56 8.35
2025-04-29T13:25:59.56 8.37
2025-04-29T13:26:00.56 8.36
2025-04-29T13:26:01.56 8.35
2025-04-29T13:26:02.56 8.34
2025-04-29T13:26:03.56 8.37
2025-04-29T13:26:04.56 8.36
2025-04-29T13:26:05.56 8.38
2025-04-29T13:26:06.56 8.33
2025-04-29T13:26:07.56 8.36
2025-04-29T13:26:08.56 8.34
2025-04-29T13:26:09.56 8.33
2025-04-29T13:26:10.56 8.32
2025-04-29T13:26:11.56 8.35
2025-04-29T13:26:12.56 8.37
2025-04-29T13:26:13.56 8.36
2025-04-29T13:26:14.56 8.36
2025-04-29T13:26:15.56 8.35
2025-04-29T13:26:16.56 8.33
2025-04-29T13:26:17.56 8.35
2025-04-29T13:26:18.56 8.36
2025-04-29T13:26:19.56 8.34
2025-04-29T13:26:20.56 8.35
2025-04-29T13:26:21.56 8.34
2025-04-29T13:26:22.56 8.35
2025-04-29T13:26:23.56 8.35
2025-04-29T13:26:24.56 8.35
2025-04-29T13:26:25.56 8.33
2025-04-29T13:26:26.56 8.35
2025-04-29T13:26:27.56 8.36
2025-04-29T13:26:28.56 8.33
2025-04-29T13:26:29.56 8.36
2025-04-29T13:26:30.56 8.36
2025-04-29T13:26:31.56 8.36
2025-04-29T13:26:32.56 8.36
2025-04-29T13:26:33.56 8.35
2025-04-29T13:26:34.56 8.33
2025-04-29T13:26:35.56 8.36
2025-04-29T13:26:36.56 8.35
2025-04-29T13:26:37.56 8.33
2025-04-29T13:26:38.56 8.35
2025-04-29T13:26:39.56 8.35
2025-04-29T13:26:40.56 8.35
2025-04-29T13:26:41.56 8.35
2025-04-29T13:26:42.56 8.35
2025-04-29T13:26:43.56 8.34
2025-04-29T13:26:44.56 8.33
2025-04-29T13:26:45.56 8.35
2025-04-29T13:26:46.56 8.33
2025-04-29T13:26:47.56 8.34
2025-04-29T13:26:48.56 8.34
2025-04-29T13:26:49.56 8.35
2025-04-29T13:26:50.56 8.35
2025-04-29T13:26:51.56 8.35
2025-04-29T13:26:52.56 8.33
2025-04-29T13:26:53.56 8.35
2025-04-29T13:26:54.56 8.35
2025-04-29T13:26:55.56 8.35
2025-04-29T13:26:56.56 8.37
2025-04-29T13:26:57.56 8.36
2025-04-29T13:26:58.56 8.35
2025-04-29T13:26:59.56 8.33
2025-04-29T13:27:00.56 8.33
2025-04-29T13:27:01.56 8.37
2025-04-29T13:27:02.56 8.36
2025-04-29T13:27:03.56 8.34
2025-04-29T13:27:04.56 8.35
2025-04-29T13:27:05.56 8.36
2025-04-29T13:27:06.56 8.33
2025-04-29T13:27:07.56 8.33
2025-04-29T13:27:08.56 8.37
2025-04-29T13:27:09.56 8.34
2025-04-29T13:27:10.56 8.37
2025-04-29T13:27:11.56 8.34
2025-04-29T13:27:12.56 8.33
2025-04-29T13:27:13.56 8.35
2025-04-29T13:27:14.56 8.36
2025-04-29T13:27:15.56 8.36
2025-04-29T13:27:16.56 8.36
2025-04-29T13:27:17.56 8.35
2025-04-29T13:27:18.56 8.35
2025-04-29T13:27:19.56 8.33
2025-04-29T13:27:20.56 8.35
2025-04-29T13:27:21.56 8.37
2025-04-29T13:27:22.56 8.35
2025-04-29T13:27:23.56 8.37
2025-04-29T13:27:24.56 8.35
2025-04-29T13:27:25.56 8.34
2025-04-29T13:27:26.56 8.33
2025-04-29T13:27:27.56 8.32
2025-04-29T13:27:28.56 8.34
2025-04-29T13:27:29.56 8.33
2025-04-29T13:27:30.56 8.33
2025-04-29T13:27:31.56 8.35
2025-04-29T13:27:32.56 8.34
2025-04-29T13:27:33.56 8.33
2025-04-29T13:27:34.56 8.33
2025-04-29T13:27:35.56 8.32
2025-04-29T13:27:36.56 8.35
2025-04-29T13:27:37.56 8.34
2025-04-29T13:27:38.56 8.33
2025-04-29T13:27:39.56 8.35
2025-04-29T13:27:40.56 8.34
2025-04-29T13:27:41.56 8.34
2025-04-29T13:27:42.56 8.35
2025-04-29T13:27:43.56 8.35
2025-04-29T13:27:44.57 8.35
2025-04-29T13:27:45.55 8.37
2025-04-29T13:27:46.55 8.37
2025-04-29T13:27:47.55 8.36
2025-04-29T13:27:48.55 8.37
2025-04-29T13:27:49.55 8.34
2025-04-29T13:27:50.55 8.35
2025-04-29T13:27:51.55 8.35
2025-04-29T13:27:52.55 8.35
2025-04-29T13:27:53.55 8.34
2025-04-29T13:27:54.55 8.35
2025-04-29T13:27:55.55 8.35
2025-04-29T13:27:56.55 8.33
2025-04-29T13:27:57.55 8.35
2025-04-29T13:27:58.55 8.35
2025-04-29T13:27:59.55 8.33
2025-04-29T13:28:00.55 8.35
2025-04-29T13:28:01.55 8.35
2025-04-29T13:28:02.55 8.35
2025-04-29T13:28:03.55 8.34
2025-04-29T13:28:04.55 8.33
2025-04-29T13:28:05.56 8.37
2025-04-29T13:28:06.54 8.34
2025-04-29T13:28:07.54 8.35
2025-04-29T13:28:08.54 8.35
2025-04-29T13:28:09.54 8.37
2025-04-29T13:28:10.54 8.37
2025-04-29T13:28:11.54 8.37
2025-04-29T13:28:12.54 8.34
2025-04-29T13:28:13.54 8.36
2025-04-29T13:28:14.54 8.34
2025-04-29T13:28:15.54 8.33
2025-04-29T13:28:16.54 8.34
2025-04-29T13:28:17.54 8.34
2025-04-29T13:28:18.54 8.35
2025-04-29T13:28:19.54 8.35
2025-04-29T13:28:20.54 8.35
2025-04-29T13:28:21.54 8.34
2025-04-29T13:28:22.54 8.35
2025-04-29T13:28:23.54 8.35
2025-04-29T13:28:24.54 8.34
2025-04-29T13:28:25.54 8.37
2025-04-29T13:28:26.54 8.35
2025-04-29T13:28:27.54 8.35
2025-04-29T13:28:28.54 8.34
2025-04-29T13:28:29.54 8.35
2025-04-29T13:28:30.54 8.36
2025-04-29T13:28:31.54 8.35
2025-04-29T13:28:32.54 8.37
2025-04-29T13:28:33.54 8.33
2025-04-29T13:28:34.54 8.35
2025-04-29T13:28:35.54 8.32
2025-04-29T13:28:36.54 8.33
2025-04-29T13:28:37.54 8.34
2025-04-29T13:28:38.54 8.32
2025-04-29T13:28:39.54 8.37
2025-04-29T13:28:40.54 8.35
2025-04-29T13:28:41.54 8.35
2025-04-29T13:28:42.54 8.35
2025-04-29T13:28:43.54 8.36
2025-04-29T13:28:44.54 8.35
2025-04-29T13:28:45.54 8.34
2025-04-29T13:28:46.54 8.33
2025-04-29T13:28:47.54 8.32
2025-04-29T13:28:48.54 8.35
2025-04-29T13:28:49.54 8.35
2025-04-29T13:28:50.54 8.35
2025-04-29T13:28:51.54 8.35
2025-04-29T13:28:52.54 8.36
2025-04-29T13:28:53.54 8.34
2025-04-29T13:28:54.54 8.35
2025-04-29T13:28:55.54 8.35
2025-04-29T13:28:56.54 8.33
2025-04-29T13:28:57.54 8.33
2025-04-29T13:28:58.54 8.35
2025-04-29T13:28:59.54 8.35
2025-04-29T13:29:00.54 8.36
2025-04-29T13:29:01.54 8.35
2025-04-29T13:29:02.54 8.36
2025-04-29T13:29:03.54 8.35
2025-04-29T13:29:04.54 8.34
2025-04-29T13:29:05.54 8.35
2025-04-29T13:29:06.54 8.37
2025-04-29T13:29:07.54 8.35
2025-04-29T13:29:08.54 8.34
2025-04-29T13:29:09.54 8.34
2025-04-29T13:29:10.54 8.33
2025-04-29T13:29:11.54 8.34
2025-04-29T13:29:12.54 8.35
2025-04-29T13:29:13.54 8.37
2025-04-29T13:29:14.54 8.35
2025-04-29T13:29:15.54 8.35
2025-04-29T13:29:16.54 8.35
2025-04-29T13:29:17.54 8.35
2025-04-29T13:29:18.54 8.35
2025-04-29T13:29:19.54 8.36
2025-04-29T13:29:20.54 8.34
2025-04-29T13:29:21.54 8.35
2025-04-29T13:29:22.54 8.35
2025-04-29T13:29:23.54 8.34
2025-04-29T13:29:24.54 8.34
2025-04-29T13:29:25.54 8.37
2025-04-29T13:29:26.54 8.35
2025-04-29T13:29:27.54 8.37
2025-04-29T13:29:28.54 8.34
2025-04-29T13:29:29.54 8.37
2025-04-29T13:29:30.54 8.37
2025-04-29T13:29:31.54 8.32
2025-04-29T13:29:32.54 8.36
2025-04-29T13:29:33.54 8.37
2025-04-29T13:29:34.54 8.35
2025-04-29T13:29:35.54 8.33
2025-04-29T13:29:36.54 8.36
2025-04-29T13:29:37.54 8.36
2025-04-29T13:29:38.54 8.35
2025-04-29T13:29:39.54 8.33
2025-04-29T13:29:40.54 8.38
2025-04-29T13:29:41.54 8.36
2025-04-29T13:29:42.54 8.37
2025-04-29T13:29:43.54 8.36
2025-04-29T13:29:44.54 8.36
2025-04-29T13:29:45.54 8.35
2025-04-29T13:29:46.54 8.35
2025-04-29T13:29:47.54 8.35
2025-04-29T13:29:48.54 8.35
2025-04-29T13:29:49.54 8.34
2025-04-29T13:29:50.54 8.37
2025-04-29T13:29:51.54 8.35
2025-04-29T13:29:52.54 8.37
2025-04-29T13:29:53.54 8.34
2025-04-29T13:29:54.54 8.36
2025-04-29T13:29:55.54 8.36
2025-04-29T13:29:56.54 8.37
2025-04-29T13:29:57.54 8.34
2025-04-29T13:29:58.54 8.38
2025-04-29T13:29:59.54 8.35
2025-04-29T13:30:00.54 8.34
2025-04-29T13:30:01.54 8.35
2025-04-29T13:30:02.54 8.35
2025-04-29T13:30:03.54 8.35
2025-04-29T13:30:04.54 8.37
2025-04-29T13:30:05.54 8.35
2025-04-29T13:30:06.54 8.38
2025-04-29T13:30:07.54 8.33
2025-04-29T13:30:08.54 8.33
2025-04-29T13:30:09.54 8.33
2025-04-29T13:30:10.54 8.37
2025-04-29T13:30:11.54 8.37
2025-04-29T13:30:12.54 8.37
2025-04-29T13:30:13.54 8.35
2025-04-29T13:30:14.54 8.39
2025-04-29T13:30:15.54 8.37
2025-04-29T13:30:16.54 8.33
2025-04-29T13:30:17.54 8.37
2025-04-29T13:30:18.54 8.34
2025-04-29T13:30:19.54 8.33
2025-04-29T13:30:20.54 8.35
2025-04-29T13:30:21.54 8.36
2025-04-29T13:30:22.54 8.37
2025-04-29T13:30:23.54 8.35
2025-04-29T13:30:24.54 8.33
2025-04-29T13:30:25.54 8.35
2025-04-29T13:30:26.54 8.35
2025-04-29T13:30:27.54 8.36
2025-04-29T13:30:28.54 8.33
2025-04-29T13:30:29.54 8.33
2025-04-29T13:30:30.54 8.35
2025-04-29T13:30:31.54 8.33
2025-04-29T13:30:32.54 8.33
2025-04-29T13:30:33.54 8.36
2025-04-29T13:30:34.54 8.35
2025-04-29T13:30:35.54 8.34
2025-04-29T13:30:36.54 8.33
2025-04-29T13:30:37.54 8.34
2025-04-29T13:30:38.54 8.34
2025-04-29T13:30:39.54 8.35
2025-04-29T13:30:40.54 8.36
2025-04-29T13:30:41.54 8.34
2025-04-29T13:30:42.54 8.34
2025-04-29T13:30:43.54 8.35
2025-04-29T13:30:44.54 8.36
2025-04-29T13:30:45.54 8.35
2025-04-29T13:30:46.54 8.35
2025-04-29T13:30:47.54 8.34
2025-04-29T13:30:48.54 8.37
2025-04-29T13:30:49.54 8.36
2025-04-29T13:30:50.54 8.35
2025-04-29T13:30:51.54 8.35
2025-04-29T13:30:52.54 8.35
2025-04-29T13:30:53.54 8.35
2025-04-29T13:30:54.54 8.36
2025-04-29T13:30:55.54 8.35
2025-04-29T13:30:56.54 8.37
2025-04-29T13:30:57.54 8.34
2025-04-29T13:30:58.54 8.34
2025-04-29T13:30:59.54 8.35
2025-04-29T13:31:00.54 8.35
2025-04-29T13:31:01.55 8.37
2025-04-29T13:31:02.54 8.35
2025-04-29T13:31:03.54 8.35
2025-04-29T13:31:04.54 8.35
2025-04-29T13:31:05.54 8.35
2025-04-29T13:31:06.54 8.36
2025-04-29T13:31:07.55 8.36
2025-04-29T13:31:08.55 8.33
2025-04-29T13:31:09.55 8.35
2025-04-29T13:31:10.55 8.33
2025-04-29T13:31:11.55 8.35
2025-04-29T13:31:12.55 8.35
2025-04-29T13:31:13.55 8.35
2025-04-29T13:31:14.55 8.34
2025-04-29T13:31:15.55 8.35
2025-04-29T13:31:16.55 8.34
2025-04-29T13:31:17.55 8.34
2025-04-29T13:31:18.55 8.35
2025-04-29T13:31:19.55 8.35
2025-04-29T13:31:20.55 8.33
2025-04-29T13:31:21.55 8.35
2025-04-29T13:31:22.55 8.37
2025-04-29T13:31:23.55 8.37
2025-04-29T13:31:24.55 8.34
2025-04-29T13:31:25.55 8.33
2025-04-29T13:31:26.55 8.35
2025-04-29T13:31:27.55 8.35
2025-04-29T13:31:28.55 8.33
2025-04-29T13:31:29.55 8.33
2025-04-29T13:31:30.55 8.37
2025-04-29T13:31:31.55 8.34
2025-04-29T13:31:32.55 8.35
2025-04-29T13:31:33.55 8.37
2025-04-29T13:31:34.55 8.37
2025-04-29T13:31:35.55 8.37
2025-04-29T13:31:36.55 8.33
2025-04-29T13:31:37.55 8.35
2025-04-29T13:31:38.55 8.36
2025-04-29T13:31:39.55 8.37
2025-04-29T13:31:40.55 8.35
2025-04-29T13:31:41.55 8.35
2025-04-29T13:31:42.55 8.36
2025-04-29T13:31:43.55 8.35
2025-04-29T13:31:44.55 8.36
2025-04-29T13:31:45.55 8.34
2025-04-29T13:31:46.55 8.35
2025-04-29T13:31:47.55 8.35
2025-04-29T13:31:48.55 8.35
2025-04-29T13:31:49.55 8.35
2025-04-29T13:31:50.55 8.32
2025-04-29T13:31:51.55 8.36
2025-04-29T13:31:52.55 8.35
2025-04-29T13:31:53.55 8.35
2025-04-29T13:31:54.55 8.32
2025-04-29T13:31:55.55 8.35
2025-04-29T13:31:56.55 8.36
2025-04-29T13:31:57.55 8.37
2025-04-29T13:31:58.55 8.37
2025-04-29T13:31:59.55 8.35
2025-04-29T13:32:00.55 8.36
2025-04-29T13:32:01.55 8.36
2025-04-29T13:32:02.55 8.33
2025-04-29T13:32:03.55 8.37
2025-04-29T13:32:04.55 8.34
2025-04-29T13:32:05.55 8.34
2025-04-29T13:32:06.55 8.33
2025-04-29T13:32:07.55 8.35
2025-04-29T13:32:08.55 8.35
2025-04-29T13:32:09.55 8.37
2025-04-29T13:32:10.55 8.35
2025-04-29T13:32:11.55 8.33
2025-04-29T13:32:12.55 8.35
2025-04-29T13:32:13.55 8.37
2025-04-29T13:32:14.55 8.35
2025-04-29T13:32:15.55 8.35
2025-04-29T13:32:16.55 8.35
2025-04-29T13:32:17.55 8.35
2025-04-29T13:32:18.55 8.36
2025-04-29T13:32:19.55 8.35
2025-04-29T13:32:20.55 8.35
2025-04-29T13:32:21.55 8.35
2025-04-29T13:32:22.55 8.35
2025-04-29T13:32:23.55 8.35
2025-04-29T13:32:24.55 8.35
2025-04-29T13:32:25.55 8.34
2025-04-29T13:32:26.55 8.35
2025-04-29T13:32:27.55 8.32
2025-04-29T13:32:28.55 8.35
2025-04-29T13:32:29.55 8.36
2025-04-29T13:32:30.55 8.33
2025-04-29T13:32:31.55 8.33
2025-04-29T13:32:32.55 8.36
2025-04-29T13:32:33.55 8.36
2025-04-29T13:32:34.55 8.33
2025-04-29T13:32:35.55 8.37
2025-04-29T13:32:36.55 8.37
2025-04-29T13:32:37.55 8.36
2025-04-29T13:32:38.55 8.35
2025-04-29T13:32:39.55 8.32
2025-04-29T13:32:40.55 8.33
2025-04-29T13:32:41.55 8.35
2025-04-29T13:32:42.55 8.36
2025-04-29T13:32:43.55 8.33
2025-04-29T13:32:44.55 8.35
2025-04-29T13:32:45.55 8.34
2025-04-29T13:32:46.55 8.33
2025-04-29T13:32:47.55 8.36
2025-04-29T13:32:48.55 8.33
2025-04-29T13:32:49.55 8.35
2025-04-29T13:32:50.55 8.35
2025-04-29T13:32:51.55 8.33
2025-04-29T13:32:52.55 8.37
2025-04-29T13:32:53.55 8.34
2025-04-29T13:32:54.55 8.33
2025-04-29T13:32:55.55 8.37
2025-04-29T13:32:56.55 8.34
2025-04-29T13:32:57.55 8.35
2025-04-29T13:32:58.55 8.35
2025-04-29T13:32:59.55 8.34
2025-04-29T13:33:00.55 8.34
2025-04-29T13:33:01.55 8.34
2025-04-29T13:33:02.55 8.33
2025-04-29T13:33:03.55 8.33
2025-04-29T13:33:04.55 8.34
2025-04-29T13:33:05.55 8.33
2025-04-29T13:33:06.55 8.36
2025-04-29T13:33:07.55 8.34
2025-04-29T13:33:08.55 8.35
2025-04-29T13:33:09.55 8.36
2025-04-29T13:33:10.55 8.35
2025-04-29T13:33:11.55 8.35
2025-04-29T13:33:12.55 8.32
2025-04-29T13:33:13.55 8.35
2025-04-29T13:33:14.55 8.34
2025-04-29T13:33:15.55 8.35
2025-04-29T13:33:16.55 8.37
2025-04-29T13:33:17.55 8.37
2025-04-29T13:33:18.55 8.35
2025-04-29T13:33:19.55 8.34
2025-04-29T13:33:20.55 8.35
2025-04-29T13:33:21.55 8.36
2025-04-29T13:33:22.55 8.35
2025-04-29T13:33:23.55 8.35
2025-04-29T13:33:24.55 8.35
2025-04-29T13:33:25.55 8.33
2025-04-29T13:33:26.55 8.34
2025-04-29T13:33:27.55 8.35
2025-04-29T13:33:28.55 8.35
2025-04-29T13:33:29.55 8.35
2025-04-29T13:33:30.55 8.35
2025-04-29T13:33:31.55 8.36
2025-04-29T13:33:32.55 8.36
2025-04-29T13:33:33.55 8.35
2025-04-29T13:33:34.55 8.35
2025-04-29T13:33:35.55 8.37
2025-04-29T13:33:36.55 8.35
2025-04-29T13:33:37.55 8.36
2025-04-29T13:33:38.55 8.34
2025-04-29T13:33:39.55 8.36
2025-04-29T13:33:40.55 8.35
2025-04-29T13:33:41.55 8.37
2025-04-29T13:33:42.55 8.35
2025-04-29T13:33:43.55 8.35
2025-04-29T13:33:44.55 8.35
2025-04-29T13:33:45.55 8.35
2025-04-29T13:33:46.55 8.37
2025-04-29T13:33:47.55 8.36
2025-04-29T13:33:48.55 8.37
2025-04-29T13:33:49.55 8.36
2025-04-29T13:33:50.55 8.36
2025-04-29T13:33:51.55 8.35
2025-04-29T13:33:52.55 8.33
2025-04-29T13:33:53.55 8.34
2025-04-29T13:33:54.55 8.34
2025-04-29T13:33:55.55 8.35
2025-04-29T13:33:56.55 8.37
2025-04-29T13:33:57.55 8.37
2025-04-29T13:33:58.55 8.35
2025-04-29T13:33:59.55 8.36
2025-04-29T13:34:00.55 8.32
2025-04-29T13:34:01.55 8.37
2025-04-29T13:34:02.55 8.36
2025-04-29T13:34:03.55 8.35
2025-04-29T13:34:04.55 8.33
2025-04-29T13:34:05.55 8.35
2025-04-29T13:34:06.55 8.35
2025-04-29T13:34:07.55 8.36
2025-04-29T13:34:08.55 8.35
2025-04-29T13:34:09.55 8.34
2025-04-29T13:34:10.55 8.36
2025-04-29T13:34:11.55 8.33
2025-04-29T13:34:12.55 8.36
2025-04-29T13:34:13.55 8.35
2025-04-29T13:34:14.55 8.36
2025-04-29T13:34:15.55 8.36
2025-04-29T13:34:16.55 8.33
2025-04-29T13:34:17.55 8.35
2025-04-29T13:34:18.55 8.37
2025-04-29T13:34:19.55 8.37
2025-04-29T13:34:20.55 8.34
2025-04-29T13:34:21.55 8.35
2025-04-29T13:34:22.55 8.34
2025-04-29T13:34:23.55 8.35
2025-04-29T13:34:24.55 8.35
2025-04-29T13:34:25.55 8.37
2025-04-29T13:34:26.55 8.35
2025-04-29T13:34:27.55 8.36
2025-04-29T13:34:28.55 8.37
2025-04-29T13:34:29.55 8.35
2025-04-29T13:34:30.55 8.37
2025-04-29T13:34:31.55 8.37
2025-04-29T13:34:32.55 8.36
2025-04-29T13:34:33.55 8.37
2025-04-29T13:34:34.55 8.35
2025-04-29T13:34:35.55 8.36
2025-04-29T13:34:36.55 8.36
2025-04-29T13:34:37.55 8.35
2025-04-29T13:34:38.55 8.37
2025-04-29T13:34:39.55 8.35
2025-04-29T13:34:40.55 8.35
2025-04-29T13:34:41.55 8.35
2025-04-29T13:34:42.55 8.34
2025-04-29T13:34:43.55 8.33
2025-04-29T13:34:44.55 8.33
2025-04-29T13:34:45.55 8.33
2025-04-29T13:34:46.55 8.35
2025-04-29T13:34:47.55 8.35
2025-04-29T13:34:48.55 8.35
2025-04-29T13:34:49.55 8.34
2025-04-29T13:34:50.55 8.35
2025-04-29T13:34:51.55 8.36
2025-04-29T13:34:52.55 8.37
2025-04-29T13:34:53.55 8.35
2025-04-29T13:34:54.55 8.37
2025-04-29T13:34:55.55 8.35
2025-04-29T13:34:56.55 8.34
2025-04-29T13:34:57.55 8.36
2025-04-29T13:34:58.55 8.38
2025-04-29T13:34:59.55 8.35
2025-04-29T13:35:00.55 8.34
2025-04-29T13:35:01.55 8.35
2025-04-29T13:35:02.55 8.34
2025-04-29T13:35:03.55 8.35
2025-04-29T13:35:04.55 8.36
2025-04-29T13:35:05.55 8.37
2025-04-29T13:35:06.55 8.35
2025-04-29T13:35:07.55 8.35
2025-04-29T13:35:08.55 8.34
2025-04-29T13:35:09.55 8.37
2025-04-29T13:35:10.55 8.37
2025-04-29T13:35:11.55 8.33
2025-04-29T13:35:12.55 8.35
2025-04-29T13:35:13.55 8.35
2025-04-29T13:35:14.55 8.33
2025-04-29T13:35:15.55 8.35
2025-04-29T13:35:16.55 8.33
2025-04-29T13:35:17.55 8.33
2025-04-29T13:35:18.55 8.33
2025-04-29T13:35:19.55 8.35
2025-04-29T13:35:20.55 8.34
2025-04-29T13:35:21.55 8.35
2025-04-29T13:35:22.55 8.35
2025-04-29T13:35:23.55 8.36
2025-04-29T13:35:24.55 8.36
2025-04-29T13:35:25.55 8.37
2025-04-29T13:35:26.55 8.35
2025-04-29T13:35:27.55 8.35
2025-04-29T13:35:28.55 8.36
2025-04-29T13:35:29.55 8.36
2025-04-29T13:35:30.55 8.32
2025-04-29T13:35:31.55 8.33
2025-04-29T13:35:32.55 8.35
2025-04-29T13:35:33.55 8.33
2025-04-29T13:35:34.55 8.36
2025-04-29T13:35:35.55 8.34
2025-04-29T13:35:36.55 8.35
2025-04-29T13:35:37.55 8.33
2025-04-29T13:35:38.55 8.36
2025-04-29T13:35:39.55 8.32
2025-04-29T13:35:40.55 8.36
2025-04-29T13:35:41.55 8.35
2025-04-29T13:35:42.55 8.35
2025-04-29T13:35:43.55 8.33
2025-04-29T13:35:44.55 8.35
2025-04-29T13:35:45.55 8.34
2025-04-29T13:35:46.55 8.35
2025-04-29T13:35:47.55 8.36
2025-04-29T13:35:48.55 8.35
2025-04-29T13:35:49.58 8.37
2025-04-29T13:35:50.54 8.35
2025-04-29T13:35:51.54 8.35
2025-04-29T13:35:52.54 8.35
2025-04-29T13:35:53.54 8.35
2025-04-29T13:35:54.54 8.34
2025-04-29T13:35:55.54 8.35
2025-04-29T13:35:56.54 8.32
2025-04-29T13:35:57.54 8.37
2025-04-29T13:35:58.54 8.35
2025-04-29T13:35:59.54 8.33
2025-04-29T13:36:00.54 8.36
2025-04-29T13:36:01.54 8.35
2025-04-29T13:36:02.54 8.33
2025-04-29T13:36:03.54 8.36
2025-04-29T13:36:04.54 8.37
2025-04-29T13:36:05.54 8.35
2025-04-29T13:36:06.54 8.35
2025-04-29T13:36:07.54 8.33
2025-04-29T13:36:08.54 8.36
2025-04-29T13:36:09.54 8.33
2025-04-29T13:36:10.54 8.35
2025-04-29T13:36:11.54 8.33
2025-04-29T13:36:12.54 8.36
2025-04-29T13:36:13.54 8.35
2025-04-29T13:36:14.54 8.37
2025-04-29T13:36:15.54 8.35
2025-04-29T13:36:16.54 8.35
2025-04-29T13:36:17.54 8.35
2025-04-29T13:36:18.54 8.37
2025-04-29T13:36:19.54 8.35
2025-04-29T13:36:20.54 8.33
2025-04-29T13:36:21.54 8.35
2025-04-29T13:36:22.54 8.35
2025-04-29T13:36:23.55 8.34
2025-04-29T13:36:24.54 8.35
2025-04-29T13:36:25.54 8.33
2025-04-29T13:36:26.55 8.35
2025-04-29T13:36:27.55 8.37
2025-04-29T13:36:28.55 8.35
2025-04-29T13:36:29.55 8.34
2025-04-29T13:36:30.55 8.33
2025-04-29T13:36:31.55 8.36
2025-04-29T13:36:32.55 8.36
2025-04-29T13:36:33.55 8.34
2025-04-29T13:36:34.55 8.35
2025-04-29T13:36:35.55 8.36
2025-04-29T13:36:36.55 8.33
2025-04-29T13:36:37.55 8.35
2025-04-29T13:36:38.55 8.37
2025-04-29T13:36:39.55 8.37
2025-04-29T13:36:40.55 8.35
2025-04-29T13:36:41.55 8.35
2025-04-29T13:36:42.55 8.37
2025-04-29T13:36:43.55 8.35
2025-04-29T13:36:44.55 8.34
2025-04-29T13:36:45.55 8.34
2025-04-29T13:36:46.55 8.33
2025-04-29T13:36:47.55 8.35
2025-04-29T13:36:48.55 8.36
2025-04-29T13:36:49.55 8.34
2025-04-29T13:36:50.55 8.35
2025-04-29T13:36:51.55 8.33
2025-04-29T13:36:52.55 8.36
2025-04-29T13:36:53.55 8.35
2025-04-29T13:36:54.55 8.36
2025-04-29T13:36:55.55 8.35
2025-04-29T13:36:56.55 8.34
2025-04-29T13:36:57.55 8.32
2025-04-29T13:36:58.55 8.35
2025-04-29T13:36:59.55 8.33
2025-04-29T13:37:00.55 8.35
2025-04-29T13:37:01.55 8.33
2025-04-29T13:37:02.55 8.33
2025-04-29T13:37:03.55 8.32
2025-04-29T13:37:04.55 8.33
2025-04-29T13:37:05.55 8.35
2025-04-29T13:37:06.55 8.35
2025-04-29T13:37:07.55 8.33
2025-04-29T13:37:08.55 8.35
2025-04-29T13:37:09.55 8.35
2025-04-29T13:37:10.55 8.37
2025-04-29T13:37:11.55 8.33
2025-04-29T13:37:12.55 8.35
2025-04-29T13:37:13.55 8.35
2025-04-29T13:37:14.55 8.33
2025-04-29T13:37:15.55 8.33
2025-04-29T13:37:16.55 8.33
2025-04-29T13:37:17.55 8.35
2025-04-29T13:37:18.55 8.34
2025-04-29T13:37:19.55 8.35
2025-04-29T13:37:20.55 8.35
2025-04-29T13:37:21.55 8.33
2025-04-29T13:37:22.55 8.34
2025-04-29T13:37:23.55 8.33
2025-04-29T13:37:24.55 8.36
2025-04-29T13:37:25.55 8.33
2025-04-29T13:37:26.55 8.35
2025-04-29T13:37:27.55 8.36
2025-04-29T13:37:28.55 8.34
2025-04-29T13:37:29.55 8.35
2025-04-29T13:37:30.55 8.35
2025-04-29T13:37:31.55 8.34
2025-04-29T13:37:32.55 8.35
2025-04-29T13:37:33.55 8.34
2025-04-29T13:37:34.55 8.34
2025-04-29T13:37:35.55 8.33
2025-04-29T13:37:36.55 8.35
2025-04-29T13:37:37.55 8.34
2025-04-29T13:37:38.55 8.34
2025-04-29T13:37:39.55 8.35
2025-04-29T13:37:40.55 8.33
2025-04-29T13:37:41.55 8.34
2025-04-29T13:37:42.55 8.34
2025-04-29T13:37:43.55 8.34
2025-04-29T13:37:44.55 8.32
2025-04-29T13:37:45.55 8.36
2025-04-29T13:37:46.55 8.35
2025-04-29T13:37:47.55 8.34
2025-04-29T13:37:48.55 8.34
2025-04-29T13:37:49.55 8.36
2025-04-29T13:37:50.55 8.35
2025-04-29T13:37:51.55 8.35
2025-04-29T13:37:52.55 8.35
2025-04-29T13:37:53.55 8.34
2025-04-29T13:37:54.55 8.35
2025-04-29T13:37:55.55 8.35
2025-04-29T13:37:56.55 8.35
2025-04-29T13:37:57.55 8.34
2025-04-29T13:37:58.55 8.35
2025-04-29T13:37:59.55 8.33
2025-04-29T13:38:00.55 8.33
2025-04-29T13:38:01.55 8.36
2025-04-29T13:38:02.55 8.36
2025-04-29T13:38:03.55 8.35
2025-04-29T13:38:04.55 8.32
2025-04-29T13:38:05.55 8.35
2025-04-29T13:38:06.55 8.35
2025-04-29T13:38:07.55 8.35
2025-04-29T13:38:08.55 8.33
2025-04-29T13:38:09.55 8.35
2025-04-29T13:38:10.55 8.34
2025-04-29T13:38:11.55 8.34
2025-04-29T13:38:12.55 8.33
2025-04-29T13:38:13.55 8.33
2025-04-29T13:38:14.55 8.33
2025-04-29T13:38:15.55 8.34
2025-04-29T13:38:16.55 8.37
2025-04-29T13:38:17.55 8.34
2025-04-29T13:38:18.55 8.34
2025-04-29T13:38:19.55 8.33
2025-04-29T13:38:20.55 8.37
2025-04-29T13:38:21.55 8.33
2025-04-29T13:38:22.55 8.33
2025-04-29T13:38:23.55 8.34
2025-04-29T13:38:24.55 8.33
2025-04-29T13:38:25.55 8.33
2025-04-29T13:38:26.55 8.35
2025-04-29T13:38:27.55 8.35
2025-04-29T13:38:28.55 8.35
2025-04-29T13:38:29.55 8.34
2025-04-29T13:38:30.55 8.34
2025-04-29T13:38:31.55 8.35
2025-04-29T13:38:32.55 8.34
2025-04-29T13:38:33.55 8.35
2025-04-29T13:38:34.55 8.35
2025-04-29T13:38:35.55 8.37
2025-04-29T13:38:36.55 8.34
2025-04-29T13:38:37.55 8.33
2025-04-29T13:38:38.55 8.34
2025-04-29T13:38:39.55 8.36
2025-04-29T13:38:40.55 8.32
2025-04-29T13:38:41.55 8.37
2025-04-29T13:38:42.55 8.35
2025-04-29T13:38:43.55 8.35
2025-04-29T13:38:44.55 8.35
2025-04-29T13:38:45.55 8.35
2025-04-29T13:38:46.55 8.35
2025-04-29T13:38:47.55 8.36
2025-04-29T13:38:48.55 8.35
2025-04-29T13:38:49.55 8.35
2025-04-29T13:38:50.55 8.36
2025-04-29T13:38:51.55 8.35
2025-04-29T13:38:52.55 8.34
2025-04-29T13:38:53.55 8.35
2025-04-29T13:38:54.55 8.34
2025-04-29T13:38:55.55 8.32
2025-04-29T13:38:56.55 8.34
2025-04-29T13:38:57.55 8.35
2025-04-29T13:38:58.55 8.35
2025-04-29T13:38:59.55 8.33
2025-04-29T13:39:00.55 8.34
2025-04-29T13:39:01.55 8.35
2025-04-29T13:39:02.55 8.33
2025-04-29T13:39:03.55 8.32
2025-04-29T13:39:04.55 8.34
2025-04-29T13:39:05.55 8.35
2025-04-29T13:39:06.55 8.34
2025-04-29T13:39:07.55 8.33
2025-04-29T13:39:08.55 8.34
2025-04-29T13:39:09.55 8.35
2025-04-29T13:39:10.55 8.35
2025-04-29T13:39:11.55 8.36
2025-04-29T13:39:12.55 8.37
2025-04-29T13:39:13.55 8.35
2025-04-29T13:39:14.55 8.35
2025-04-29T13:39:15.55 8.35
2025-04-29T13:39:16.55 8.34
2025-04-29T13:39:17.55 8.33
2025-04-29T13:39:18.55 8.35
2025-04-29T13:39:19.55 8.35
2025-04-29T13:39:20.55 8.35
2025-04-29T13:39:21.55 8.37
2025-04-29T13:39:22.55 8.35
2025-04-29T13:39:23.55 8.36
2025-04-29T13:39:24.55 8.37
2025-04-29T13:39:25.55 8.34
2025-04-29T13:39:26.55 8.33
2025-04-29T13:39:27.55 8.35
2025-04-29T13:39:28.55 8.37
2025-04-29T13:39:29.55 8.36
2025-04-29T13:39:30.55 8.35
2025-04-29T13:39:31.55 8.35
2025-04-29T13:39:32.55 8.34
2025-04-29T13:39:33.55 8.36
2025-04-29T13:39:34.55 8.37
2025-04-29T13:39:35.55 8.33
2025-04-29T13:39:36.55 8.37
2025-04-29T13:39:37.55 8.35
2025-04-29T13:39:38.55 8.35
2025-04-29T13:39:39.55 8.34
2025-04-29T13:39:40.55 8.36
2025-04-29T13:39:41.55 8.37
2025-04-29T13:39:42.55 8.34
2025-04-29T13:39:43.55 8.35
2025-04-29T13:39:44.55 8.34
2025-04-29T13:39:45.55 8.33
2025-04-29T13:39:46.55 8.34
2025-04-29T13:39:47.55 8.35
2025-04-29T13:39:48.55 8.33
2025-04-29T13:39:49.55 8.32
2025-04-29T13:39:50.55 8.36
2025-04-29T13:39:51.55 8.36
2025-04-29T13:39:52.55 8.35
2025-04-29T13:39:53.55 8.35
2025-04-29T13:39:54.55 8.35
2025-04-29T13:39:55.55 8.38
2025-04-29T13:39:56.55 8.37
2025-04-29T13:39:57.55 8.35
2025-04-29T13:39:58.55 8.35
2025-04-29T13:39:59.55 8.32
2025-04-29T13:40:00.55 8.35
2025-04-29T13:40:01.55 8.33
2025-04-29T13:40:02.55 8.38
2025-04-29T13:40:03.55 8.37
2025-04-29T13:40:04.55 8.33
2025-04-29T13:40:05.55 8.37
2025-04-29T13:40:06.55 8.35
2025-04-29T13:40:07.55 8.35
2025-04-29T13:40:08.55 8.35
2025-04-29T13:40:09.55 8.35
2025-04-29T13:40:10.55 8.34
2025-04-29T13:40:11.55 8.32
2025-04-29T13:40:12.55 8.34
2025-04-29T13:40:13.55 8.35
2025-04-29T13:40:14.55 8.35
2025-04-29T13:40:15.55 8.35
2025-04-29T13:40:16.55 8.35
2025-04-29T13:40:17.55 8.35
2025-04-29T13:40:18.55 8.35
2025-04-29T13:40:19.55 8.35
2025-04-29T13:40:20.55 8.33
2025-04-29T13:40:21.55 8.37
2025-04-29T13:40:22.55 8.35
2025-04-29T13:40:23.55 8.35
2025-04-29T13:40:24.55 8.35
2025-04-29T13:40:25.55 8.36
2025-04-29T13:40:26.55 8.35
2025-04-29T13:40:27.55 8.35
2025-04-29T13:40:28.55 8.35
2025-04-29T13:40:29.55 8.36
2025-04-29T13:40:30.55 8.35
2025-04-29T13:40:31.55 8.36
2025-04-29T13:40:32.55 8.34
2025-04-29T13:40:33.55 8.35
2025-04-29T13:40:34.55 8.33
2025-04-29T13:40:35.55 8.35
2025-04-29T13:40:36.56 8.35
2025-04-29T13:40:37.54 8.33
2025-04-29T13:40:38.54 8.34
2025-04-29T13:40:39.54 8.36
2025-04-29T13:40:40.54 8.34
2025-04-29T13:40:41.54 8.35
2025-04-29T13:40:42.54 8.33
2025-04-29T13:40:43.54 8.35
2025-04-29T13:40:44.54 8.35
2025-04-29T13:40:45.54 8.35
2025-04-29T13:40:46.54 8.35
2025-04-29T13:40:47.54 8.36
2025-04-29T13:40:48.54 8.34
2025-04-29T13:40:49.54 8.37
2025-04-29T13:40:50.54 8.36
2025-04-29T13:40:51.54 8.38
2025-04-29T13:40:52.54 8.34
2025-04-29T13:40:53.54 8.36
2025-04-29T13:40:54.54 8.37
2025-04-29T13:40:55.54 8.37
2025-04-29T13:40:56.54 8.36
2025-04-29T13:40:57.54 8.32
2025-04-29T13:40:58.54 8.37
2025-04-29T13:40:59.54 8.33
2025-04-29T13:41:00.54 8.37
2025-04-29T13:41:01.54 8.33
2025-04-29T13:41:02.54 8.35
2025-04-29T13:41:03.54 8.33
2025-04-29T13:41:04.54 8.37
2025-04-29T13:41:05.54 8.34
2025-04-29T13:41:06.54 8.37
2025-04-29T13:41:07.54 8.35
2025-04-29T13:41:08.54 8.33
2025-04-29T13:41:09.54 8.35
2025-04-29T13:41:10.54 8.37
2025-04-29T13:41:11.54 8.34
2025-04-29T13:41:12.54 8.34
2025-04-29T13:41:13.54 8.35
2025-04-29T13:41:14.54 8.33
2025-04-29T13:41:15.54 8.35
2025-04-29T13:41:16.54 8.35
2025-04-29T13:41:17.54 8.33
2025-04-29T13:41:18.54 8.35
2025-04-29T13:41:19.54 8.36
2025-04-29T13:41:20.54 8.33
2025-04-29T13:41:21.54 8.36
2025-04-29T13:41:22.54 8.35
2025-04-29T13:41:23.54 8.37
2025-04-29T13:41:24.54 8.34
2025-04-29T13:41:25.54 8.32
2025-04-29T13:41:26.54 8.35
2025-04-29T13:41:27.54 8.36
2025-04-29T13:41:28.54 8.35
2025-04-29T13:41:29.54 8.35
2025-04-29T13:41:30.54 8.33
2025-04-29T13:41:31.54 8.33
2025-04-29T13:41:32.54 8.36
2025-04-29T13:41:33.54 8.36
2025-04-29T13:41:34.54 8.38
2025-04-29T13:41:35.54 8.34
2025-04-29T13:41:36.54 8.36
2025-04-29T13:41:37.54 8.37
2025-04-29T13:41:38.54 8.32
2025-04-29T13:41:39.54 8.34
2025-04-29T13:41:40.54 8.35
2025-04-29T13:41:41.55 8.35
2025-04-29T13:41:42.54 8.35
2025-04-29T13:41:43.54 8.36
2025-04-29T13:41:44.55 8.37
2025-04-29T13:41:45.55 8.34
2025-04-29T13:41:46.55 8.33
2025-04-29T13:41:47.55 8.35
2025-04-29T13:41:48.55 8.34
2025-04-29T13:41:49.55 8.34
2025-04-29T13:41:50.55 8.35
2025-04-29T13:41:51.55 8.35
2025-04-29T13:41:52.55 8.36
2025-04-29T13:41:53.55 8.34
2025-04-29T13:41:54.55 8.35
2025-04-29T13:41:55.55 8.34
2025-04-29T13:41:56.55 8.34
2025-04-29T13:41:57.55 8.37
2025-04-29T13:41:58.55 8.35
2025-04-29T13:41:59.55 8.35
2025-04-29T13:42:00.55 8.33
2025-04-29T13:42:01.55 8.36
2025-04-29T13:42:02.55 8.38
2025-04-29T13:42:03.55 8.34
2025-04-29T13:42:04.55 8.35
2025-04-29T13:42:05.55 8.37
2025-04-29T13:42:06.55 8.35
2025-04-29T13:42:07.55 8.35
2025-04-29T13:42:08.55 8.36
2025-04-29T13:42:09.55 8.35
2025-04-29T13:42:10.55 8.37
2025-04-29T13:42:11.55 8.35
2025-04-29T13:42:12.55 8.38
2025-04-29T13:42:13.55 8.35
2025-04-29T13:42:14.55 8.35
2025-04-29T13:42:15.55 8.34
2025-04-29T13:42:16.55 8.37
2025-04-29T13:42:17.55 8.36
2025-04-29T13:42:18.55 8.37
2025-04-29T13:42:19.55 8.35
2025-04-29T13:42:20.55 8.36
2025-04-29T13:42:21.55 8.38
2025-04-29T13:42:22.55 8.35
2025-04-29T13:42:23.55 8.36
2025-04-29T13:42:24.55 8.37
2025-04-29T13:42:25.55 8.35
2025-04-29T13:42:26.55 8.36
2025-04-29T13:42:27.55 8.37
2025-04-29T13:42:28.55 8.35
2025-04-29T13:42:29.55 8.35
2025-04-29T13:42:30.55 8.37
2025-04-29T13:42:31.55 8.37
2025-04-29T13:42:32.55 8.36
2025-04-29T13:42:33.55 8.35
2025-04-29T13:42:34.55 8.35
2025-04-29T13:42:35.55 8.35
2025-04-29T13:42:36.55 8.35
2025-04-29T13:42:37.55 8.34
2025-04-29T13:42:38.55 8.34
2025-04-29T13:42:39.55 8.35
2025-04-29T13:42:40.55 8.35
2025-04-29T13:42:41.55 8.37
2025-04-29T13:42:42.55 8.37
2025-04-29T13:42:43.55 8.33
2025-04-29T13:42:44.55 8.33
2025-04-29T13:42:45.55 8.35
2025-04-29T13:42:46.55 8.33
2025-04-29T13:42:47.55 8.35
2025-04-29T13:42:48.55 8.36
2025-04-29T13:42:49.55 8.33
2025-04-29T13:42:50.55 8.34
2025-04-29T13:42:51.55 8.37
2025-04-29T13:42:52.55 8.37
2025-04-29T13:42:53.55 8.35
2025-04-29T13:42:54.55 8.35
2025-04-29T13:42:55.55 8.35
2025-04-29T13:42:56.55 8.38
2025-04-29T13:42:57.55 8.33
2025-04-29T13:42:58.55 8.37
2025-04-29T13:42:59.55 8.35
2025-04-29T13:43:00.55 8.35
2025-04-29T13:43:01.55 8.36
2025-04-29T13:43:02.55 8.33
2025-04-29T13:43:03.55 8.34
2025-04-29T13:43:04.55 8.34
2025-04-29T13:43:05.55 8.32
2025-04-29T13:43:06.55 8.34
2025-04-29T13:43:07.55 8.35
2025-04-29T13:43:08.55 8.35
2025-04-29T13:43:09.55 8.33
2025-04-29T13:43:10.55 8.33
2025-04-29T13:43:11.55 8.34
2025-04-29T13:43:12.55 8.33
2025-04-29T13:43:13.55 8.32
2025-04-29T13:43:14.55 8.34
2025-04-29T13:43:15.55 8.33
2025-04-29T13:43:16.55 8.33
2025-04-29T13:43:17.55 8.35
2025-04-29T13:43:18.55 8.35
2025-04-29T13:43:19.55 8.33
2025-04-29T13:43:20.55 8.35
2025-04-29T13:43:21.55 8.33
2025-04-29T13:43:22.55 8.34
2025-04-29T13:43:23.55 8.35
2025-04-29T13:43:24.55 8.32
2025-04-29T13:43:25.55 8.35
2025-04-29T13:43:26.55 8.35
2025-04-29T13:43:27.55 8.36
2025-04-29T13:43:28.55 8.35
2025-04-29T13:43:29.55 8.35
2025-04-29T13:43:30.55 8.34
2025-04-29T13:43:31.55 8.35
2025-04-29T13:43:32.55 8.34
2025-04-29T13:43:33.55 8.34
2025-04-29T13:43:34.55 8.33
2025-04-29T13:43:35.55 8.36
2025-04-29T13:43:36.55 8.33
2025-04-29T13:43:37.55 8.37
2025-04-29T13:43:38.55 8.33
2025-04-29T13:43:39.55 8.35
2025-04-29T13:43:40.55 8.37
2025-04-29T13:43:41.55 8.35
2025-04-29T13:43:42.55 8.33
2025-04-29T13:43:43.55 8.36
2025-04-29T13:43:44.55 8.36
2025-04-29T13:43:45.55 8.35
2025-04-29T13:43:46.55 8.35
2025-04-29T13:43:47.55 8.36
2025-04-29T13:43:48.55 8.33
2025-04-29T13:43:49.55 8.34
2025-04-29T13:43:50.55 8.35
2025-04-29T13:43:51.55 8.36
2025-04-29T13:43:52.55 8.35
2025-04-29T13:43:53.55 8.35
2025-04-29T13:43:54.55 8.34
2025-04-29T13:43:55.55 8.33
2025-04-29T13:43:56.55 8.34
2025-04-29T13:43:57.55 8.36
2025-04-29T13:43:58.55 8.36
2025-04-29T13:43:59.55 8.36
2025-04-29T13:44:00.55 8.35
2025-04-29T13:44:01.55 8.36
2025-04-29T13:44:02.55 8.33
2025-04-29T13:44:03.55 8.34
2025-04-29T13:44:04.55 8.35
2025-04-29T13:44:05.55 8.37
2025-04-29T13:44:06.55 8.35
2025-04-29T13:44:07.55 8.37
2025-04-29T13:44:08.55 8.36
2025-04-29T13:44:09.55 8.34
2025-04-29T13:44:10.55 8.35
2025-04-29T13:44:11.55 8.35
2025-04-29T13:44:12.55 8.35
2025-04-29T13:44:13.55 8.36
2025-04-29T13:44:14.55 8.36
2025-04-29T13:44:15.55 8.34
2025-04-29T13:44:16.55 8.36
2025-04-29T13:44:17.55 8.35
2025-04-29T13:44:18.55 8.35
2025-04-29T13:44:19.55 8.35
2025-04-29T13:44:20.55 8.33
2025-04-29T13:44:21.55 8.34
2025-04-29T13:44:22.55 8.35
2025-04-29T13:44:23.55 8.33
2025-04-29T13:44:24.55 8.35
2025-04-29T13:44:25.55 8.36
2025-04-29T13:44:26.55 8.37
2025-04-29T13:44:27.55 8.33
2025-04-29T13:44:28.55 8.36
2025-04-29T13:44:29.55 8.35
2025-04-29T13:44:30.55 8.33
2025-04-29T13:44:31.55 8.37
2025-04-29T13:44:32.55 8.35
2025-04-29T13:44:33.55 8.35
2025-04-29T13:44:34.55 8.37
2025-04-29T13:44:35.55 8.35
2025-04-29T13:44:36.55 8.35
2025-04-29T13:44:37.55 8.37
2025-04-29T13:44:38.55 8.35
2025-04-29T13:44:39.55 8.34
2025-04-29T13:44:40.55 8.34
2025-04-29T13:44:41.55 8.33
2025-04-29T13:44:42.55 8.32
2025-04-29T13:44:43.55 8.37
2025-04-29T13:44:44.55 8.35
2025-04-29T13:44:45.55 8.35
2025-04-29T13:44:46.55 8.33
2025-04-29T13:44:47.55 8.35
2025-04-29T13:44:48.55 8.35
2025-04-29T13:44:49.55 8.37
2025-04-29T13:44:50.55 8.33
2025-04-29T13:44:51.55 8.32
2025-04-29T13:44:52.55 8.34
2025-04-29T13:44:53.55 8.35
2025-04-29T13:44:54.55 8.37
2025-04-29T13:44:55.55 8.32
2025-04-29T13:44:56.55 8.35
2025-04-29T13:44:57.55 8.36
2025-04-29T13:44:58.55 8.36
2025-04-29T13:44:59.55 8.36
2025-04-29T13:45:00.55 8.34
2025-04-29T13:45:01.55 8.34
2025-04-29T13:45:02.55 8.35
2025-04-29T13:45:03.55 8.36
2025-04-29T13:45:04.55 8.35
2025-04-29T13:45:05.55 8.35
2025-04-29T13:45:06.55 8.34
2025-04-29T13:45:07.55 8.34
2025-04-29T13:45:08.55 8.37
2025-04-29T13:45:09.55 8.34
2025-04-29T13:45:10.55 8.36
2025-04-29T13:45:11.55 8.33
2025-04-29T13:45:12.55 8.35
2025-04-29T13:45:13.55 8.35
2025-04-29T13:45:14.55 8.33
2025-04-29T13:45:15.55 8.34
2025-04-29T13:45:16.55 8.33
2025-04-29T13:45:17.55 8.33
2025-04-29T13:45:18.55 8.34
2025-04-29T13:45:19.55 8.36
2025-04-29T13:45:20.55 8.35
2025-04-29T13:45:21.55 8.35
2025-04-29T13:45:22.55 8.35
2025-04-29T13:45:23.55 8.35
2025-04-29T13:45:24.55 8.34
2025-04-29T13:45:25.55 8.32
2025-04-29T13:45:26.55 8.34
2025-04-29T13:45:27.55 8.35
2025-04-29T13:45:28.55 8.37
2025-04-29T13:45:29.55 8.33
2025-04-29T13:45:30.55 8.36
2025-04-29T13:45:31.55 8.34
2025-04-29T13:45:32.55 8.33
2025-04-29T13:45:33.55 8.34
2025-04-29T13:45:34.55 8.34
2025-04-29T13:45:35.55 8.34
2025-04-29T13:45:36.55 8.34
2025-04-29T13:45:37.55 8.35
2025-04-29T13:45:38.55 8.35
2025-04-29T13:45:39.55 8.34
2025-04-29T13:45:40.55 8.33
2025-04-29T13:45:41.55 8.34
2025-04-29T13:45:42.55 8.35
2025-04-29T13:45:43.55 8.36
2025-04-29T13:45:44.55 8.32
2025-04-29T13:45:45.55 8.36
2025-04-29T13:45:46.55 8.33
2025-04-29T13:45:47.55 8.37
2025-04-29T13:45:48.55 8.32
2025-04-29T13:45:49.55 8.36
2025-04-29T13:45:50.55 8.32
2025-04-29T13:45:51.55 8.35
2025-04-29T13:45:52.55 8.36
2025-04-29T13:45:53.55 8.34
2025-04-29T13:45:54.55 8.35
2025-04-29T13:45:55.55 8.35
2025-04-29T13:45:56.55 8.33
2025-04-29T13:45:57.55 8.35
2025-04-29T13:45:58.55 8.33
2025-04-29T13:45:59.55 8.36
2025-04-29T13:46:00.55 8.34
2025-04-29T13:46:01.55 8.35
2025-04-29T13:46:02.55 8.33
2025-04-29T13:46:03.55 8.33
2025-04-29T13:46:04.55 8.35
2025-04-29T13:46:05.55 8.36
2025-04-29T13:46:06.55 8.35
2025-04-29T13:46:07.55 8.36
2025-04-29T13:46:08.55 8.34
2025-04-29T13:46:09.55 8.35
2025-04-29T13:46:10.55 8.36
2025-04-29T13:46:11.55 8.37
2025-04-29T13:46:12.55 8.35
2025-04-29T13:46:13.55 8.34
2025-04-29T13:46:14.55 8.36
2025-04-29T13:46:15.55 8.36
2025-04-29T13:46:16.55 8.33
2025-04-29T13:46:17.55 8.35
2025-04-29T13:46:18.55 8.37
2025-04-29T13:46:19.55 8.35
2025-04-29T13:46:20.55 8.38
2025-04-29T13:46:21.55 8.35
2025-04-29T13:46:22.55 8.37
2025-04-29T13:46:23.55 8.34
2025-04-29T13:46:24.55 8.33
2025-04-29T13:46:25.55 8.35
2025-04-29T13:46:26.55 8.34
2025-04-29T13:46:27.55 8.35
2025-04-29T13:46:28.55 8.35
2025-04-29T13:46:29.55 8.36
2025-04-29T13:46:30.55 8.36
2025-04-29T13:46:31.55 8.34
2025-04-29T13:46:32.55 8.37
2025-04-29T13:46:33.55 8.36
2025-04-29T13:46:34.55 8.35
2025-04-29T13:46:35.55 8.36
2025-04-29T13:46:36.55 8.36
2025-04-29T13:46:37.55 8.33
2025-04-29T13:46:38.55 8.33
2025-04-29T13:46:39.55 8.35
2025-04-29T13:46:40.55 8.36
2025-04-29T13:46:41.55 8.35
2025-04-29T13:46:42.55 8.36
2025-04-29T13:46:43.55 8.37
2025-04-29T13:46:44.55 8.33
2025-04-29T13:46:45.55 8.37
2025-04-29T13:46:46.55 8.37
2025-04-29T13:46:47.55 8.35
2025-04-29T13:46:48.55 8.35
2025-04-29T13:46:49.55 8.35
2025-04-29T13:46:50.55 8.33
2025-04-29T13:46:51.55 8.33
2025-04-29T13:46:52.55 8.35
2025-04-29T13:46:53.55 8.36
2025-04-29T13:46:54.55 8.33
2025-04-29T13:46:55.55 8.33
2025-04-29T13:46:56.55 8.36
2025-04-29T13:46:57.55 8.37
2025-04-29T13:46:58.55 8.34
2025-04-29T13:46:59.55 8.33
2025-04-29T13:47:00.55 8.34
2025-04-29T13:47:01.56 8.35
2025-04-29T13:47:02.56 8.35
2025-04-29T13:47:03.56 8.35
2025-04-29T13:47:04.56 8.36
2025-04-29T13:47:05.56 8.37
2025-04-29T13:47:06.56 8.33
2025-04-29T13:47:07.56 8.39
2025-04-29T13:47:08.56 8.34
2025-04-29T13:47:09.56 8.33
2025-04-29T13:47:10.56 8.33
2025-04-29T13:47:11.56 8.35
2025-04-29T13:47:12.56 8.35
2025-04-29T13:47:13.56 8.33
2025-04-29T13:47:14.56 8.35
2025-04-29T13:47:15.56 8.38
2025-04-29T13:47:16.56 8.36
2025-04-29T13:47:17.56 8.35
2025-04-29T13:47:18.56 8.34
2025-04-29T13:47:19.56 8.35
2025-04-29T13:47:20.56 8.35
2025-04-29T13:47:21.56 8.34
2025-04-29T13:47:22.56 8.34
2025-04-29T13:47:23.56 8.36
2025-04-29T13:47:24.56 8.33
2025-04-29T13:47:25.57 8.33
2025-04-29T13:47:26.55 8.35
2025-04-29T13:47:27.55 8.35
2025-04-29T13:47:28.55 8.33
2025-04-29T13:47:29.55 8.34
2025-04-29T13:47:30.55 8.36
2025-04-29T13:47:31.55 8.35
2025-04-29T13:47:32.55 8.35
2025-04-29T13:47:33.55 8.36
2025-04-29T13:47:34.55 8.37
2025-04-29T13:47:35.55 8.36
2025-04-29T13:47:36.55 8.35
2025-04-29T13:47:37.55 8.34
2025-04-29T13:47:38.55 8.35
2025-04-29T13:47:39.55 8.34
2025-04-29T13:47:40.55 8.35
2025-04-29T13:47:41.55 8.34
2025-04-29T13:47:42.55 8.32
2025-04-29T13:47:43.55 8.35
2025-04-29T13:47:44.55 8.35
2025-04-29T13:47:45.55 8.34
2025-04-29T13:47:46.55 8.35
2025-04-29T13:47:47.55 8.36
2025-04-29T13:47:48.55 8.33
2025-04-29T13:47:49.55 8.35
2025-04-29T13:47:50.55 8.35
2025-04-29T13:47:51.55 8.35
2025-04-29T13:47:52.55 8.35
2025-04-29T13:47:53.55 8.37
2025-04-29T13:47:54.55 8.33
2025-04-29T13:47:55.55 8.36
2025-04-29T13:47:56.55 8.35
2025-04-29T13:47:57.55 8.34
2025-04-29T13:47:58.55 8.37
2025-04-29T13:47:59.55 8.37
2025-04-29T13:48:00.55 8.33
2025-04-29T13:48:01.55 8.35
2025-04-29T13:48:02.55 8.33
2025-04-29T13:48:03.55 8.35
2025-04-29T13:48:04.55 8.35
2025-04-29T13:48:05.55 8.37
2025-04-29T13:48:06.55 8.34
2025-04-29T13:48:07.55 8.35
2025-04-29T13:48:08.55 8.35
2025-04-29T13:48:09.55 8.35
2025-04-29T13:48:10.55 8.34
2025-04-29T13:48:11.55 8.35
2025-04-29T13:48:12.55 8.35
2025-04-29T13:48:13.55 8.34
2025-04-29T13:48:14.55 8.35
2025-04-29T13:48:15.55 8.33
2025-04-29T13:48:16.55 8.35
2025-04-29T13:48:17.55 8.36
2025-04-29T13:48:18.55 8.33
2025-04-29T13:48:19.55 8.33
2025-04-29T13:48:20.55 8.35
2025-04-29T13:48:21.55 8.36
2025-04-29T13:48:22.55 8.36
2025-04-29T13:48:23.55 8.35
2025-04-29T13:48:24.55 8.37
2025-04-29T13:48:25.55 8.33
2025-04-29T13:48:26.55 8.34
2025-04-29T13:48:27.55 8.35
2025-04-29T13:48:28.55 8.35
2025-04-29T13:48:29.55 8.34
2025-04-29T13:48:30.55 8.33
2025-04-29T13:48:31.55 8.35
2025-04-29T13:48:32.55 8.36
2025-04-29T13:48:33.55 8.35
2025-04-29T13:48:34.55 8.36
2025-04-29T13:48:35.55 8.35
2025-04-29T13:48:36.55 8.33
2025-04-29T13:48:37.55 8.35
2025-04-29T13:48:38.55 8.35
2025-04-29T13:48:39.55 8.35
2025-04-29T13:48:40.55 8.35
2025-04-29T13:48:41.55 8.37
2025-04-29T13:48:42.55 8.35
2025-04-29T13:48:43.55 8.34
2025-04-29T13:48:44.55 8.35
2025-04-29T13:48:45.55 8.35
2025-04-29T13:48:46.55 8.37
2025-04-29T13:48:47.55 8.35
2025-04-29T13:48:48.55 8.35
2025-04-29T13:48:49.55 8.35
2025-04-29T13:48:50.55 8.37
2025-04-29T13:48:51.55 8.37
2025-04-29T13:48:52.55 8.35
2025-04-29T13:48:53.55 8.34
2025-04-29T13:48:54.55 8.34
2025-04-29T13:48:55.55 8.34
2025-04-29T13:48:56.55 8.37
2025-04-29T13:48:57.55 8.35
2025-04-29T13:48:58.55 8.36
2025-04-29T13:48:59.55 8.36
2025-04-29T13:49:00.55 8.34
2025-04-29T13:49:01.55 8.35
2025-04-29T13:49:02.55 8.34
2025-04-29T13:49:03.55 8.34
2025-04-29T13:49:04.55 8.34
2025-04-29T13:49:05.55 8.33
2025-04-29T13:49:06.55 8.35
2025-04-29T13:49:07.55 8.35
2025-04-29T13:49:08.55 8.34
2025-04-29T13:49:09.55 8.35
2025-04-29T13:49:10.55 8.34
2025-04-29T13:49:11.55 8.34
2025-04-29T13:49:12.55 8.35
2025-04-29T13:49:13.55 8.35
2025-04-29T13:49:14.55 8.34
2025-04-29T13:49:15.55 8.37
2025-04-29T13:49:16.55 8.36
2025-04-29T13:49:17.55 8.37
2025-04-29T13:49:18.55 8.35
2025-04-29T13:49:19.55 8.33
2025-04-29T13:49:20.55 8.34
2025-04-29T13:49:21.55 8.33
2025-04-29T13:49:22.55 8.33
2025-04-29T13:49:23.55 8.37
2025-04-29T13:49:24.55 8.35
2025-04-29T13:49:25.55 8.33
2025-04-29T13:49:26.55 8.35
2025-04-29T13:49:27.55 8.35
2025-04-29T13:49:28.55 8.35
2025-04-29T13:49:29.55 8.37
2025-04-29T13:49:30.55 8.35
2025-04-29T13:49:31.55 8.33
2025-04-29T13:49:32.55 8.35
2025-04-29T13:49:33.55 8.35
2025-04-29T13:49:34.55 8.35
2025-04-29T13:49:35.55 8.36
2025-04-29T13:49:36.55 8.33
2025-04-29T13:49:37.55 8.35
2025-04-29T13:49:38.55 8.34
2025-04-29T13:49:39.55 8.33
2025-04-29T13:49:40.55 8.37
2025-04-29T13:49:41.55 8.33
2025-04-29T13:49:42.55 8.35
2025-04-29T13:49:43.55 8.34
2025-04-29T13:49:44.55 8.33
2025-04-29T13:49:45.55 8.36
2025-04-29T13:49:46.55 8.37
2025-04-29T13:49:47.55 8.36
2025-04-29T13:49:48.55 8.34
2025-04-29T13:49:49.55 8.33
2025-04-29T13:49:50.55 8.34
2025-04-29T13:49:51.55 8.35
2025-04-29T13:49:52.55 8.35
2025-04-29T13:49:53.55 8.33
2025-04-29T13:49:54.55 8.36
2025-04-29T13:49:55.55 8.34
2025-04-29T13:49:56.55 8.35
2025-04-29T13:49:57.55 8.31
2025-04-29T13:49:58.55 8.35
2025-04-29T13:49:59.55 8.34
2025-04-29T13:50:00.55 8.36
2025-04-29T13:50:01.55 8.34
2025-04-29T13:50:02.55 8.33
2025-04-29T13:50:03.55 8.34
2025-04-29T13:50:04.55 8.33
2025-04-29T13:50:05.55 8.33
2025-04-29T13:50:06.55 8.36
2025-04-29T13:50:07.55 8.37
2025-04-29T13:50:08.55 8.36
2025-04-29T13:50:09.55 8.35
2025-04-29T13:50:10.55 8.34
2025-04-29T13:50:11.55 8.33
2025-04-29T13:50:12.55 8.35
2025-04-29T13:50:13.55 8.34
2025-04-29T13:50:14.55 8.36
2025-04-29T13:50:15.55 8.35
2025-04-29T13:50:16.55 8.36
2025-04-29T13:50:17.55 8.35
2025-04-29T13:50:18.55 8.35
2025-04-29T13:50:19.55 8.36
2025-04-29T13:50:20.55 8.33
2025-04-29T13:50:21.55 8.33
2025-04-29T13:50:22.55 8.35
2025-04-29T13:50:23.55 8.35
2025-04-29T13:50:24.55 8.33
2025-04-29T13:50:25.55 8.35
2025-04-29T13:50:26.55 8.36
2025-04-29T13:50:27.55 8.37
2025-04-29T13:50:28.55 8.34
2025-04-29T13:50:29.55 8.35
2025-04-29T13:50:30.55 8.34
2025-04-29T13:50:31.55 8.35
2025-04-29T13:50:32.55 8.35
2025-04-29T13:50:33.55 8.35
2025-04-29T13:50:34.55 8.36
2025-04-29T13:50:35.55 8.35
2025-04-29T13:50:36.55 8.37
2025-04-29T13:50:37.55 8.37
2025-04-29T13:50:38.55 8.35
2025-04-29T13:50:39.55 8.35
2025-04-29T13:50:40.55 8.34
2025-04-29T13:50:41.55 8.33
2025-04-29T13:50:42.55 8.36
2025-04-29T13:50:43.55 8.32
2025-04-29T13:50:44.55 8.36
2025-04-29T13:50:45.55 8.34
2025-04-29T13:50:46.55 8.34
2025-04-29T13:50:47.55 8.35
2025-04-29T13:50:48.55 8.33
2025-04-29T13:50:49.55 8.39
2025-04-29T13:50:50.55 8.35
2025-04-29T13:50:51.55 8.36
2025-04-29T13:50:52.55 8.37
2025-04-29T13:50:53.55 8.35
2025-04-29T13:50:54.55 8.35
2025-04-29T13:50:55.55 8.33
2025-04-29T13:50:56.55 8.36
2025-04-29T13:50:57.55 8.36
2025-04-29T13:50:58.55 8.35
2025-04-29T13:50:59.55 8.37
2025-04-29T13:51:00.55 8.35
2025-04-29T13:51:01.55 8.35
2025-04-29T13:51:02.55 8.33
2025-04-29T13:51:03.55 8.33
2025-04-29T13:51:04.55 8.37
2025-04-29T13:51:05.55 8.35
2025-04-29T13:51:06.55 8.35
2025-04-29T13:51:07.55 8.33
2025-04-29T13:51:08.55 8.31
2025-04-29T13:51:09.55 8.38
2025-04-29T13:51:10.55 8.33
2025-04-29T13:51:11.55 8.36
2025-04-29T13:51:12.55 8.37
2025-04-29T13:51:13.55 8.35
2025-04-29T13:51:14.55 8.35
2025-04-29T13:51:15.55 8.35
2025-04-29T13:51:16.55 8.37
2025-04-29T13:51:17.56 8.33
2025-04-29T13:51:18.54 8.37
2025-04-29T13:51:19.54 8.33
2025-04-29T13:51:20.54 8.36
2025-04-29T13:51:21.54 8.33
2025-04-29T13:51:22.54 8.36
2025-04-29T13:51:23.54 8.36
2025-04-29T13:51:24.54 8.34
2025-04-29T13:51:25.54 8.35
2025-04-29T13:51:26.54 8.35
2025-04-29T13:51:27.54 8.37
2025-04-29T13:51:28.54 8.35
2025-04-29T13:51:29.54 8.35
2025-04-29T13:51:30.54 8.35
2025-04-29T13:51:31.54 8.37
2025-04-29T13:51:32.54 8.33
2025-04-29T13:51:33.54 8.35
2025-04-29T13:51:34.54 8.35
2025-04-29T13:51:35.54 8.33
2025-04-29T13:51:36.54 8.36
2025-04-29T13:51:37.54 8.33
2025-04-29T13:51:38.54 8.35
2025-04-29T13:51:39.54 8.37
2025-04-29T13:51:40.54 8.34
2025-04-29T13:51:41.54 8.33
2025-04-29T13:51:42.54 8.34
2025-04-29T13:51:43.54 8.35
2025-04-29T13:51:44.54 8.35
2025-04-29T13:51:45.54 8.37
2025-04-29T13:51:46.54 8.37
2025-04-29T13:51:47.54 8.36
2025-04-29T13:51:48.54 8.33
2025-04-29T13:51:49.54 8.36
2025-04-29T13:51:50.54 8.35
2025-04-29T13:51:51.54 8.34
2025-04-29T13:51:52.54 8.35
2025-04-29T13:51:53.54 8.36
2025-04-29T13:51:54.54 8.35
2025-04-29T13:51:55.54 8.33
2025-04-29T13:51:56.54 8.35
2025-04-29T13:51:57.54 8.36
2025-04-29T13:51:58.54 8.34
2025-04-29T13:51:59.54 8.36
2025-04-29T13:52:00.54 8.35
2025-04-29T13:52:01.54 8.35
2025-04-29T13:52:02.54 8.35
2025-04-29T13:52:03.54 8.35
2025-04-29T13:52:04.54 8.33
2025-04-29T13:52:05.54 8.35
2025-04-29T13:52:06.54 8.37
2025-04-29T13:52:07.54 8.37
2025-04-29T13:52:08.54 8.32
2025-04-29T13:52:09.54 8.34
2025-04-29T13:52:10.54 8.33
2025-04-29T13:52:11.54 8.35
2025-04-29T13:52:12.54 8.35
2025-04-29T13:52:13.54 8.36
2025-04-29T13:52:14.54 8.35
2025-04-29T13:52:15.54 8.33
2025-04-29T13:52:16.54 8.35
2025-04-29T13:52:17.54 8.36
2025-04-29T13:52:18.54 8.33
2025-04-29T13:52:19.54 8.33
2025-04-29T13:52:20.55 8.35
2025-04-29T13:52:21.55 8.34
2025-04-29T13:52:22.55 8.34
2025-04-29T13:52:23.55 8.33
2025-04-29T13:52:24.55 8.33
2025-04-29T13:52:25.55 8.34
2025-04-29T13:52:26.55 8.35
2025-04-29T13:52:27.55 8.34
2025-04-29T13:52:28.55 8.36
2025-04-29T13:52:29.55 8.36
2025-04-29T13:52:30.55 8.35
2025-04-29T13:52:31.55 8.35
2025-04-29T13:52:32.55 8.37
2025-04-29T13:52:33.55 8.33
2025-04-29T13:52:34.55 8.33
2025-04-29T13:52:35.55 8.34
2025-04-29T13:52:36.55 8.35
2025-04-29T13:52:37.55 8.37
2025-04-29T13:52:38.55 8.37
2025-04-29T13:52:39.55 8.34
2025-04-29T13:52:40.55 8.35
2025-04-29T13:52:41.55 8.35
2025-04-29T13:52:42.55 8.34
2025-04-29T13:52:43.55 8.36
2025-04-29T13:52:44.55 8.35
2025-04-29T13:52:45.55 8.34
2025-04-29T13:52:46.55 8.36
2025-04-29T13:52:47.55 8.36
2025-04-29T13:52:48.55 8.35
2025-04-29T13:52:49.55 8.33
2025-04-29T13:52:50.55 8.36
2025-04-29T13:52:51.55 8.33
2025-04-29T13:52:52.55 8.35
2025-04-29T13:52:53.55 8.35
2025-04-29T13:52:54.55 8.35
2025-04-29T13:52:55.55 8.34
2025-04-29T13:52:56.55 8.33
2025-04-29T13:52:57.55 8.35
2025-04-29T13:52:58.55 8.37
2025-04-29T13:52:59.55 8.32
2025-04-29T13:53:00.55 8.33
2025-04-29T13:53:01.55 8.36
2025-04-29T13:53:02.55 8.35
2025-04-29T13:53:03.55 8.35
2025-04-29T13:53:04.55 8.35
2025-04-29T13:53:05.55 8.36
2025-04-29T13:53:06.55 8.35
2025-04-29T13:53:07.55 8.37
2025-04-29T13:53:08.55 8.37
2025-04-29T13:53:09.55 8.35
2025-04-29T13:53:10.55 8.33
2025-04-29T13:53:11.55 8.35
2025-04-29T13:53:12.55 8.32
2025-04-29T13:53:13.55 8.32
2025-04-29T13:53:14.55 8.33
2025-04-29T13:53:15.55 8.33
2025-04-29T13:53:16.55 8.35
2025-04-29T13:53:17.55 8.35
2025-04-29T13:53:18.55 8.33
2025-04-29T13:53:19.55 8.35
2025-04-29T13:53:20.55 8.36
2025-04-29T13:53:21.55 8.35
2025-04-29T13:53:22.55 8.33
2025-04-29T13:53:23.55 8.35
2025-04-29T13:53:24.55 8.34
2025-04-29T13:53:25.55 8.35
2025-04-29T13:53:26.55 8.33
2025-04-29T13:53:27.55 8.35
2025-04-29T13:53:28.55 8.33
2025-04-29T13:53:29.55 8.36
2025-04-29T13:53:30.55 8.35
2025-04-29T13:53:31.55 8.35
2025-04-29T13:53:32.55 8.36
2025-04-29T13:53:33.55 8.35
2025-04-29T13:53:34.55 8.33
2025-04-29T13:53:35.55 8.36
2025-04-29T13:53:36.55 8.35
2025-04-29T13:53:37.55 8.34
2025-04-29T13:53:38.55 8.33
2025-04-29T13:53:39.55 8.33
2025-04-29T13:53:40.55 8.35
2025-04-29T13:53:41.55 8.35
2025-04-29T13:53:42.55 8.34
2025-04-29T13:53:43.55 8.34
2025-04-29T13:53:44.55 8.36
2025-04-29T13:53:45.55 8.33
2025-04-29T13:53:46.55 8.35
2025-04-29T13:53:47.55 8.37
2025-04-29T13:53:48.55 8.35
2025-04-29T13:53:49.55 8.33
2025-04-29T13:53:50.55 8.36
2025-04-29T13:53:51.55 8.35
2025-04-29T13:53:52.55 8.36
2025-04-29T13:53:53.55 8.33
2025-04-29T13:53:54.55 8.35
2025-04-29T13:53:55.55 8.37
2025-04-29T13:53:56.55 8.35
2025-04-29T13:53:57.55 8.36
2025-04-29T13:53:58.55 8.35
2025-04-29T13:53:59.55 8.35
2025-04-29T13:54:00.55 8.33
2025-04-29T13:54:01.55 8.35
2025-04-29T13:54:02.55 8.34
2025-04-29T13:54:03.55 8.33
2025-04-29T13:54:04.55 8.33
2025-04-29T13:54:05.55 8.35
2025-04-29T13:54:06.55 8.34
2025-04-29T13:54:07.55 8.34
2025-04-29T13:54:08.55 8.35
2025-04-29T13:54:09.55 8.35
2025-04-29T13:54:10.55 8.33
2025-04-29T13:54:11.55 8.35
2025-04-29T13:54:12.55 8.35
2025-04-29T13:54:13.55 8.33
2025-04-29T13:54:14.55 8.35
2025-04-29T13:54:15.55 8.33
2025-04-29T13:54:16.55 8.35
2025-04-29T13:54:17.55 8.35
2025-04-29T13:54:18.55 8.34
2025-04-29T13:54:19.55 8.33
2025-04-29T13:54:20.55 8.37
2025-04-29T13:54:21.55 8.33
2025-04-29T13:54:22.55 8.34
2025-04-29T13:54:23.55 8.33
2025-04-29T13:54:24.55 8.35
2025-04-29T13:54:25.55 8.34
2025-04-29T13:54:26.55 8.37
2025-04-29T13:54:27.55 8.34
2025-04-29T13:54:28.55 8.32
2025-04-29T13:54:29.55 8.37
2025-04-29T13:54:30.55 8.33
2025-04-29T13:54:31.55 8.33
2025-04-29T13:54:32.55 8.35
2025-04-29T13:54:33.55 8.35
2025-04-29T13:54:34.55 8.37
2025-04-29T13:54:35.55 8.37
2025-04-29T13:54:36.55 8.35
2025-04-29T13:54:37.55 8.35
2025-04-29T13:54:38.55 8.35
2025-04-29T13:54:39.55 8.33
2025-04-29T13:54:40.55 8.36
2025-04-29T13:54:41.55 8.37
2025-04-29T13:54:42.55 8.36
2025-04-29T13:54:43.55 8.36
2025-04-29T13:54:44.55 8.33
2025-04-29T13:54:45.55 8.35
2025-04-29T13:54:46.55 8.35
2025-04-29T13:54:47.55 8.35
2025-04-29T13:54:48.55 8.37
2025-04-29T13:54:49.55 8.36
2025-04-29T13:54:50.55 8.33
2025-04-29T13:54:51.55 8.37
2025-04-29T13:54:52.55 8.33
2025-04-29T13:54:53.55 8.37
2025-04-29T13:54:54.55 8.36
2025-04-29T13:54:55.55 8.35
2025-04-29T13:54:56.55 8.35
2025-04-29T13:54:57.55 8.33
2025-04-29T13:54:58.55 8.34
2025-04-29T13:54:59.55 8.36
2025-04-29T13:55:00.55 8.35
2025-04-29T13:55:01.55 8.35
2025-04-29T13:55:02.55 8.34
2025-04-29T13:55:03.55 8.35
2025-04-29T13:55:04.55 8.35
2025-04-29T13:55:05.55 8.36
2025-04-29T13:55:06.55 8.35
2025-04-29T13:55:07.55 8.37
2025-04-29T13:55:08.55 8.37
2025-04-29T13:55:09.56 8.37
2025-04-29T13:55:10.54 8.36
2025-04-29T13:55:11.54 8.38
2025-04-29T13:55:12.54 8.35
2025-04-29T13:55:13.54 8.37
2025-04-29T13:55:14.54 8.37
2025-04-29T13:55:15.54 8.34
2025-04-29T13:55:16.54 8.35
2025-04-29T13:55:17.54 8.36
2025-04-29T13:55:18.54 8.35
2025-04-29T13:55:19.54 8.33
2025-04-29T13:55:20.54 8.32
2025-04-29T13:55:21.54 8.35
2025-04-29T13:55:22.54 8.35
2025-04-29T13:55:23.54 8.35
2025-04-29T13:55:24.54 8.35
2025-04-29T13:55:25.54 8.34
2025-04-29T13:55:26.54 8.35
2025-04-29T13:55:27.54 8.35
2025-04-29T13:55:28.54 8.35
2025-04-29T13:55:29.54 8.36
2025-04-29T13:55:30.54 8.33
2025-04-29T13:55:31.54 8.35
2025-04-29T13:55:32.54 8.37
2025-04-29T13:55:33.54 8.35
2025-04-29T13:55:34.54 8.35
2025-04-29T13:55:35.54 8.34
2025-04-29T13:55:36.54 8.34
2025-04-29T13:55:37.54 8.35
2025-04-29T13:55:38.54 8.33
2025-04-29T13:55:39.54 8.37
2025-04-29T13:55:40.54 8.33
2025-04-29T13:55:41.54 8.35
2025-04-29T13:55:42.54 8.34
2025-04-29T13:55:43.54 8.35
2025-04-29T13:55:44.54 8.35
2025-04-29T13:55:45.54 8.35
2025-04-29T13:55:46.54 8.35
2025-04-29T13:55:47.54 8.32
2025-04-29T13:55:48.54 8.35
2025-04-29T13:55:49.54 8.36
2025-04-29T13:55:50.54 8.35
2025-04-29T13:55:51.54 8.33
2025-04-29T13:55:52.54 8.35
2025-04-29T13:55:53.54 8.35
2025-04-29T13:55:54.54 8.34
2025-04-29T13:55:55.54 8.36
2025-04-29T13:55:56.54 8.34
2025-04-29T13:55:57.54 8.36
2025-04-29T13:55:58.54 8.35
2025-04-29T13:55:59.54 8.36
2025-04-29T13:56:00.54 8.34
2025-04-29T13:56:01.54 8.35
2025-04-29T13:56:02.54 8.35
2025-04-29T13:56:03.54 8.35
2025-04-29T13:56:04.54 8.35
2025-04-29T13:56:05.54 8.34
2025-04-29T13:56:06.54 8.33
2025-04-29T13:56:07.54 8.35
2025-04-29T13:56:08.54 8.37
2025-04-29T13:56:09.54 8.35
2025-04-29T13:56:10.54 8.35
2025-04-29T13:56:11.54 8.35
2025-04-29T13:56:12.54 8.35
2025-04-29T13:56:13.54 8.35
2025-04-29T13:56:14.54 8.35
2025-04-29T13:56:15.54 8.33
2025-04-29T13:56:16.54 8.35
2025-04-29T13:56:17.54 8.35
2025-04-29T13:56:18.54 8.37
2025-04-29T13:56:19.54 8.33
2025-04-29T13:56:20.54 8.36
2025-04-29T13:56:21.54 8.34
2025-04-29T13:56:22.54 8.37
2025-04-29T13:56:23.54 8.35
2025-04-29T13:56:24.54 8.37
2025-04-29T13:56:25.54 8.34
2025-04-29T13:56:26.54 8.37
2025-04-29T13:56:27.54 8.35
2025-04-29T13:56:28.54 8.35
2025-04-29T13:56:29.54 8.37
2025-04-29T13:56:30.54 8.34
2025-04-29T13:56:31.54 8.35
2025-04-29T13:56:32.54 8.34
2025-04-29T13:56:33.54 8.39
2025-04-29T13:56:34.54 8.35
2025-04-29T13:56:35.54 8.35
2025-04-29T13:56:36.54 8.37
2025-04-29T13:56:37.54 8.35
2025-04-29T13:56:38.54 8.36
2025-04-29T13:56:39.54 8.35
2025-04-29T13:56:40.54 8.36
2025-04-29T13:56:41.54 8.35
2025-04-29T13:56:42.56 8.35
2025-04-29T13:56:43.53 8.35
2025-04-29T13:56:44.53 8.37
2025-04-29T13:56:45.53 8.35
2025-04-29T13:56:46.53 8.35
2025-04-29T13:56:47.53 8.35
2025-04-29T13:56:48.53 8.37
2025-04-29T13:56:49.53 8.35
2025-04-29T13:56:50.53 8.37
2025-04-29T13:56:51.53 8.35
2025-04-29T13:56:52.53 8.37
2025-04-29T13:56:53.53 8.33
2025-04-29T13:56:54.53 8.35
2025-04-29T13:56:55.53 8.35
2025-04-29T13:56:56.53 8.34
2025-04-29T13:56:57.53 8.35
2025-04-29T13:56:58.53 8.33
2025-04-29T13:56:59.53 8.33
2025-04-29T13:57:00.53 8.35
2025-04-29T13:57:01.53 8.37
2025-04-29T13:57:02.53 8.37
2025-04-29T13:57:03.53 8.33
2025-04-29T13:57:04.53 8.37
2025-04-29T13:57:05.53 8.33
2025-04-29T13:57:06.53 8.36
2025-04-29T13:57:07.53 8.32
2025-04-29T13:57:08.53 8.35
2025-04-29T13:57:09.53 8.33
2025-04-29T13:57:10.53 8.35
2025-04-29T13:57:11.53 8.34
2025-04-29T13:57:12.53 8.36
2025-04-29T13:57:13.53 8.33
2025-04-29T13:57:14.53 8.34
2025-04-29T13:57:15.53 8.34
2025-04-29T13:57:16.53 8.34
2025-04-29T13:57:17.53 8.33
2025-04-29T13:57:18.53 8.34
2025-04-29T13:57:19.53 8.33
2025-04-29T13:57:20.53 8.36
2025-04-29T13:57:21.53 8.35
2025-04-29T13:57:22.53 8.33
2025-04-29T13:57:23.53 8.36
2025-04-29T13:57:24.53 8.33
2025-04-29T13:57:25.53 8.33
2025-04-29T13:57:26.53 8.36
2025-04-29T13:57:27.53 8.33
2025-04-29T13:57:28.53 8.36
2025-04-29T13:57:29.53 8.35
2025-04-29T13:57:30.53 8.34
2025-04-29T13:57:31.53 8.34
2025-04-29T13:57:32.53 8.33
2025-04-29T13:57:33.53 8.35
2025-04-29T13:57:34.53 8.37
2025-04-29T13:57:35.53 8.36
2025-04-29T13:57:36.53 8.35
2025-04-29T13:57:37.53 8.35
2025-04-29T13:57:38.53 8.35
2025-04-29T13:57:39.54 8.33
2025-04-29T13:57:40.54 8.35
2025-04-29T13:57:41.54 8.36
2025-04-29T13:57:42.54 8.36
2025-04-29T13:57:43.54 8.36
2025-04-29T13:57:44.54 8.35
2025-04-29T13:57:45.54 8.33
2025-04-29T13:57:46.54 8.35
2025-04-29T13:57:47.54 8.33
2025-04-29T13:57:48.54 8.33
2025-04-29T13:57:49.54 8.36
2025-04-29T13:57:50.54 8.35
2025-04-29T13:57:51.54 8.34
2025-04-29T13:57:52.54 8.33
2025-04-29T13:57:53.54 8.32
2025-04-29T13:57:54.54 8.36
2025-04-29T13:57:55.54 8.35
2025-04-29T13:57:56.54 8.35
2025-04-29T13:57:57.54 8.36
2025-04-29T13:57:58.54 8.37
2025-04-29T13:57:59.54 8.34
2025-04-29T13:58:00.54 8.35
2025-04-29T13:58:01.54 8.35
2025-04-29T13:58:02.54 8.35
2025-04-29T13:58:03.54 8.35
2025-04-29T13:58:04.54 8.35
2025-04-29T13:58:05.54 8.37
2025-04-29T13:58:06.54 8.35
2025-04-29T13:58:07.54 8.34
2025-04-29T13:58:08.54 8.35
2025-04-29T13:58:09.54 8.35
2025-04-29T13:58:10.54 8.35
2025-04-29T13:58:11.54 8.36
2025-04-29T13:58:12.54 8.35
2025-04-29T13:58:13.54 8.34
2025-04-29T13:58:14.54 8.34
2025-04-29T13:58:15.54 8.35
2025-04-29T13:58:16.54 8.37
2025-04-29T13:58:17.54 8.35
2025-04-29T13:58:18.54 8.33
2025-04-29T13:58:19.54 8.34
2025-04-29T13:58:20.54 8.35
2025-04-29T13:58:21.54 8.35
2025-04-29T13:58:22.54 8.37
2025-04-29T13:58:23.54 8.36
2025-04-29T13:58:24.54 8.34
2025-04-29T13:58:25.54 8.35
2025-04-29T13:58:26.54 8.37
2025-04-29T13:58:27.54 8.35
2025-04-29T13:58:28.54 8.34
2025-04-29T13:58:29.54 8.35
2025-04-29T13:58:30.54 8.36
2025-04-29T13:58:31.54 8.35
2025-04-29T13:58:32.54 8.35
2025-04-29T13:58:33.54 8.32
2025-04-29T13:58:34.54 8.35
2025-04-29T13:58:35.54 8.38
2025-04-29T13:58:36.54 8.33
2025-04-29T13:58:37.54 8.34
2025-04-29T13:58:38.54 8.33
2025-04-29T13:58:39.54 8.35
2025-04-29T13:58:40.54 8.32
2025-04-29T13:58:41.54 8.35
2025-04-29T13:58:42.54 8.35
2025-04-29T13:58:43.54 8.37
2025-04-29T13:58:44.54 8.35
2025-04-29T13:58:45.54 8.34
2025-04-29T13:58:46.54 8.35
2025-04-29T13:58:47.54 8.34
2025-04-29T13:58:48.54 8.37
2025-04-29T13:58:49.54 8.35
2025-04-29T13:58:50.54 8.36
2025-04-29T13:58:51.54 8.37
2025-04-29T13:58:52.54 8.36
2025-04-29T13:58:53.54 8.35
2025-04-29T13:58:54.54 8.34
2025-04-29T13:58:55.54 8.33
2025-04-29T13:58:56.54 8.34
2025-04-29T13:58:57.54 8.36
2025-04-29T13:58:58.54 8.36
2025-04-29T13:58:59.54 8.35
2025-04-29T13:59:00.54 8.34
2025-04-29T13:59:01.55 8.35
2025-04-29T13:59:02.53 8.37
2025-04-29T13:59:03.53 8.35
2025-04-29T13:59:04.53 8.35
2025-04-29T13:59:05.53 8.34
2025-04-29T13:59:06.53 8.34
2025-04-29T13:59:07.53 8.33
2025-04-29T13:59:08.53 8.33
2025-04-29T13:59:09.53 8.34
2025-04-29T13:59:10.53 8.36
2025-04-29T13:59:11.53 8.37
2025-04-29T13:59:12.53 8.35
2025-04-29T13:59:13.53 8.36
2025-04-29T13:59:14.53 8.37
2025-04-29T13:59:15.53 8.35
2025-04-29T13:59:16.53 8.34
2025-04-29T13:59:17.53 8.37
2025-04-29T13:59:18.53 8.35
2025-04-29T13:59:19.53 8.36
2025-04-29T13:59:20.53 8.34
2025-04-29T13:59:21.53 8.33
2025-04-29T13:59:22.53 8.37
2025-04-29T13:59:23.53 8.33
2025-04-29T13:59:24.53 8.36
2025-04-29T13:59:25.53 8.36
2025-04-29T13:59:26.53 8.33
2025-04-29T13:59:27.53 8.35
2025-04-29T13:59:28.53 8.38
2025-04-29T13:59:29.53 8.35
2025-04-29T13:59:30.53 8.35
2025-04-29T13:59:31.53 8.37
2025-04-29T13:59:32.53 8.36
2025-04-29T13:59:33.53 8.34
2025-04-29T13:59:34.53 8.36
2025-04-29T13:59:35.53 8.34
2025-04-29T13:59:36.53 8.37
2025-04-29T13:59:37.53 8.38
2025-04-29T13:59:38.53 8.37
2025-04-29T13:59:39.53 8.35
2025-04-29T13:59:40.53 8.37
2025-04-29T13:59:41.53 8.37
2025-04-29T13:59:42.53 8.35
2025-04-29T13:59:43.53 8.34
2025-04-29T13:59:44.53 8.37
2025-04-29T13:59:45.53 8.35
2025-04-29T13:59:46.53 8.35
2025-04-29T13:59:47.53 8.35
2025-04-29T13:59:48.53 8.36
2025-04-29T13:59:49.53 8.38
2025-04-29T13:59:50.53 8.35
2025-04-29T13:59:51.53 8.36
2025-04-29T13:59:52.53 8.36
2025-04-29T13:59:53.53 8.34
2025-04-29T13:59:54.53 8.35
2025-04-29T13:59:55.53 8.35
2025-04-29T13:59:56.53 8.35
2025-04-29T13:59:57.53 8.35
2025-04-29T13:59:58.53 8.33
2025-04-29T13:59:59.53 8.35
